Laserfiche WebLink
STORM DRAIN PUMP STATION <br />N. r.5. 1 ,f'x. 45.5 t <br />A <br />Pum,05����• "•� <br />• . 41 Cllecic lro/ve <br />- • 4' Gate <'o/ve <br />a ' oisLha. <br />5Lhalje <br />L///e <br />4'' gate !ro/ve <br />L--.A..A <br />STRUCTURAL. SECTIONS <br />5aale : ' , = 5' //0,- - Derr. //.;,. s. <br />30' <br />STORM DRAIN CALCULATIONS _ <br />TOTAL AREA (Including Street) = 0.89 Ac. <br />Q = 0.89 x 0.90 x 1.2 = 0.96 cfs <br />Use 12" Pipe <br />0.96 x 7.5 = 7.2 gal/sec = 432 gal/min <br />Say 450 gal/min - Use 2 Pumps <br />Each pump - 225 gal/min design <br />PUMP DESIGN: Each Pump 225 gat/min <br />Total Head = 15 ft. <br />(Min.) R.P.M. = 1150 (Max.) R.P.M. = 1750 <br />Pumps to be approved by Engineer before installation. <br />CONTROLS <br />The control equipment shall be mounted in a NEMA Type 1 steel enclosure with a <br />removable access cover. The circuit breakers, starter reset buttons, and control <br />switches shall be operable without removing the access cover for deadfront <br />operation. <br />A grounding type convenience outlet shall be provided on the side of the cabinet <br />for operation of 115 volt AC devices. <br />Thermal magnetic air circuit breakers shall be provided for branch disconnect <br />service and short circuit protection of all motor control and auxiliary circuits. <br />Magnetic across -the -line starters with under -voltage release and overload coils <br />for each phase shall be provided for each pump motor to give positive protection. <br />Each single phase auxiliary motor shall be equipped with an over -current <br />protection device in addition to the branch circuit breaker, or shall be <br />impedance protected. All switches shall be labeled and a coded wiring diagram <br />shall be provided. <br />To control the operation of the pumps with variations of liquid level in the wet <br />well, a minimum of three (3) mercury replacement switches shall be provided. A <br />minimum of 30' of cord shall be provided with each switch to eliminate the <br />hazards created by splicing. The cord shall have a corrosion resistant vinyl <br />jacket and be multi -stranded in order to prevent fatigue. <br />An automatic alternator with manual switch shall be provided to change the <br />sequence of operation of the pumps every eight hours. The manual switch shall <br />allow for either pump to be selected as base pump or for automatic alternation. <br />Provisions shall also be made for the pumps to operate in parallel should the <br />level in the wet well continue to rise above the starting level for the low <br />level pump. <br />APPROVED BY <br />CN/EF/ N'OODB,P/' GE f/RE O/ST,P/GT DATE <br />GENERAL NOTES <br />1. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the <br />preservation of all survey and construction stakes. Survey and construction stakes <br />that are lost or destroyed due to Contractor's negligence will be set by the Engineer <br />at the Contractor's expense. <br />2. The existing underground utilities were plotted from available records. The Contractor <br />shall be responsible for contacting all utility agencies to mark their facilities in <br />the field before any excavation. The Contractor shall notify and co-ordinate all work <br />with any agency requiring removal or relocation of their utilities. Pacific Bell, <br />P. G. & E., Lodi Cable T. V., Woodbridge Sanitary District and Woodbridge Lighting <br />District. USA (800) 642-2444. <br />3. Contractor shall be responsible for notifying and co-ordinating all work with any <br />agency requiring removal or relocation of utilities, such as Pacific Bell, P. G. & E., <br />etc. <br />4. All underground utilities within the street area, including gas and telephone line, <br />shall be installed prior to paving. <br />5. All manholes to be set flush with finish grade unless otherwise indicated. <br />6. All water lines shall have a minimum cover of 30". <br />7. All existing irrigation lines within the right of way shall be crushed in place or <br />removed. <br />8. Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective items of construction. <br />9. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continously and not be <br />limited to normal working hours and that Contractor shall defend, indemnify, and hold <br />the Owner and the Engineer harmless from any and all liability, real or alleged, in <br />connection with the performance of work on this project, excepting for liability <br />arising from the sole negligence of the Owner or the Engineer. <br />10. Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />any utilities. <br />11. Water services shall be marked by the curb and gutter Contractor with "W" stamped <br />on the top of curb. Sewer services shall be similarly marked with a "S". <br />12. All work will be required to be inspected by the Department of Public Works. They <br />shall be notified not less than 24 hours in advance of commencement of work. <br />13. Lot grading shall be completed before starting any underground construction. Refer <br />to attached grading plan. <br />14. Each SS service to have C.O. at property line. <br />15. Note that sanitary inspection will be performed by San Joaquin County Department of <br />Public Works and Woodbridge Sanitary District Engineer and/or District Staff <br />(Kjeldsen-Sinnock and Associates (209) 946-0268). Must have inspection before <br />backfill and notify inspector 48 hours prior. <br />16. Separation of water and sewer mains (including crossings) and sewer laterals crossing <br />over water mains shall meet or exceed the latest standards of the State of California <br />Department of Health Services. Where water crosses SO or SS use an 18 - 20 ft. length <br />of Cl. 200 pipe, centered over the SS or SO if: a) The water is under the SS or <br />SD. b) The vertical clearance is less than 1 ft. <br />17. It is agreed that field conditions may require changes to these plans. It is further <br />agreed that the Director of Public Works may require changes, alterations or <br />additions to these plans, when the Director deems them to be necessary or desirable <br />for the proper completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost for the improvements <br />without prior approval of the surety. <br />18. Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" Valve and complete <br />fire hydrant assembly. <br />19. Contractor to provide compaction tests and be solely responsible for safety conditions. <br />20. Testing, sterilization, and installation shall conform to the applicable Standards <br />of the Department of Public Works and the Local Health District. <br />21. Jetting will not be allowed except by special arrangement with the Department <br />of Public Works. All costs associated with jetting, if allowed, shall be borne <br />by the Contractor. <br />22. When cutting through public streets,make neat cut. Match existing structural section <br />(3" A.C. - 8" A.B. minimum). Maintain one way traffic at all times and two way <br />at night. <br />23. San Joaquin County Department of Public Works Specifications and Standard Plans <br />are hereby made a part of these plans. <br />24. Fire hydrant shall be a Model 615 Long Beach Iron Works with 2 - 2 1/2" outlets <br />and 1 - 4 1/2" steamer outlet, or equal, approved by the Chief Woodbridge Fire <br />District. <br />25. Pipetype ted afrengths ellawed �.i model rozpa' 4,titiiies unless olher,vioe soecifiad en,o/sns, ire /s f®/ls�vs fforn, Drain (fD) QCP Or <br />ACP. -CI. l ; A"itory Sewer (fS) - Rye per "AM 0J0JW , 60Q9f ; lYtfer X) • PYC, Cl. /50 or yrea>er per Awww Va' C-900 er Aeo. , C/ /50 <br />er yre'ter per ASTM CPl6, 74PF I1. <br />CONSTRUCTION QUANTITIES <br />STREET SYSTEM <br />DATE <br />REVISIONS <br />BY <br />Roadway Excavation <br />650 <br />3 5' <br />Prepared For: <br />OAKWOOD GROUP <br />301 W. LOCUST STREET <br />LODI PH: 369-8400 <br />22' <br />SHEET O OF % <br />Compact Original Ground <br />5,500 <br />S.F. <br />N D I <br />A N A <br />+ <br />ST R E S T <br />STREET <br />Aggregate Base, Cl. II (0.50') <br />5,500 <br />S.F. <br />�X/5 t• StrUGturo/ <br />w a� <br />FILE 6 aw 9 0 <br />NO. V Vi/ <br />Asphalt Concrete,Type "B" (0.25') <br />5,500 <br />S.F. <br />T.I. - <br />6'.0 <br />7'0 /0' Val/e5 <br />Concrete Subgrade Compaction <br />2,860 <br />S.F. <br />+.� MW Square Type Curb, Gutter & Sidewalk (5') <br />1 <br />L.F. <br />Feather & eX/5t <br />Square Type Curb, Gutter & Sidewalk (1') <br />165 <br />L.F. <br />/�/n <br />Neat cut <br />crowl� <br />a Commercial Type Driveway & Sidewalk <br />s` <br />62 <br />-� <br />yar/es <br />40 <br />---_- <br />Street Sign <br />sr � <br />1 <br />Each <br />\ <br />/' _-'-' <br />z <br />_- <br />i01in+ vl � STORM DRAIN SYSTEM <br />.. SITE <br />JE�X /9 74, Trove/eL✓ Way <br />,4'17.97_.l/C�t <br />0, 2551 46 <br />Type "/3 „ <br />0, 67' 92a/o <br />�- <br />O. 50' AB <br />C/. II •0/4 "/f/AX. Aggregate <br />RC C017C . <br />a° 15" Storm Drain <br />0. 671 g2% <br />R.C. 6-017W. pr%g, 61-Otll7d <br />5u b9l-aLYe <br />APPROVED BY <br />CN/EF/ N'OODB,P/' GE f/RE O/ST,P/GT DATE <br />GENERAL NOTES <br />1. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the <br />preservation of all survey and construction stakes. Survey and construction stakes <br />that are lost or destroyed due to Contractor's negligence will be set by the Engineer <br />at the Contractor's expense. <br />2. The existing underground utilities were plotted from available records. The Contractor <br />shall be responsible for contacting all utility agencies to mark their facilities in <br />the field before any excavation. The Contractor shall notify and co-ordinate all work <br />with any agency requiring removal or relocation of their utilities. Pacific Bell, <br />P. G. & E., Lodi Cable T. V., Woodbridge Sanitary District and Woodbridge Lighting <br />District. USA (800) 642-2444. <br />3. Contractor shall be responsible for notifying and co-ordinating all work with any <br />agency requiring removal or relocation of utilities, such as Pacific Bell, P. G. & E., <br />etc. <br />4. All underground utilities within the street area, including gas and telephone line, <br />shall be installed prior to paving. <br />5. All manholes to be set flush with finish grade unless otherwise indicated. <br />6. All water lines shall have a minimum cover of 30". <br />7. All existing irrigation lines within the right of way shall be crushed in place or <br />removed. <br />8. Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or lump <br />sum bid for the respective items of construction. <br />9. Contractor agrees that he shall assume sole and complete responsibility for job site <br />conditions during the course of construction of this project, including safety for <br />all persons and property; that this requirement shall apply continously and not be <br />limited to normal working hours and that Contractor shall defend, indemnify, and hold <br />the Owner and the Engineer harmless from any and all liability, real or alleged, in <br />connection with the performance of work on this project, excepting for liability <br />arising from the sole negligence of the Owner or the Engineer. <br />10. Contractor shall give Engineer a minimum of 48 hours notification prior to staking <br />any utilities. <br />11. Water services shall be marked by the curb and gutter Contractor with "W" stamped <br />on the top of curb. Sewer services shall be similarly marked with a "S". <br />12. All work will be required to be inspected by the Department of Public Works. They <br />shall be notified not less than 24 hours in advance of commencement of work. <br />13. Lot grading shall be completed before starting any underground construction. Refer <br />to attached grading plan. <br />14. Each SS service to have C.O. at property line. <br />15. Note that sanitary inspection will be performed by San Joaquin County Department of <br />Public Works and Woodbridge Sanitary District Engineer and/or District Staff <br />(Kjeldsen-Sinnock and Associates (209) 946-0268). Must have inspection before <br />backfill and notify inspector 48 hours prior. <br />16. Separation of water and sewer mains (including crossings) and sewer laterals crossing <br />over water mains shall meet or exceed the latest standards of the State of California <br />Department of Health Services. Where water crosses SO or SS use an 18 - 20 ft. length <br />of Cl. 200 pipe, centered over the SS or SO if: a) The water is under the SS or <br />SD. b) The vertical clearance is less than 1 ft. <br />17. It is agreed that field conditions may require changes to these plans. It is further <br />agreed that the Director of Public Works may require changes, alterations or <br />additions to these plans, when the Director deems them to be necessary or desirable <br />for the proper completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost for the improvements <br />without prior approval of the surety. <br />18. Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" Valve and complete <br />fire hydrant assembly. <br />19. Contractor to provide compaction tests and be solely responsible for safety conditions. <br />20. Testing, sterilization, and installation shall conform to the applicable Standards <br />of the Department of Public Works and the Local Health District. <br />21. Jetting will not be allowed except by special arrangement with the Department <br />of Public Works. All costs associated with jetting, if allowed, shall be borne <br />by the Contractor. <br />22. When cutting through public streets,make neat cut. Match existing structural section <br />(3" A.C. - 8" A.B. minimum). Maintain one way traffic at all times and two way <br />at night. <br />23. San Joaquin County Department of Public Works Specifications and Standard Plans <br />are hereby made a part of these plans. <br />24. Fire hydrant shall be a Model 615 Long Beach Iron Works with 2 - 2 1/2" outlets <br />and 1 - 4 1/2" steamer outlet, or equal, approved by the Chief Woodbridge Fire <br />District. <br />25. Pipetype ted afrengths ellawed �.i model rozpa' 4,titiiies unless olher,vioe soecifiad en,o/sns, ire /s f®/ls�vs fforn, Drain (fD) QCP Or <br />ACP. -CI. l ; A"itory Sewer (fS) - Rye per "AM 0J0JW , 60Q9f ; lYtfer X) • PYC, Cl. /50 or yrea>er per Awww Va' C-900 er Aeo. , C/ /50 <br />er yre'ter per ASTM CPl6, 74PF I1. <br />CONSTRUCTION QUANTITIES <br />STREET SYSTEM <br />MAIN STREET ( LOWER SACRAMENTO M <br />7-./, = 6.0 <br />BENCHM RK DATUM: <br />Per U.S.B.S. B.M. 19-8 <br />1907-45 Location N.W. <br />corner of Masonic Bldg. <br />in the town of Woodbridge. <br />Elev. 46.40 <br />Note: Quantities for estimating purposes only. Pay <br />quantities will be actual quantities installed. <br />N0. I <br />DATE <br />REVISIONS <br />BY <br />Roadway Excavation <br />650 <br />C.Y. <br />Prepared For: <br />OAKWOOD GROUP <br />301 W. LOCUST STREET <br />LODI PH: 369-8400 <br />MAIN STREET � L0. SACRAMENTO R D./ <br />INDIANA STREET <br />STREET IMPROVEMENTS <br />E r S I� E ET <br />SHEET O OF % <br />Compact Original Ground <br />5,500 <br />S.F. <br />N D I <br />A N A <br />+ <br />ST R E S T <br />STREET <br />Aggregate Base, Cl. II (0.50') <br />5,500 <br />S.F. <br />SUBMITTED BY <br />R.C.E. yZGBS DATE 7 /4 B7 <br />w a� <br />FILE 6 aw 9 0 <br />NO. V Vi/ <br />Asphalt Concrete,Type "B" (0.25') <br />5,500 <br />S.F. <br />T.I. - <br />6'.0 <br />Concrete Subgrade Compaction <br />2,860 <br />S.F. <br />+.� MW Square Type Curb, Gutter & Sidewalk (5') <br />109 <br />L.F. <br />Square Type Curb, Gutter & Sidewalk (1') <br />165 <br />L.F. <br />a Commercial Type Driveway & Sidewalk <br />s` <br />62 <br />L.F. <br />40 <br />---_- <br />Street Sign <br />sr � <br />1 <br />Each <br />\ <br />/' _-'-' <br />z <br />_- <br />i01in+ vl � STORM DRAIN SYSTEM <br />.. SITE <br />-- <br />a° 15" Storm Drain <br />126 <br />L.F. <br />exist struGiu_ru/ <br />sr. 12" Storm Drain (Incl. Jacking) <br />181 <br />L.F. <br />1 <br />5' /-o /4.5VarieS <br />"'' 10" Storm Drain <br />12 <br />L.F. <br />/ <br />Feotner >a exist crown <br />Storm Drain Manhole <br />;. <br />1 Side Inlet Catch Basin <br />& <br />3 <br />2 <br />Each <br />Each <br />%4"eft <br />/ Mir <br />ZP-� <br />Neat Cul e5 <br />i 6" Force Main Pipe <br />.. <br />230 <br />L.F. <br />... , <br />yprie5 <br />-_-- <br />Storm Drain Pumping System & Controls <br />Lump <br />Sum <br />WATER SYSTEM <br />LAKE <br />� X s t.--- Tl -0 ve/ed {9/a}/ <br />MUNICIP <br />PutK,i 8" Water <br />ROA01, <br />1,075 <br />L.F. <br />----- <br />.N.. ,` 8" Valves <br />4 <br />Each <br />l6;l_6 <br />0.25' AG- Type "i" <br />Fire Hydrant f Assy. <br />VICINITY MAP 2" Water Service & Meter Box <br />1 <br />1 <br />Each <br />Each <br />eI77,% <br />Gomm. CG S <br />- „ <br />A„B. Cl. II /4 �%%4x ,4ggregQfc <br />N.T.S. 4" Fire Service <br />1 <br />Each <br />o. G7' 92 % <br />.eC Col,7C.Sudg�a4G <br />0.67' 92% R.C. Cotr/,t7. OC/y, 6rOur/d <br />G C? M/0 . <br />MAIN STREET ( LOWER SACRAMENTO M <br />7-./, = 6.0 <br />BENCHM RK DATUM: <br />Per U.S.B.S. B.M. 19-8 <br />1907-45 Location N.W. <br />corner of Masonic Bldg. <br />in the town of Woodbridge. <br />Elev. 46.40 <br />Note: Quantities for estimating purposes only. Pay <br />quantities will be actual quantities installed. <br />N0. I <br />DATE <br />REVISIONS <br />BY <br />DESIGN (9/6 DRAWN BY "�'� <br />/ <br />� �^'� <br />~�••✓� <br />APPROVED BY <br />P'►b�-i4 19 �'L <br />�' s � � <br />AQ _JOA UIN COUNTY DIRE OF PUBLIC WORKS <br />B A U M B A C H & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LODI, CALIF. <br />95240 PH: 209-388-8818 <br />Prepared For: <br />OAKWOOD GROUP <br />301 W. LOCUST STREET <br />LODI PH: 369-8400 <br />MAIN STREET � L0. SACRAMENTO R D./ <br />INDIANA STREET <br />STREET IMPROVEMENTS <br />E r S I� E ET <br />SHEET O OF % <br />JOB NO. 8724 <br />SUBMITTED BY <br />R.C.E. yZGBS DATE 7 /4 B7 <br />w a� <br />FILE 6 aw 9 0 <br />NO. V Vi/ <br />