Laserfiche WebLink
'I <br />WOODBR1DCE <br />i . <br />t <br />�70 6Yao</bri4yc Son/tory D/.sf. <br />� Treo1rr�ent P/on1' <br />Pss ROAD <br />F� <br />GO'PUE -e Fvturc R//Y <br />0 <br />temporary <br />O,T,4INAGE <br />POND <br />See 5/if. 54'7 <br />NOTE-- For 2xnc� �oca��on o7( <br />EXtSf <br />Fence <br />o --i <br />2 <br />3 <br />,�7 <br />R <br />- - - - GENERAL NOTES <br />SERVICES L. ` <br />I Sewage Woodbridge Sanitary District <br />Natural Gas b Electric -P. G. b E. <br />Telephone P. T. II T. <br />Television Cable Lodi Cable T.V. I <br />Water ' <br />item-lOrainage Mokelulme Acres Maintance District- 1. All work shall conform to these plans and any special provisions for this project. <br />7 <br />9 <br />10 <br />L. Refer to the final map of this SUtrdIVIS lon for all centerline and property line data. <br />l 3. The street light system shall be installed by Pacific Gas E Electric Company. <br />4. Contractor shall receive an approved set of plans prior to beginning construction. <br />5. Baumbach 5 Piazza (Engineer) shall set all survey controls and construction stakes necessary for completion of work. <br />The Contractor shall be responsible for the preservation of all survey and construction stakes. Survey and construction <br />stakes that are lost or destroyed due to Lbntractor's negligence will be set'by the Engineer at the Contractor's expense. <br />6. The Contractor shall take precautionary measures to protect existing underground utilities. The Contractor shall do <br />} no excavation until all utility agencies have been given the opportunity to mark their facilities in the field. <br />7. 'house services, fire hydrant laterals, and street light conduit shall be installed prior to -curb and gutter construction. <br />All underground utilities within the street area, including gas and telephone lines, shall be installed prior to paving. <br />8. All <br />les <br />be set flush with <br />ess <br />90. All existingnirrigatioshall n lineve as withinntheeright-ofish grade ,way shall beetrushedtin place or removed. f <br />11. Water used in any phase of construction, such as backfill compaction, dust control, testing or other work herein required, <br />shall be included in the unit price or lump sash bid for the respective. itelp of construction. <br />; 12. Contractor agrees that he shall assume sole and complete responsibility for job site conditions during the course of con- <br />-� struction of this project, including safety for ail persons and property; that this requirement shall apply eoati+amously <br />and not be limited to normal working hours and that Contractor shall defend, indemnify, and hold the Owner and the Engi- <br />neer harmless from any and all liability, real or alleged, in connection with the performance of work on this project, <br />excepting for liability arising from the sole negligence of the Owner or the Engineer. <br />13. The Contractor may use machinery capable of extruding concrete on compacted subgrade to place curb and gutter monolithically." <br />Uike ow QUND UTILITY 14. Contractor shall give Engineer a minimum of 48 hours ratification prior to staking any utilities. <br />15. Water services shall be marked by the curb and gutter Contractor with a "W" stamped on the top of curb. location of water ' <br />markings shall be verified in the field by the Enqineer. <br />LOCATION, 16. i week Trill eo r�m�ftad to be inspected by tie Engineer and reviewed by the Department of Public Works. They shall <br />be notified apt loos them 24 hours in advance of <br />commencement of work. t <br />0 O 17. fire hydrant bid shall "include the following: Tee, 6" late'r`al, 6" Ifilve and complete fire'hydrent assembly. <br />18. Lot grading shall be completed before starting any underground construction. Refer to attached grading plan. <br />INDIANA STRkET a WALDEN DRIVE �9 # 10"SS sAo// ba PVC. pipe. <br />20. EOCa SS Servica -Ao A -VC C.O. of Fi~ - Saa dad.://„ Stoats. <br />LU <br />m <br />I' <br />"R" vo/ue Test <br />R = 68 <br />0 <br />AUGUSTA ST. <br />I.omP <br />Hold <br />8 - <br />Abana'on exist <r/e// <br />per 5• J. co. <br />i Orc/inonce <br />A <br />IIS <br />C <br />O <br />E <br />H <br />13' <br />16' <br />I <br />IE <br />1 <br />O H <br />1 <br />40 <br />F <br />/ <br />4CQ' <br />v <br />LF <br />As <br />Eq' <br />W <br />E4' <br />2 � <br />�• P W .: <br />MCD' U <br />U <br />� M <br />• <br />I <br />��'tire RIYV/ <br />Pss ROAD <br />F� <br />GO'PUE -e Fvturc R//Y <br />0 <br />temporary <br />O,T,4INAGE <br />POND <br />See 5/if. 54'7 <br />NOTE-- For 2xnc� �oca��on o7( <br />EXtSf <br />Fence <br />o --i <br />2 <br />3 <br />,�7 <br />R <br />- - - - GENERAL NOTES <br />SERVICES L. ` <br />I Sewage Woodbridge Sanitary District <br />Natural Gas b Electric -P. G. b E. <br />Telephone P. T. II T. <br />Television Cable Lodi Cable T.V. I <br />Water ' <br />item-lOrainage Mokelulme Acres Maintance District- 1. All work shall conform to these plans and any special provisions for this project. <br />7 <br />9 <br />10 <br />L. Refer to the final map of this SUtrdIVIS lon for all centerline and property line data. <br />l 3. The street light system shall be installed by Pacific Gas E Electric Company. <br />4. Contractor shall receive an approved set of plans prior to beginning construction. <br />5. Baumbach 5 Piazza (Engineer) shall set all survey controls and construction stakes necessary for completion of work. <br />The Contractor shall be responsible for the preservation of all survey and construction stakes. Survey and construction <br />stakes that are lost or destroyed due to Lbntractor's negligence will be set'by the Engineer at the Contractor's expense. <br />6. The Contractor shall take precautionary measures to protect existing underground utilities. The Contractor shall do <br />} no excavation until all utility agencies have been given the opportunity to mark their facilities in the field. <br />7. 'house services, fire hydrant laterals, and street light conduit shall be installed prior to -curb and gutter construction. <br />All underground utilities within the street area, including gas and telephone lines, shall be installed prior to paving. <br />8. All <br />les <br />be set flush with <br />ess <br />90. All existingnirrigatioshall n lineve as withinntheeright-ofish grade ,way shall beetrushedtin place or removed. f <br />11. Water used in any phase of construction, such as backfill compaction, dust control, testing or other work herein required, <br />shall be included in the unit price or lump sash bid for the respective. itelp of construction. <br />; 12. Contractor agrees that he shall assume sole and complete responsibility for job site conditions during the course of con- <br />-� struction of this project, including safety for ail persons and property; that this requirement shall apply eoati+amously <br />and not be limited to normal working hours and that Contractor shall defend, indemnify, and hold the Owner and the Engi- <br />neer harmless from any and all liability, real or alleged, in connection with the performance of work on this project, <br />excepting for liability arising from the sole negligence of the Owner or the Engineer. <br />13. The Contractor may use machinery capable of extruding concrete on compacted subgrade to place curb and gutter monolithically." <br />Uike ow QUND UTILITY 14. Contractor shall give Engineer a minimum of 48 hours ratification prior to staking any utilities. <br />15. Water services shall be marked by the curb and gutter Contractor with a "W" stamped on the top of curb. location of water ' <br />markings shall be verified in the field by the Enqineer. <br />LOCATION, 16. i week Trill eo r�m�ftad to be inspected by tie Engineer and reviewed by the Department of Public Works. They shall <br />be notified apt loos them 24 hours in advance of <br />commencement of work. t <br />0 O 17. fire hydrant bid shall "include the following: Tee, 6" late'r`al, 6" Ifilve and complete fire'hydrent assembly. <br />18. Lot grading shall be completed before starting any underground construction. Refer to attached grading plan. <br />INDIANA STRkET a WALDEN DRIVE �9 # 10"SS sAo// ba PVC. pipe. <br />20. EOCa SS Servica -Ao A -VC C.O. of Fi~ - Saa dad.://„ Stoats. <br />LU <br />m <br />I' <br />"R" vo/ue Test <br />R = 68 <br />0 <br />AUGUSTA ST. <br />I.omP <br />Hold <br />8 - <br />Abana'on exist <r/e// <br />per 5• J. co. <br />i Orc/inonce <br />...1 <br />W <br />Q <br />t a <br />Q <br />c7� <br />J t/i <br />CONSTRUCTION QUANTITIES <br />B b STREET SYSTEAM� NowM <br />A ClearingGrubbing i Lot Grading Lump 541M <br />Roadway Excavetfion 8,05 0 C. Y. <br />LEGEND Compost Original Ground JIncWdes Partial"A") 7&500 Sa <br />WIM <br />A <br />t� <br />C <br />O <br />E <br />H <br />13' <br />16' <br />I <br />IE <br />1 <br />O H <br />...1 <br />W <br />Q <br />t a <br />Q <br />c7� <br />J t/i <br />CONSTRUCTION QUANTITIES <br />B b STREET SYSTEAM� NowM <br />A ClearingGrubbing i Lot Grading Lump 541M <br />Roadway Excavetfion 8,05 0 C. Y. <br />LEGEND Compost Original Ground JIncWdes Partial"A") 7&500 Sa <br />WIM <br />A <br />8 <br />C <br />O <br />E <br />H <br />13' <br />16' <br />LJk.SAdL:E <br />50 25' 18' I1 'T' <br />INDIA E g !no' 30 ea, 15' 7' <br />Concrete Sebgrade Compaction Z5,560 S.F. <br />�I Aggregato Base Cl. II (.25') 53,800 S.;F. <br />Asphalt Concrete - Type B (.17') [ Includes Anval "A) 54 500 SIF <br />Bowled Curb, Gutter a Sidewalk <br />3, 54 LF <br />See Note 3 --- � Survey Monuments -4 Ea. <br />6Q I I - I Street Sign Post 3 Ea, <br />Street Lights 1 J'_0t 4 /0 'Ea,Asphalt. Cooait - Type -W (.W)(LT_-% le Street) 22,000 5F <br />Deed End Barricade I E O' <br />/N 12 13 14 1 15 16 17 IB }•} I 13 I 6' Chain 11M4_Fence B Gate(i) sec elate. �.t.s. 4 /910 <br />t L,F. - (By owner) <br />Temporary Holding Pond (Includes Access Road) _ Lamp &#n <br />• --- <br />48 <br />' <br />47-w�z•So <br />46TRE T ass - WATER <br />Se 45 Sal 6' We <br />/_. r <br />won. Nor 4 4 I so hinter <br />-Z. 43 42 h 25 24 23 22 21 20 19 tiQ�� r V ailve <br />�1\ Mio� u � Blems f <br />y, firs hydrant Assembly (Includes Tee, <br />I ZNOTE5 : <br />1. Ins0 <br />In -stall 00 L. F. of [o' Cham 6" Lateral, 6" Valve i Rich Ranger #W or equal <br />Link Fence '� <br />Q g i? 0� -ter <br />SeFvtce Pen <br />on the property line between OODBRIDGE ; -- -�- (2') <br />� IRRIGATION DISTRICT CANAL and Lot940 Water Service <br />rnru 48 and Lot 39. / 41 In <br />yF <br />KleeP 2. 1nsto11 (o9 L. F. of 6' Chain Link Fey� Q � <br />" on the property line between Pprcelice <br />Woo/6��4 and Lots 39 and40 also install OL.t• <br />G s s 26 27 28 29 30 3 { 32 3.*� 11 z 3 <br />isW of re ChoinLek Fence between <br />6'x c l "All Q ;Ilt/Oe �``e 40 © 1 I �!!1 DRAIN SYSTEM <br />Gates aloe the R/W between Parcel "Ail ,/ <br />Ji LA 9ALLE 5TREE-r. "a� ��P�Or r Storm brain� <br />a Fd A P PROVED B Y 3. Install 227 L.F, of Cn' Cham Link Fence „ W StK® Orlin <br />Rood along the northerly property line of 1, e� i SD STR ET 22" Storm <br />iii v�tp Lots 15 thru 18. Remove existing 4' Chain rr rr Ie� }-i 1 "Storm Drain <br />'dips kJ Link Fence north of said Property Line. PO el "Ato 12" Storm Drain <br />wooo p Y' r 4. Install 86'5 LF of 6' Chain Link Fence with O Side Inlet titch Basin <br />_f ° 106 v < 3'fthigh barbed wire 12'Gate. <br />6 - / �.Drop <br />1-I � � �� -� 1; , _ -- --. _ --- - ---- - - s� ee � 3 � � 2111 S.nolim Braainh Basin <br />' y� 'Q/ems°Xe 39 38 37 36 35 34 33 `� ?� 46" Storm Drain Manhole <br />V 1 n �; -fA` �\ (� , S C). o 2 ro 24" Storm Drain Riser <br />A (; o S N JOAQUIN LOCAL H ALTH DISTRICT D TE e <br />I � <br />IRRIGATION Dt9 X� \p O, I I Naauw°11_/F�.aa <br />F/nq/ AppraYo/ Sonitor <br />. 1 ' %,•. 0�5li70t wi// be ��i seporoJ�/elYer <br />IN - �, , /nsto/l One free .oe� H. A. 5tu'g. <br />o \' RICT ATE q aeon construction of 9 <br />v \ <br />411 Lots N. !. C SEWER SYSTEM <br />Sanitary Sewer <br />I ,_�.�__.. earner Rod � •�'� 8" Sanitary Sewer <br />- <br />SAN FIRE WARDEN DATE KEY MAP 10" Sanitary Sewer <br />SAN J AQUIN <br />V LEONARD ORTIZ SCALA �a�; - <br />J- l 1 t _ Fire Chief �' )S <br />Soni ry r Manhole- <br />CHI OODB ID E FIR DISTRIC T Lamp Hole <br />j; VICINITY MAP sanitary sewer Service_ <br />N7.6. _ <br />j SAN JOAQUIN .CO11NTY FLOOD CONTROL FA WATER CONSERVATION DISTRICT <br />N0. DATE <br />REVISIONS 8Y DESIGN TF. DRAWN BY E.S. APPROVED <br />�eylie S'at SC „= 0.0„ �- :. d 9 1 19 �- BAUMBACH & PIAZZA E MA <br />I KEY P <br />2 5113,1&1.Revise SO S/zes Es / CIVIL ENGINEERS - SURVEYORS <br />3 ?/0 6 82 2V/5E AV eaCa3?1an /� SUBMITD BY / �! A 221 W. OAK ST., LODI , CALIF. 95240 PH. 209 -368-80" <br />' R.C.E. DATE l SAN JOAQUIN COON DIRECTOR OF PLI WORKS <br />F T' <br />PRINTED ON DIEPO NO. 1000H CLEARPRINT ' --- •/F <br />--- / <br />874 <br />1_.F <br />3 <br />E4: <br />6 <br />Ea. <br />2 <br />EQ: <br />Q <br />Eq; <br />40 <br />Ea. <br />/ <br />4CQ' <br />/Z 2 <br />LF <br />54G <br />LF <br />4.61 <br />L F <br />L F 285 X-,- <br />/ <br />Ea <br />543 <br />LF <br />As <br />Eq' <br />/ <br />E4' <br />1 372 L F <br />G e4 L F <br />3f/ BO L F ,i <br />! 3 5a <br />4 9 Ea <br />COUNTRY VIEW SHEET I OF <br />1SIIt IN, I ane No. 79104 j <br />FILE <br />SUBDIVISION IMPWVEMENTS NO. j <br />