Laserfiche WebLink
\II <br />BRANT <br />* — ciinih of Ga�siraario� <br />Limits of Unit No. P <br />Canstiuction <br />Unit No. eAf <br />Denotes Soils Tests <br />1 b,* k'leinfelder & Associates <br />Y4"' p w <br />Deikgn <br />do <br />t <br />9 O W <br />ion �/ 0 <br />0 <br />P a e N <br />0 \ con <br />0 <br />%%% `o N �• <br />VICTOR <br />NO. DATE 11 LL REVISIONS <br />fti .5�20�C�Z UOn ririlJ - /✓r�Gc <br />MINTED ON DI EPO NO. 100011 CLEAR"INT <br />i <br />(Z' <br />F4 <br />..... \vim ...... <br />ams: <br />•L o t 3 <br />KEY MAP <br />BYDESIGN TP DRAWN BY <br />rP <br />BY <br />R.C.E. 13IL78 DATE <br />APPROVED <br />1 <br />1 <br />1 <br />SAN JOAQUIN <br />DATUM] 5.✓Co. B.W#4-//E/Cv10403 <br />J 0 <br />G Ft <br />J <br />0 <br />Ob ORANOT 'MO. <br />vichrr Rd. � <br />0 <br />� SITE r <br />0 <br />V � <br />Ai U J <br />A:6TTLCMAN ROAD <br />VICINITY MAP <br />N. T5. <br />SERVICES <br />Sewage Septic Tanks <br />Natural Gas & Electric P. G. & E. <br />Telephone Pacific.Telephone Company <br />Water Wells (Prihete) <br />6 " 1982 <br />OF PUBLIC WORKS <br />GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for this project. <br />2. Refer to the final map of this subdivision for all centerline and property line data. <br />3. Contractor shall. receive an approved set of plans prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the preserva- <br />tion of all survey and construction stakes. Survey and construction stakes that are <br />lost or destroyed due to Contractor's negligence will be set by the Engineer at the <br />Contractor's expense. <br />5. The Contractor shall take precautionary measures to protect existing underground <br />utilities. The Contractor shall do no excavation until all utility agencies have been <br />d given the opportunity to mark their facilities in the field. <br />6. Concrete culverts shall conform to ASTM designation C-76. <br />7. Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective item of construction. <br />8. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for all <br />persons and property; that this requirement shall apply continuously and not be limited <br />to normal working hours, and that Contractor shall defend, indemnify, and hold the <br />Owner and the Engineer harmless from any and all liability, real or alleged, in connec- <br />tion with the performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />9. Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />any utilities. <br />10. All work will be required to be inspected by the Engineer and reviewed by the Department <br />of Public Works. They shall be notified not less than 24 hours in advance of commence- <br />m^ent// of work. / / <br />m / 1. ALTOma!<.0 =��QPO �J O�i1/On n! �pi- /anC�T �a C, G" �v;70 <br />I <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS — SURVEYORS <br />323W. ELM. ST., LODI, CALIF. 95240 PH. 209-368-6618 <br />CONSTRUCTION <br />QUANTITIES m <br />(FOR USE OF THE DEPARTMENT <br />OF PUBLIC WORKS ONLY) <br />STREET SYSTEM <br />Clearing &Grubbing. & Oradin9 <br />Lump Sum <br />Earthwork- (4xriovdi ton) <br />970 <br />C.Y. <br />Compact Original Ground -/?, <br />-090 <br />S.F. <br />Aggregate Base - Cl. II ( 7" ) <br />/4, /ov <br />S.F. <br />Asphalt Concrete - Type B (.17') <br />Street Sign Post <br />/y ?Bo <br />S.F. <br />.Driveways ( Replace & Construct') <br />/ <br />3 <br />Each <br />Each <br />Reflectors - P ddle Type <br />Surrey Moauleeaa <br />8 <br />Each <br />A.B. -C/II CO. BJ') <br />i <br />S/AO <br />Each <br />Ea <br />15" Culvert (CMP) <br />34 <br />L.F. <br />21" Culvert (RCP Cl. III) <br />1/8 <br />L.F. <br />KEY SHEET <br />BRANDT TRACT <br />SUBDIVISION IMPROVEMENTS <br />UNIT NO_ 2 <br />SHECT I OF 5 <br />JOB NO. 79&3 V <br />FILE 6-ro42 <br />NO. <br />>ti <br />