Laserfiche WebLink
120940 <br />I <br />GRADING and DRAINAGE PLAN NOTES <br />1. ALL WORK AND MATERIALS SHALL BE INCOMPLETE ACCORDANCE WITH CURRENT STAN- <br />DARDS AND SPECIFICATIONS OF SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />AND THESE APPROVED SET OF PLANS. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH <br />OF ALL BURIED UTILITIES PRIOR TO BEGINNING CONSTRUCTION. SEE SITE AND <br />UTILITY NOTE NO. 3. <br />3. GRADING OUTSIDE OF THE CO.. RIGHT-OF-WAY MUST COMPLY WITH CHAPTER 70 OF <br />THE UNIFORM BUILDING CODE. <br />4. ALL SIDE SLOPES SHOWN ON THESE PLANS SHALL BE 2:1 (MAXIMUM), UNLESS <br />OTHERWISE SPECIFIED. <br />5. BACKFILL TRENCH OF PIPES IN LIFTS OF 6"-8 AND COMPACT TO 95% REi.i VE <br />COMPACTION UNDER ROADWAYS AND 90% COMPACTION OFF ROADWAYS. ALL PIPE SHALL <br />BE INSTALLED WITH CLASS "B" BEDDING IN ACCORDANCE WITH APWA STANDARDS. <br />6. ALL WORK SHALL BE IN ACCORDANCE WITH THE SOILS ENGINEER'S RECOMMENDATIONS. <br />SEE SOILS REPORT NOTES. <br />7. THE OWNER RESERVES THE RIGHT TO HAVE ALL GRADING OPERATIONS, EXCAVATION, <br />FILL, COMPACTION, TRENCHING AND BACKFILL INSPECTED AND TESTED BY A <br />QUALIFIED REGISTERED SOILS ENGINEER. THE CONTRACTOR SHALL SCHEDULE AND <br />COOPERATE WITH THE SOILS ENGINEER WHEN TESTS, INSPECTIONS AND APPROVALS <br />ARE DEEMED NECESSARY BY THE OWNER TO ASSURE COMPLIANCE WITH THE ESTABLISHED <br />RECOMMENDATIONS. <br />8. PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION, DEBRIS, RUBBLE, <br />TREES, AND ROOT SYSTEMS SHALL BE REMOVED FROM THE SITE TO THE SATISFACTION <br />OF THE OWNER. <br />9. IF ANY UNKNOWN SUB -SURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION, <br />THEY SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND THE <br />OWNER PRIOR TO PROCEEDING. <br />10. DUST SHALL BE CONTROLLED BY WATERING THROUGHOUT THE GRADING AND BUILDING <br />CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL ARRANGE AND PAY FOR <br />CONSTRUCTION WATER. <br />11. THE CONTRACTOR SHALL BE RESPONSIBLE TOR THE PROTECTION OF ALL EXISTING <br />UTILITIES TO REMAIN IN USE WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR <br />NOT SHOWN ON PLANS. <br />12. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT <br />PROPERTIES, PUBLIC AND PRIVATE, AT ALL TIMES DURING CONSTRUCTION AND NOT <br />TO CAUSE ANY MUD, SILT OR DEBRIS TO BE ONTO THE ADJACENT PROPERTIES. ANY <br />MUD OR DEBRIS CAUSED ON ADJACENT PROPERTY SHALL BE REMOVED IMMEDIATELY. <br />13. ALL DISTURBED AREAS SHALL BE SEEDED OR STABILIZED BY COUNTY METHODS FOR <br />PREVENTION OF ON-SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. <br />14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPORTING AND/OR EXPORTING ALL <br />MATERIAL AS REQUIRED TO PROPERLY GRADE THIS SITE TO THE FINISHED ELEVATIONS <br />SHOWN HEREON IN ACCORDANCE WITH THE APPROVED PLANS, SPECIFICATIONS, AND <br />THE SOILS ENGINEER'S RECOMMENDATIONS. <br />SOIL REPORT NOTES <br />1. THE FOLLOWING SOILS REPORT FOR THE SITE SHALL BE CONSIDERED PART OF <br />THESE CONSTRUCTION DOCUMENTS: <br />SOIL INVESTIGATION: 1525-35 <br />AS PERFORMED BY: BALBI 6 CHANG ASSOCIATES <br />151 LINK ROAD, SUITE A <br />CORDELIA, CA 94585 <br />(707) 864-2020 <br />DATED: MAY 9, 1989 <br />2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL <br />PROVISIONS OF THE SOILS REPORT FOR THE SITE BE OBSERVED AND COMPLIED <br />'WITH DURING ALL PHASES OF THE SITE PREPARATION, GRADING OPERATIONS, <br />FOUNDATION, SLAB, AND PAVING CONSTRUCTION. <br />3. ANY PROVISION OF THE SOILS REPORT WHICH CONFLICT WITH INFORMATION SHOWN <br />ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRE FURTHER CLARIFICATION, <br />SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR DETERMINATION. <br />4. A REPRESENTATIVE OF THE SOILS ENGINEER SHALL BE AVAILABLE TO OBSERVE AND <br />APPROVE THE EARTHWORK OPERATIONS AND TO VERIFY FIELD CONDITIONS AS WORK <br />PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS CERTIFYING THAT <br />THE METHODS AND MATERIALS OF THE EARTHWORK OPERATIONS WERE IN ACCORDANCE <br />WITH THE RECOMMENDATIONS OF THE SOIL'S INVESTIGATION AND THAT THE <br />WAS ,PERFORMED TO HIS SATISFACTION. <br />SITE and UTILITY NOTES <br />1. ALL WORK AND MATERIALS SHALL BE INCOMPLETEACCORDANCE WITH THE CURRENT <br />SAN JOAQUIN COUNTY STANDARD SPECIFICATIONS, CHAPTER 70 OF THE UNIFORM <br />BUILDING CODE (LATEST EDITION),WOODBRIDGE SANITARY DISTRICT, AND ALL <br />OTHER GOVERNING AGENCY'S STANDARDS. <br />2. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE <br />GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUC- <br />TION OPERATIONS. <br />3.' THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION <br />WHETHER SHOWN ON THESE PLANS OR NOT. LOCATIONS OF SAID UTILITIES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE BEST RECORDS AVAILABLE AND ARE <br />SUBJECT TO A DEGREE 07 UNKNOWN VARIATION. IF CONFLICTS SHOULD OCCUR, <br />THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC., TO <br />RESOLVE ALL'PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE <br />UTILITIES INVOLVED PRIOR TO CONSTRUCTION. (SEE CONTACT LIST, SHEET <br />C-1.) <br />5. TWO COPIES OF THESE APPROVED PLANS MUST ON THE JOB SITE WHENEVER <br />CONSTRUCTION IS IN PROGRESS, ONE SET SHALL BE SUBMITTED TO BARGHAUSEN <br />CONSULTING ENGINEERS, INC., WITH RECORD OF AS -BUILT INFORMATION AT <br />COMPLETION OF PROJECT. <br />6. INSPECTION WILL BE ACCOMPLISHED BY REPRESENTATIVES OF THE SAN JOAQUIN <br />COUNTY AND WOODBRIDGE SANITARY DISTRICT. IT SHALL BE THE CONTRACTOR'S <br />RESPONSIBILITY TO NOTIFY THE FIELD INSPECTION SECTIONS 24 HOURS IN <br />ADVANCE OF BACKFILLING ALL CONSTRUCTION. <br />7. PRIOR TO ANY CONSTRUCTION/DEVELOPMENT ACTIVITY, SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS INSPECTION SECTION MUST BE CONTACTED FOR A <br />PRE -CONSTRUCTION MEETING. <br />8. CONTRACTOR SHALL REFER TO GUIDELINES AND RECOMMENDATIONS SET FORTH IN <br />GEOTECHNICAL STUDY FOR ALTERNATE PAVEMENT SECTIONS, SUBGRADE PREPARATION <br />AND OTHER APPLICABLE SITE PREPARATION DESIGNS. (SEE SOILS REPORT <br />NOTES.) <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING <br />UTILITIES TO REMAIN IN USE WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR <br />NOT SHOWN ON THE PLAN. <br />10. UTILITY LINES MAY NOT BE COVERED UNTIL AFTER THEY HAVE BEEN TESTED AND <br />APPROVED BY OWNER AND GOVERNING AGENCY. UPON COMPLETION OF THE BACKFILL <br />OPERATIONS, THE UTILITY LINES SHALL BE RETESTED. <br />11. ALL UTILITY LINE EXCAVATION BEDDING AND BACKFILL MATERIALS, AND COMPAC- <br />TION SHALL BE PERFORMED IN ACCORDANCE WITH THE SOILS ENGINEER'S RECOM- <br />MENDATIONS AND THE GOVERNING AGENCY REQUIREMENTS. UTILITY LINES INCLUDE <br />STORM DRAIN, WATER, SEWER, ELECTRICAL, TELEPHONE, GAS, AND LANDSCAPE <br />IRRIGATION LINES. <br />12. ALL WATER SERVICE SHALL BE COPPER TUBING CONFORMING TO ASTM B-88 <br />(TYPE 'K'), ANNEALED. THE TUBING SHALL BE COUPLED USING FLARE TYPE <br />COMPRESSION FITTINGS CONFORMING TO AWWA C800 (150 PSI WORKING PRESSURE). <br />13. ALL ON-SITE SEWER FACILITIES SHALL CONFORM TO THE CURRENT UNIFORM <br />PLUMBING CODE. - <br />14. ALL PVC PIPE AND PITTINGS SHALL MEET EXTRA STRENGTH MIN. OF SDR -35 OF <br />THE REQUIREMENTS OF ASTM SPECIFICATIONS D-3034-73. <br />15. ALL NEW ON-SITE ASPHALT PAVEMENT SHALL CONSIST OF: <br />- 3"(MIN.) COMPACTED DEPTH CLASS "B" ASPHALT CONCRETE, OVER <br />- 7-1/2"(MIN.) AGGREGATE BASE (CLASS 2) COMPACTED TO 95% OF MAXIMUM <br />DENSITY PER ASTM D-1557, OVER <br />- STRUCTURAL FILL COMPACTED TO 95%OF MAXIMUM DENSITY PER ASTM D-1557. <br />16. ALL NEW ON-SITE CONCRETE PAVEMENT SHALL CONSIST OF: <br />-6"(MIN.) PORTLAND CEMENT CONCRETE (4,000 PSI) WITH 6" X 6" - #10/#10 <br />WELDED WIRE MESH, OVER <br />-6"(MIN.) CRUSHED ROCK BASE COURSE COMPACTED TO 95% OF MAXIMTLM DENSITY <br />PER ASTM D-1557, OVER <br />-12"(MIN.) STRUCTURAL FILL COMPACTED TO 95% OF MAXIMUM DENSITY PER ASTM <br />D-1557, OVER <br />-STRUCTURAL FILL COMPACTED TO 90% OF MAXIMUM DENSITY PER ASTM D-1557. <br />17. A TACK COAT SHALL BE APPLIED TO ALL CONCRETE EDGES TO WHICH ASPHALT IS <br />TO BE PLACED. <br />18. SOIL STERILIZATION (WEED KILLER) SHALL BE APPLIED IN AREAS TO BE PAVED. <br />KEEP 2' MINIMUM CLEAR OF EXISTING AND PROPOSED LANDSCAPE AREAS., APPLY <br />AT MANUFACTURER'S RECOMMENDED RATE TO ASSURE 3" MINIMUM PENETRATION. <br />19. PONDING OR "BIRDBATHS" EXCEEDING ONE-QUARTER INCH IN DEPTH SHALL NOT BE <br />ACCEPTABLE AND SHALL BE CORRECTED BY THE CONTRACTOR. <br />20. CONTRACTOR HAS BEEN DIRECTED TO 'POT HOLE' AND LOCATE EXISTING <br />UNDERGROUND UTILITIES PRIOR TO COMMENCING ANY GRADING OPERATIONS. <br />CONTRACTOR SHALL WAIVE AY RIGHTS TO CHARGE FOR ANY EXTRA WORK <br />FOR RELOCATING UTILITIES OR REVISIONS TO PLANS IF HE FAILS TO COMPLY <br />WITH THIS REQUIREMENT. <br />Inlet <br />Plan <br />Section A -A <br />Metal Frame and Grate - <br />may be set large down <br />tment block! in lieu of <br />9 in Collor -' :e Specs.-) <br />_10 -�to , <br />Outlet ape <br />U <br />Q_ <br />4: <br />Q /1 <br />I' E <br />8.. 1-t.-8. 8.. <br />Section B-0 <br />TYPICAL CATCH BASIN A.P.W.A.STD. PLAN <br />TYPICAL CATCH BASIN <br />ZD <br />n <br />8"m PVC <br />INLET N <br />iD <br />2.-0" <br />8"0 PVC OIL/WATER <br />SEPARATOR 8 OVERFLOW <br />8"m PVC <br />OUTLET <br />' C.B. # 1 TYPE I W/OIL/WATER <br />SEPARATION DEVICE <br />N.T.S. <br />LL <br />w <br />U <br />r <br />r <br />uj <br />-EXTRUDED CONC. CURB w <br />a <br />LL <br />a <br />io <br />3" CLR. n� <br />) <br />N.. <br />appy <br />• ROCK MULCH <br />VARIES ! ;�:=; /SLOPE @2t I max. <br />See landscape plan <br />EXIST. GRADE 2 8-28-89 ADD HEALTH DEPT. SIGNATURE <br />2" COMPT. DEPTH TYPE 'B' / <br />ASPHALTIC CONCRETE <br />4" COMPT. DEPTH CLASS 2 <br />AGGREGATE BASE <br />14 PAVING SECTION - BEHIND BLDG. <br />N.T.S. <br />APPROVED FOR . C,O,N8zT,iWCTIQIN RLe <br />l N JOAQUIN C- . HEALTH bEi <br />.SAN JOAQUIN CO. 1 . OF PUBLIC:`WORK8. DATE N JOA'OUIN4I1kE"WARDEN <br />WOooDBRID�E S TARY`DISTRICT DATE WOOD~E FIRE Dill <br />V/ <br />Z <br />0 <br />V j �a <br />LCL 0 <br />W u' w LL <br />a w �� <br />Cl) �v <br />�W <br />JLU_ U)Z <br />R 2 3 <br />W a O 00 <br />D a ^3 <br />W W � <br />r Z <br />0 <br />Z <br />am <br />Z <br />U. <br />J <br />a <br />V <br />Z <br />00 <br />L) <br />a <br />0 <br />N <br />a <br />c�c <br />it <br />N <br />L0 <br />0 <br />H <br />C) <br />14 <br />U. <br />N <br />0 <br />In <br />0 <br />Ui <br />V <br />r <br />• <br />« <br />a <br />NO DATE REVISION <br />appy <br />I 7-25-89 REVISED SOUTH PIL AREA TO ROCK MULCH <br />Qt,\OfESS/pay <br />EXIST. GRADE 2 8-28-89 ADD HEALTH DEPT. SIGNATURE <br />y <br />G__ <br />W� CO 0 =' <br />EXP. •3 - <br />IV <br />SOF Cr1\E0� <br />type <br />date <br />Ba rg M ��n <br />NEW 2.7 DIA. <br />AM / PM <br />drawn <br />4rawn <br />IB' <br />D.P. <br />DATE <br />Consulting Engineers Inc. <br />prof. <br />sheet <br />g-,rr�: <br />DATE Land Planning, Survey & Engineering Specialists <br />Ac- lfy�s' <br />C-4 <br />9 S 3750 Auburn Blvd., Salve A, Sacramento, Co. 88821 (818) 484-1212 <br />rev. <br />5 <br />2 <br />1 of <br />24" x 38" - PHASE III - MASTER <br />DESIGN: J.S.Q. /r <br />am <br />Z <br />U. <br />J <br />a <br />V <br />Z <br />00 <br />L) <br />a <br />0 <br />N <br />a <br />c�c <br />it <br />N <br />L0 <br />0 <br />H <br />C) <br />14 <br />U. <br />N <br />0 <br />In <br />0 <br />Ui <br />V <br />