<br />GENERAL:
<br />SCOPE OF WORK
<br />Furnish all materials, labor, equipment and related items necessary to accomplish the treatment
<br />and preparation of existing sod, placement and grading of import soil, placement of specified
<br />plant materials, fertilizer, staking and mulch, clean-up and debris removal.
<br />QUALIFICATIONS
<br />Landscape contractor &hall be skilled and knowledgeable in the field of work. Contractor shall be
<br />licensed to perform the work specified within the presiding jurisdiction.
<br />!OB CONDITIONS
<br />It is the contractor's responsibility to review the site and report any discrepancies to the owner or
<br />the owner's representative. All plant material and finished grades are subject to approval by the
<br />owner. Repair and/or replace items damaged as a result of work, or work not in compliance with
<br />plans and specifications, as directed by owner at no additional cost.
<br />Protection. P iSave and protect a11
<br />existing plantings shownown to remain. Do not plant until other
<br />construction operations e anions have been completed.
<br />An irri i
<br />_Pal ons tem is to be installed, stalled damage
<br />not plant
<br />8 Ys a I
<br />root the system hasa been toted and approved. Handle. plants with care - do not damage or break
<br />root system beyond necessary scarification.
<br />Repair. During the course of work, repair all existing planting areas by pruning dead growth,
<br />reestablishing finished grade, reenulching to specified depth, and treating soil with an approved
<br />pre -emergent herbicide. Repair any damage caused in the course of work to curbs, paving,
<br />lighting, fences and structures to the satisfaction of owner, at no additional cost.
<br />Qx&ElujLq%;LM1jULCtl Guarantee all plant material for a period of one year from dale of final
<br />acceptance of the job by owner. Maintain all planting areas until final acceptance of final job.
<br />Guarantee lawn until active growth is evident (60 days of growing season).
<br />Clean up all litter and clippings, soils on walks, driveways, and curbs, etc. The site shall be left in
<br />a alln and spotless condition. Remove all Rag labels from plant material and submit to Architect
<br />(Barghausen Consulting Engineers, Inc.).
<br />Irri,,tio,. Provide fully balanced and complete irrigation system per plan. All pipe shall be
<br />laced at a minimum twelve such 12'
<br />P ( )depth. All heads shall be mounted on triple swing ell
<br />joints or Rex pipe. See Sheet L-2 for irrigation.
<br />Contractor shall submit to owner certfloor 'on of all Imaterial including: (plant size, specie, variety,
<br />and quantity), soil amendments, herbicides, and anti-dessicant. Certification shall also be
<br />provided for all work specified to be performed after initial installation; i.e., fertilizer topdressing
<br />and specified irrigation maintenance.
<br />Inter relations: Should p S pull bidder find discrepancies in, or omissions from, the Drawings or
<br />specifications, he should at once notify the landscape architect, who will send written instructions
<br />or addenda to all bidders. Neither owner or landscape architect will be responsible for oral
<br />interpretations. All addenda issued during the time of bidding shall become part of the contract
<br />documents.
<br />Labor and Material,: and Materi l,Materiial, The Contractor shallrovid n
<br />pay e and a for all labor and materials all
<br />P
<br />equipment sed transportation n i
<br />e t, red b such labor an materials f
<br />d in the complete and efficient
<br />9 Yc en[
<br />r
<br />construction and finishing of the project work as shown a the Drawings and herein specified.
<br />Number oflleof I et, ss: Whenever an item is refereed to in ►singular number or where the number of
<br />items required is listed, the Contractor shall supply all Los items necessary to make the installa-
<br />tion complete. The number of items, when given by the landscape architect, is for assistance only.
<br />PLANTING SPECIFICATIONS:
<br />MATERIALS
<br />Plant materials Plant materials shall be Grade No. 1, sized in accordance with (AAN) American
<br />Standards for Nursery Stock (ANSI Z60.1-1986). Plants shall be healthy, vigorous, free from
<br />disease, pests, or injury. Root -bound plants will not be accepted. Do not prune or lop plants
<br />received from the nursery prior to delivery to site. Substitutions must be approved in writing by
<br />owner's representative. B d B' indicates balled and burfapped;'ConL' indicates container.
<br />6WZj[VA elan[ •e size is theypt hie. Container, caliper, or ball sizes establish
<br />minimum conditions.
<br />Tomil Preparation: Screened, 3 -way mix at six-inch (6') depth. All landscape soils shall be
<br />amended.
<br />Soil Animadhoonal, ! mnnd•d c..ily: All soil shall be amended in field with soil amendment and
<br />shall be tilled into new and existing site soils to an overall depth of 8 inches minimum. Fertilizer
<br />shall be in the following available N.P.K. elements - per 1,000 square feet or
<br />10 cubic yards of backfill: 23% Nitrogen (N) of which 55% shat, be controlled release Hynite,
<br />ureaform and SCU (coated urea); _0% Phosphoric acid (P205)) 0% soluble potash (K20), and
<br />fritted trace elements. As specified, Lilly Miller 'Pro Ornamental Special." Add pea ymzb
<br />"Beady Grow" tar0rdo co nlaset. « .
<br />pl .ti..'ha Ifilt: Fifty percent (50%) existing soil; 50 % glow" t
<br />1 I -
<br />Mix thoroughly.
<br />.1 p'p quanlily
<br />Ire• .f__ ad -abs.
<br />Rock Mulch: Smooth, unfractured washed River Rock up to 10 inch sfumeter -
<br />60% to be B to 8 inches.
<br />20=.!t =I ar" Wpm"
<br />Law fertiP'`•r Same as amended soil with the addition ofcr
<br />1,000 square feel, and top dressing of 3 pounds slow release nitrogen after 6 weeks of growth.
<br />All soil amendment fertilizer shall be pelleled. -
<br />( over
<br />Herbicide. Apply pre -emergent herbicide to all existing and new planting areas per manufac-
<br />turer's recommendations. 'Treflan," "Ronstar," or "Surnan." Application of herbicide shall be by
<br />a qualified licensed applicator.
<br />Anti-Deuicant: 'Wilt -Proof*, or equal, 48 hours prior to shipment to site. Thoroughly root
<br />water, by injection, planta prior to delivery. Plant material delivered to site shall he kept
<br />continually moist until irrigation system is operational.
<br />EXECUTION:
<br />IIOL-(!.TION:
<br />Preparation flf_glan(laai aration for I lggaration for planLgfgg(ina. Rototill soil amendment into soil to a minimum depth of six to eight
<br />inches (6' - 8') in all new planting areas. Remove rocks and foreign objects over one and
<br />one half inches (1-1/2n) in diameter. alar. Fine grade and prepare for r
<br />Asa/PIantinBinstallation. All
<br />finished grades shall be smooth even grades and firmly compacted.
<br />Shrubs. Excavate shrub pits to a minimum of six inches (6') below, and twice the root ball
<br />diameter. Add fertilizer prior to backfilling. Water thoroughly and take care to prevent root
<br />damage. Plant shrubs in locations shown on plan in straight rows - evenly spaced. Mulch all
<br />planting areas to a minimum - '- (3') three -inches ieaardeplh.
<br />Ensure that plant crown is at proper position to grade.
<br />Herbicide: Apply pre -emergent herbicide to all plantings per manufacturer's recommendations.
<br />Herbicide shall be applied in granular (preferred) form a minimum of two weeks and a maxi... um
<br />of six weeks after landscape installation .s completed. Remove any existing growth of weeds
<br />within 48 hours prior to herbicide application. If weather conditions warrant, provide I/2"
<br />irrigation to areas of herbicide application immediately following completion of work.
<br />NOTE.:
<br />Plant quantities and/or arca coverages are shown for convenience of contractor in preparing
<br />estimates. Contractor shall provide sufficient material to complete work as illustrated on plan and
<br />at specified spacing.
<br />PLANTING NOTES (CALIFORNIA) PLANTING DETAILS
<br />NOTES - Tree Planting Detail
<br />1. Pit SizeTwice as wide as root ball with four/highnd in center of pit
<br />bottom.
<br />2. Plantine Depth: Top of root ball two inches abo.
<br />3. Backfill Material: 50% native soil and 50% soil i h hall be a 90%
<br />c sbark base roduc[ 0-1 4: iz r wi ws e t ea[ed Hh trCro n then firm to
<br />reduce settling.
<br />'Y r
<br />4. Planting Tablets: 21 gram agriform ptin, tablets (20-10-5). Use 3 for 5 G.C.
<br />Size: 6 for 15 G.C. Size: 12 for 2 Iii" size. -
<br />5. Earth Basin: Diameter 12" lar the root ball. N in lawns.
<br />0 0[ la s.
<br />6. Mulch Untreated 0 4" -
<br />9 %bark product, I 5 8' Size: Common) known
<br />� � / / as
<br />Y
<br />pathway or miniature bar .
<br />7. Vitamin B -I Supert v
<br />a li uinox start ore zeal. APP1Y Per manufacturer's
<br />h w
<br />instructions with t second watering a[erin of the basin.
<br />8. Stakes: 2" x 2" 8' RWD. Stakes or IodgeDole pine stakes 2" diameter by 8'.
<br />Copper na anate treated (green color, with 10" tapered point.)
<br />9. - Staking Height: Sufficient to support trunk in vertical, unbinding position then
<br />secured with cable ties.
<br />NOTES - Shrub Planting Detail
<br />I. Pit Size: Twice as wide as the root ball.
<br />2. Plantine Depth: Top of root ball two inches above finish grade.
<br />3. Backfill Material: 50% native soil and 50% saw Y g ns s sog6a'��6a a. GGYh
<br />8
<br />4. Planting Tablets: 21 gram agriform planting tablets (20-10-5). Use 1 for I G.C.
<br />size. 3 for 5 G.C. size.
<br />5. Earth Basin: Diameter 12" larger than the root ball.
<br />6. .......d bent M_L M.a P -d-1 614" 49.
<br />7. Vitamin B-1: u r 'v 'f
<br />$ tine Ii uinox start or equal. Apply r
<br />pe a manufacturer's
<br />. q q PD Y D
<br />instructions with then
<br />Seco d watering acerin of the basin.
<br />SOD LAWN SPECIFICATIONS
<br />MATERIALS
<br />Immortal topsoil: Topsoil shall be screened, 3 -way mix at six -inches (60) depth minimum.
<br />Soil Amendment Ameaded Spill AB spit shall be ..ended in field with soil amendment and
<br />shall be lilted into new and existing site soils to an overall depth of 6 inches to 8 inches minimum.
<br />The following available N.P.K. elements per 1,000 square feet or 10 cubic yards of backfill;
<br />23% slow release nitrogen (Urea formaldehyde at M% or sulphur coated urea (IBDU)I,
<br />IFA single superphosphate (P20), 0% potassium sulfate (K20 at
<br />SO%),.Mierooulricata per manufacturer's recommendations. AsN W/O ymrde "ready gyow".
<br />aaIw B oornpeN
<br />Lawn fertilizer: Same as amended soil.
<br />Top dress three pounds (3 lbs.) slow release nitrogen per 1,000 square feet (as specified in sed
<br />ABseadgz=0 after six (6) weeks of growth of lawn.
<br />3Rd: . \ Sod is to be free of Pon annus, pests and diseases.
<br />It shall be no mord than 3Uoaths old. Sod shelf not be cul from field more than 24 hours prior
<br />to delivery to project site.,'
<br />EXECUTION L IN of tell fescue' ken. dM"lipriess• land Bad grass.
<br />a
<br />Acceptance of Gr d ,. Commencement of soil preparation by the Landscape Contractor sha0
<br />constitute Lcceptance of the subgrades and shall place responsibility for finish grades with the
<br />Landscape Contractor.
<br />Soil Preparation. Scarify subgrade to a depth of 8". Apply a minimum of 6" of specified on-site
<br />or imported topsoil and rotovale ialo the lop 8" of subgrade. Remove all rocks 2' or larger.
<br />greadcast fertilizer as noted on drawings over all plaeliog areas and till Tato lop 6' of soil. Apply
<br />--- dolomite limestone in all law areas As required to bring the pH to a factor of 6.0. Upon
<br />approval of Owner's representative, lime may be adjusted based upon pH test results.
<br />All area shall be rough graded within 10' before commencement of planting.
<br />AB grades Aall produce positive drainage. Area shall be graded such that new grades meet and
<br />blood naturally with Ike existing grades.
<br />Finished Conditions. ,ggj�gied CCondition . Finish grades shall be as follows: Plat beds; minus P as all adjacent walks,
<br />curbs and surface edges. Lawn area; Bah at all adjacent walks, curbs and surface edges. Finish
<br />grades defined as elevations after installation of mulch, sod or seed lawn.
<br />Verification of Grades. Approve all grades with Owner's representative before beginning planting
<br />operations.
<br />Fine Gradina in Sod Area. Fine grade to a uniform finish following contours of all areas and
<br />removing all surface rock larger than 1' in diameter.
<br />Roll surface with 400 -pound roller. Repeat fine grading procedures and rolling until fawn grades
<br />are free of undulations. Final roll bawd upon completion of installation.
<br />Seat Lag(a_lin-1,11,14o, an wn
<br />Sodding shill take e lace after shrub planting and mulching is complete.
<br />Instill sod so that all joints are lightly bulled and smooth. Lay sod with long edges perpendicular
<br />to the slope. Alternate joints in running bond fashion. Roll sod to provide a uniform surface.
<br />Irregularities of V in 5' will be the maximum acceptable tolerance. Approval will be based on
<br />uniform, healthy and vigorous growth, with no dry or dead spots. Any sod which has not been
<br />installed within 48 hours of cutting to be removed and disposed of off site.
<br />FINISH GRADE SECTIONS N.Th,
<br />it
<br />2oI�K MULl.I{ L4 LMnlr �x�
<br />yi L ✓Er I I .4 /� rM6.l,,vu iri-S1 3 ovrrR P t
<br />7.
<br />ROCK MULCH AT CUR@
<br />Ctk'faw
<br />T t:lc Tl+ai.� 01V
<br />��� ul� � 4���
<br />tc�
<br />retaA4�y T�+TC SLE
<br />TIMBER HEADER M&CH TRANSITION
<br />��
<br />rl Ks� y nw dF&�
<br />(2) - lax 4' cof•tnULloUc� I
<br />r:0lw0 tIWIJ
<br />I � 7-- TAKE
<br />TpP �
<br />AA,�o
<br />TI X PT pirsisc?&=)
<br />2. Lig L��III Flblli��.
<br />3. Llii �IWt" 4hppEp:2_ F+09_ a10VEp
<br />I IoN4
<br />C CVP
<br />-OPV L
<br />- ?,� a'x�vla-ffl�NL.la.15 I��P�Iz
<br />` 'SHIVID LPWW
<br />�I?lnvlJD',� r
<br />lex iT _kPIUT Ili
<br />IaI X2' x 12°
<br />Ifx Z°x12' STpF
<br />REDWOOD HEADER DETAIL N.Ts.
<br />a
<br />,'KUNE C)p.MvC�Ep TWIG P.�L{Z
<br />� p,.+.�E3 IN vr�z71G,� (�Irlol.l
<br />d P�zvr�l P� PSR o� old �n tTINc�
<br />d
<br />New G¢OIUu of z ALL" kT
<br />Id ,d�/26GO�`�E��
<br />E+�LINb F. I�I.A IJ6 L15E 1J'rVv
<br />h �E.LT�pELCI'<Ln��T�r�71
<br />�i TT
<br />C2 2x X10 D.
<br />2 F.,
<br />To .5121�KZ0`iv (y�!� LaI•,(g, � PIr TR
<br />G
<br />.�
<br />�P,
<br />�WIE IYIN I
<br />'LI �adtllct�� }`oF VJaKE.{Ifa1J(s
<br />M HMF- 0,VXLJAr FROM Tor
<br />e7" Rce:rr- em&LIL
<br />ovz r'�ip�r��xar"sNr1i �I-�HIN,ry 6
<br />4f)6'f'RAPG
<br />VERGREEN EE PLANTING
<br />uu E � �v ASCII • .
<br />31 HUL.cfls.urov►"I
<br />V4 Aee./e
<br />�
<br />r14`'MOt�G�� 1
<br />r e fill p -
<br />all, 'r r
<br />• I
<br />k�ia. s
<br />Pt' -1G 12'I QLANr IIT _�_�_
<br />L�htllcFd Imo. � dkdxLrcollTal�tz�La'rr.ER
<br />C>'I-���TER �+I) CPLe,titl"t�� �-;SoRt MSH)
<br />GROUNDCOVER PLANTING DETAIL
<br />Ewa= LINE
<br />auFsla/WALK
<br />SPACING DETAIL u.Ts.
<br />P'
<br />��..:
<br />:e
<br />0
<br />�i alII ial. ,�"�� 11
<br />t
<br />VA � W.I�)
<br />- '`) ZM
<br />m',Rt,4 T" OF -,
<br />Cs1=U d- 1iFt� vjo{� M114. ew Co'I H IC�HKci7
<br />To rFfo�ll�' guceaaavE� �w.��-mer � 1�.
<br />To y1FTHl 3°c+�fl1.WLC�gfl� hIOEP{64JG ofC�il prla✓I1.1(71
<br />TYPICAL EARTH BERM SECTION uTs
<br />IRRIGATION NOTES
<br />IRRIGATION NOTES (See also Irrigation Specifications u, Sheet L-3)
<br />L General contractor to provide:
<br />a. Installation of 110, electrical service from electrical source to autonrelie eonlroller,
<br />including wire hook-up into mounted controller. Irrigaticoi contractor will mount
<br />controller per design and coordinale with general con track),.
<br />h. Installation of I 1/2 -inch combined hullel n irri 'alien xc rviee m Ie a l rl ( I. '-
<br />/ l/ g 1a ti
<br />a Provide galvani7ed standard threaded stub out with threaded c a tfichalf,L side
<br />of meter. Sluh-out to be installed appnhxvn al cly IS Inches .clow fl ushcd yade.
<br />it. Verification of static water pressure at point -o F cnnnccl,on (I'.O.C.). (-nnl¢aclor
<br />shall notifyowner and Bar to sen Consulting En inn rs Inc of an v;viation in
<br />u e g c.
<br />static pressure over 5 psi greater/less than design pressure.
<br />e. Installation of sleeving.
<br />2. System has been designed for Iti GPM at �� psi. Sialic pressure by water
<br />department test /calculation � Psi.
<br />3. All work per local code. Install per manufacturer's specifications.
<br />P P P
<br />4. All valves to be placed in "Carson" grade level boxes with boll -lock lids for approved
<br />equal). Set boxes 1 inch higher than finish grade so top of box is flush will lop of soil or
<br />mulch.
<br />5. Mainline pipe to be buried 18 inches laterals 12 inches below finish rad N) lock or
<br />PP 6
<br />debris to be backfilled over pipe.
<br />6. Head and line positioning is diagrammatic; adjust in field as necessary for adcgnule
<br />coverage.
<br />7. Place all shrub heads as close to walks and hard surfaces as possible for protection.
<br />8. Provide owner with two (2) sets "as -built" drawings and operator's manual upon
<br />completion. Instruct owner as to proper winterization of irrigation system blow out .
<br />P P P 8 Y ( )
<br />9. Familiarize facility operator with irrigation system function, controller programming,
<br />system operation and maintenance requirements.
<br />10. No sprinklers on risers shall be installed next to walks, street, and/or Pavement.
<br />Sprinklers in hazardous locations shall be flush mounted, high -pop models only.
<br />11. Sprinkler spacing shall not exceed 60% of the diameter of the throw.
<br />12. All control wire splices shall be made at valve boxes.
<br />13. Each valve box to contain a minimum of one(1) spare yellow ellow control wire. Route one
<br />spare wire from the controller to the last valve of each mainline branch.
<br />14. All electrical equipment requiring greater than 24 volt power shall be U.L. tested and
<br />approved, and shall bear the U.L. label.
<br />15. Croat connection insoeclion required. The backflow device shall be tested upon
<br />P P
<br />the original installation, and annually thereafter by the owner. The (eating shall be
<br />performed by a person holding a current certificate of competence as a Cross -Connection
<br />Specialist. The test report shall be submitted to the local water district, with copy to
<br />Barghausen Consulting Engineers, Inc. Contractor shall include cost, if separate from
<br />permit fees, in scope of work.
<br />r E - T-fPB VaGUUM
<br />J. �
<br />�w
<br />4Ez
<br />r .V. �15 Cts UM `r
<br />WIT+l t�Lb2 E "f 1WIRE P�Io V 111Y1-
<br />Bo� •ro{z�
<br />AL
<br />T=
<br />,
<br />!� I E P -AP T M
<br />I
<br />Ga>'O kfJ o
<br />T RBl�lo. IJ E
<br />cele Na
<br />A
<br />5T KL-
<br />AR
<br />U LF. PLAN! - A
<br />M L(FI N
<br />��TauN�
<br />PiLF/�ItkCA'- 0"'L CE C-0Njt101,l,�(Z
<br />� riff ACW�
<br />ASEAN
<br />II�ll4 E
<br />I' Cates
<br />r k
<br />�GP,.,�Ij-V�.
<br />D � IL NA7PP¢�IIGi
<br />("M A09
<br />\
<br />�L '/3 OF YtJR AP
<br />- f RG
<br />0.61"
<br />fXAR� Gbi ..._
<br />'U
<br />III-
<br />CI coie^" AG7<I�»'R�1 Fia�l Llu�F
<br />1414
<br />..
<br />-MT FMOZ12 OIL) „5L- 1H T
<br />T L-LX4n0j1JR040 �JCtSP-!'L:E
<br />jI(;6�irL 4G�ON
<br />f7W,
<br />D IDUOUS
<br />TREE PLANTING DETAIL IJ ,r, 5 .
<br />b
<br />C2 2x X10 D.
<br />2 F.,
<br />To .5121�KZ0`iv (y�!� LaI•,(g, � PIr TR
<br />G
<br />.�
<br />�P,
<br />�WIE IYIN I
<br />'LI �adtllct�� }`oF VJaKE.{Ifa1J(s
<br />M HMF- 0,VXLJAr FROM Tor
<br />e7" Rce:rr- em&LIL
<br />ovz r'�ip�r��xar"sNr1i �I-�HIN,ry 6
<br />4f)6'f'RAPG
<br />VERGREEN EE PLANTING
<br />uu E � �v ASCII • .
<br />31 HUL.cfls.urov►"I
<br />V4 Aee./e
<br />�
<br />r14`'MOt�G�� 1
<br />r e fill p -
<br />all, 'r r
<br />• I
<br />k�ia. s
<br />Pt' -1G 12'I QLANr IIT _�_�_
<br />L�htllcFd Imo. � dkdxLrcollTal�tz�La'rr.ER
<br />C>'I-���TER �+I) CPLe,titl"t�� �-;SoRt MSH)
<br />GROUNDCOVER PLANTING DETAIL
<br />Ewa= LINE
<br />auFsla/WALK
<br />SPACING DETAIL u.Ts.
<br />P'
<br />��..:
<br />:e
<br />0
<br />�i alII ial. ,�"�� 11
<br />t
<br />VA � W.I�)
<br />- '`) ZM
<br />m',Rt,4 T" OF -,
<br />Cs1=U d- 1iFt� vjo{� M114. ew Co'I H IC�HKci7
<br />To rFfo�ll�' guceaaavE� �w.��-mer � 1�.
<br />To y1FTHl 3°c+�fl1.WLC�gfl� hIOEP{64JG ofC�il prla✓I1.1(71
<br />TYPICAL EARTH BERM SECTION uTs
<br />IRRIGATION NOTES
<br />IRRIGATION NOTES (See also Irrigation Specifications u, Sheet L-3)
<br />L General contractor to provide:
<br />a. Installation of 110, electrical service from electrical source to autonrelie eonlroller,
<br />including wire hook-up into mounted controller. Irrigaticoi contractor will mount
<br />controller per design and coordinale with general con track),.
<br />h. Installation of I 1/2 -inch combined hullel n irri 'alien xc rviee m Ie a l rl ( I. '-
<br />/ l/ g 1a ti
<br />a Provide galvani7ed standard threaded stub out with threaded c a tfichalf,L side
<br />of meter. Sluh-out to be installed appnhxvn al cly IS Inches .clow fl ushcd yade.
<br />it. Verification of static water pressure at point -o F cnnnccl,on (I'.O.C.). (-nnl¢aclor
<br />shall notifyowner and Bar to sen Consulting En inn rs Inc of an v;viation in
<br />u e g c.
<br />static pressure over 5 psi greater/less than design pressure.
<br />e. Installation of sleeving.
<br />2. System has been designed for Iti GPM at �� psi. Sialic pressure by water
<br />department test /calculation � Psi.
<br />3. All work per local code. Install per manufacturer's specifications.
<br />P P P
<br />4. All valves to be placed in "Carson" grade level boxes with boll -lock lids for approved
<br />equal). Set boxes 1 inch higher than finish grade so top of box is flush will lop of soil or
<br />mulch.
<br />5. Mainline pipe to be buried 18 inches laterals 12 inches below finish rad N) lock or
<br />PP 6
<br />debris to be backfilled over pipe.
<br />6. Head and line positioning is diagrammatic; adjust in field as necessary for adcgnule
<br />coverage.
<br />7. Place all shrub heads as close to walks and hard surfaces as possible for protection.
<br />8. Provide owner with two (2) sets "as -built" drawings and operator's manual upon
<br />completion. Instruct owner as to proper winterization of irrigation system blow out .
<br />P P P 8 Y ( )
<br />9. Familiarize facility operator with irrigation system function, controller programming,
<br />system operation and maintenance requirements.
<br />10. No sprinklers on risers shall be installed next to walks, street, and/or Pavement.
<br />Sprinklers in hazardous locations shall be flush mounted, high -pop models only.
<br />11. Sprinkler spacing shall not exceed 60% of the diameter of the throw.
<br />12. All control wire splices shall be made at valve boxes.
<br />13. Each valve box to contain a minimum of one(1) spare yellow ellow control wire. Route one
<br />spare wire from the controller to the last valve of each mainline branch.
<br />14. All electrical equipment requiring greater than 24 volt power shall be U.L. tested and
<br />approved, and shall bear the U.L. label.
<br />15. Croat connection insoeclion required. The backflow device shall be tested upon
<br />P P
<br />the original installation, and annually thereafter by the owner. The (eating shall be
<br />performed by a person holding a current certificate of competence as a Cross -Connection
<br />Specialist. The test report shall be submitted to the local water district, with copy to
<br />Barghausen Consulting Engineers, Inc. Contractor shall include cost, if separate from
<br />permit fees, in scope of work.
<br />r E - T-fPB VaGUUM
<br />J. �
<br />�w
<br />4Ez
<br />PI�sTI� wu� 1aX (SI Z E To PIT)
<br />i�✓1u6°JT�-7':asllur� VALVE
<br />p.r_-. gm IaGpUUIJ6 (IF Res�.t�)
<br />LIE116L 5111 "i ' �,-- t- l u ls,-f raR.l`T�E
<br />1 -1-
<br />_
<br />Eel
<br />z
<br />�I UIL�iI I r'� � 111
<br />RIGATION DETAILS
<br />'Nlr'Ig{•L-
<br />GAL(/, NMS
<br />0 0
<br />O
<br />J
<br />PiLF/�ItkCA'- 0"'L CE C-0Njt101,l,�(Z
<br />CW -V, Lt -WN
<br />ASEAN
<br />a
<br />�GP,.,�Ij-V�.
<br />Wr' a t Til a4J
<br />("M A09
<br />\
<br />Fn,Nl�l'1 GFtdlx
<br />�_NIM��_nLL1t
<br />uY
<br />..
<br />� " s _CLL �'.•• F I'k>,I♦JUNG
<br />aaam
<br />Z
<br />GOLfn FNG
<br />GPL' 411p� FQ7r GONG F a-mHG
<br />1-14IM! , "
<br />o L.L. 12' Mht HK.1{o;1r( Zr WN.'"li'a°'r•-I
<br />.
<br />N tri.GR PEA-(> op- P"llt�0 LOvel-, AL{..
<br />G01 1JGOfIo1J4 aN e'9aE-Ilel-'f To Fse THata# c>,
<br />VACUUM BREAKER
<br />PI�sTI� wu� 1aX (SI Z E To PIT)
<br />i�✓1u6°JT�-7':asllur� VALVE
<br />p.r_-. gm IaGpUUIJ6 (IF Res�.t�)
<br />LIE116L 5111 "i ' �,-- t- l u ls,-f raR.l`T�E
<br />1 -1-
<br />_
<br />Eel
<br />z
<br />�I UIL�iI I r'� � 111
<br />RIGATION DETAILS
<br />f
<br />LAW
<br />-- - LUKE f / k 'a�CfhF tcx- l IIF va n IC�Io�
<br />0 0
<br />O
<br />J
<br />PiLF/�ItkCA'- 0"'L CE C-0Njt101,l,�(Z
<br />FII.iI-� rd�l_iL
<br />ASEAN
<br />a
<br />ulI
<br />I;� SPL' J E
<br />I�P.MO'/Arrx,E Cta/EI2 --
<br />\
<br />R P -6 ,N
<br />VA;aL WrrIA
<br />a L LJO �E
<br />uY
<br />Z
<br />�y/V
<br />V
<br />aaam
<br />Z
<br />WILL Ho_ESt
<br />f'N.TU1 DIAMl3j5
<br />ee
<br />Nestle
<br />LU
<br />a
<br />II
<br />To �TZIIJKL-E}ZS
<br />Z�•Z
<br />- v
<br />c ILL
<br />A-J�
<br />c
<br />FE F'W-LGE d1=1�P'I�R
<br />en Ey._ Com* 43JI'fP
<br />Fo
<br />I J "wIIJ L-IIJE PfT-71 G
<br />J
<br />h -w11.1 SUPPt-Y LIr.tE
<br />U'
<br />����
<br />r SLICE f
<br />a
<br />;Q
<br />'
<br />U5
<br />�Le:GPzteoi �uk.1c,71eN PX2x
<br />--f�c t -11 J
<br />l-u>a E
<br />CONTROL WIRE BOX/ SLEEVINGT MTs•
<br />s
<br />i
<br />i
<br />=
<br />-- voWE f IIWIJ�
<br />\ TRENCH DETAIL
<br />f
<br />LAW
<br />-- - LUKE f / k 'a�CfhF tcx- l IIF va n IC�Io�
<br />0 0
<br />O
<br />J
<br />PiLF/�ItkCA'- 0"'L CE C-0Njt101,l,�(Z
<br />FII.iI-� rd�l_iL
<br />ASEAN
<br />a
<br />ulI
<br />I;� SPL' J E
<br />I�P.MO'/Arrx,E Cta/EI2 --
<br />\
<br />R P -6 ,N
<br />VA;aL WrrIA
<br />a L LJO �E
<br />A! �/T_. p.Y I. �Co✓FR
<br />(6�AZEo To FIT)
<br />Z
<br />3
<br />aaam
<br />Z
<br />WILL Ho_ESt
<br />f'N.TU1 DIAMl3j5
<br />Nestle
<br />LU
<br />II
<br />To �TZIIJKL-E}ZS
<br />Z�•Z
<br />A-J�
<br />c
<br />FE F'W-LGE d1=1�P'I�R
<br />en Ey._ Com* 43JI'fP
<br />Fo
<br />I J "wIIJ L-IIJE PfT-71 G
<br />J
<br />h -w11.1 SUPPt-Y LIr.tE
<br />mss'.
<br />rW-At--e EX'RZa>, t:olLs Ig") OF F1+CL-I LII FaE Iti \/p.WE 8Uj(.
<br />- TvPE 1,1111zr-- MJOI: E 70G271 -IBI- E. Fzl f 20 PtET.
<br />- Y'lI1J. (or f7EPT1-i, ��g" 1--1r15h-IED �oRN•/✓=L UhJt�-'ER F�C.I-1 �/G�Ls/E.
<br />REMOTE CONTROL VALVE
<br />FIkIISF-1 r' �t=E
<br />Y-I�TIG V4LVG 'ELIC
<br />_ (,eAz� To ,=1T)
<br />Jill 6zJ 1G1e- GOLJFPi_idc, .Ya-• --
<br />(GAF ��8s E.-Sorip
<br />-1'X 12o GAS, LV 011111_=
<br />KC sXs,ZT+4Tee
<br />QUICK COUPLING VALVE
<br />Ann
<br />SpRv*�kIOZZLE Go° C>,Ga�SNRUb✓
<br />I`I�IlSM Gfa6P3
<br />/CsaW.� NP�(E�170ti1
<br />F �,/(P--
<br />! TEE \\\e\
<br />eviyia. VIICY�I 4117E vlF,ry
<br />rte- uP RI5E2
<br />4 &
<br />>+
<br />:rPAN
<br />E .hen
<br />RS 0 0
<br />CL C T
<br />W
<br />> Y/
<br />cis 4 0
<br />0.0 _/o/�
<br />C � � V/
<br />U c0 W
<br />4)VElmo .
<br />O C
<br />Z _O
<br />Z3 C) 0
<br />0 Tom
<br />=
<br />L � � a
<br />a
<br />0 O 0
<br />EN
<br />♦ ♦ a -
<br />v gO
<br />Ln
<br />L X
<br />exam/q
<br />O
<br />M W
<br />r}J
<br />A\ n
<br />Brr� 0
<br />a
<br />Q
<br />Z
<br />cc0
<br />J Q
<br />Q
<br />W I- IAA'
<br />� Q D Z
<br />0 ~ O V
<br />(A J a: Z
<br />Ul 04-
<br />man
<br />Fm NAL Z M Q
<br />0 p- W O 0
<br />W
<br />7
<br />Z ��
<br />Z 0:Q he < Anal Z
<br />0 a V U)
<br />tQ Z
<br />LU
<br />0 2 W cc }
<br />RISER ASSEMBLY N7.5. 4C 3 in Inne
<br />I
<br />LAW
<br />d
<br />0 0
<br />O
<br />J
<br />PiLF/�ItkCA'- 0"'L CE C-0Njt101,l,�(Z
<br />ASEAN
<br />a
<br />Jo
<br />O
<br />a_
<br />I�P.MO'/Arrx,E Cta/EI2 --
<br />\
<br />Q
<br />VA;aL WrrIA
<br />a L LJO �E
<br />Z
<br />3
<br />aaam
<br />Z
<br />WILL Ho_ESt
<br />f'N.TU1 DIAMl3j5
<br />Nestle
<br />LU
<br />�lpE
<br />Z�•Z
<br />A-J�
<br />J
<br />U'
<br />����
<br />r SLICE f
<br />a
<br />U5
<br />�Le:GPzteoi �uk.1c,71eN PX2x
<br />CONTROL WIRE BOX/ SLEEVINGT MTs•
<br />s
<br />i
<br />=
<br />a
<br />Z
<br />IJtcft: - 1Id�1� EIL�res
<br />PRof-1 NICfEf� � _ II SiSTEH
<br />�L.v uNIoNCTfri a -
<br />G.oL,/ U"I� (Tyr)
<br />b -,IN
<br />Ul.lt�R �•N-f1F� tXGL'
<br />UNIT CAX-� Rrn:pulparll
<br />�o •P9OJIp6 F-F�IL(ENTSS*TEt0 VAIl\/Eh I(FT6�W�,Tloevl
<br />a dt4TWi c APPL7o! iy UV ufw, Imo j EG G 8 i �o�
<br />CE"p
<br />CHECK VALVE ASSEMBLY W/ QUICK COUPLER
<br />r
<br />MO DATE REVISION appy' RyFtSS10. H
<br />I m"2g•29q C+.Et 01sN/le-N, t�oe J*15 _
<br />W a s W
<br />IVI�a �
<br />7�
<br />N
<br />ta
<br />rNE 2.7 DIA Bar hausen AM/PM drawn Z
<br />ics Consulting Engineers Inc. Prol• 0
<br />Land Planning, Survey 8 Engineering Specialists FAC #5650 L-3
<br />$750 Auburn Sid., SuRo A, SwraW821nee fte, Co. S21 (SIS) 454-1212I IILI
<br />rov. I of 3 V
<br />14- It 36" - PHASE III - MASTER DESIGN:
<br />
|