'I
<br />WOODBR1DCE
<br />i .
<br />t
<br />�70 6Yao</bri4yc Son/tory D/.sf.
<br />� Treo1rr�ent P/on1'
<br />Pss ROAD
<br />F�
<br />GO'PUE -e Fvturc R//Y
<br />0
<br />temporary
<br />O,T,4INAGE
<br />POND
<br />See 5/if. 54'7
<br />NOTE-- For 2xnc� �oca��on o7(
<br />EXtSf
<br />Fence
<br />o --i
<br />2
<br />3
<br />,�7
<br />R
<br />- - - - GENERAL NOTES
<br />SERVICES L. `
<br />I Sewage Woodbridge Sanitary District
<br />Natural Gas b Electric -P. G. b E.
<br />Telephone P. T. II T.
<br />Television Cable Lodi Cable T.V. I
<br />Water '
<br />item-lOrainage Mokelulme Acres Maintance District- 1. All work shall conform to these plans and any special provisions for this project.
<br />7
<br />9
<br />10
<br />L. Refer to the final map of this SUtrdIVIS lon for all centerline and property line data.
<br />l 3. The street light system shall be installed by Pacific Gas E Electric Company.
<br />4. Contractor shall receive an approved set of plans prior to beginning construction.
<br />5. Baumbach 5 Piazza (Engineer) shall set all survey controls and construction stakes necessary for completion of work.
<br />The Contractor shall be responsible for the preservation of all survey and construction stakes. Survey and construction
<br />stakes that are lost or destroyed due to Lbntractor's negligence will be set'by the Engineer at the Contractor's expense.
<br />6. The Contractor shall take precautionary measures to protect existing underground utilities. The Contractor shall do
<br />} no excavation until all utility agencies have been given the opportunity to mark their facilities in the field.
<br />7. 'house services, fire hydrant laterals, and street light conduit shall be installed prior to -curb and gutter construction.
<br />All underground utilities within the street area, including gas and telephone lines, shall be installed prior to paving.
<br />8. All
<br />les
<br />be set flush with
<br />ess
<br />90. All existingnirrigatioshall n lineve as withinntheeright-ofish grade ,way shall beetrushedtin place or removed. f
<br />11. Water used in any phase of construction, such as backfill compaction, dust control, testing or other work herein required,
<br />shall be included in the unit price or lump sash bid for the respective. itelp of construction.
<br />; 12. Contractor agrees that he shall assume sole and complete responsibility for job site conditions during the course of con-
<br />-� struction of this project, including safety for ail persons and property; that this requirement shall apply eoati+amously
<br />and not be limited to normal working hours and that Contractor shall defend, indemnify, and hold the Owner and the Engi-
<br />neer harmless from any and all liability, real or alleged, in connection with the performance of work on this project,
<br />excepting for liability arising from the sole negligence of the Owner or the Engineer.
<br />13. The Contractor may use machinery capable of extruding concrete on compacted subgrade to place curb and gutter monolithically."
<br />Uike ow QUND UTILITY 14. Contractor shall give Engineer a minimum of 48 hours ratification prior to staking any utilities.
<br />15. Water services shall be marked by the curb and gutter Contractor with a "W" stamped on the top of curb. location of water '
<br />markings shall be verified in the field by the Enqineer.
<br />LOCATION, 16. i week Trill eo r�m�ftad to be inspected by tie Engineer and reviewed by the Department of Public Works. They shall
<br />be notified apt loos them 24 hours in advance of
<br />commencement of work. t
<br />0 O 17. fire hydrant bid shall "include the following: Tee, 6" late'r`al, 6" Ifilve and complete fire'hydrent assembly.
<br />18. Lot grading shall be completed before starting any underground construction. Refer to attached grading plan.
<br />INDIANA STRkET a WALDEN DRIVE �9 # 10"SS sAo// ba PVC. pipe.
<br />20. EOCa SS Servica -Ao A -VC C.O. of Fi~ - Saa dad.://„ Stoats.
<br />LU
<br />m
<br />I'
<br />"R" vo/ue Test
<br />R = 68
<br />0
<br />AUGUSTA ST.
<br />I.omP
<br />Hold
<br />8 -
<br />Abana'on exist <r/e//
<br />per 5• J. co.
<br />i Orc/inonce
<br />A
<br />IIS
<br />C
<br />O
<br />E
<br />H
<br />13'
<br />16'
<br />I
<br />IE
<br />1
<br />O H
<br />1
<br />40
<br />F
<br />/
<br />4CQ'
<br />v
<br />LF
<br />As
<br />Eq'
<br />W
<br />E4'
<br />2 �
<br />�• P W .:
<br />MCD' U
<br />U
<br />� M
<br />•
<br />I
<br />��'tire RIYV/
<br />Pss ROAD
<br />F�
<br />GO'PUE -e Fvturc R//Y
<br />0
<br />temporary
<br />O,T,4INAGE
<br />POND
<br />See 5/if. 54'7
<br />NOTE-- For 2xnc� �oca��on o7(
<br />EXtSf
<br />Fence
<br />o --i
<br />2
<br />3
<br />,�7
<br />R
<br />- - - - GENERAL NOTES
<br />SERVICES L. `
<br />I Sewage Woodbridge Sanitary District
<br />Natural Gas b Electric -P. G. b E.
<br />Telephone P. T. II T.
<br />Television Cable Lodi Cable T.V. I
<br />Water '
<br />item-lOrainage Mokelulme Acres Maintance District- 1. All work shall conform to these plans and any special provisions for this project.
<br />7
<br />9
<br />10
<br />L. Refer to the final map of this SUtrdIVIS lon for all centerline and property line data.
<br />l 3. The street light system shall be installed by Pacific Gas E Electric Company.
<br />4. Contractor shall receive an approved set of plans prior to beginning construction.
<br />5. Baumbach 5 Piazza (Engineer) shall set all survey controls and construction stakes necessary for completion of work.
<br />The Contractor shall be responsible for the preservation of all survey and construction stakes. Survey and construction
<br />stakes that are lost or destroyed due to Lbntractor's negligence will be set'by the Engineer at the Contractor's expense.
<br />6. The Contractor shall take precautionary measures to protect existing underground utilities. The Contractor shall do
<br />} no excavation until all utility agencies have been given the opportunity to mark their facilities in the field.
<br />7. 'house services, fire hydrant laterals, and street light conduit shall be installed prior to -curb and gutter construction.
<br />All underground utilities within the street area, including gas and telephone lines, shall be installed prior to paving.
<br />8. All
<br />les
<br />be set flush with
<br />ess
<br />90. All existingnirrigatioshall n lineve as withinntheeright-ofish grade ,way shall beetrushedtin place or removed. f
<br />11. Water used in any phase of construction, such as backfill compaction, dust control, testing or other work herein required,
<br />shall be included in the unit price or lump sash bid for the respective. itelp of construction.
<br />; 12. Contractor agrees that he shall assume sole and complete responsibility for job site conditions during the course of con-
<br />-� struction of this project, including safety for ail persons and property; that this requirement shall apply eoati+amously
<br />and not be limited to normal working hours and that Contractor shall defend, indemnify, and hold the Owner and the Engi-
<br />neer harmless from any and all liability, real or alleged, in connection with the performance of work on this project,
<br />excepting for liability arising from the sole negligence of the Owner or the Engineer.
<br />13. The Contractor may use machinery capable of extruding concrete on compacted subgrade to place curb and gutter monolithically."
<br />Uike ow QUND UTILITY 14. Contractor shall give Engineer a minimum of 48 hours ratification prior to staking any utilities.
<br />15. Water services shall be marked by the curb and gutter Contractor with a "W" stamped on the top of curb. location of water '
<br />markings shall be verified in the field by the Enqineer.
<br />LOCATION, 16. i week Trill eo r�m�ftad to be inspected by tie Engineer and reviewed by the Department of Public Works. They shall
<br />be notified apt loos them 24 hours in advance of
<br />commencement of work. t
<br />0 O 17. fire hydrant bid shall "include the following: Tee, 6" late'r`al, 6" Ifilve and complete fire'hydrent assembly.
<br />18. Lot grading shall be completed before starting any underground construction. Refer to attached grading plan.
<br />INDIANA STRkET a WALDEN DRIVE �9 # 10"SS sAo// ba PVC. pipe.
<br />20. EOCa SS Servica -Ao A -VC C.O. of Fi~ - Saa dad.://„ Stoats.
<br />LU
<br />m
<br />I'
<br />"R" vo/ue Test
<br />R = 68
<br />0
<br />AUGUSTA ST.
<br />I.omP
<br />Hold
<br />8 -
<br />Abana'on exist <r/e//
<br />per 5• J. co.
<br />i Orc/inonce
<br />...1
<br />W
<br />Q
<br />t a
<br />Q
<br />c7�
<br />J t/i
<br />CONSTRUCTION QUANTITIES
<br />B b STREET SYSTEAM� NowM
<br />A ClearingGrubbing i Lot Grading Lump 541M
<br />Roadway Excavetfion 8,05 0 C. Y.
<br />LEGEND Compost Original Ground JIncWdes Partial"A") 7&500 Sa
<br />WIM
<br />A
<br />t�
<br />C
<br />O
<br />E
<br />H
<br />13'
<br />16'
<br />I
<br />IE
<br />1
<br />O H
<br />...1
<br />W
<br />Q
<br />t a
<br />Q
<br />c7�
<br />J t/i
<br />CONSTRUCTION QUANTITIES
<br />B b STREET SYSTEAM� NowM
<br />A ClearingGrubbing i Lot Grading Lump 541M
<br />Roadway Excavetfion 8,05 0 C. Y.
<br />LEGEND Compost Original Ground JIncWdes Partial"A") 7&500 Sa
<br />WIM
<br />A
<br />8
<br />C
<br />O
<br />E
<br />H
<br />13'
<br />16'
<br />LJk.SAdL:E
<br />50 25' 18' I1 'T'
<br />INDIA E g !no' 30 ea, 15' 7'
<br />Concrete Sebgrade Compaction Z5,560 S.F.
<br />�I Aggregato Base Cl. II (.25') 53,800 S.;F.
<br />Asphalt Concrete - Type B (.17') [ Includes Anval "A) 54 500 SIF
<br />Bowled Curb, Gutter a Sidewalk
<br />3, 54 LF
<br />See Note 3 --- � Survey Monuments -4 Ea.
<br />6Q I I - I Street Sign Post 3 Ea,
<br />Street Lights 1 J'_0t 4 /0 'Ea,Asphalt. Cooait - Type -W (.W)(LT_-% le Street) 22,000 5F
<br />Deed End Barricade I E O'
<br />/N 12 13 14 1 15 16 17 IB }•} I 13 I 6' Chain 11M4_Fence B Gate(i) sec elate. �.t.s. 4 /910
<br />t L,F. - (By owner)
<br />Temporary Holding Pond (Includes Access Road) _ Lamp &#n
<br />• ---
<br />48
<br />'
<br />47-w�z•So
<br />46TRE T ass - WATER
<br />Se 45 Sal 6' We
<br />/_. r
<br />won. Nor 4 4 I so hinter
<br />-Z. 43 42 h 25 24 23 22 21 20 19 tiQ�� r V ailve
<br />�1\ Mio� u � Blems f
<br />y, firs hydrant Assembly (Includes Tee,
<br />I ZNOTE5 :
<br />1. Ins0
<br />In -stall 00 L. F. of [o' Cham 6" Lateral, 6" Valve i Rich Ranger #W or equal
<br />Link Fence '�
<br />Q g i? 0� -ter
<br />SeFvtce Pen
<br />on the property line between OODBRIDGE ; -- -�- (2')
<br />� IRRIGATION DISTRICT CANAL and Lot940 Water Service
<br />rnru 48 and Lot 39. / 41 In
<br />yF
<br />KleeP 2. 1nsto11 (o9 L. F. of 6' Chain Link Fey� Q �
<br />" on the property line between Pprcelice
<br />Woo/6��4 and Lots 39 and40 also install OL.t•
<br />G s s 26 27 28 29 30 3 { 32 3.*� 11 z 3
<br />isW of re ChoinLek Fence between
<br />6'x c l "All Q ;Ilt/Oe �``e 40 © 1 I �!!1 DRAIN SYSTEM
<br />Gates aloe the R/W between Parcel "Ail ,/
<br />Ji LA 9ALLE 5TREE-r. "a� ��P�Or r Storm brain�
<br />a Fd A P PROVED B Y 3. Install 227 L.F, of Cn' Cham Link Fence „ W StK® Orlin
<br />Rood along the northerly property line of 1, e� i SD STR ET 22" Storm
<br />iii v�tp Lots 15 thru 18. Remove existing 4' Chain rr rr Ie� }-i 1 "Storm Drain
<br />'dips kJ Link Fence north of said Property Line. PO el "Ato 12" Storm Drain
<br />wooo p Y' r 4. Install 86'5 LF of 6' Chain Link Fence with O Side Inlet titch Basin
<br />_f ° 106 v < 3'fthigh barbed wire 12'Gate.
<br />6 - / �.Drop
<br />1-I � � �� -� 1; , _ -- --. _ --- - ---- - - s� ee � 3 � � 2111 S.nolim Braainh Basin
<br />' y� 'Q/ems°Xe 39 38 37 36 35 34 33 `� ?� 46" Storm Drain Manhole
<br />V 1 n �; -fA` �\ (� , S C). o 2 ro 24" Storm Drain Riser
<br />A (; o S N JOAQUIN LOCAL H ALTH DISTRICT D TE e
<br />I �
<br />IRRIGATION Dt9 X� \p O, I I Naauw°11_/F�.aa
<br />F/nq/ AppraYo/ Sonitor
<br />. 1 ' %,•. 0�5li70t wi// be ��i seporoJ�/elYer
<br />IN - �, , /nsto/l One free .oe� H. A. 5tu'g.
<br />o \' RICT ATE q aeon construction of 9
<br />v \
<br />411 Lots N. !. C SEWER SYSTEM
<br />Sanitary Sewer
<br />I ,_�.�__.. earner Rod � •�'� 8" Sanitary Sewer
<br />-
<br />SAN FIRE WARDEN DATE KEY MAP 10" Sanitary Sewer
<br />SAN J AQUIN
<br />V LEONARD ORTIZ SCALA �a�; -
<br />J- l 1 t _ Fire Chief �' )S
<br />Soni ry r Manhole-
<br />CHI OODB ID E FIR DISTRIC T Lamp Hole
<br />j; VICINITY MAP sanitary sewer Service_
<br />N7.6. _
<br />j SAN JOAQUIN .CO11NTY FLOOD CONTROL FA WATER CONSERVATION DISTRICT
<br />N0. DATE
<br />REVISIONS 8Y DESIGN TF. DRAWN BY E.S. APPROVED
<br />�eylie S'at SC „= 0.0„ �- :. d 9 1 19 �- BAUMBACH & PIAZZA E MA
<br />I KEY P
<br />2 5113,1&1.Revise SO S/zes Es / CIVIL ENGINEERS - SURVEYORS
<br />3 ?/0 6 82 2V/5E AV eaCa3?1an /� SUBMITD BY / �! A 221 W. OAK ST., LODI , CALIF. 95240 PH. 209 -368-80"
<br />' R.C.E. DATE l SAN JOAQUIN COON DIRECTOR OF PLI WORKS
<br />F T'
<br />PRINTED ON DIEPO NO. 1000H CLEARPRINT ' --- •/F
<br />--- /
<br />874
<br />1_.F
<br />3
<br />E4:
<br />6
<br />Ea.
<br />2
<br />EQ:
<br />Q
<br />Eq;
<br />40
<br />Ea.
<br />/
<br />4CQ'
<br />/Z 2
<br />LF
<br />54G
<br />LF
<br />4.61
<br />L F
<br />L F 285 X-,-
<br />/
<br />Ea
<br />543
<br />LF
<br />As
<br />Eq'
<br />/
<br />E4'
<br />1 372 L F
<br />G e4 L F
<br />3f/ BO L F ,i
<br />! 3 5a
<br />4 9 Ea
<br />COUNTRY VIEW SHEET I OF
<br />1SIIt IN, I ane No. 79104 j
<br />FILE
<br />SUBDIVISION IMPWVEMENTS NO. j
<br />
|