Laserfiche WebLink
see Be <br />li.galy. -anchor- boli -s) c- <br />in place as svlown. <br />Use galy. vlvts a, was4 <br />lv secure yrattro� <br />Taylor Grate t"x 1g sW <br />w/ t x -1;skeet strap I <br />G( -Z l ) s�-kall be.. gzly <br />I- Moioc', weathec- prot'ec_Ved) Type- T <br />or ewal , 40 H.P. � l l -to RPM)w� se if oder . <br />I- Vert-tcal propeller pump w/t(." column +o opec2�e, ai- <br />n-ts RPM) ecLulpped w/ i al. solenotd Operz�ed WIOrtcalor; <br />Pump steal\ be capable. o� eQme not +csoo GPM <br />o <br />zs.o i DI F <br />0 <br />OF <br />Elev. 16•SD �� <br />Elev. l9.2 -r <br />6'cha+n llr+k rcence <br />Smia11 QA -alt- Steel <br />Coupl+nc� Type 411 <br />c1m. stainless s+eel electrodes) <br />Plastic coated +o wk%m r."oP +lps, <br />'rhe electrodes shall toe secured to <br />the sump w/Insulated brackets, <br />as required +o msu+-e. accurate <br />con tro l . <br />Etev. M -o PUMP ON" <br />Flev. 4.0 Future PUMP ON <br />Eley +o 50+in PuMPs,Ov=F" <br />f <br />4.0 <br />I L' As recommended <br />t� by manufac+urer <br />ille: <br />05 rebar I-Lo.c. - C1ass�0" Cone <br />both ways <br />SECTION B -B <br />I/2"=1'-0" <br />q'dla. galy.-toga. C.M.P. <br />C.M.P. steal( be thomuojVily cleaned <br />F, given s heavy coo} of ho} <br />asphalt by sprayms mscde Gr out <br />F-tev. -I.SO <br />I APPROVED 19 APPROVED June- 10 19-2-7— <br />no. <br />IYI¢ter <br />2�) C <br />UNOER6RAUN0 <br />q- wltze <br />To 1_t6•t{TS <br />(y RECERTICLE <br />10 A <br />IP <br />3 -#t -L <br />2-S KW <br />TRANSF. <br />480/12.o/z1•o -•— <br />IS A /-LP <br />/ 4.6o V <br />2 -BIZ <br />3- % THw <br />M5 A <br />3P <br />STARTER <br />3_#q- <br />1 <br />4d FFP <br />I FUTJRE <br />WIR+Ncr %hsst� ON USE OF 0,0iPMlp_ WIRE. <br />NO SUBSTITUTE <br />1-#4 rebaJ" <br />4 sides <br />•Lx q- studs @ tb°� <br />S/q_" Plywood 6auk <br />wall <br />` "� x 8 andnor bolts <br />i z <br />-Lx 4- rdwd plate <br />ELECTRICAL CONTROL <br />HOUSE <br />SCALE 3/4'=1'-0 <br />APPROVED `,�3�_1977 <br />� s 22111 <br />Gari Joaquin covr+uLLU S3vllding Dept . <br />FRONT <br />4 <br />4. <br />.. <br />Ej <br />4 -*4 elreular hoops, "L" <br />T• V te" <br />clear 6#-L ties l8"or- I2 a <br />t <br />8round sump.OeQress <br />-top bzr under Beam Seat <br />Sec Rpe support <br />�eta+l <br />3 <br />0 <br />Ot <br />N <br />C <br />P <br />u <br />C <br />Consi- rL" lonou x 4tLf) d+a <br />L <br />i <br />10 92. svnooth steel Sleeve <br />I,Lp <br />Q <br />welded to C.M.P. Groui- 3(." <br />S.D.P. In plz,ce. <br />c1m. stainless s+eel electrodes) <br />Plastic coated +o wk%m r."oP +lps, <br />'rhe electrodes shall toe secured to <br />the sump w/Insulated brackets, <br />as required +o msu+-e. accurate <br />con tro l . <br />Etev. M -o PUMP ON" <br />Flev. 4.0 Future PUMP ON <br />Eley +o 50+in PuMPs,Ov=F" <br />f <br />4.0 <br />I L' As recommended <br />t� by manufac+urer <br />ille: <br />05 rebar I-Lo.c. - C1ass�0" Cone <br />both ways <br />SECTION B -B <br />I/2"=1'-0" <br />q'dla. galy.-toga. C.M.P. <br />C.M.P. steal( be thomuojVily cleaned <br />F, given s heavy coo} of ho} <br />asphalt by sprayms mscde Gr out <br />F-tev. -I.SO <br />I APPROVED 19 APPROVED June- 10 19-2-7— <br />no. <br />IYI¢ter <br />2�) C <br />UNOER6RAUN0 <br />q- wltze <br />To 1_t6•t{TS <br />(y RECERTICLE <br />10 A <br />IP <br />3 -#t -L <br />2-S KW <br />TRANSF. <br />480/12.o/z1•o -•— <br />IS A /-LP <br />/ 4.6o V <br />2 -BIZ <br />3- % THw <br />M5 A <br />3P <br />STARTER <br />3_#q- <br />1 <br />4d FFP <br />I FUTJRE <br />WIR+Ncr %hsst� ON USE OF 0,0iPMlp_ WIRE. <br />NO SUBSTITUTE <br />1-#4 rebaJ" <br />4 sides <br />•Lx q- studs @ tb°� <br />S/q_" Plywood 6auk <br />wall <br />` "� x 8 andnor bolts <br />i z <br />-Lx 4- rdwd plate <br />ELECTRICAL CONTROL <br />HOUSE <br />SCALE 3/4'=1'-0 <br />APPROVED `,�3�_1977 <br />� s 22111 <br />Gari Joaquin covr+uLLU S3vllding Dept . <br />FRONT <br />4 <br />2¢ <br />x 68 <br />FLOOR <br />imp <br />n shinoles <br />cox Plywooc{ <br />AcRYc.lc <br />i <br />ood Sldin9 <br />th sawn <br />tr�M <br />.orn ¢r5 <br />revisions <br />)tion date by fel WONG ENGINEERS job n0. 1637 <br />date <br />PLANNING • ENGINEERING* SURVEYING scale AS SHOWN <br />U STOCKTON, CALIFORNIA <br />���� drawn <br />(0, aV Th.XA.a. R.C.E. No. 14269 design WE <br />Cast 4- i x 8" gale. bot}s in manhole as shown <br />Const. -stash rack w/ ''/4' x l"x 9°L" steel bars <br />welded vertically +-oY4" X t"x 4.0 Saeel bar -lop and <br />bottom a+ (W o.c. Galvanize after Qabrlca}ton <br />Bol+ +n place W/Ealy. v,ut w washer <br />Ivls+z(( cn line -to puvnp, <br />Casa -in ,lace <br />bolts (tyP� <br />TRASH RACK DETAIL <br />PIPE SUPPORT <br />r�ra}Ing2ea3T <br />A` i <br />L tly,1.�.'�• 4 <br />tiG�a� <br />II <br />3p <br />-4.. f6 anchor bolt <br />welded +o seats <br />Thread enci5 <br />lPa(+ beams in place <br />(+YP) <br />strap,4G wide x z cwcumFrence, plus IIP <br />rill a, boli• --o 6c)ttom support <br />��felt loekween pipe w- Suppor�- <br />strap x G"wide x z CLMUMPee.nCe plus lip <br />eld +o Vvc- posk, drill -1-o accept bolt <br />vV4, 1S.S <br />plate G c6 wetd +o vvc pos-� <br />lass +I r3" cone . <br />BEAM SEAT DETAIL <br />SECTION A -A <br />TALLAHATCHEY TERRACE UNIT NO.I <br />STORM PUMPING PLANT DETAILS <br />A <br />SHEET <br />9 <br />OE' TEN <br />FILE <br />1 <br />�*--mss <br />Ej <br />2¢ <br />x 68 <br />FLOOR <br />imp <br />n shinoles <br />cox Plywooc{ <br />AcRYc.lc <br />i <br />ood Sldin9 <br />th sawn <br />tr�M <br />.orn ¢r5 <br />revisions <br />)tion date by fel WONG ENGINEERS job n0. 1637 <br />date <br />PLANNING • ENGINEERING* SURVEYING scale AS SHOWN <br />U STOCKTON, CALIFORNIA <br />���� drawn <br />(0, aV Th.XA.a. R.C.E. No. 14269 design WE <br />Cast 4- i x 8" gale. bot}s in manhole as shown <br />Const. -stash rack w/ ''/4' x l"x 9°L" steel bars <br />welded vertically +-oY4" X t"x 4.0 Saeel bar -lop and <br />bottom a+ (W o.c. Galvanize after Qabrlca}ton <br />Bol+ +n place W/Ealy. v,ut w washer <br />Ivls+z(( cn line -to puvnp, <br />Casa -in ,lace <br />bolts (tyP� <br />TRASH RACK DETAIL <br />PIPE SUPPORT <br />r�ra}Ing2ea3T <br />A` i <br />L tly,1.�.'�• 4 <br />tiG�a� <br />II <br />3p <br />-4.. f6 anchor bolt <br />welded +o seats <br />Thread enci5 <br />lPa(+ beams in place <br />(+YP) <br />strap,4G wide x z cwcumFrence, plus IIP <br />rill a, boli• --o 6c)ttom support <br />��felt loekween pipe w- Suppor�- <br />strap x G"wide x z CLMUMPee.nCe plus lip <br />eld +o Vvc- posk, drill -1-o accept bolt <br />vV4, 1S.S <br />plate G c6 wetd +o vvc pos-� <br />lass +I r3" cone . <br />BEAM SEAT DETAIL <br />SECTION A -A <br />TALLAHATCHEY TERRACE UNIT NO.I <br />STORM PUMPING PLANT DETAILS <br />A <br />SHEET <br />9 <br />OE' TEN <br />FILE <br />