Laserfiche WebLink
GENERAL NOTES: <br />1. EROSION AND SEDIMENT CONTROL MEASURES SRWl BE EFFECTIVE FOR THE DURATION OF THE <br />CONSNLC77ON ACTAITY <br />2. NO STORM RUNOFF WATER SFNLL BE ALLOWED TO DRAIN DIRECTLY INTO THE EXISTING UNDERGROUND <br />STORM SYSTEM BEFORE THE ON-SITE STORM DRAIN SYSTEM IS INSTALLED. <br />J AS SOON AS IS PRACTICAL AFTER TME NEW ON-SITE STORM DRAIN SYSTEM IS INSTALLED, THE C47CH <br />34SINS SHALL BE INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH <br />BASINS, AS SHOWN. THE CONTRACTOR SHALL HAVE AN OP77ON TO INSTALL PR£FABRlG7ED STEEL <br />FRAMES W17H FILTER SCREEN OF FILTER FABRIC ATTACHED TO THE FRONT OF THE DRAIN INLET AND <br />EXTEND 12 INCHES12� ON EACH SIDE OF THE DRAIN INLET OPENING. FRAME SHALL BE APPROVED <br />BY THE CITY ENGIN AND SIWl FIT THE OPENING WITH LESS THAN ONE-QUARTER INCH (1/49 <br />GAP AT ANY ONE POINT. <br />4. THE MANE ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR <br />IMPLEMENTATION OF THE EROSION AND SEDIMENTATION CONTROL PLAN 914LL BE PROVIDED. <br />5. A MINIMUM OF 50' OF DRAINROCK, 1-1 2' DIAMETER OR LARGER. AT A MINIMUM DEPTH OF 6, <br />SHALL BE INSTALLED AT EACH ORAEWAY EO&IIEE TO THE SITE THIS DOES NOT NEED 70 BE DONE <br />AT DRIVEWAYS, WHICH WILL BE CLOSED BY IMMOVABLE B4W-40E5 DURING CONSTRUCTION. <br />6. ALL EROSION AND SMMENTA77ON CONTROL MEASURES SHALL BE MAWTNNED UNTIL DISTURBED <br />AREAS ARE STABILIZED. CHANGES TO THE EROSION AND S£LNMENTATON CONTROL PLAN SHALL BE <br />ANDE TO MEET FIELD C'ONWIONS, BUT ONLY WITH THE APPROVAL OF OR AT THE DIREC77ON OF THE <br />CITY ENGINEER. <br />7. DURING THE R4114Y SEASON ALL SIDEWALK AND PAVED AREAS SH&L BE KEPT CLEAR OF EARTH <br />94TOW AND DEBRIS THE SITE SH4LL BE MAINTNNED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF <br />FROM ENTERING ANY STORM DRAINAGE SYSTEM. <br />B. 7H£ EROSION AND SMMENTA77ON CONTROL PUN COVERS ONLY THE FIRST WINTER DURING WHICH <br />CONSTRUCTION IS 70 TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH <br />SUBSEQUENT YEAR UNTIL THE COUNTY ACCEPTS THE S17E IMPROVEMENTS <br />9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL <br />FACILTIES AT THE END OF EACH WORK DAY DURING THE RAINY SEASON. <br />10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TQ CLEAN OUT SEDIMENT BASINS WHENEVER THE <br />LM OF SEDIMENT REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PIANS <br />11. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PR07ECT TEMPORARY BORROW AREAS AND/OR <br />STOCKPILES WITH APPROPRL47E EROSION CONTROL MEASURES 5477SFAC70W TO THE COUNTY ENGINEER. <br />12 THE CLEANING OF PAVED STREETS DURING AND AT THE COMPLETION OF CONSIRUC770N, SH4J. BE <br />PERFORMED 07TH MECHANICAL SWEEPERS THE USE OF WATER TRUCKS TO WASH DOW THE STREET <br />IS PROHIBITED. <br />1J. SEN OR SKIRT BETWEEN TRAILER & GRADING 70 PREVENT DIPOSURE TO DRAIN. <br />14. THE FOLLOWING PUNS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. <br />15 THE INFORMA71ON ON THIS PUN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR <br />AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL <br />BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS 70 THIS PUN. <br />16. ANY ON-SITE FUELING SHALL BE LONE AT THE CON7R4C7ORS RISK IN THE DESIGNATED <br />VEHICLE AWNTENANCE AREA AS A MWIMAM, A SPILL CONTAINMENT KIT SHALL BE ON SITE. <br />ADD770AKLLY, THE CONTRACTOR IS ENCOLARAGED TO PROVIDE A SECONDARY CONTAINMENT - <br />BEAM AROUND THE MUNTENYACE AREA AND/OR SPILLS FROM ENTERING INTO 7EH STORM <br />DRAINAGE SYSTEM ANY CLEANUP OF FUEL OR OIL SPILLS ON THE PROJECT SITE SRW1 BE <br />THE RESPONSIBILITY OF THE CONTRACTOR. <br />APPROVED BY: <br />LINDEN COUNTY WATER DISTRICT <br />5-14.69' <br />GENERAL MANAGER DATE: <br />LINDEN COUNTY WATER DISTRICT <br />JO' MIN <br />EXIS77NG <br />GROUND <br />FILTER FABRIC (SHALLBE EQUIVELENT TO PROFILE VIEW <br />MINAE' WITH <br />M/N. TENSILE <br />STRENGTH <br />OF 135psi. k SIEVE <br />OPEN/NG 70-100) <br />PROVIDE TRANSITION <br />BETWEEN STABILIZED <br />CONSTRUCTION ENTRANCE <br />AND PUBLIC R/W <br />is - an, <br />63 <br />EXISTING GROUND <br />) AGGREGATE <br />CRUSHED ROCK <br />DIVERSION RIDGE <br />TO CONTAIN WATER <br />WITHIN CONSTRUC77ON <br />AREA <br />GROUND <br />PLAN VIEW <br />STABILIZED CONSTRUC77ON ENTRANCE <br />NTS <br />FILTER B <br />FRAME <br />(OPTIONAL) <br />EXISTING DROP_ <br />INLET GRATE <br />SECTION A <br />EXISTING DROP <br />INLET FRAME <br />DETAIL A <br />1.3 CM (5) <br />MAXIMUM <br />STORM DRAIN INLET RLTER BAG DETAIL <br />NIS <br />STORM WATER POLLUTION <br />PREVENTION PLAN <br />GRAVEL BAGS SHALL <br />A BE MODE OF WOVEN <br />GEDTEXELE FABRIC <br />1/4' PEA GRAVEL <br />1. GRAVEL BAGS SHALL BE WOVEN G£OTE7(TLE FABRIC <br />2. CONSTRUCT ON GENTLY SLOPING STREETS WHERE WATER CAN <br />POND AND ALLOW SEDIMENT 70 SEPARATE OUT OF SUSPENSION. <br />J LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW <br />OF BAGS TO SERVE AS THE SPILLWAY. SPILLWAY HEIGHT SHALL <br />BE LOWER THAN CURB HEIGHT A• SUFFICIENT IN SIZE TO PASS <br />FLOWS FROM SEVERE STORM EVENT. <br />4. PLACE 2 LAYERS OF GRAVEL B4GS OVER UPPING 84GS AND <br />PACK THEM 77GHMY TOGETHER TO MINIMIZE THE SPACE BETWEEN <br />84GS FILL BAG WTII 1/4' PEA GRAVEL <br />5. INSPECT k REPAIR FILTERS AFTER EA STORM EVENT. REMOVE <br />SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. <br />REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY <br />70 A SEDIMENT BASIN OR OTHER FIL7ERING MEASURE. <br />6. SEDIMENT h GRAVEL SHALL BE IMMEDIATELY REMOVED FROM <br />TRAVELED *4Y OF ROAD. <br />7. GRAVEL BAG INLET PR07EC77ON ON ROADS OPEN TO PUBLIC <br />WILL REQUIRE DELINEATION DEVICES TO ALERT MOTORISTS, <br />BICYCLISTS AND PEDESTRIANS. THE USE OF SUCH DEVICES SHALT. <br />BE SUBIECT TO THE RESIDENT ENGINEERS APPROVAL. <br />FLOR RANCH <br />UNIT N0.3 <br />LINDEN, CALIFORNIA <br />NOTE <br />1. STRAW ROLL INSTALLATION REQUIRES THE- <br />PLACEMENT <br />HEPLACEMENT AND SECURE STAKING OF THE ROLL <br />IN A TRENCH, 3"-5" 75-125mm) DEEP. <br />RUNOFF MUST NOT BE ALLOWED TO RUN <br />UNDER OR AROUND ROLL. <br />STRAW ROLLS <br />NIS <br />GRAVEL BAGS <br />WHAF <br />REVISIONS <br />PIPE DAM <br />NTS <br />BINDING WIRE <br />OR 7W/NE <br />RECORD DRAWIN <br />.orrectlons <br />n, Chan es B <br />9 y __ F,.7C <br />Aoy Person Using Thi, LP�awir a <br />Ali Information By+nspechnn ".,.roe- `F'Ol. - <br />CONCRETE WASTE MANAGEMENT NOTES <br />CONCRETE SLURRY WASTES <br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. <br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF OUTSIDE THE HIGHWAY RIGHT-OF-WAY <br />IN CONFORMANCE WITH SEC77ON 7-1.13 OF STANDARD SPECIFICATIONS OR PLACED IN A TEMPORARY <br />CONCRETE WASHOUT FACILITY. <br />J. DISPOSAL OF HARDENED PCC AND AC WASTE SHALL BE INCONFORM4NCE WITH SECTION 15-3.02 OF <br />THE STANDARD SPECIFICATIONS. <br />4. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM <br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />5. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM <br />DRAINS OR RECEIVING WATERS. <br />6. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT (AS DESCRIBED IN ON-SITE TEMPORARY <br />CONCRETE WASHOUT FACILITY, CONCRETE TRANSIT TRUCK WASHOUT PROCEDURES, BELOW) AND ALLOW <br />SLURRY TO DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5, SOLID WASTE <br />MANAGEMENT" OR, FOR ON-SITE DISPOSAL, IN ACCORDANCE WITH STANDARD SPECIFICA77ON 15-302, <br />REMOVAL METHODS. <br />Z COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD <br />SPECIFICATIONS SECTION 42-1.02 AND 42-2.02, -CONSTRUCTION.- <br />ON-SITE TEMPORARY CONCRETE WASHOUT FACILITY TRANSIT TRUCK WASHOUT PROCEDURES <br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM <br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE <br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS <br />AREAS TO PREVENT DISTURBANCE OR TRACKING. <br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT <br />OPERATORS TO UTILIZE THE PROPER FACILITIES THE SIGN SHALL BE INSTALLED AS SHOWN ON THE <br />PLANS AND IN CONFORMANCE WITH THE PROVISIONS IN SECTION 56-2, ROADSIDE SIGNS, OF THE <br />STANDARD SPECIFICATIONS. <br />3. TEMPORARY CONCRETE WASHOUT FACILITES SHALL BE CONSTRUCTED ABOVE GRADE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND <br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />4. TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT <br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING <br />WASHOUT PROCEDURES. <br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. <br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE <br />CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED OF PER BMP WM-5, SOLID WASTE <br />MANAGEMENT', AND IN CONFORMANCE WITH THE PROVISIONS IN SECT70N 15-302, REMOVAL METHODS, <br />OF THE STANDARD SPECIFICATIONS DISPOSE OF HARDENED CONCRETE ON A REGULAR 84SIS. <br />TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) <br />TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON <br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH <br />SUFFICIENT QUANDTY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT <br />OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE CONTRACTORS EXPENSE, <br />UPON APPROVAL OF THE ENGINEER. <br />PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEE77NG AND SHALL BE FREE <br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. <br />PORTABLE DELINEATORS SHALL CONFORM TO THE PROVISIONS IN SECTION 12-304, PORTABLE <br />DELINEATORS; OF THE STANDARD SPECIFICATIONS THE DELINEATOR BASES SHALL BE CEMENTED TO <br />THE PAVEMENT IN THE SAME MANNER AS PROVIDED FOR CEMENTING PAVEMENT MARKERS TO PAVEMENT <br />IN SEC77ON 85-1.06, PLACEMENT", OF THE STANDARD SPECIFICATIONS PORTABLE DELINEATORS SHALL <br />BE APPLIED ONLY TO A CLEAN, DRY SURFACE <br />REMOVAL OF TEMPORARY CONCRETE WASHOUT FACILITIES <br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS <br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF IN <br />CONFORMANCE WITH THE PROVISIONS IN SECTION 15-302 OF THE STANDARD SPECIFICATIONS. MATERIALS <br />USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE PROPERTY OF THE <br />CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL BE DISPOSED OF OUTSIDE <br />THE HIGHWAY RIGHT-OF-WAY IN CONFORMANCE WITH THE PROVISIONS IN SECTION 7-1.13 OF THE <br />STANDARD SPECIFICATIONS. <br />2 HOLES, DEPRESSIONS OR OTHER GROUND DISTUR84NCE CAUSED BY THE REMOVAL OF THE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE <br />PROVISIONS IN SECTION 15-1.02 PRESERVATION OF PROPERTY" OF THE STANDARD SPECIFICATIONS. <br />J. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE <br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY. <br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING CORING, GRINDING <br />AND GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED, <br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING <br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITES AND 12" FOR BELOW GRADE <br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITES SHALL INCLUDE REMOVING AND <br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTON41. COND177ON. <br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE <br />PROVISIONS IN SECI7ON 15-3.02, REMOVAL METHODS, OF THE STANDARD SPECIFICATIONS. <br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR <br />USE ONCE THE WASHOUT IS 75% FULL. <br />2 X 2 WOOD STAKE <br />O 24" O.C. <br />STAKED AND ENTRENCHED <br />STRAW BILE <br />ML POLYETHYLENE <br />10' MIN <br />CONCRETE WASHOUTAREA <br />NTS <br />■ PLANNING• ENGINEERING• SURVEYING <br />_ .888SN191atPWA • WMw, CNMIIIM 96887 <br />ON 836889 FAX MW 889.8889 <br />,AGN NG. <br />05-034 <br />LEGEND <br />TEMPORARY STABILIZED CONSTRUCTION ENTRANCE NOTES <br />05/16/2005 16:41 <br />WALE <br />1. THE MATERIAL FOR CONSTRUCTION OF THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE 2 TO 3 INCH STONE <br />GR. By <br />2. THE THICKNESS OF THE PAD SHALL NOT BE CESS THAN 6 INCHES. <br />CIL BY <br />PAVED ROAD <br />mm <br />3. THE WIDTH OF THE PAD SHALL NOT BE LESS THAN THE FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS, OR 30' M/N. <br />RLE <br />J:\2]05\OS-OJI\4.a\qIP\I7-s do <br />4. THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 50 FEE(. <br />5 THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACK/NG OR FLOW/NG OF SEDIMENT ONTO PUBLIC <br />RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS COND177ONS DEMAND, AND REPAIR <br />AND/OR CLEAN OUT ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO <br />PUBLIC RIGHT-OF-WAY SHALL BE REMOVED IMMEDATELY. <br />STABILIZED CONSTRUCTION <br />�. <br />6. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. <br />EXISTING OPEN <br />PLACE PERFORATED PVC <br />ENTRANCE <br />WHEN WASHING IS REQUIRED, IT FIA <br />0 SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN <br />KICK HOOD <br />PIPE A CROSS CURB OPENING <br />APPROVE D SEDIMENT TROP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTER/NC ANY STORM DRAIN, DITCH <br />TO KEEP LARGE DEBRIS FROM <br />OR WATERCOURSE THROUGH USE SANDBAGS, GRAVEL, BOARDS, OTI OTHER APPROVED METHODS <br />ENTERING STORM DRAIN SYSTEM <br />Z CONTRACTOR TO REMOVE AND DISPOSE OF STABILIZED CONSTRUCTION ENTRANCE UPON <br />DI R OF CONSTRUCTION. <br />DETAIL A <br />or OR ® CATCH BASIN <br />B. ALL CONSTRUCTION VEHICLES INGRESS/NG/EGRESSINC PROJECT SITE SHALL CROSS STABILIZED CONSTRUCT70N ENTRANCE <br />STABILIZED ONN <br />° <br />o CURB INLET SEDIMENT PROTECT ON <br />STRAW ROLL OR RBER ROLL NOTES <br />d <br />- <br />MIN/MUM <br />® GRAVEL BAGS <br />BAG WIDTH - <br />1. INSPECT AND REPAIR ROLL AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. <br />(BACK OF GRATE ° <br />2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE <br />JE-iEd%X-34 STRAW ROLLS <br />PERMANENTLY STABILIZED. <br />CONTACT <br />5 CM (29 <br />AT FRONT <br />AND SIDES <br />1" X1' X 18" WOOD STAKES <br />MIN/MUM <br />/ AT 10' O.C. OR AS NECESSARY <br />AT BACK <br />(FLOOD <br />A <br />RELEASE) <br />MAX/MUM <br />BACK OF CURB <br />BAG WIDTH <br />GRAVEL BAGS TO OVERLAP CURB INLET <br />ONTO CURB <br />_L <br />FILTER TO REMAIN <br />FLOWUNE <br />' <br />��-y�� SIDEWALK OR A.G PAVING <br />THROUGH BUILDOUT OUTLET PIPE <br />FILTER B <br />FRAME <br />(OPTIONAL) <br />EXISTING DROP_ <br />INLET GRATE <br />SECTION A <br />EXISTING DROP <br />INLET FRAME <br />DETAIL A <br />1.3 CM (5) <br />MAXIMUM <br />STORM DRAIN INLET RLTER BAG DETAIL <br />NIS <br />STORM WATER POLLUTION <br />PREVENTION PLAN <br />GRAVEL BAGS SHALL <br />A BE MODE OF WOVEN <br />GEDTEXELE FABRIC <br />1/4' PEA GRAVEL <br />1. GRAVEL BAGS SHALL BE WOVEN G£OTE7(TLE FABRIC <br />2. CONSTRUCT ON GENTLY SLOPING STREETS WHERE WATER CAN <br />POND AND ALLOW SEDIMENT 70 SEPARATE OUT OF SUSPENSION. <br />J LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW <br />OF BAGS TO SERVE AS THE SPILLWAY. SPILLWAY HEIGHT SHALL <br />BE LOWER THAN CURB HEIGHT A• SUFFICIENT IN SIZE TO PASS <br />FLOWS FROM SEVERE STORM EVENT. <br />4. PLACE 2 LAYERS OF GRAVEL B4GS OVER UPPING 84GS AND <br />PACK THEM 77GHMY TOGETHER TO MINIMIZE THE SPACE BETWEEN <br />84GS FILL BAG WTII 1/4' PEA GRAVEL <br />5. INSPECT k REPAIR FILTERS AFTER EA STORM EVENT. REMOVE <br />SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. <br />REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY <br />70 A SEDIMENT BASIN OR OTHER FIL7ERING MEASURE. <br />6. SEDIMENT h GRAVEL SHALL BE IMMEDIATELY REMOVED FROM <br />TRAVELED *4Y OF ROAD. <br />7. GRAVEL BAG INLET PR07EC77ON ON ROADS OPEN TO PUBLIC <br />WILL REQUIRE DELINEATION DEVICES TO ALERT MOTORISTS, <br />BICYCLISTS AND PEDESTRIANS. THE USE OF SUCH DEVICES SHALT. <br />BE SUBIECT TO THE RESIDENT ENGINEERS APPROVAL. <br />FLOR RANCH <br />UNIT N0.3 <br />LINDEN, CALIFORNIA <br />NOTE <br />1. STRAW ROLL INSTALLATION REQUIRES THE- <br />PLACEMENT <br />HEPLACEMENT AND SECURE STAKING OF THE ROLL <br />IN A TRENCH, 3"-5" 75-125mm) DEEP. <br />RUNOFF MUST NOT BE ALLOWED TO RUN <br />UNDER OR AROUND ROLL. <br />STRAW ROLLS <br />NIS <br />GRAVEL BAGS <br />WHAF <br />REVISIONS <br />PIPE DAM <br />NTS <br />BINDING WIRE <br />OR 7W/NE <br />RECORD DRAWIN <br />.orrectlons <br />n, Chan es B <br />9 y __ F,.7C <br />Aoy Person Using Thi, LP�awir a <br />Ali Information By+nspechnn ".,.roe- `F'Ol. - <br />CONCRETE WASTE MANAGEMENT NOTES <br />CONCRETE SLURRY WASTES <br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. <br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF OUTSIDE THE HIGHWAY RIGHT-OF-WAY <br />IN CONFORMANCE WITH SEC77ON 7-1.13 OF STANDARD SPECIFICATIONS OR PLACED IN A TEMPORARY <br />CONCRETE WASHOUT FACILITY. <br />J. DISPOSAL OF HARDENED PCC AND AC WASTE SHALL BE INCONFORM4NCE WITH SECTION 15-3.02 OF <br />THE STANDARD SPECIFICATIONS. <br />4. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM <br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />5. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM <br />DRAINS OR RECEIVING WATERS. <br />6. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT (AS DESCRIBED IN ON-SITE TEMPORARY <br />CONCRETE WASHOUT FACILITY, CONCRETE TRANSIT TRUCK WASHOUT PROCEDURES, BELOW) AND ALLOW <br />SLURRY TO DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5, SOLID WASTE <br />MANAGEMENT" OR, FOR ON-SITE DISPOSAL, IN ACCORDANCE WITH STANDARD SPECIFICA77ON 15-302, <br />REMOVAL METHODS. <br />Z COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD <br />SPECIFICATIONS SECTION 42-1.02 AND 42-2.02, -CONSTRUCTION.- <br />ON-SITE TEMPORARY CONCRETE WASHOUT FACILITY TRANSIT TRUCK WASHOUT PROCEDURES <br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM <br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE <br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS <br />AREAS TO PREVENT DISTURBANCE OR TRACKING. <br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT <br />OPERATORS TO UTILIZE THE PROPER FACILITIES THE SIGN SHALL BE INSTALLED AS SHOWN ON THE <br />PLANS AND IN CONFORMANCE WITH THE PROVISIONS IN SECTION 56-2, ROADSIDE SIGNS, OF THE <br />STANDARD SPECIFICATIONS. <br />3. TEMPORARY CONCRETE WASHOUT FACILITES SHALL BE CONSTRUCTED ABOVE GRADE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND <br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />4. TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT <br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING <br />WASHOUT PROCEDURES. <br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. <br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE <br />CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED OF PER BMP WM-5, SOLID WASTE <br />MANAGEMENT', AND IN CONFORMANCE WITH THE PROVISIONS IN SECT70N 15-302, REMOVAL METHODS, <br />OF THE STANDARD SPECIFICATIONS DISPOSE OF HARDENED CONCRETE ON A REGULAR 84SIS. <br />TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) <br />TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON <br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH <br />SUFFICIENT QUANDTY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT <br />OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE CONTRACTORS EXPENSE, <br />UPON APPROVAL OF THE ENGINEER. <br />PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEE77NG AND SHALL BE FREE <br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. <br />PORTABLE DELINEATORS SHALL CONFORM TO THE PROVISIONS IN SECTION 12-304, PORTABLE <br />DELINEATORS; OF THE STANDARD SPECIFICATIONS THE DELINEATOR BASES SHALL BE CEMENTED TO <br />THE PAVEMENT IN THE SAME MANNER AS PROVIDED FOR CEMENTING PAVEMENT MARKERS TO PAVEMENT <br />IN SEC77ON 85-1.06, PLACEMENT", OF THE STANDARD SPECIFICATIONS PORTABLE DELINEATORS SHALL <br />BE APPLIED ONLY TO A CLEAN, DRY SURFACE <br />REMOVAL OF TEMPORARY CONCRETE WASHOUT FACILITIES <br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS <br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF IN <br />CONFORMANCE WITH THE PROVISIONS IN SECTION 15-302 OF THE STANDARD SPECIFICATIONS. MATERIALS <br />USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE PROPERTY OF THE <br />CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL BE DISPOSED OF OUTSIDE <br />THE HIGHWAY RIGHT-OF-WAY IN CONFORMANCE WITH THE PROVISIONS IN SECTION 7-1.13 OF THE <br />STANDARD SPECIFICATIONS. <br />2 HOLES, DEPRESSIONS OR OTHER GROUND DISTUR84NCE CAUSED BY THE REMOVAL OF THE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE <br />PROVISIONS IN SECTION 15-1.02 PRESERVATION OF PROPERTY" OF THE STANDARD SPECIFICATIONS. <br />J. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE <br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY. <br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING CORING, GRINDING <br />AND GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED, <br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING <br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITES AND 12" FOR BELOW GRADE <br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITES SHALL INCLUDE REMOVING AND <br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTON41. COND177ON. <br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE <br />PROVISIONS IN SECI7ON 15-3.02, REMOVAL METHODS, OF THE STANDARD SPECIFICATIONS. <br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR <br />USE ONCE THE WASHOUT IS 75% FULL. <br />2 X 2 WOOD STAKE <br />O 24" O.C. <br />STAKED AND ENTRENCHED <br />STRAW BILE <br />ML POLYETHYLENE <br />10' MIN <br />CONCRETE WASHOUTAREA <br />NTS <br />■ PLANNING• ENGINEERING• SURVEYING <br />_ .888SN191atPWA • WMw, CNMIIIM 96887 <br />ON 836889 FAX MW 889.8889 <br />,AGN NG. <br />05-034 <br />DATE <br />05/16/2005 16:41 <br />WALE <br />AS SHOWN <br />GR. By <br />SLS <br />CIL BY <br />JOE <br />RLE <br />J:\2]05\OS-OJI\4.a\qIP\I7-s do <br />CONCRETE WASHOUT SHALL BE REMOVED <br />PRIOR TO LEVEL REACHING TOP OF <br />STRAW BALES <br />DIRT BERM (TYP.) <br />COPYRIGHTO 2005 MCR ENGINEERING <br />No. C54M <br />EXP. 12-31-05 <br />9I1-7 /0-5 <br />SKEET <br />NUT' R <br />17 <br />cw17 <br />