Laserfiche WebLink
m <br />N <br />R A L <br />Scale: /n= 5' <br />C <br />0 <br />- <br />c <br />1 0.50 <br />shall be included in his bid price. <br />06) <br />E� <br />0.65 <br />50 <br />4.0 <br />1.05 <br />-0 LQ <br />tS <br />1 0.33 <br />0.67 <br />0.67 <br />0.65 <br />50 <br />4.0 <br />0.79 <br />OC <br />Vista Rio CbLrr <br />0.17 <br />73 <br />D <br />I <br />a <br />N > <br />4.0 <br />c <br />I <br />CI <br />CIL Z <br />; C <br />0.67 <br />cg <br />TD- <br />I <br />' <br />0.79 0.94 <br />C) <br />O I <br />0.,33 u <br />0.67 <br />-E <br />Q h <br />�f) <br />O�+�_ <br />L <br />.� <br />I / <br />Del Rio Drive <br />0.•D <br />0.40 <br />0.67 <br />Q %3� <br />U <br />40 <br />Q <br />I <br />5' <br />RIVER MEADOWS <br />I� Scale: 1"= 100' <br />UNIT NO.2 GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for <br />- 3 this project. <br />M '2. Refer to the final map of this subdivision for all center line and <br />3 OkF1 property line data. <br />0 4J 3. The street light system shall be installed by Pacific Gas & Electric <br />W F Company. <br />IZIVER 4. Contractor shall receive an approved set of plans and specifications <br />\ DeRI f V _prior to beginning construction. <br />Baumbach & Piazza (Engineer) shall set all survey controls and <br />5/ \1 � O 5. construction stakes necessary for completion of work. The Contractor <br />52 53 54 55 56 57 58 % / W O aS�TE shall be responsible for the <br />� preservation of all survey and <br />p W construction stakes. Survey and construction stakes that are lost or <br />DY <br />destro ed due to Contractor's negligence will be set by the Engineer <br />( 0.' AUGu$TA AVO at the Contractor's expense. <br />wID' fN01ANA Rt)• 6. The existing underground utilities were plotted from available <br />'S a"K' RD UQSi records. The Contractor shall be responsible for contacting all <br />1 �� utility agencies to mark their facilities in the field before any <br />76 ¢ 59 / O Q excavation. The Contractor shall notify and coordinate all work <br />(�, / with any agency requiring removal or relocation of their utilities. <br />v Pacific Bell, P. G. & E., Lodi Cable T. V., Woodbridge Sanitary <br />W Q ,� le 79 FsT ��/ �. 2 VICIN�TY MAP District and Mokelumne Acres Maintenance District. U.S.A. (800) 642- <br />7 !q 2444. <br />$ `•L NOT TO ,SCALE !� 7. House services, fire hydrant laterals, and street light conduit shall <br />%5 60 be installed prior to curb and gutter construction. All underground <br />F2 Q Y A � / [ �� utilities within the street area, including gas and telephone lines, <br />a O <br />o k `/ �C Q` shall be installed prior to paving <br />74 E 1 f ® 90 �-o Q 1 B. All manholes to be set flush with the finish grade unless otherwise <br />® 6� , <br />MMMM I1111'N1 per U.S.G.S E.N. indicated. <br />y;' 9. All water lines shall have a minimum cover of 30". <br />a ��` (� 19-D 1907-4S. Locatian N.N. cAtJ104 10. Water used in an <br />73 2 �� 1 Q� I /-k ` of Masonic Building in the town of! y phase of construction, such as backfill compaction, <br />/ / �'Q NoodbridQe. Elevation: 46.40 1e �'a dust control, testing or other work herein required, shall be <br />At L ♦ included in the unit price or lump sum bid for the respective item of <br />t construction. <br />e '•. l 11. Contractor agrees that he shall assume sole and complete <br />77 v 2 ¢ ,/ � responsibility for job site conditions during the course of <br />Q construction of this <br />r 9 Y persons and <br />�� ; �p project including safety for all <br />`_ property; that this requirement shall apply continuously and not be <br />8"W / / <br />2,1111 L 6 NO limited to normal working hours and that Contractor shall defend, <br />/ /Jrrr! indemnify, and hold the Owner, County and the Engineer harmless from <br />Aany and all liability, real or alledged, in connection with the <br />Q LP Side Inlet Catch Basin performance of work on this project, excepting for liability arising <br />64 Low Point from the sole negligence of the Owner or the Engineer. <br />DRIV / V / � NHigh Point r 12. Contractor shallgiveEngineer a minimum of 48 hours notification <br />67 66 65 / Tc Top of Curb prior to staking any utilities. <br />69 68 I `f cord Clean Out to grade 13. Sanitary sewer services shall be marked by the curb & gutter <br />• <br />T C�•-- Store) Drain line Indicating direetion Of flow <br />Sanitary Sewer Line Indicating direction of flow contractor with an "S" stamped on the top of curb. <br />Water Lin! I Yllre 14. Water services shall be marked by the curb and gutter Contractor with <br />a "W" stamped on the top of curb. Location of water markings shall <br />Fire Hydrant be verified in the field by the Engineer. <br />Street Light(/No•N1NyAAiwX0r9-AW1*''My4w/A►111/1' 15. Lot gradingshall be completed before starting any underground <br />y{f1 �•�/ff consruction. Refer to attached grading plan. <br />self AV AW w IWYrw 16. Separation of water and sewer mains (including crossings) and sewer <br />WOODBR/OGE GOLF 4COUNTRY CLUB MR �~4wo *AVIV laterals crossing over water mains shall meet or exceed the latest <br />00 ~ ~ standards of the State of California Department of Health Services. <br />_ I � LOWLOTIof Soils Test per J.N.Nwinfelder r vjectho.20 1867:05 17. Contractor shall be responsible for notifying and co -coordinate all <br />/ work with any agency requiring removal or relocation of utilities, <br />WOODBRIDGE GREEA15 11nr�'JI KEY MAPRYI ES : <br />such as Pacific Bell, P. G. & E., etc. <br />Scale: /"= /00' 18. All off-site water lines shall be pressure tested, disinfected, <br />'RNESS WAV <br />GRANDE R11 <br />2I <br />25' <br />Beve/ed- Type CG4 S <br />90% Rx, concrete <br />5416grode Comooct/on <br />;L RI <br />IVE <br />RIVE <br />50' <br />S T R UC T U <br />VISTA RIO COURT <br />RIVERSIDE DRIVE <br />R A L <br />Scale: /n= 5' <br />Street Li tf <br />9h Woodbridge Lighting District <br />Sewage MoodbMdge Sanitary District <br />Natural bas i Electric - P. G. Pacific E. <br />S E C TIO N Telephone Television Cable LodiBell <br />Lodi Cable T.Y. <br />iftterseparate <br />Stora) Drainage------Itkeluwre'Aerea Maintenance Disteict <br />flushed and tested for bacteria in conformance with the San Joaquin <br />County Health Code Requirements prior to connecting to existing water <br />line. <br />19. All off-site storm drains shall be cleaned prior to final acceptance. <br />20. Contractor shall visit site prior to bidding. Specifications are a <br />document. <br />21. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />- <br />_ <br />1 0.50 <br />shall be included in his bid price. <br />25' <br />/8' <br />4"10er ft. 1 <br />13 <br />L= <br />4 rype "B " 1/2 /' Max. 4q9. <br />AB Cl ZT 3/4" IWGrx. Agy. ,I!' <br />22. Where water crosses SD or SS use an 18-20 ft. length of Cl. 200 pipe, <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />b) The vertical clearance is less than 1 foot. 4011f5 M C4,Yhl BASINS '01.45fWEP 141f?&S 4150. <br />23. No materials resulting from tapping procedures may enter District <br />sewer. <br />24. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 24 hours in advance of <br />commencement of work. <br />25. Each SS service to have C.O. at property line. <br />26. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />95i R. 0. Ori /no/ Ground eY completion of the work, provided that such changes, alterations or <br />9 A.C.- Asphalt Concrete A.B.- Aggregate Base C.O.G.- Com pact Original Ground G.E.-Gravel Equivalent additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />30 �' \ 27. Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" <br />NOTE: -Structural section within Unit 2 are based upon an assumed "R".:value°of,�, J Valve and complete fire hydrant assembly. <br />-Imported fill shall be tested for "R" value and final structural section apipro(edby Co. Engineer prior 28. Prior to performing any work in Woodbridge Road, the Contractor shall <br />t0 road construction.obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />29. Contractor shall notify Mokelumne Acres Maintenance District for <br />w oo D B R I O GE ROAD approval prior to connecting water line to existing water main. <br />r 30. Installation of all sanitary sewer improvements shall conform to the <br />R"Value= 50 T.1,=6 G.E. Req'd.= 0.96 G.E. Provided= Lol Ir o /n SHEET INDEX APPRb V ED BY standards of the Woodbridge Sanitary District. All such work is <br />o subject to inspection by the District Engineer. The Contractor shall <br />40' EXl$t PpVelTlent notify District Engineer 48 hours <br />prior to the commencement of any <br />work on the sanitary system. (209) 946-0268. <br />7.5' 2O' /2' O E I S H E E T -��' g- a$ 31. Contractor shall obtain a grading permit from the San Joaquin County <br />0.5' JOAQUIN COUNTY HEALTH DISTRICT DATE Building Division. (Fee By Owner) <br />=� I` � � -7-S -Sg 32. Pipe type an� strengths allowed for underground utilities, unless <br />2/ y 0 0 DETAILSPLAN <br />w otherwise specified on <br />e or ACP, Cl. iII; Sanitary Sewer (SS) - PVC, per ASTM D3034, SDR35; <br />' %4'p rff. -J--- --- SAN QUIN FIRE W D DATE <br />T_ P Plans, are as follows: Storm Drain (SD) - RCP <br />.:., .� ,.. �---- Exist. Roadwa � <br />'., - ✓ e Water (W)' - PVC, Cl. 150 or greater per AWWA Std. C-900 or ACP., Cl. <br />D GRADING PLAN CHOF DGE E DIS T DATE 150 or greater per ASTM C296, Type II. <br />6 High Maso nary / �ry „ 0 / �j' s 33. All traffic signs and markings shall conform to San Joaquin County Standards <br />Vertrca/ CGS (Std a 51 0.20'A.C.�T e Q /2 Max.A 7 CONSTRUCTION QUANTITIES ,��"GSL 7•/'')•98 and to the "Manual of Uniform Traffic Control Devices". <br />Fence Design to be YP 99' <br />approved by S. J. Co. 92% R.C. Concrete Subgrade 0.50A8. �C/, IL 3/4" MQX• Agg• ** ENGINEER WOODBRID SANITARY DISTRICT DATE 34. Any changes to the approved Improvement Plans..and Specifications must be <br />Compaction 0.67' 95% R.C. Original Ground and certified b " <br />Department of � 2 GE N E RA TO f� DETAIL__- WELL SITE .� eq/J,orot/a/ inva�d i><cvnstrUcfian does not begin within /20 prepared y the Civil Engineer and shall be approved by the <br />Concrete STAN DA R D "Director" prior to implementation. <br />Public Works, Prior 40' days 2tter Siyniny. 35. At the time of acceptance of +improvements, the resolution shall include that <br />to construction. CONSTRUCTION STAKING LIABILITY WAIVER <br />05 75 Varies CONSTRUCTION Rio Drive and Wilderness Way be declared through highways at the intersections <br />/� <br />/4 rft. ---- f • <br />- F _ _ ____ _ _ o Grande Rio Drive and Vista Rio Court. <br />_ � Varies .. ..,.. <br />Z) 3 „ 36. Co actin�on Tests: <br />l u R 1 V These improvement plans have been prepared with the 1f q r� Own ha <br />Pe _ w o �INIr 1 its I,�U��� 6� T?I azza /-/3-89 The er s 11 have compaction tests taken for street subgrade, utility trenches and <br />2 0� v intent that the firm of Baumbach & Piazza, Inc'. will be , <br />oL lot fill. Any required retests will be at the Contractors expense. Sanitary Sewer <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or �, ,;, trench compaction tests shall be done by a qualified soils testing laboratory as <br />- follows• <br />Feather Exlst.Roadway surveying firm should be employed to use these plans for <br />Note:Gutter Pan Slope (Sto34r65.3to W/A.Cto Crown the purpose of construction staking, notice is hereby = Frequency nth (Inches) <br />/ Yert%COIT e GGsS16t436t94.75� 020'�1.C.-- Type /'B/' vP" Max• Aq9, assumegiven res onsibthe firm iliBaufor cerrorsaoraomissions11 fot Sanitary Sewer trenches less than 6' deep 200" 0-6 4-30 <br />I ; YP (Std.B5) v p Y <br />92% R.C. Concrete SUbgrade 0.5o'AB.� C/. II 3/4" Max. Agy. any, which might occur and which could have been.a Bided, Sanitary Sewer trenches over 6 deep 200 0-6, 24 30 $ 42 48 <br />95% R,C. Original Ground 0.67' <br />Compaction corrected or mitigated if Baumbach & Piazza,' Inc:•►FtSd <br />Test results shall he submitted to the Engineer as soon as soon as possible. <br />`., SUPERELEVATION performed the staking work. <br />NO. DATE REVISIONS BY y� ' OI I� <br />�• DESIGN DRAWN BY APPROVED BY: Henry M. Hirata RCE No. 21258 B A U M B A -`i. H & PIAZZA SMEET OF <br />-), 19�� CIVIL ENGINEERS KEY SHEET DEL RIO <br />SURVEYORS' Joe No. 8752 <br />3 le -BS' A�7r 'C3... /� 70 1 T./? SU ED Bye <br />3 / O /13 OK./ 40;Z" 1:90 R.C.E. /9G B DATE 6 -2 -ea AN JOAQUIN <br />l� <br />323 W. ELM ST. L001, CALIF. <br />F PUBLIC WORKS- 95240 PH: 209-388-06141 <br />j+IL_ <br />f <br />Units 2 <br />FILE <br />No. G -g 4:3 <br />-* STRUCTURAL SECTION CHART FOR 50' STREETS <br />Street Name A. C. A.B. C.O.G. C.S.C. G.E. Re d R Value Traffic Ind. G.E. Prov. <br />Del Rio Drive <br />0.20 <br />1 0.50 <br />0.67 <br />0.67 <br />0.65 <br />50 <br />4.0 <br />1.05 <br />Wilderness Way0.17 <br />1 0.33 <br />0.67 <br />0.67 <br />0.65 <br />50 <br />4.0 <br />0.79 <br />Vista Rio CbLrr <br />0.17 <br />1 0.33 <br />0.67 <br />0.67 <br />0.65 <br />50 <br />4.0 <br />0.79 <br />Riverside Drive <br />0.19 <br />0.3340 <br />0.67 <br />0.67 <br />--0,7-T 90 <br />40 <br />4.0 <br />0.79 0.94 <br />Grande Rio Drive <br />O I <br />0.,33 u <br />0.67 <br />9ra7vK <br />� 73'o.yU <br />40 <br />4.0 <br />Del Rio Drive <br />0.•D <br />0.40 <br />0.67 <br />9.67,m <br />_0�7o•?o <br />40 <br />4.0 <br />,_};$'0.94 <br />:]I <br />Wilderness Way <br />00 <br />0 <br />40 <br />1 4.0 <br />1 a.&? r,�W <br />22. Where water crosses SD or SS use an 18-20 ft. length of Cl. 200 pipe, <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />b) The vertical clearance is less than 1 foot. 4011f5 M C4,Yhl BASINS '01.45fWEP 141f?&S 4150. <br />23. No materials resulting from tapping procedures may enter District <br />sewer. <br />24. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 24 hours in advance of <br />commencement of work. <br />25. Each SS service to have C.O. at property line. <br />26. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />95i R. 0. Ori /no/ Ground eY completion of the work, provided that such changes, alterations or <br />9 A.C.- Asphalt Concrete A.B.- Aggregate Base C.O.G.- Com pact Original Ground G.E.-Gravel Equivalent additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />30 �' \ 27. Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" <br />NOTE: -Structural section within Unit 2 are based upon an assumed "R".:value°of,�, J Valve and complete fire hydrant assembly. <br />-Imported fill shall be tested for "R" value and final structural section apipro(edby Co. Engineer prior 28. Prior to performing any work in Woodbridge Road, the Contractor shall <br />t0 road construction.obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />29. Contractor shall notify Mokelumne Acres Maintenance District for <br />w oo D B R I O GE ROAD approval prior to connecting water line to existing water main. <br />r 30. Installation of all sanitary sewer improvements shall conform to the <br />R"Value= 50 T.1,=6 G.E. Req'd.= 0.96 G.E. Provided= Lol Ir o /n SHEET INDEX APPRb V ED BY standards of the Woodbridge Sanitary District. All such work is <br />o subject to inspection by the District Engineer. The Contractor shall <br />40' EXl$t PpVelTlent notify District Engineer 48 hours <br />prior to the commencement of any <br />work on the sanitary system. (209) 946-0268. <br />7.5' 2O' /2' O E I S H E E T -��' g- a$ 31. Contractor shall obtain a grading permit from the San Joaquin County <br />0.5' JOAQUIN COUNTY HEALTH DISTRICT DATE Building Division. (Fee By Owner) <br />=� I` � � -7-S -Sg 32. Pipe type an� strengths allowed for underground utilities, unless <br />2/ y 0 0 DETAILSPLAN <br />w otherwise specified on <br />e or ACP, Cl. iII; Sanitary Sewer (SS) - PVC, per ASTM D3034, SDR35; <br />' %4'p rff. -J--- --- SAN QUIN FIRE W D DATE <br />T_ P Plans, are as follows: Storm Drain (SD) - RCP <br />.:., .� ,.. �---- Exist. Roadwa � <br />'., - ✓ e Water (W)' - PVC, Cl. 150 or greater per AWWA Std. C-900 or ACP., Cl. <br />D GRADING PLAN CHOF DGE E DIS T DATE 150 or greater per ASTM C296, Type II. <br />6 High Maso nary / �ry „ 0 / �j' s 33. All traffic signs and markings shall conform to San Joaquin County Standards <br />Vertrca/ CGS (Std a 51 0.20'A.C.�T e Q /2 Max.A 7 CONSTRUCTION QUANTITIES ,��"GSL 7•/'')•98 and to the "Manual of Uniform Traffic Control Devices". <br />Fence Design to be YP 99' <br />approved by S. J. Co. 92% R.C. Concrete Subgrade 0.50A8. �C/, IL 3/4" MQX• Agg• ** ENGINEER WOODBRID SANITARY DISTRICT DATE 34. Any changes to the approved Improvement Plans..and Specifications must be <br />Compaction 0.67' 95% R.C. Original Ground and certified b " <br />Department of � 2 GE N E RA TO f� DETAIL__- WELL SITE .� eq/J,orot/a/ inva�d i><cvnstrUcfian does not begin within /20 prepared y the Civil Engineer and shall be approved by the <br />Concrete STAN DA R D "Director" prior to implementation. <br />Public Works, Prior 40' days 2tter Siyniny. 35. At the time of acceptance of +improvements, the resolution shall include that <br />to construction. CONSTRUCTION STAKING LIABILITY WAIVER <br />05 75 Varies CONSTRUCTION Rio Drive and Wilderness Way be declared through highways at the intersections <br />/� <br />/4 rft. ---- f • <br />- F _ _ ____ _ _ o Grande Rio Drive and Vista Rio Court. <br />_ � Varies .. ..,.. <br />Z) 3 „ 36. Co actin�on Tests: <br />l u R 1 V These improvement plans have been prepared with the 1f q r� Own ha <br />Pe _ w o �INIr 1 its I,�U��� 6� T?I azza /-/3-89 The er s 11 have compaction tests taken for street subgrade, utility trenches and <br />2 0� v intent that the firm of Baumbach & Piazza, Inc'. will be , <br />oL lot fill. Any required retests will be at the Contractors expense. Sanitary Sewer <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or �, ,;, trench compaction tests shall be done by a qualified soils testing laboratory as <br />- follows• <br />Feather Exlst.Roadway surveying firm should be employed to use these plans for <br />Note:Gutter Pan Slope (Sto34r65.3to W/A.Cto Crown the purpose of construction staking, notice is hereby = Frequency nth (Inches) <br />/ Yert%COIT e GGsS16t436t94.75� 020'�1.C.-- Type /'B/' vP" Max• Aq9, assumegiven res onsibthe firm iliBaufor cerrorsaoraomissions11 fot Sanitary Sewer trenches less than 6' deep 200" 0-6 4-30 <br />I ; YP (Std.B5) v p Y <br />92% R.C. Concrete SUbgrade 0.5o'AB.� C/. II 3/4" Max. Agy. any, which might occur and which could have been.a Bided, Sanitary Sewer trenches over 6 deep 200 0-6, 24 30 $ 42 48 <br />95% R,C. Original Ground 0.67' <br />Compaction corrected or mitigated if Baumbach & Piazza,' Inc:•►FtSd <br />Test results shall he submitted to the Engineer as soon as soon as possible. <br />`., SUPERELEVATION performed the staking work. <br />NO. DATE REVISIONS BY y� ' OI I� <br />�• DESIGN DRAWN BY APPROVED BY: Henry M. Hirata RCE No. 21258 B A U M B A -`i. H & PIAZZA SMEET OF <br />-), 19�� CIVIL ENGINEERS KEY SHEET DEL RIO <br />SURVEYORS' Joe No. 8752 <br />3 le -BS' A�7r 'C3... /� 70 1 T./? SU ED Bye <br />3 / O /13 OK./ 40;Z" 1:90 R.C.E. /9G B DATE 6 -2 -ea AN JOAQUIN <br />l� <br />323 W. ELM ST. L001, CALIF. <br />F PUBLIC WORKS- 95240 PH: 209-388-06141 <br />j+IL_ <br />f <br />Units 2 <br />FILE <br />No. G -g 4:3 <br />