<br />GENERAL NOTES:
<br />1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
<br />PERMITS AND LICENSES REQUIRED FOR THE CONSTRUCTION AND
<br />COMPLETION OF THIS PROJECT,
<br />2) ALL IMPROVEMENTS TO BE DONE SHALL BE IN ACCOR-
<br />DANCE WITH THE REQUIREMENTS OF THE SAN JOAQUIN COUNTY
<br />DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS; SAN
<br />JOAQUIN COUNTY BUILDING DEPARTMENT; THE LATEST EDITION OF
<br />THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION,
<br />STANDARD SPECIFICATIONS; AND THE LATHROP COUNTY WATER
<br />DISTRICT STANDARDS.
<br />3) IT IS INTENDED THAT THESE PLANS AND SPECIFICA-
<br />TIONS REQUIRE ALL LABOR AND MATERIALS NECESSARY AND PROPER
<br />FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETER
<br />IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. tHE
<br />CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING
<br />ANY DISCREPANCIES AND AMBIGUITIES WHICH MAY EXIST IN THE
<br />PLANS OR SPECIFICATIONS. IF THE PLANS OR SPECIFICATIONS
<br />DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN
<br />COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST
<br />GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND
<br />WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED.
<br />4) BUILDING PADS: CONTRACTOR TO PROVIDE COMPACTED
<br />PADS FOR BUILDINGS GRADED TO THE ELEVATIONS SHOWN ON THE
<br />GRADING PLAN.
<br />5) ALL COMPACTION TESTS TO BE PAID FOR BY THE
<br />CONTRACTOR.
<br />6) THE CONTRACTOR SHALL VERIFY LOCATION OF ALL
<br />EXISTING UNDERGROUND UTILITIES AND SHALL CONTACT THE
<br />RESPECTIVE UTILITY COMPANIES PRIOR TO COMMENCEMENT OF
<br />WORK. HE SHALL BE RESPONSIBLE FOR THE LOCATION AND
<br />PRESERVATION OF ALL SUCH FACILITIES IN THE AREA OF
<br />CONSTRUCTION, AND SHALL NOTIFY UTILITIES TWENTY-FOUR HOURS
<br />IN ADVANCE OF ANY CONSTRUCTION. (UNDERGROUND SERVICE
<br />ALERT - (800) 642-2444).
<br />7) CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE
<br />REMOVAL AND/OR RELOCATION OF ALL EXISTING UTILITIES WITH
<br />RESPECTIVE UTILITY COMPANIES.
<br />8) DUST CONTROL: APPROPRIATE DUST CONTROL SHALL BE
<br />PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST
<br />NUISANCE AT THE CONTRACTOR'S EXPENSE.
<br />9) THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
<br />FIELD CHANGES MADE WITHOUT AUTHORIZATION FROM THE EN-
<br />GINEER.
<br />APPROVED BY THE SAN JOAQU7N COUNTY
<br />DIRECTOR OF PUBLIC WORKS.
<br />BY:/ i /G�_�z' .� % T f
<br />542
<br />541
<br />LATHROP VILLAGE HOMES
<br />UNIT NO. 14
<br />U
<br />540.
<br />LATHROP, CALIFORNIA
<br />s
<br />i ! CL 539
<br />538
<br />537
<br />536 I 535
<br />534
<br />533 I 532
<br />531
<br />HEAVY BORDER REPRESENTS L OTS
<br />TO BE REGRADED AS SHOWN ON
<br />THESE PLANS.
<br />10) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS,
<br />BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY TO PROVIDE
<br />FOR PUBLIC SAFETY.
<br />11) CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
<br />WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUC-
<br />TION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND
<br />COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE
<br />COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF
<br />ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE
<br />MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
<br />WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES
<br />TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL AND SAN
<br />JOAQUIN COUNTY HARMLESS FROM ANY AND ALL LIABILITY, REAL
<br />OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON
<br />THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE
<br />NEGLIGENCE OF DESIGN PROFESSIONAL.
<br />12) THE CONTRACTOR SHALL PROVIDE SHORING, BRACING,
<br />SLOPING OR PROVISIONS TO PROTECT WORKMEN FOR ALL AREAS TO
<br />BE EXCAVATED TO A DEPTH OF FIVE FEET OR MORE. SAID
<br />PROTECTION TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS
<br />OF SAN JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS, AND
<br />STATE REGULATIONS.
<br />13) NECESSARY ENCROACHMENT PERMITS SHALL BE OBTAINED
<br />FROM THE COUNTY OF SAN JOAQUIN, BEFORE BEGINNING OF WORK.
<br />14) CONSTRUCTION STAKING FOR CURB, GUTTER, SIDEWALK,
<br />SANITARY SEWER, AND STORM DRAIN SHALL BE DONE BY THOMPSON-
<br />HYSELL ENGINEERS. THE CONTRACTOR SHALL NOTIFY CIVIL
<br />ENGINEERS 48 HOURS IN ADVANCE OF HIS NEED FOR STAKING.
<br />15) THE CONTRACTOR SHALL STAMP THE LETTER "S" AND "W"
<br />DIRECTLY ABOVE THE SEWER AND WATER LATERAL LOCATIONS, AT
<br />THE BACK OF SIDEWALK.
<br />16) DRIVEWAYS ON STREETS WITH 6" VERTICAL CURBS SHALL
<br />BE LOCATED BY THOMPSON-HYSELL ENGINEERS IN THE FIELD AT
<br />THE TIME OF CONSTRUCTION.
<br />17) THOMPSON-HYSELL ENGINEERS SHALL SET THE MONU-
<br />MENTS.
<br />BENCH MARK: CHISELED "X" IN SIDEWALK, SOUTH RETURN, MINGO
<br />WAY AT THE CAMBRIDGE DRIVE INTERSECTION.
<br />ELEVATION: 14.81, FOR LATHROP COUNTY WATER DISTRICT DATUM
<br />SUBTRACT 0.35.
<br />NOTE: FINISHED FLOOR ELEVATION OF ALL NEW CONSTRUCTION
<br />SHALL BE 1.0' ABOVE THE 100 YEAR FLOOD ELEVATION.
<br />100 YEAR FLOOD ELEVATION - 16.5
<br />CO VER SHEET
<br />INDEX•
<br />1. COVER SHEET
<br />2. GRADING & DRAINAGE PLAN
<br />3. PLAN & PROFILE - MATADOR WAY
<br />4. PLAN & PROFILE - TORO LANE
<br />LATHROP VILLAGE HOMES
<br />UNIT NO. /4
<br />SUPPL 0WEVTAL DRAW/NGS
<br />FOR ADDI T/ONAL INFORMATION
<br />REFER TO KONG ENGINEERS , INC
<br />DRAW/NGS, DATED NOV 30. /987
<br />REVISIONS
<br />TORO
<br />NO.
<br />DESCRIPTION
<br />DATE
<br />AS 8U/LT
<br />LANE
<br />514
<br />515
<br />516
<br />517
<br />518
<br />519
<br />520
<br />521
<br />522
<br />523
<br />0�
<br />10) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS,
<br />BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY TO PROVIDE
<br />FOR PUBLIC SAFETY.
<br />11) CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
<br />WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUC-
<br />TION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND
<br />COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE
<br />COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF
<br />ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE
<br />MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
<br />WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES
<br />TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL AND SAN
<br />JOAQUIN COUNTY HARMLESS FROM ANY AND ALL LIABILITY, REAL
<br />OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON
<br />THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE
<br />NEGLIGENCE OF DESIGN PROFESSIONAL.
<br />12) THE CONTRACTOR SHALL PROVIDE SHORING, BRACING,
<br />SLOPING OR PROVISIONS TO PROTECT WORKMEN FOR ALL AREAS TO
<br />BE EXCAVATED TO A DEPTH OF FIVE FEET OR MORE. SAID
<br />PROTECTION TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS
<br />OF SAN JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS, AND
<br />STATE REGULATIONS.
<br />13) NECESSARY ENCROACHMENT PERMITS SHALL BE OBTAINED
<br />FROM THE COUNTY OF SAN JOAQUIN, BEFORE BEGINNING OF WORK.
<br />14) CONSTRUCTION STAKING FOR CURB, GUTTER, SIDEWALK,
<br />SANITARY SEWER, AND STORM DRAIN SHALL BE DONE BY THOMPSON-
<br />HYSELL ENGINEERS. THE CONTRACTOR SHALL NOTIFY CIVIL
<br />ENGINEERS 48 HOURS IN ADVANCE OF HIS NEED FOR STAKING.
<br />15) THE CONTRACTOR SHALL STAMP THE LETTER "S" AND "W"
<br />DIRECTLY ABOVE THE SEWER AND WATER LATERAL LOCATIONS, AT
<br />THE BACK OF SIDEWALK.
<br />16) DRIVEWAYS ON STREETS WITH 6" VERTICAL CURBS SHALL
<br />BE LOCATED BY THOMPSON-HYSELL ENGINEERS IN THE FIELD AT
<br />THE TIME OF CONSTRUCTION.
<br />17) THOMPSON-HYSELL ENGINEERS SHALL SET THE MONU-
<br />MENTS.
<br />BENCH MARK: CHISELED "X" IN SIDEWALK, SOUTH RETURN, MINGO
<br />WAY AT THE CAMBRIDGE DRIVE INTERSECTION.
<br />ELEVATION: 14.81, FOR LATHROP COUNTY WATER DISTRICT DATUM
<br />SUBTRACT 0.35.
<br />NOTE: FINISHED FLOOR ELEVATION OF ALL NEW CONSTRUCTION
<br />SHALL BE 1.0' ABOVE THE 100 YEAR FLOOD ELEVATION.
<br />100 YEAR FLOOD ELEVATION - 16.5
<br />CO VER SHEET
<br />INDEX•
<br />1. COVER SHEET
<br />2. GRADING & DRAINAGE PLAN
<br />3. PLAN & PROFILE - MATADOR WAY
<br />4. PLAN & PROFILE - TORO LANE
<br />LATHROP VILLAGE HOMES
<br />UNIT NO. /4
<br />SUPPL 0WEVTAL DRAW/NGS
<br />FOR ADDI T/ONAL INFORMATION
<br />REFER TO KONG ENGINEERS , INC
<br />DRAW/NGS, DATED NOV 30. /987
<br />530
<br />529
<br />528
<br />524 525
<br />THOMPSON • HYSELL
<br />ENGINEERS
<br />1016 12TH STREET, MODESTO, CA. 95354 (209) 521-8986
<br />I
<br />D
<br />P
<br />O
<br />O
<br />v __-�
<br />THIS PRINT MADE
<br />0
<br />JAN 111991
<br />SAN JOAQUIN p� �CC�O���U��NwTTYnngg{�(
<br />COPYRIGHT © MAV 1989 TI�=fIVSELl`1:NC.'1IA29'3
<br />AP VED
<br />CE 312-60 EXP RES /2
<br />SCALE " - QO I DR. BY r 0.
<br />JOB NO. 7a2 CK. BY 08.
<br />DISK DATE
<br />SHEET
<br />NUMBER
<br />OFA
<br />REVISIONS
<br />NO.
<br />DESCRIPTION
<br />DATE
<br />AS 8U/LT
<br />2-2/ 90
<br />530
<br />529
<br />528
<br />524 525
<br />THOMPSON • HYSELL
<br />ENGINEERS
<br />1016 12TH STREET, MODESTO, CA. 95354 (209) 521-8986
<br />I
<br />D
<br />P
<br />O
<br />O
<br />v __-�
<br />THIS PRINT MADE
<br />0
<br />JAN 111991
<br />SAN JOAQUIN p� �CC�O���U��NwTTYnngg{�(
<br />COPYRIGHT © MAV 1989 TI�=fIVSELl`1:NC.'1IA29'3
<br />AP VED
<br />CE 312-60 EXP RES /2
<br />SCALE " - QO I DR. BY r 0.
<br />JOB NO. 7a2 CK. BY 08.
<br />DISK DATE
<br />SHEET
<br />NUMBER
<br />OFA
<br />
|