Laserfiche WebLink
"COc/NTRY V/,ews" <br />Unit No.3 <br />�v <br />0 <br />No Ace/s <br />VICINITY MAP <br />NTS. <br />8enchmarR Doturtl Per U. S.O.S. B.M. <br />10-8 1007-4f. Location N.W.co►nor <br />of Mosonlc. Duiloina to the town of... <br />Woo abrldge . llovot%on - 46.40 <br />$II-UCTURAL SECTIONS <br />9G4/G t /,r a 5' <br />n/oTi< : .4// Roodw� ii%/ To BC 9�• RG �J'/i�. <br />-4// .Lot Fi%/ To 6e AO `/• PC <br />" X01<PL. UiYlNE ACRS ' <br />GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for this project. <br />2. Refer to the final map of this subdivision for all centerline and property line data. <br />3. The street light system shall be installed by Pacific Gas and Electric Company. <br />4. Contractor shall receive do approved set of plans prior to beginning construction. <br />5. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be res onsible for th <br />SPECIAL NOTE:P <br />vation of all survey and <br />construction stakes. Survey and construction <br />e preser- <br />stakes that are <br />connection with the performance of work on this project, excepting for liability <br />lost or destroyed due to <br />Contractor's negligence will be set by the Engineer <br />at the <br />/7¢ <br />Contractor's expense. <br />��!! <br />C O N S T R U C TIO N <br />r.'vlL/ <br />Contractor shall provide continuous compaction tests and <br />6. The existing underground <br />utilities were plotted from available records. <br />The Contractor <br />fill pond as portion of lot grading bid. Fence shall be <br />173 <br />/72 <br />/7/ <br />/70 <br />/Gy <br />/GO <br />167 <br />/7S <br />on the top of curb. Sewer Services shall be similarly marked with an "S". <br />16. <br />�v <br />0 <br />No Ace/s <br />VICINITY MAP <br />NTS. <br />8enchmarR Doturtl Per U. S.O.S. B.M. <br />10-8 1007-4f. Location N.W.co►nor <br />of Mosonlc. Duiloina to the town of... <br />Woo abrldge . llovot%on - 46.40 <br />$II-UCTURAL SECTIONS <br />9G4/G t /,r a 5' <br />n/oTi< : .4// Roodw� ii%/ To BC 9�• RG �J'/i�. <br />-4// .Lot Fi%/ To 6e AO `/• PC <br />" X01<PL. UiYlNE ACRS ' <br />GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for this project. <br />2. Refer to the final map of this subdivision for all centerline and property line data. <br />3. The street light system shall be installed by Pacific Gas and Electric Company. <br />4. Contractor shall receive do approved set of plans prior to beginning construction. <br />5. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be res onsible for th <br />SPECIAL NOTE:P <br />vation of all survey and <br />construction stakes. Survey and construction <br />e preser- <br />stakes that are <br />connection with the performance of work on this project, excepting for liability <br />lost or destroyed due to <br />Contractor's negligence will be set by the Engineer <br />at the <br />G ,f. Fill pond in 8" max. lifts to 90% R.C. min. compaction. <br />Contractor's expense. <br />��!! <br />C O N S T R U C TIO N <br />r.'vlL/ <br />Contractor shall provide continuous compaction tests and <br />6. The existing underground <br />utilities were plotted from available records. <br />The Contractor <br />fill pond as portion of lot grading bid. Fence shall be <br />shall be responsible for <br />contacting all utility agencies to mark their <br />facilities in <br />salvaged for reuse by owner. <br />the field before any excavation The Contract- h 11 f <br />1" Water Service <br />KEY MAP <br />5C0/e : /"= 50' <br />ROA/C/ow TyoG C6 I/9 LLL <br />- O, /7' A C. r ypa ♦e • (XZ' Wox.,W(J9.) <br />, GT 92y RG 0, 2-91,4.,e c/. 2r 3/4',%10X, ilgyrG OtC <br />Cone. 3ub9Aoa'C Comte. O G7, • 9 <br />�O04WAlay Ejr. conoatid to this /i,�a <br />7-/ - 4'O { WETHERLY CIRCLE RIO VERDE STREET Ti. =so <br />0. JE. Provia'aa/ + 0.70 G. £. rrovio'Cd = D. 70 <br />00 , <br />�- <br />3--- 5 22' � .ee• moi' a. <br />/ �2 <br />®sys/ear 7yA20 as 05 <br />O. G7' 0pp `fi z!L <br />CO,lG. 3Ud,/Igr6 4emp. <br />REVISIONS <br />INDIANA <br />t <br />//t ` ft f <br />O.ZO,/C - 7y� yB • (9't+',ffaX. Aly.) <br />0.33 Aif ci j ! 010,wsx..I4y�gotaJ <br />0- 67' 4- 9d•/" RC Oriyina/ 6/bvncl <br />S T R E E T R/ = 7-3 <br />s G. E- <br />OR <br />. Provided > O.B6 <br />BENEDICT DRIVE <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />s a note y and co-ordinate all work <br />with any agency requiring removal or relocation of their utilities. Pacific Bell, <br />P. G. & E., Lodi Cable T. V., Woodbridge Sanitary District and Woodbridge Lighting <br />Lighting District. USA (800) 642-2444. <br />Contractor shall be responsible for notifying and co-ordinating all work with any <br />agency requiring removal or relocation of utilities, such as Pacific Bell, P. G. & E., <br />etc. <br />House services, fire hydrant laterals, and street light conduit shall be installed <br />prior to curb and gutter construction. All underground utilities within the street <br />area, including gas and telephone line, shall be installed prior to paving. <br />All manholes to be set flush with finish grade unless otherwise indicated. <br />All water lines shall have a minimum cover of 301. <br />All existing irrigation lines within the right of way shall be crushed in place or <br />removed. <br />Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective items of construction. <br />13. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend,indemnify, and hold <br />the Owner and the Engineer harmless from any and all liability, real or alleged in <br />1 <br />Sanitary Sewer Manhole <br />4 Each <br />connection with the performance of work on this project, excepting for liability <br />42 Each <br />WATER SYSTEM <br />Item <br />No. 19638 <br />��!! <br />C O N S T R U C TIO N <br />r.'vlL/ <br />V) <br />N0. <br />DATE <br />/ �2 <br />®sys/ear 7yA20 as 05 <br />O. G7' 0pp `fi z!L <br />CO,lG. 3Ud,/Igr6 4emp. <br />REVISIONS <br />INDIANA <br />t <br />//t ` ft f <br />O.ZO,/C - 7y� yB • (9't+',ffaX. Aly.) <br />0.33 Aif ci j ! 010,wsx..I4y�gotaJ <br />0- 67' 4- 9d•/" RC Oriyina/ 6/bvncl <br />S T R E E T R/ = 7-3 <br />s G. E- <br />OR <br />. Provided > O.B6 <br />BENEDICT DRIVE <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />s a note y and co-ordinate all work <br />with any agency requiring removal or relocation of their utilities. Pacific Bell, <br />P. G. & E., Lodi Cable T. V., Woodbridge Sanitary District and Woodbridge Lighting <br />Lighting District. USA (800) 642-2444. <br />Contractor shall be responsible for notifying and co-ordinating all work with any <br />agency requiring removal or relocation of utilities, such as Pacific Bell, P. G. & E., <br />etc. <br />House services, fire hydrant laterals, and street light conduit shall be installed <br />prior to curb and gutter construction. All underground utilities within the street <br />area, including gas and telephone line, shall be installed prior to paving. <br />All manholes to be set flush with finish grade unless otherwise indicated. <br />All water lines shall have a minimum cover of 301. <br />All existing irrigation lines within the right of way shall be crushed in place or <br />removed. <br />Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective items of construction. <br />13. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend,indemnify, and hold <br />the Owner and the Engineer harmless from any and all liability, real or alleged in <br />6" Sanitary Sewer <br />562 L.F. <br />Sanitary Sewer Manhole <br />4 Each <br />connection with the performance of work on this project, excepting for liability <br />42 Each <br />WATER SYSTEM <br />Item <br />arising from the sole negligence of the Owner or the Engineer. <br />��!! <br />C O N S T R U C TIO N <br />QUANTITIES <br />14. <br />Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />any utilities. <br />3 Each <br />8" Valve <br />3 Each <br />15. <br />Water services shall be marked by the curb and gutter Contractor with "W" stamped <br />#960) <br />4 Each <br />1" Water Service <br />STREET SYSTEM <br />on the top of curb. Sewer Services shall be similarly marked with an "S". <br />16. <br />All work will be required to beinspected by the Department of Public Works. They <br />Item <br />Quantity <br />shall be notified not less than 24 hours in advance of commencement of work. <br />\ Lot Grading & Clearing <br />17. <br />Lot grading shall be completed before starting any underground construction. Refer to <br />Roadway Excavation <br />4,900 <br />C.Y. <br />attached grading plan. <br />i2 Compact Original Ground <br />58,000 <br />S.F. <br />18. <br />Each SS service to have C.O. at line. on 6. <br />Concrete Se Compaction <br />19,460 <br />S.F. <br />19. <br />Note that sanitary inspection will berty <br />performed by Santail <br />Joaquinsheet <br />County Department of <br />Base - <br />� Aggregate Base Cl. II (0.25') <br />17,380 <br />S.F. <br />Public Works and Woodbridge Sanitary g <br />9 y District Engineer and /or District staff <br />Asphalt Concrete - Type'B'(0.17') <br />17,380 <br />S.F. <br />(Kleldsen-Sinnock & Associates (209) 946-0268). Must have inspection before backfill <br />Aggregate Base - Cl. II (0.33') <br />40,620 <br />S.F. <br />and notify inspector 48 hours prior. <br />Asphalt Concrete - Type B (0.20'). <br />40,620 <br />S.F. <br />20. <br />No materials resulting from tapping procedures may enter District sewer. <br />Beveled Curb, Gutter & Sidewalk <br />2,760 <br />L.F. <br />21. <br />Separation of water and sewer mains (including crossings) and sewer laterals crossing <br />Survey Monument - Type'S' <br />10 <br />Each <br />over water mains shall meet or exceed the latest standards of the State of California <br />Street Sign <br />4 <br />Each <br />Department of Health Services. Where water crosses SD or SS use an 18 - 20ft. length <br />Street Light <br />7 <br />Each <br />of Cl. 200 pipe, centered over the SS or SO if: a) The water is under the SS or SD. <br />Fill Pond <br />Lump sum <br />b) The vertical clearance is less than 1 ft. <br />ChoiO,c/iiK Fence (By <br />1,402 <br />L.F. <br />22. <br />It is agreed that field conditions may require changes to these plans. It is further <br />agreed that the Director of Public Works may require changes, alterations or additions <br />STORM DRAIN SYSTEM <br />to these plans, when the Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or additions shall not <br />12" Storm Drain <br />149 <br />L.F. <br />exceed 10% of the original estimate of the cost for the improvements without prior <br />15" Storm Drain <br />124 <br />L.F. <br />approval of the surety. <br />10" Storm Drain <br />48" Storm Drain Manhole <br />143 <br />1 <br />L.F. <br />Each <br />23. <br />Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" Valve and complete <br />fire hydrant assembly. <br />Side Inlet Catch Basin <br />6 <br />Each <br />24. <br />All water lines shall be pressure tested, disinfected,. flushed and tested for bacteria <br />in conformance with the San Joaquin County Health Code Requirements prior to connecting <br />to existing water line. Contractor <br />SANITARY SEWER SYSTEM <br />shall notify Mokelumne Acres Maintenance District <br />for approval prior to connecting water line to <br />existing water line. <br />6" Sanitary Sewer <br />562 L.F. <br />Sanitary Sewer Manhole <br />4 Each <br />Sanitary Service <br />42 Each <br />WATER SYSTEM <br />Item <br />Quantity <br />6" Water <br />467L.F. <br />8" Water <br />1137 L.F. <br />6" Valve <br />3 Each <br />8" Valve <br />3 Each <br />* Fire Hydrant Assembly (Rich Ranger <br />#960) <br />4 Each <br />1" Water Service <br />42 Each <br />* Includes Tee, Valve and Lateral <br />These quantities are for estimating purposes only. Pay quantities will be actual <br />quantities installed. <br />SERVICES <br />Street Lights Woodbridge Lighting District <br />Sewage Woodbridge Sanitary District <br />Natural Gas & <br />Electric P. G. & E. <br />Telephone Pacific Bell <br />Television Cable_ Lodi Cable T. V. <br />Water <br />Storm Drainage % Mokelumne Acres Maintenance district <br />LEGEND <br />S.I.C.B. or Side Inlet Catch Basin <br />L.P. Low Point <br />H.P. High Point <br />T.C. Top of Curb <br />C.O.T.G. Clean Out to Grade <br />S.D. Storm Drain Line Indicating Direction of Flow <br />S.S. Sanitary Sewer Line Indicating Direction of Flow <br />W. Water Line <br />q Fire Hydrant <br />070 Street Light(/oo ob&, f/GSV) <br />- 4 - V&lVe (/ocTiidinf 90X) <br />NOTE: <br />Per�etrgtio.7 Treafrnant w/��q�i�,' <br />Asp//U/f <Grodc 5G-70 or5'E- 25Oj <br />is req dof G. go/� 5q. yd. i;7 o le <br />C7/!7/U/%CO fin: ^%. <br />SHEET INDEX <br />10 KEY SHEET <br />4),®,(4) -PLAN S PROFILE <br />®,OO DETAILS <br />OO GRADING PLAN <br />APPROVED BY <br />WIIF <br />,�X X45?A <br />SN ,/f7A(�U/N COGNL HE,OL 7N O/fTR/GT <br />UH/E <br />SAN F✓OAQU/N F/.OE WA.PDEN <br />DATE <br />j c 14 <br />GH/EF 0 ,P/D6E Fp/Qf 5TQ/GT <br />DATE <br />, <br />fN6/NEFW lt'OODB2/ 6 SAN/TAQY 9/SM1e7 <br />0.97E <br />BY DESIGN 7-P DRAWN BY -/M APPROVED BY E /--C;2 BAU M BAC H & PIAZZA <br />SCIVIL ENGIN <br />URVEYORSEERS KEY SHEET <br />SbBMITT y 323 W. ELM ST. LOOT CALIF. <br />98240 PN:209-369-8819 <br />R.C.E. �yv DATE �-&� SAN JOAQUIN COUSTY DIRECTOR OF PUBLIC WORKS <br />COUNTRY VIEW SUBDIVISION <br />UNIT NO, 4 <br />SUBDIVISION IMPROVEMENTS <br />SHEET,/ D <br />OF B <br />JOB NO. g3pti_� <br />FILE <br />NO. rJ <br />6 -go -7 <br />