<br />GRADING and DRAINAGE PLAN NOTES
<br />1. ALL WORK AND MATERIALS SHALL BE INCOMPLETE ACCORDANCE WITH CURRENT STAN-
<br />DARDS AND SPECIFICATIONS OF SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS
<br />AND THESE APPROVED SET OF PLANS.
<br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH
<br />OF ALL BURIED UTILITIES PRIOR TO BEGINNING CONSTRUCTION. SEE SITE AND
<br />UTILITY NOTE NO. 3.
<br />3. GRADING OUTSIDE OF THE CO.. RIGHT-OF-WAY MUST COMPLY WITH CHAPTER 70 OF
<br />THE UNIFORM BUILDING CODE.
<br />4. ALL SIDE SLOPES SHOWN ON THESE PLANS SHALL BE 2:1 (MAXIMUM), UNLESS
<br />OTHERWISE SPECIFIED.
<br />5. BACKFILL TRENCH OF PIPES IN LIFTS OF 6"-8 AND COMPACT TO 95% REi.i VE
<br />COMPACTION UNDER ROADWAYS AND 90% COMPACTION OFF ROADWAYS. ALL PIPE SHALL
<br />BE INSTALLED WITH CLASS "B" BEDDING IN ACCORDANCE WITH APWA STANDARDS.
<br />6. ALL WORK SHALL BE IN ACCORDANCE WITH THE SOILS ENGINEER'S RECOMMENDATIONS.
<br />SEE SOILS REPORT NOTES.
<br />7. THE OWNER RESERVES THE RIGHT TO HAVE ALL GRADING OPERATIONS, EXCAVATION,
<br />FILL, COMPACTION, TRENCHING AND BACKFILL INSPECTED AND TESTED BY A
<br />QUALIFIED REGISTERED SOILS ENGINEER. THE CONTRACTOR SHALL SCHEDULE AND
<br />COOPERATE WITH THE SOILS ENGINEER WHEN TESTS, INSPECTIONS AND APPROVALS
<br />ARE DEEMED NECESSARY BY THE OWNER TO ASSURE COMPLIANCE WITH THE ESTABLISHED
<br />RECOMMENDATIONS.
<br />8. PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION, DEBRIS, RUBBLE,
<br />TREES, AND ROOT SYSTEMS SHALL BE REMOVED FROM THE SITE TO THE SATISFACTION
<br />OF THE OWNER.
<br />9. IF ANY UNKNOWN SUB -SURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION,
<br />THEY SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND THE
<br />OWNER PRIOR TO PROCEEDING.
<br />10. DUST SHALL BE CONTROLLED BY WATERING THROUGHOUT THE GRADING AND BUILDING
<br />CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL ARRANGE AND PAY FOR
<br />CONSTRUCTION WATER.
<br />11. THE CONTRACTOR SHALL BE RESPONSIBLE TOR THE PROTECTION OF ALL EXISTING
<br />UTILITIES TO REMAIN IN USE WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR
<br />NOT SHOWN ON PLANS.
<br />12. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT
<br />PROPERTIES, PUBLIC AND PRIVATE, AT ALL TIMES DURING CONSTRUCTION AND NOT
<br />TO CAUSE ANY MUD, SILT OR DEBRIS TO BE ONTO THE ADJACENT PROPERTIES. ANY
<br />MUD OR DEBRIS CAUSED ON ADJACENT PROPERTY SHALL BE REMOVED IMMEDIATELY.
<br />13. ALL DISTURBED AREAS SHALL BE SEEDED OR STABILIZED BY COUNTY METHODS FOR
<br />PREVENTION OF ON-SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION.
<br />14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPORTING AND/OR EXPORTING ALL
<br />MATERIAL AS REQUIRED TO PROPERLY GRADE THIS SITE TO THE FINISHED ELEVATIONS
<br />SHOWN HEREON IN ACCORDANCE WITH THE APPROVED PLANS, SPECIFICATIONS, AND
<br />THE SOILS ENGINEER'S RECOMMENDATIONS.
<br />SOIL REPORT NOTES
<br />1. THE FOLLOWING SOILS REPORT FOR THE SITE SHALL BE CONSIDERED PART OF
<br />THESE CONSTRUCTION DOCUMENTS:
<br />SOIL INVESTIGATION: 1525-35
<br />AS PERFORMED BY: BALBI 6 CHANG ASSOCIATES
<br />151 LINK ROAD, SUITE A
<br />CORDELIA, CA 94585
<br />(707) 864-2020
<br />DATED: MAY 9, 1989
<br />2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL
<br />PROVISIONS OF THE SOILS REPORT FOR THE SITE BE OBSERVED AND COMPLIED
<br />'WITH DURING ALL PHASES OF THE SITE PREPARATION, GRADING OPERATIONS,
<br />FOUNDATION, SLAB, AND PAVING CONSTRUCTION.
<br />3. ANY PROVISION OF THE SOILS REPORT WHICH CONFLICT WITH INFORMATION SHOWN
<br />ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRE FURTHER CLARIFICATION,
<br />SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR DETERMINATION.
<br />4. A REPRESENTATIVE OF THE SOILS ENGINEER SHALL BE AVAILABLE TO OBSERVE AND
<br />APPROVE THE EARTHWORK OPERATIONS AND TO VERIFY FIELD CONDITIONS AS WORK
<br />PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS CERTIFYING THAT
<br />THE METHODS AND MATERIALS OF THE EARTHWORK OPERATIONS WERE IN ACCORDANCE
<br />WITH THE RECOMMENDATIONS OF THE SOIL'S INVESTIGATION AND THAT THE
<br />WAS ,PERFORMED TO HIS SATISFACTION.
<br />SITE and UTILITY NOTES
<br />1. ALL WORK AND MATERIALS SHALL BE INCOMPLETEACCORDANCE WITH THE CURRENT
<br />SAN JOAQUIN COUNTY STANDARD SPECIFICATIONS, CHAPTER 70 OF THE UNIFORM
<br />BUILDING CODE (LATEST EDITION),WOODBRIDGE SANITARY DISTRICT, AND ALL
<br />OTHER GOVERNING AGENCY'S STANDARDS.
<br />2. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE
<br />GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUC-
<br />TION OPERATIONS.
<br />3.' THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
<br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION
<br />WHETHER SHOWN ON THESE PLANS OR NOT. LOCATIONS OF SAID UTILITIES AS
<br />SHOWN ON THESE PLANS ARE BASED UPON THE BEST RECORDS AVAILABLE AND ARE
<br />SUBJECT TO A DEGREE 07 UNKNOWN VARIATION. IF CONFLICTS SHOULD OCCUR,
<br />THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC., TO
<br />RESOLVE ALL'PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
<br />4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE
<br />UTILITIES INVOLVED PRIOR TO CONSTRUCTION. (SEE CONTACT LIST, SHEET
<br />C-1.)
<br />5. TWO COPIES OF THESE APPROVED PLANS MUST ON THE JOB SITE WHENEVER
<br />CONSTRUCTION IS IN PROGRESS, ONE SET SHALL BE SUBMITTED TO BARGHAUSEN
<br />CONSULTING ENGINEERS, INC., WITH RECORD OF AS -BUILT INFORMATION AT
<br />COMPLETION OF PROJECT.
<br />6. INSPECTION WILL BE ACCOMPLISHED BY REPRESENTATIVES OF THE SAN JOAQUIN
<br />COUNTY AND WOODBRIDGE SANITARY DISTRICT. IT SHALL BE THE CONTRACTOR'S
<br />RESPONSIBILITY TO NOTIFY THE FIELD INSPECTION SECTIONS 24 HOURS IN
<br />ADVANCE OF BACKFILLING ALL CONSTRUCTION.
<br />7. PRIOR TO ANY CONSTRUCTION/DEVELOPMENT ACTIVITY, SAN JOAQUIN COUNTY
<br />DEPARTMENT OF PUBLIC WORKS INSPECTION SECTION MUST BE CONTACTED FOR A
<br />PRE -CONSTRUCTION MEETING.
<br />8. CONTRACTOR SHALL REFER TO GUIDELINES AND RECOMMENDATIONS SET FORTH IN
<br />GEOTECHNICAL STUDY FOR ALTERNATE PAVEMENT SECTIONS, SUBGRADE PREPARATION
<br />AND OTHER APPLICABLE SITE PREPARATION DESIGNS. (SEE SOILS REPORT
<br />NOTES.)
<br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING
<br />UTILITIES TO REMAIN IN USE WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR
<br />NOT SHOWN ON THE PLAN.
<br />10. UTILITY LINES MAY NOT BE COVERED UNTIL AFTER THEY HAVE BEEN TESTED AND
<br />APPROVED BY OWNER AND GOVERNING AGENCY. UPON COMPLETION OF THE BACKFILL
<br />OPERATIONS, THE UTILITY LINES SHALL BE RETESTED.
<br />11. ALL UTILITY LINE EXCAVATION BEDDING AND BACKFILL MATERIALS, AND COMPAC-
<br />TION SHALL BE PERFORMED IN ACCORDANCE WITH THE SOILS ENGINEER'S RECOM-
<br />MENDATIONS AND THE GOVERNING AGENCY REQUIREMENTS. UTILITY LINES INCLUDE
<br />STORM DRAIN, WATER, SEWER, ELECTRICAL, TELEPHONE, GAS, AND LANDSCAPE
<br />IRRIGATION LINES.
<br />12. ALL WATER SERVICE SHALL BE COPPER TUBING CONFORMING TO ASTM B-88
<br />(TYPE 'K'), ANNEALED. THE TUBING SHALL BE COUPLED USING FLARE TYPE
<br />COMPRESSION FITTINGS CONFORMING TO AWWA C800 (150 PSI WORKING PRESSURE).
<br />13. ALL ON-SITE SEWER FACILITIES SHALL CONFORM TO THE CURRENT UNIFORM
<br />PLUMBING CODE. -
<br />14. ALL PVC PIPE AND PITTINGS SHALL MEET EXTRA STRENGTH MIN. OF SDR -35 OF
<br />THE REQUIREMENTS OF ASTM SPECIFICATIONS D-3034-73.
<br />15. ALL NEW ON-SITE ASPHALT PAVEMENT SHALL CONSIST OF:
<br />- 3"(MIN.) COMPACTED DEPTH CLASS "B" ASPHALT CONCRETE, OVER
<br />- 7-1/2"(MIN.) AGGREGATE BASE (CLASS 2) COMPACTED TO 95% OF MAXIMUM
<br />DENSITY PER ASTM D-1557, OVER
<br />- STRUCTURAL FILL COMPACTED TO 95%OF MAXIMUM DENSITY PER ASTM D-1557.
<br />16. ALL NEW ON-SITE CONCRETE PAVEMENT SHALL CONSIST OF:
<br />-6"(MIN.) PORTLAND CEMENT CONCRETE (4,000 PSI) WITH 6" X 6" - #10/#10
<br />WELDED WIRE MESH, OVER
<br />-6"(MIN.) CRUSHED ROCK BASE COURSE COMPACTED TO 95% OF MAXIMTLM DENSITY
<br />PER ASTM D-1557, OVER
<br />-12"(MIN.) STRUCTURAL FILL COMPACTED TO 95% OF MAXIMUM DENSITY PER ASTM
<br />D-1557, OVER
<br />-STRUCTURAL FILL COMPACTED TO 90% OF MAXIMUM DENSITY PER ASTM D-1557.
<br />17. A TACK COAT SHALL BE APPLIED TO ALL CONCRETE EDGES TO WHICH ASPHALT IS
<br />TO BE PLACED.
<br />18. SOIL STERILIZATION (WEED KILLER) SHALL BE APPLIED IN AREAS TO BE PAVED.
<br />KEEP 2' MINIMUM CLEAR OF EXISTING AND PROPOSED LANDSCAPE AREAS., APPLY
<br />AT MANUFACTURER'S RECOMMENDED RATE TO ASSURE 3" MINIMUM PENETRATION.
<br />19. PONDING OR "BIRDBATHS" EXCEEDING ONE-QUARTER INCH IN DEPTH SHALL NOT BE
<br />ACCEPTABLE AND SHALL BE CORRECTED BY THE CONTRACTOR.
<br />20. CONTRACTOR HAS BEEN DIRECTED TO 'POT HOLE' AND LOCATE EXISTING
<br />UNDERGROUND UTILITIES PRIOR TO COMMENCING ANY GRADING OPERATIONS.
<br />CONTRACTOR SHALL WAIVE AY RIGHTS TO CHARGE FOR ANY EXTRA WORK
<br />FOR RELOCATING UTILITIES OR REVISIONS TO PLANS IF HE FAILS TO COMPLY
<br />WITH THIS REQUIREMENT.
<br />Inlet
<br />Plan
<br />Section A -A
<br />Metal Frame and Grate -
<br />may be set large down
<br />tment block! in lieu of
<br />9 in Collor -' :e Specs.-)
<br />_10 -�to ,
<br />Outlet ape
<br />U
<br />Q_
<br />4:
<br />Q /1
<br />I' E
<br />8.. 1-t.-8. 8..
<br />Section B-0
<br />TYPICAL CATCH BASIN A.P.W.A.STD. PLAN
<br />TYPICAL CATCH BASIN
<br />ZD
<br />n
<br />8"m PVC
<br />INLET N
<br />iD
<br />2.-0"
<br />8"0 PVC OIL/WATER
<br />SEPARATOR 8 OVERFLOW
<br />8"m PVC
<br />OUTLET
<br />' C.B. # 1 TYPE I W/OIL/WATER
<br />SEPARATION DEVICE
<br />N.T.S.
<br />LL
<br />w
<br />U
<br />r
<br />r
<br />uj
<br />-EXTRUDED CONC. CURB w
<br />a
<br />LL
<br />a
<br />io
<br />3" CLR. n�
<br />)
<br />N..
<br />appy
<br />• ROCK MULCH
<br />VARIES ! ;�:=; /SLOPE @2t I max.
<br />See landscape plan
<br />EXIST. GRADE 2 8-28-89 ADD HEALTH DEPT. SIGNATURE
<br />2" COMPT. DEPTH TYPE 'B' /
<br />ASPHALTIC CONCRETE
<br />4" COMPT. DEPTH CLASS 2
<br />AGGREGATE BASE
<br />14 PAVING SECTION - BEHIND BLDG.
<br />N.T.S.
<br />APPROVED FOR . C,O,N8zT,iWCTIQIN RLe
<br />l N JOAQUIN C- . HEALTH bEi
<br />.SAN JOAQUIN CO. 1 . OF PUBLIC:`WORK8. DATE N JOA'OUIN4I1kE"WARDEN
<br />WOooDBRID�E S TARY`DISTRICT DATE WOOD~E FIRE Dill
<br />V/
<br />Z
<br />0
<br />V j �a
<br />LCL 0
<br />W u' w LL
<br />a w ��
<br />Cl) �v
<br />�W
<br />JLU_ U)Z
<br />R 2 3
<br />W a O 00
<br />D a ^3
<br />W W �
<br />r Z
<br />0
<br />Z
<br />am
<br />Z
<br />U.
<br />J
<br />a
<br />V
<br />Z
<br />00
<br />L)
<br />a
<br />0
<br />N
<br />a
<br />c�c
<br />it
<br />N
<br />L0
<br />0
<br />H
<br />C)
<br />14
<br />U.
<br />N
<br />0
<br />In
<br />0
<br />Ui
<br />V
<br />r
<br />•
<br />«
<br />a
<br />NO DATE REVISION
<br />appy
<br />I 7-25-89 REVISED SOUTH PIL AREA TO ROCK MULCH
<br />Qt,\OfESS/pay
<br />EXIST. GRADE 2 8-28-89 ADD HEALTH DEPT. SIGNATURE
<br />y
<br />G__
<br />W� CO 0 ='
<br />EXP. •3 -
<br />IV
<br />SOF Cr1\E0�
<br />type
<br />date
<br />Ba rg M ��n
<br />NEW 2.7 DIA.
<br />AM / PM
<br />drawn
<br />4rawn
<br />IB'
<br />D.P.
<br />DATE
<br />Consulting Engineers Inc.
<br />prof.
<br />sheet
<br />g-,rr�:
<br />DATE Land Planning, Survey & Engineering Specialists
<br />Ac- lfy�s'
<br />C-4
<br />9 S 3750 Auburn Blvd., Salve A, Sacramento, Co. 88821 (818) 484-1212
<br />rev.
<br />5
<br />2
<br />1 of
<br />24" x 38" - PHASE III - MASTER
<br />DESIGN: J.S.Q. /r
<br />am
<br />Z
<br />U.
<br />J
<br />a
<br />V
<br />Z
<br />00
<br />L)
<br />a
<br />0
<br />N
<br />a
<br />c�c
<br />it
<br />N
<br />L0
<br />0
<br />H
<br />C)
<br />14
<br />U.
<br />N
<br />0
<br />In
<br />0
<br />Ui
<br />V
<br />
|