My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-1386
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-1381-1484
>
SU-1386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 10:59:38 AM
Creation date
10/14/2024 10:59:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRINTED ON DIEPO NO. 1000H CLEARPRINT <br />MOKELUMNE ST. <br />H <br />AUGUSTA <br />1— <br />2 <br />H <br />W <br />r <br />v <br />EXist�'•SS <br />ST. <br />1 <br />69 INDIAN A ST. <br />W ; <br />� m <br />J <br />O <br />v <br />CAROLINA ST. "5$ Exist <br />w• <br />W"Wh <br />U <br />p <br />h <br />69 INDIAN A ST. <br />W ; <br />� m <br />J <br />O <br />v <br />CAROLINA ST. "5$ Exist <br />w• <br />VICINITY MAP <br />REVISIONS BY DESIGNPJ/J DRAWN BY <br />APPROVED <br />R.C.E. /9638 DATE <br />r <br />r <br />GENERAL NOTES <br />1. All work shall conform to these plans, specifications and any special provisions <br />for this project. <br />2. San Joaquin County Standard Plans and Specifications are hereby made a part of <br />these plans, as are the Specifications of Southern Pacific Transportation Co. <br />3. Contractor shall receive an approved set of plans prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the <br />preservation of all survey and construction stakes. Survey and construction stakes <br />r that are lost or destroyed due to Contractor's negligence will be set by the <br />Engineer at the Contractor's expense. <br />5. Underground utilities are plotted from available records. It is the Contractor's <br />responsibility to protect underground utilities whether shown on these plans or <br />not and to have utility agencies mark their facilities prior to beginning construction. <br />6. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continuously and not be <br />limited to normal working hours, and that Contractor shall defend, indemnify, and <br />hold the Owner and the Engineer harmless from any and all liability, real or alleged, <br />in connection with the performance of work on this project, excepting for liability <br />arising from the sole negligence of the Owner or the Engineer. <br />7. All work will be required to be inspected by San Joaquin County Department of Public <br />Works And the department shall be notified not less than 24 hours in advance of <br />HI 8commencement of work. <br />. Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />.any utilities. <br />G+w 9. It is the contractor's responsibility to contact S. P. <br />Transportation Co. and secure permits. <br />m <br />Ex1et <br />•se <br />00 <br />cPNCONSTRUCTION QUANTITIES <br />i <br />rEYvm�� MAP 6" Water 130 L. F. <br />Go/G 200 ' 8" Water 2599 L. F. <br />6" Valve It Box 1 Each <br />8" Valve A Qox 7 Each <br />Blow -Off 2 Each <br />Jacked Casing - Steel Pipe 60 L.F. <br />Water Service 3 Each <br />APPROVED BY <br />C� <br />N JOAQUIN COUNTY ECTOR OF PUBLIC WORKS DATE <br />�� LEONARD ORTIZ Y <br />L <br />Fire Chief <br />CH , F � `yODOBR/DGE F/RE D/STR/CT DATE <br />i <br />SAN ✓OAc907N COUNTY /RE W,4RDEN DATE <br />V ✓OAQU/N COUNT LOCAL HEALTH D/STR/CT DATE' <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS - SURVEYORS <br />221 W. OAK ST., LODI, CALIF. 95240 PH. 209-368.8098 <br />IDBRIDGE WATER LINE all <br />STREET INDIANA STRkE1 <br />KEY M A P <br />SHEET I OF G <br />JOB NO. 79//2-0<l05 <br />FILE <br />NO. <br />W"Wh <br />h <br />VICINITY MAP <br />REVISIONS BY DESIGNPJ/J DRAWN BY <br />APPROVED <br />R.C.E. /9638 DATE <br />r <br />r <br />GENERAL NOTES <br />1. All work shall conform to these plans, specifications and any special provisions <br />for this project. <br />2. San Joaquin County Standard Plans and Specifications are hereby made a part of <br />these plans, as are the Specifications of Southern Pacific Transportation Co. <br />3. Contractor shall receive an approved set of plans prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the <br />preservation of all survey and construction stakes. Survey and construction stakes <br />r that are lost or destroyed due to Contractor's negligence will be set by the <br />Engineer at the Contractor's expense. <br />5. Underground utilities are plotted from available records. It is the Contractor's <br />responsibility to protect underground utilities whether shown on these plans or <br />not and to have utility agencies mark their facilities prior to beginning construction. <br />6. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continuously and not be <br />limited to normal working hours, and that Contractor shall defend, indemnify, and <br />hold the Owner and the Engineer harmless from any and all liability, real or alleged, <br />in connection with the performance of work on this project, excepting for liability <br />arising from the sole negligence of the Owner or the Engineer. <br />7. All work will be required to be inspected by San Joaquin County Department of Public <br />Works And the department shall be notified not less than 24 hours in advance of <br />HI 8commencement of work. <br />. Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />.any utilities. <br />G+w 9. It is the contractor's responsibility to contact S. P. <br />Transportation Co. and secure permits. <br />m <br />Ex1et <br />•se <br />00 <br />cPNCONSTRUCTION QUANTITIES <br />i <br />rEYvm�� MAP 6" Water 130 L. F. <br />Go/G 200 ' 8" Water 2599 L. F. <br />6" Valve It Box 1 Each <br />8" Valve A Qox 7 Each <br />Blow -Off 2 Each <br />Jacked Casing - Steel Pipe 60 L.F. <br />Water Service 3 Each <br />APPROVED BY <br />C� <br />N JOAQUIN COUNTY ECTOR OF PUBLIC WORKS DATE <br />�� LEONARD ORTIZ Y <br />L <br />Fire Chief <br />CH , F � `yODOBR/DGE F/RE D/STR/CT DATE <br />i <br />SAN ✓OAc907N COUNTY /RE W,4RDEN DATE <br />V ✓OAQU/N COUNT LOCAL HEALTH D/STR/CT DATE' <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS - SURVEYORS <br />221 W. OAK ST., LODI, CALIF. 95240 PH. 209-368.8098 <br />IDBRIDGE WATER LINE all <br />STREET INDIANA STRkE1 <br />KEY M A P <br />SHEET I OF G <br />JOB NO. 79//2-0<l05 <br />FILE <br />NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.