Q'i
<br />4 6
<br />W"d
<br />Poll e
<br />IX
<br />51-afe
<br />4'// C'0177'1�0/q
<br />\7
<br />4
<br />N�l
<br />f
<br />t,'c a /e - /,0 ,
<br />SITE PLA N
<br />. .................... ....... . . .
<br />E3
<br />/I a%0ava/,Aow al'
<br />0 /1 re S.5 a 1l/'C, // — 9/-0 // --'\\
<br />0 1114,ler clauf a 10�W Av-f 10r 10�lel
<br />0✓ 0Asa a*
<br />ZZ -1
<br />Za . 0/7 1017,k 460hl�7W 474 0�lel
<br />ra CC, ee2 - V
<br />,0 e;hea*
<br />r471
<br />/0
<br />0/7
<br />7ire
<br />AL "Al'ao4ev
<br />We, la'(fe/ as 1;7,176,1- 447514- 9 6al. 7
<br />4117
<br />17 6 /;��
<br />,10, - 1�5,x
<br />/-Or* ^-1017Ze OCI-eO/7 h7,,,9/474;0 471
<br />/V+ I
<br />XX
<br />-/0k1"6,76T :7a4 C�l _-7
<br />ohall he on&
<br />ell
<br />f/a R C,
<br />Ik-
<br />�hl$S
<br />A/
<br />llov z)l;,fn
<br />d%0^0 Mid WJF PAWPLJ &AAlki
<br />(,4,o C 0
<br />5/1d,'171'C19'e0e;A
<br />Pet
<br />7e 6
<br />r
<br />We,lel- �?1-040aAFIW.41 h17 6/W
<br />,Eleva�lof7 41700
<br />117 4��O 4A? V.
<br />41a pe
<br />NO OATE Re V� $10*5 By APPROVED
<br />DIRAW�L� BY
<br />rp
<br />iE r 4
<br />GNFD
<br />E DATE �WORK
<br />J S
<br />moor1flo (7p Moro 40 R C , �Wm cik"".k4r
<br />ELECTRICAL NOTES
<br />le , 5f, co/l 6, 4/41 e;A
<br />P1 PE '"',SUPPORT
<br />la All electrical work and 'equipment shall conform with Title 24, Part 3 of the
<br />California Administrative Code, the National Electrical Code, OSHA Electrical
<br />requirements and local county and utility requirements (Bldfj, pay rmit rs,joired"
<br />2. Circuit breaker, for, convenience outlet circuit shall be Quicklag ground fault type.
<br />3° A11 I equipment shall be grounded with ground conductor in the conduit- runs. All
<br />grounds shall be interconnected,
<br />4. All conduit shall be Sch, 40 P.V.C� - MiniHILA111 size 3/4",
<br />5, Conductors shall be copper with THW insulation. Wire No, 10 and smaller shall be
<br />solid conductor. No. 8 and larger shall be stranded, All control wire shall be
<br />stranded, Minimum wire size shall be No. 12 in the light and power systems and
<br />No, 14 for control. Grounding conductors,shal"l be insulated.
<br />6» A standard pU111p panel shall be installed and the wiring connecting the panel to
<br />the source of power shall meet local ordina'rices,
<br />BAUMBACH & PIAZZA
<br />CIVIL KNOINW31 — SUMV9YORS
<br />323 W. ELM ST. WDICALIF, 9,5240 PH 209-368-6618
<br />PARCEL 08"
<br />ELEVATION
<br />4ee,11'01 ��11110 el'XIellaleal
<br />En A l
<br />19e,01"
<br />7-0
<br />-,,4, r "re-Ilel
<br />m
<br />(9_> 10" AC.P. & Adaptoe by water line Contractor
<br />WPODBRIDGE GREENS
<br />3 U a DIVI 1110 v IMPROVEMENTS
<br />UT NO I
<br />St4f�TT OF
<br />FILE
<br />40,
<br />
|