<br />■ IMPROVEMENT PLANS
<br />eAf
<br />51 G'
<br />( 8' '*fa)(. )
<br />4-ASphO/t C04C.,Type "B•
<br />.6 %2" Aggieqote rose. C12, 7
<br />/3• Aggiegofa 4ubb0fe /
<br />1
<br />1
<br />Match ,Exi9t.
<br />_ 42' ( STA. jPO t 00 7'0 STA. 56 +00
<br />/G----/ 4 5
<br />I
<br />),4S,Oho/t C04c. -TYPe •B"' Over'/ay
<br />/4'
<br />at Cut I Neat ea!
<br />40,4sp//o/t CO4L. Type •B•
<br />e%2" AggieyateBosa,C/.a Typical.
<br />/3 • Ayq(cyoee Sabbose / cut 56ct/64
<br />Piofi/6 910�%O � Fulu/C /
<br />2' Cuib
<br />YAR. 2 •/. A•fi4. 4 /.
<br />5y. VAR.
<br />uaa J
<br />--
<br />STRUCTURAL SECTION
<br />TYPICAL Sip/e. Hb/. ,,,as. •
<br />1' a
<br />REVISIONS 8Y DESIGN n DRAWN BY APPROVED BY F7
<br />lal
<br />SUBMITTED BY
<br />R.C.E. /2G8S DATE Ci SAN JOAQUIN C6EINTV DIRECTOR OF PUBLIC WORKS
<br />Ty,Oica/
<br />F/ /" Section
<br />3
<br />K
<br />GENERAL NOTES
<br />1. All work shall conform to these plans and any special provisions for this project.
<br />2. Contractor shall receive an approved set of plans prior to beginning construction.
<br />3. The Contractor shall take precautionary measures to protect existing underground
<br />utilities. , The.Contractor shall do no excavation until all utility agencies have
<br />been given the opportunity to. mark their facilities in the field.
<br />4. Water used in any phase of. construction, such as backfill compaction, dust control,
<br />testing or other work herein required, shall be included in the unit price or lump
<br />sum bid for the respective item of construction.
<br />5. Contractor agrees that he shall assume sole and complete responsibility for job
<br />site conditions during' the course of construction of this project, including safety .
<br />for all persons and property; that this requirement shall apply continuously and
<br />not be limited to normal working hours, and that Contractor shall defend, indemnify,
<br />and hold the Owner and .the Engineer harmless from any and all liability, real or
<br />alleged, to connection with the performance of work on this project, excepting for
<br />liability arising from the sole negligence of the Owner or the Engineer.
<br />6. Contractor shall give Engineer a minimum of 48 hours notification prior to staking
<br />any utilities.
<br />7. All work will be"Nquired to be inspected by the Department of Public Works. They
<br />shall be notified not less than 24 hours in advance of commencement of work.
<br />8. Any traffic striping, legend and signs damaged during construction are to be replaced
<br />by the Contractor.
<br />9. It is agreed that field conditions may require changes to these plans. It is*further
<br />agreed that the Director of Public Works may require changes, alterations or additions
<br />to these plans, when the Director deems them to be necessary or desirable for the
<br />proper completion of the work, provided that such changes, alterations or additions
<br />shall not exceed 10% of the original estimate of the cost for the improvements without
<br />cc ,;.prior ipproval.of the surety..,.,• ,
<br />An Enrroachnlent Pkrrnit`.is required. f�r.work lvithin Arch _Road right=of-vray:'
<br />BAUMBACH & PIAZZA
<br />CIVIL ENGINEERS
<br />SURVEYORS
<br />323 W. ELM 8T. LOCI CALIF.
<br />95240 PM:208-:Asi-0898
<br />PREPARED FOR:
<br />KITCI'IELL CIN -
<br />510 J Street
<br />Sacramento, Calif.
<br />95814.: .
<br />W
<br />Q
<br />h
<br />U�
<br />2
<br />ARCH ROAD
<br />VICINITY MAP
<br />LIMITS Or
<br />CONSTRUCTION
<br />OUANTITIES
<br />J
<br />y
<br />1
<br />1
<br />(FOR ESTIMATING PURPOSES
<br />ONLY)
<br />1.
<br />CLEARING 6 GRUBBING
<br />h
<br />2.
<br />EARTHWORK
<br />GENERAL NOTES
<br />1. All work shall conform to these plans and any special provisions for this project.
<br />2. Contractor shall receive an approved set of plans prior to beginning construction.
<br />3. The Contractor shall take precautionary measures to protect existing underground
<br />utilities. , The.Contractor shall do no excavation until all utility agencies have
<br />been given the opportunity to. mark their facilities in the field.
<br />4. Water used in any phase of. construction, such as backfill compaction, dust control,
<br />testing or other work herein required, shall be included in the unit price or lump
<br />sum bid for the respective item of construction.
<br />5. Contractor agrees that he shall assume sole and complete responsibility for job
<br />site conditions during' the course of construction of this project, including safety .
<br />for all persons and property; that this requirement shall apply continuously and
<br />not be limited to normal working hours, and that Contractor shall defend, indemnify,
<br />and hold the Owner and .the Engineer harmless from any and all liability, real or
<br />alleged, to connection with the performance of work on this project, excepting for
<br />liability arising from the sole negligence of the Owner or the Engineer.
<br />6. Contractor shall give Engineer a minimum of 48 hours notification prior to staking
<br />any utilities.
<br />7. All work will be"Nquired to be inspected by the Department of Public Works. They
<br />shall be notified not less than 24 hours in advance of commencement of work.
<br />8. Any traffic striping, legend and signs damaged during construction are to be replaced
<br />by the Contractor.
<br />9. It is agreed that field conditions may require changes to these plans. It is*further
<br />agreed that the Director of Public Works may require changes, alterations or additions
<br />to these plans, when the Director deems them to be necessary or desirable for the
<br />proper completion of the work, provided that such changes, alterations or additions
<br />shall not exceed 10% of the original estimate of the cost for the improvements without
<br />cc ,;.prior ipproval.of the surety..,.,• ,
<br />An Enrroachnlent Pkrrnit`.is required. f�r.work lvithin Arch _Road right=of-vray:'
<br />BAUMBACH & PIAZZA
<br />CIVIL ENGINEERS
<br />SURVEYORS
<br />323 W. ELM 8T. LOCI CALIF.
<br />95240 PM:208-:Asi-0898
<br />PREPARED FOR:
<br />KITCI'IELL CIN -
<br />510 J Street
<br />Sacramento, Calif.
<br />95814.: .
<br />W
<br />Q
<br />h
<br />U�
<br />2
<br />ARCH ROAD
<br />VICINITY MAP
<br />LIMITS Or
<br />CONSTRUCTION
<br />CONSTRUCTION
<br />OUANTITIES
<br />y
<br />1
<br />1
<br />(FOR ESTIMATING PURPOSES
<br />ONLY)
<br />1.
<br />CLEARING 6 GRUBBING
<br />h
<br />2.
<br />EARTHWORK
<br />LUMP SUM
<br />S
<br />COMPACT SUBGRAOE
<br />74,000 S.F.
<br />4.
<br />AGGREGATE BASE, Cl. II
<br />74,000 S.F.
<br />5.
<br />0
<br />Q
<br />72,800 S.F.
<br />6.
<br />ASPHALT CONCRETE , TYPE "B" (4")
<br />56,000 S.F.
<br />7.
<br />N�
<br />LUMP SUM
<br />8.
<br />10" C.M.P. 6 DITCH RELOCATION
<br />LUMP SUM
<br />9.
<br />TRAFFIC STRIPING
<br />LUMP SUM
<br />10.
<br />TRAFFIC SIGNS
<br />LUMP SUFI
<br />ij
<br />Q
<br />CONSTRUCTION
<br />OUANTITIES
<br />(FOR ESTIMATING PURPOSES
<br />ONLY)
<br />1.
<br />CLEARING 6 GRUBBING
<br />LUMP SUM
<br />2.
<br />EARTHWORK
<br />LUMP SUM
<br />3.
<br />COMPACT SUBGRAOE
<br />74,000 S.F.
<br />4.
<br />AGGREGATE BASE, Cl. II
<br />74,000 S.F.
<br />5.
<br />ASPHALT CONCRETE, TYPE "B"
<br />(2" OVERLAY)
<br />72,800 S.F.
<br />6.
<br />ASPHALT CONCRETE , TYPE "B" (4")
<br />56,000 S.F.
<br />7.
<br />AGGREGATE SUBBASE
<br />LUMP SUM
<br />8.
<br />10" C.M.P. 6 DITCH RELOCATION
<br />LUMP SUM
<br />9.
<br />TRAFFIC STRIPING
<br />LUMP SUM
<br />10.
<br />TRAFFIC SIGNS
<br />LUMP SUFI
<br />SHEET INDEX
<br />© KEY SHEET
<br />®-® STREET IMPROVEMENTS
<br />0-0 TRAFFIC STRIPING
<br />0-0 CROSS SECTIONS
<br />ARCH ROAD
<br />IMPROVEMENT PLANS
<br />KEY SHEET
<br />SHEET O OF
<br />JOB NO. 07795