Laserfiche WebLink
it <br />I <br />� <br />I <br />4 <br />, <br />QUANTITIES <br />GENERAL NOTES <br />STREET SYSTEM <br />I. <br />2. <br />All -work shall conform to these plans -and any special provisions for this project. <br />Refer <br />Lot Grading & Grubbing <br />Lump Sum <br />3. <br />to the final map of this subdivision for all centerline and property line data. <br />Re" street light system shall be installed by Pacific Gas <br />Roadway Excavation <br />1,600 <br />C.Y. <br />4. <br />& Electric Company. <br />Contractor shall receive an approved set of plans prior to beginning construction. <br />Compact Original Ground <br />60,800 <br />S.F. <br />_X 8•W _ / J <br />1 1 Alp/ <br />If <br />1 11 3 r; RII VER MEADOW <br />1 3 Unit No, <br />li r <br />111 63 <br />W <br />11 W <br />If"46 66 67 <br />S, <br />62 6I 60 Y <br />Q <br />J <br />•� / �, <br />9 � I <br />12 5� <br />69 <br />Imo-. I <br />>70 I LL i <br />I <br />7 I <br />VAL EY OA PLA E _ 50' P U. E. <br />v �_--�- ---�--�>------ t �--- --- -- log---------�\ <br />1� <br />/ I t <br />r <br />,:;f �w; 49 50 51 52 03 54 I 72 <br />o �s <br />v w <br />WOODBRiDGE b -3 0 1 W 1 <br />lBenchmark Datum per u.s•a.s. s. M. `s Const 526 LF Fe along I <br />19-15 1907 -45. Location - N.W. corner northerly R/W Of 1Nloodbrldge W o e, <br />of Masonic bldg. In the town of Wood- I 1 Road . (I 6 t 86.25 tddd ?2+54 1 `' <br />bri!?90. Bitrvo ,on .46.40 <br />Including returns) 1 <br />See Detail 5heet\6 y �� <br />3ary "P � v% 0- <br />1 -PROPERTY 1)G <br />= LOCATION RIVEIL �' c •� <br />woos <br />U.3.Q.s. B.M. ��► MOKELUMNE ACRES <br />19-B 1907-46••- <br />�1 ROAD <br />' m <br />l�l�l <br />C AUGUSTA <br />3 i <br />iwoult _. -LEGEND <br />w.I,o S-LC.B, or j Side Inlet Catch Basin <br />KEY MAP L. P. Law Point <br />c�R�uNA scnLe: iw•too H. P,. High Point <br />e.�. "R" Value Test ro4 T. C. Top of Curb <br />0 5ee SolI5 Report by J, W. Klelnfeider C. 0. T. G. Clean Out to Grade <br />-9 o q Ae5ociataS -. dated May 8, 1981 --<:� Storm Drain Line indicating direction of flow <br />-<Z� Sanitary Sewer Line indicating direction of flow <br />-EDE:)- idater Line <br />VICINITY MAP __0 Fire Hydrant <br />N T 9 STRUCTURAL Scale: 1"-5Horiz.e, Vert. SECTION street Light <br />-- APPROVED BY <br />Rj6-01 <br />�w <br />25 <br />SAN 3L LT IRICT DATE <br />T -Street Lights Woodbridge Ughtinq District <br />i <br />o G � ---�� Stege Woodbridge Sanitary District p JOAQUIN FIRE WARDEN DATE <br />Natural Gas & Electric_ P. G. & E. <br />.b 6 ..b. d ♦ a. / , <br />Telephone ' P Pacific Bell <br />/3eve/ed Type C Of S <br />Television Cable Lodi Cable T.V. CHIEF DBRIDO FIRE DISTRICT DATE- <br />- <br />O./7' A G. - Tycie a/3 „ Water <br />0.67'-92%R. G• Goricrete Storm Drainage �- Mokelumne Acres Maintenance District <br />-- 15.33' A.FS. C/, Il <br />l Subgrode Comoactior/ 0.67'-- 92 /. R. C. oriyir/a/ Grour�d <br />q ENGINEER, W000 IDGE 9ANIT R D <br />VALLEY OAK PLACE RIVER MEADOWS DRIVE <br />R <br />60'�w p' , <br />N 30,v lw -- -- -- - <br />--- ---- - - _'. S o <br />._ ___ _..__.... <br />22' - ------ - - --- 22. 5' 3Fcncc Detail E <br />v <br />{�c Cr I /' /' See Sheet G €a - 32 <br />C: �1 I exist edge of Pavement <br />eat Cal I <br />Z]Z:il - o. /_ 4 C, . r e iii it o. G. �, 1- I <br />d - leve/ed T yo ' O,/7'.4.C. ^-Tyne •/O" <br />(� 7 -yo GG�5,-0.�3'A,/3 G/ _2r O. jO'A./j C/. ZZ <br />t� o Very. G. G. 5. <br />J 0.67' 92 y" R. G. Concrete l-- O. ro7' - 9E I/* /2, G, Origina/Ground 0.67' 92 % R. C, Gonerete 0.67' ^ 92% /?, C, Ori /na/ Ground <br />Subgrade Gornpoction <br />5ubgrade Gomoactior/ <br />9 <br />y I� <br />MEADOWLARK DRIVE WOODBRIDGE ROAD <br />v <br />(o, O _ <br />N0. DATE REVISIONS BY DESIGN DRAWN BY APPROVED RIVER MEADOWS SHEET I OF % <br />v 1984 BAUMBACH & PIAZZA <br />CIVIL ENGINEERS - SURVEYORS KEY MAP UNIT MD 2 JOB NO. 50109 -2 <br />DESIGNED BYZ ell <br />HENRY M. INRATA RCF 212%g <br />R.C.E. /9G�78 DATE G-�'89 SAN JOAQUIN COUNTY DIRECTOR OF PUBLIC WORKS 323 W. ELM ST., LODI, CALIF. 95240 PH. 209 368-6618 SUBDIVISION IMPROVEMENTS FILE <br />NO. <br />4 <br />CONSTRUCTION <br />QUANTITIES <br />GENERAL NOTES <br />STREET SYSTEM <br />I. <br />2. <br />All -work shall conform to these plans -and any special provisions for this project. <br />Refer <br />Lot Grading & Grubbing <br />Lump Sum <br />3. <br />to the final map of this subdivision for all centerline and property line data. <br />Re" street light system shall be installed by Pacific Gas <br />Roadway Excavation <br />1,600 <br />C.Y. <br />4. <br />& Electric Company. <br />Contractor shall receive an approved set of plans prior to beginning construction. <br />Compact Original Ground <br />60,800 <br />S.F. <br />5. <br />$aumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />Concrete Subgrade Compaction <br />24,540 <br />S.F. <br />neces- <br />sary for completion of work. The Contractor shall be responsible for the preservation <br />Aggregate Base - Cl. II (0.33') <br />50, sao <br />S.F. <br />of all survey and construction stakes. Survey and construction stakes that are lost or <br />destroyed due to Contractor's negligence be <br />Aggregate Base - Cl. II (0.50') <br />10,220 <br />S.F. <br />will set by the Engineer at the Contractor's <br />expense. <br />Asphalt Concrete Type B (0.17') <br />61,370 <br />S.F. <br />6. <br />The Contractor shall take precautionary measures to protect existing underground utilities. <br />Vertical Curb, Gutter & Sidewalk <br />658 <br />L.F. <br />The Contractor shall do no excavation until all utility agencies have been the <br />Beveled Curb, Gutter & Sidewalk <br />2,629 <br />L.F. <br />given <br />opportunity to mark their facilities in the field. <br />Commercial Driveway <br />124 <br />S.F. <br />7. <br />House services, fire hydrant laterals, and street light conduit shall be installed <br />Commercial Curb &Gutter <br />31 <br />L.F. <br />prior <br />to curb and gutter construction. All underground utilities within the street in <br />Survey Monument Type S <br />2 <br />Each <br />area, - <br />cluding gas and telephone lines, shall be installed prior to paving. <br />Dead End Barricade <br />2 <br />Each <br />8. <br />All manholes to be set flush with the finish grade unless otherwise indicated. <br />Street Sign <br />4 <br />Each <br />9. <br />All water lines shall have a minimum cover of 3' - 0". <br />Street Light <br />Fence (Woodbridge Road) <br />By P. G. & E. <br />526 L.F. <br />10. <br />11. <br />All existing irrigation lines within the right of way shall be removed. <br />Water used in <br />any phase of construction, such as backfill compaction, dust control, testing <br />or other work herein required, shall be included <br />in the unit price or lump sum bid for the <br />respective item of construction. <br />STORM DRAIN SYSTEM <br />12. <br />Contractor agrees that he shall assume sole and complete responsibility for job site <br />10" Storm Drain <br />156 <br />L.F. <br />conditions during the course of construction of this project, including safety for all <br />persons and property; that this requirement <br />12" Storm Drain <br />3/z <br />L.F. <br />shall apply continuously and not be limited <br />to normal working hours and that Contractor shall defend, indemnify, and hold the Owner <br />*36" Storm Drain <br />48" Storm Drain Manhole <br />382 <br />1 <br />L.F. <br />Only <br />,Cou�fy <br />and the Engineer harmless from any and all liability, real or alleged, in connection with <br />the performance <br />Side Inlet Catch Basin <br />6 <br />Each <br />of work on this project, excepting for liability arising from the sole <br />negligence of the Owner or the Engineer. <br />13. <br />The Contractor may use machinery capable of extruding concrete on compacted subgrade to <br />place curb and gutter monolithically. <br />SANITARY SEWER SYSTEM <br />14. <br />Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />utilities. any <br />6" Sanitary Sewer <br />8" Sanitary Sewer <br />354 <br />265 <br />L.F. <br />L.F. <br />15. <br />Water services shall be marked by the curb and gutter Contractor with a "W" stamped on <br />10" Sanitary Sewer <br />562 <br />L.F. <br />16. <br />the top of curb. Location of water markings shall be verified in the field by the Engineer. <br />All work will be required to be inspected <br />Sanitary Sewer Manhole <br />3 <br />Each <br />by the Department of Public Works. They shall <br />be notified not less than 24 hours in <br />Lamp Hole <br />4" Sanitary <br />2 <br />Each <br />17. <br />advance of commencement of work. <br />Fire Hydrant bid shall include the following: Tee, 6" Lateral, 6" Valve and complete <br />Sewer Service <br />24 <br />Each <br />fire hydrant assembly. <br />18. <br />Lot grading shall be completed before starting any underground construction. Refer to <br />attached grading plan. <br />WATER SYSTEM <br />19. <br />Separation of water and sewer mains (including crossings) and sewer laterals crossing over <br />8" Water <br />798 <br />L.F. <br />water mains shall meet or exceed the latest standards of the State of California Depart - <br />ment of Health Services. <br />8" Water Valve <br />Fire Hydrant Assembly (includes Tee, 6" <br />3 <br />Lateral, 6" <br />Each <br />20. <br />Contractor shall be responsible for notifying and co-ordinating all work with any agency <br />Valve and Rich Ranger #960 or equal) <br />4 <br />Each <br />21. <br />requiring removal or relocation of utilities, such as Pacific Bell, P. G. & E., etc. <br />Prior <br />to performing any work in Woodbridge Road, the Contractor shall obtain an encroach- <br />ment permit from the San <br />1" Water Service <br />24 <br />Each <br />22. <br />Joaquin County Department of Public Works. <br />All off-site water lines shall be <br />pressure tested, disinfected, flushed and tested for <br />bacteria in conformance with the San Joaquin County Health Code Requirements <br />prior to <br />connecting to existing water line. <br />/17,540//¢C/ Zyale V¢/o/o¢r a� CoOn�r i/ieW <br />23. <br />Contractor shall notify Mokelumne Acres Maintenance District for approval to <br />6177, No' 2 <br />Y <br />prior <br />connecting water line to existing water lines. <br />24. <br />25. <br />All off-site storm drains shall be cleaned prior to final acceptance. <br />Installation <br />of all sanitary sewer improvements shall conform to the standards of the <br />Woodbridge Sanitary District. All such is <br />work subject to inspection by the District <br />Engineer. The Contractor shall notify District Engineer 48 hours <br />prior to the commence- <br />ment of any work on the sanitary system. <br />26. <br />Contractor shall visit site prior to bidding. Specifications <br />27. <br />are a separate document. <br />Sanitary sewer services shall be marked by the <br />the top of curb. curb & gutter contractor with an "S" stamped on <br />28. <br />New traffic striping and the restoration of any damaged existing painted legends or signs is <br />the responsibility of the Contractor <br />and shall be included in his bid price. <br />C AUGUSTA <br />3 i <br />iwoult _. -LEGEND <br />w.I,o S-LC.B, or j Side Inlet Catch Basin <br />KEY MAP L. P. Law Point <br />c�R�uNA scnLe: iw•too H. P,. High Point <br />e.�. "R" Value Test ro4 T. C. Top of Curb <br />0 5ee SolI5 Report by J, W. Klelnfeider C. 0. T. G. Clean Out to Grade <br />-9 o q Ae5ociataS -. dated May 8, 1981 --<:� Storm Drain Line indicating direction of flow <br />-<Z� Sanitary Sewer Line indicating direction of flow <br />-EDE:)- idater Line <br />VICINITY MAP __0 Fire Hydrant <br />N T 9 STRUCTURAL Scale: 1"-5Horiz.e, Vert. SECTION street Light <br />-- APPROVED BY <br />Rj6-01 <br />�w <br />25 <br />SAN 3L LT IRICT DATE <br />T -Street Lights Woodbridge Ughtinq District <br />i <br />o G � ---�� Stege Woodbridge Sanitary District p JOAQUIN FIRE WARDEN DATE <br />Natural Gas & Electric_ P. G. & E. <br />.b 6 ..b. d ♦ a. / , <br />Telephone ' P Pacific Bell <br />/3eve/ed Type C Of S <br />Television Cable Lodi Cable T.V. CHIEF DBRIDO FIRE DISTRICT DATE- <br />- <br />O./7' A G. - Tycie a/3 „ Water <br />0.67'-92%R. G• Goricrete Storm Drainage �- Mokelumne Acres Maintenance District <br />-- 15.33' A.FS. C/, Il <br />l Subgrode Comoactior/ 0.67'-- 92 /. R. C. oriyir/a/ Grour�d <br />q ENGINEER, W000 IDGE 9ANIT R D <br />VALLEY OAK PLACE RIVER MEADOWS DRIVE <br />R <br />60'�w p' , <br />N 30,v lw -- -- -- - <br />--- ---- - - _'. S o <br />._ ___ _..__.... <br />22' - ------ - - --- 22. 5' 3Fcncc Detail E <br />v <br />{�c Cr I /' /' See Sheet G €a - 32 <br />C: �1 I exist edge of Pavement <br />eat Cal I <br />Z]Z:il - o. /_ 4 C, . r e iii it o. G. �, 1- I <br />d - leve/ed T yo ' O,/7'.4.C. ^-Tyne •/O" <br />(� 7 -yo GG�5,-0.�3'A,/3 G/ _2r O. jO'A./j C/. ZZ <br />t� o Very. G. G. 5. <br />J 0.67' 92 y" R. G. Concrete l-- O. ro7' - 9E I/* /2, G, Origina/Ground 0.67' 92 % R. C, Gonerete 0.67' ^ 92% /?, C, Ori /na/ Ground <br />Subgrade Gornpoction <br />5ubgrade Gomoactior/ <br />9 <br />y I� <br />MEADOWLARK DRIVE WOODBRIDGE ROAD <br />v <br />(o, O _ <br />N0. DATE REVISIONS BY DESIGN DRAWN BY APPROVED RIVER MEADOWS SHEET I OF % <br />v 1984 BAUMBACH & PIAZZA <br />CIVIL ENGINEERS - SURVEYORS KEY MAP UNIT MD 2 JOB NO. 50109 -2 <br />DESIGNED BYZ ell <br />HENRY M. INRATA RCF 212%g <br />R.C.E. /9G�78 DATE G-�'89 SAN JOAQUIN COUNTY DIRECTOR OF PUBLIC WORKS 323 W. ELM ST., LODI, CALIF. 95240 PH. 209 368-6618 SUBDIVISION IMPROVEMENTS FILE <br />NO. <br />