Laserfiche WebLink
1 <br />EIGHT MILE ROAD <br />5h rz ft*al /I R/Dy <br />_ 25' <br />!i �. RES7RI CTED ACCESS a Const. 6"A.C. dike <br />Well Site or Alternate 6" <br />/6' /6' Extruded Cono . <br />Curb <br />O� I <br />w <br />� I <br />N I Jo <br />Q I <br />�4 I <br />I <br />I <br />;hi. sl <br />II LOS CERR ITO� - <br />I I 8 "W 6" -- <br />SN. S. <br />"W SN.S. DRIVE <br />9 <br />22 <br />fir <br />;hi 3Q 3 <br />Z" <br />/LAS REYES 8 <br />O w0 OPROV <br />� f I SW 4Z <br />N <br />7YPE 'q" <br />B�W �s i O <br />DRIVE/s� I 1 12 SAN uo,4001 <br />4.AS. <br />`r 7 am- <br />i <br />\ d <br />ill, Milli lill <br />I I <br />PRIME GOAT /INCLNDE " PRIME CORr l LI'll R9RliA17J' <br />l{ SEE SEG. 39 l 93 OF vtll <br />31A.0 - Type e8y %2"max. logy. <br />8" A. ,B. - Cl. 27 95% Relative Compaction <br />12" ,r 95 /. R. C. ComPocted Native Maz`eria/ <br />T. /. = 4.0 R- value = 5 <br />6.E. Reva'=125 E.E. PRDPlDEO= 1.36 <br />INTERIOR SiREEiS - 7YPIC,V L SECTION <br />5CA1E I"= 5' <br />9--S-I P­9� <br />-MORIol .r/AE DEPT. oaa7i <br />OfNfRAL <br />_ 50' <br />4IF B'P. U.E. a I /0'P. ,E <br />RfFfR t0 A.C. SO.ESMT, <br />30.9Z' OR 30.67' <br />NfAr CUT 0 RfMDVE 0. 9?'oR A67' <br />4.3' <br />6" A. C. D/X <br />Ex. 4 % 4 MAX) New .111 WALL <br />EX/ST E. P <br />tilant4in qd <br />f Shou/der <br />I/ 311 - rvpE B -a <br />` ANCIB�P, SEE SfCT.T391099 of SPfCS /N `~��•� '' +` I! P A do ; <br />z Jt <br />12" NAY/i 10A7ER/AL <br />95% R.G. J�,t'cfj Bank -� 359'Fc <br />N07E : 911011V I' BREAM IN/401 <br />,41. e. l OD COW P7 RI��h Em6A.�kinen71 jJ/f��j ExGu✓aIll <br />lOC/D7/ONS AS SHOWN - NA7/ UE M 07ERAil @ <br />Fe %. R. C. <br />ON /1WPR0PEMEN7 Pl AN. <br />T. /. = 6 6- E. REQ'D _ 1.85 E. E. PROP/DED _ 1. f5 R - VDl UE = 5 <br />C-146117 M/.1E ROAD - r PP/CAl SEC7/0N (s7,g <br />SGALE NONE <br />27. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety of all persons and <br />property; that this requirement shall apply continuously and not <br />be limited to normal working hours; and that the contractor shall <br />defend, indemnify and hold harmless, the County of San Joaquin, <br />its elected officials, officers, employees, and agents from any <br />and all claims, costs of litigation, damages, and attorney's <br />fees, for personal injury or property damage of whatever nature <br />which are claimed to have occurred during the term of this <br />project. <br />6 LEGEND <br />S.I.C�B. or Side Inlet Catch Basin <br />/ L.P. Low Point <br />H.P. High Point <br />I e� I ff T.C. Top of Curb <br />S.D. (RCP.rr.#rv-6[pl)Stormi Drain Line Indicating Direction of Flow <br />BARB C! /l0E \ /s <br />W. Ore.. -al IV) Water Line <br />'Fire Hydrant <br />X <br />5 -fls O VON-ety <br />N N'Pier All <br />�� O Direct .7#1011 CAI Basin <br />411 d'ide .771911Citcb Blain <br />Zj. �� y 0 Manhole <br />1 )l Reducer <br />-} Byree/ "/ <br />griringe t/ipe <br />SERVICESO survey Monument Bax <br />Street Lights tb <br />Sewage _ septic 5ysiem a <br />Natural Gas & Electric - P. G. & E. T <br />Telephone Pacific Bell ° <br />Television Cable_ CONhNENTALCABLEv/5/aN 's 31` ° Horney 9 $� I.n� r „orn CONSTRUCTION STAKING LIABILITY WAIVER <br />Water 5 J. Gounty G5/J. Nn.46 MA HIN �MO90n n o Handel Narmon,tie(r �' s <br />Storm Drainage 5✓ Coun GSA. NO. 44 Zy md.l. 7i s,oee 2 • W co <br />SHEET INDEX y I� ¢ad Rd Scn�AtkisonRd.oa,DUae These improvement plans have been prepared with the <br />aid t Q r...,,sia"d <br />PROPOSE D SITE intent that the firm of Baumbach & Piazza, Inc. will be <br />-.i is., performing the construction staking for the complete <br />OA .. ,- <br />C 1p project. If, however, another engineering and/or <br />i XES' S',fIEFr TUDOR ROSE Coro Pose Rd. t -•� �SCH." surveying firm should be employed to use these plans for <br />a�-- PIAN RROFIL E l.o 1amo WA{' R° 99 N'r- i 'n ?�°/ �e `L`' the purpose of construction staking, notice is hereby <br />is < given that the firm of Baumbach & Piazza, Inc. will not <br />PLAN PROFJL� las REs'Es OR. , 105' CERRITOS dR. EigntMit. . ,Road Eight Mile Rd assume any responsibility for errors or omissions, if <br />b -- <br />Q-- PLAN` PROFILE EASEnoENr "B" - Ouo nick ' of +s r any, which might occur and which could have been avoided, <br />(}-- PLAN �` PROFILE L -Ill MILE Ril LEN ' 'm` t x F corrected or mitigated if Baumbach & Piazza, Inc. had <br />EA dEW. Roto ? m Ro,d Comscoc performed the staking work. <br />u r, Moro 1,,I Rdo- "too a <br />a-- EASEMENT�WATERLOOaOke, <br />D <br />II Hildse WATERLOG <br />DETAIL ;Nf-f-7 = ° ;°n° 95CH ,; = <br />Ketcham <br />8�-- DETAIL SNEE7 �e 6000 a �-� Ln. �-�-Oak Ave. BENCHMARK DATUM : E/eu 44.6y <br />" =Q o ° F°ncMld Per U. S. G.S. Datum- Ch/se/%d square <br />�- GRAD/N6 PLAN ., / soca o , m�-I 0 , `s d. ° <br />i g'v <br />�//� L '�0C Z6 on the southwest Cornero-frai/rocrq' grate <br />/ f- �1�/ /T ,' i \.c i v n o' >^ u E E v <br />post lights), on the soath siry6 of <br />Eiyht M116 RRL iyE5 t of /C//// Odli l�r7Ci <br />VICINITY MAP E45t of rsrojeCz`site. <br />__. Mile <br />NOT TO SCALE <br />NO <br />1. All work shall conform to these plans and any special provisions for <br />this project. <br />2. Refer to the final map of this subdivision for all center line and <br />property line data. <br />3. Contractor shall receive an approved set of plans and specifications <br />prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and <br />construction stakes necessary for completion of work. The Contractor <br />shall be responsible for the preservation of all survey and <br />construction stakes. Survey and construction stakes that are lost or <br />destroyed due to Contractor's negligence will be set by the Engineer <br />at the Contractor's expense. <br />5. The existing underground utilities were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities in the field before any <br />excavation. The Contractor shall notify and coordinate all work with <br />any agency requiring removal or relocation of their utilities. <br />Pacific Bell and P. G. & E. U.S.A. (800) 642-2444. <br />6. House services and fire hydrant laterals shall be installed prior to <br />pavement construction. All underground utilities within the street <br />area, including gas and telephone lines, shall be installed prior to <br />paving. <br />7. All manholes to be set flush with the finish grade unless otherwise <br />indicated. <br />B. All water lines shall have a minimum cover of 30". <br />9. Water used in any phase of construction, such as backfill compaction, <br />dust control, testing or other work herein regdired, shall be <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />10. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety for all persons and <br />property= that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner and the Engineer harmless from <br />any and all liability, real or alledged, in connection with the <br />performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />11. Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />12. Lot grading shall be completed before starting any underground <br />construction. Refer to attached grading plan. <br />13. Contractor shall be responsible for notifying and co -coordinate all <br />work with any agency requiring removal or relocation of utilities, <br />such as P--ri?ic Bell, P. G. & E., etc. <br />14. All off-sI,ts water lines shall be pressure tested, disinfected, <br />flushed and tested for bacteria in conformance with the San Joaquin <br />County Health Code Requirements. <br />15. All off-site storm drains shall be cleaned prior to final acceptance. <br />16. Contractor shall visit site prior to bidding. Specifications are a <br />separate document. <br />17. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />shall be included in his bid price. <br />18. Where water crosses SD use an ie -20 ft. length of Cl. 200 pipe, <br />centered over the SD if: a) The water is under the SD. <br />Its) The vertical clearance is less than 1 foot. Applies to catch <br />basins also. <br />19. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 24 hours in advance of <br />commencement of work. <br />20. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />21. Fire hydrant bid shall include the following: Tee, 6" Lateral, 6" <br />Valve and complete fire hydrant assembly. <br />22. Prior to performing any work in Eight Mile Road, the Contractor shall <br />obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />23. Pipe type and strengths allowed for underground utilities, unless <br />otherwise specified on plans, are as follows: Storm Drain (SD) - RCP <br />or ACP, Cl. IIII Water (W) - PVC, Cl. 150 or greater per AWWA Std. C- <br />900 or ACP., Cl. 150 or greater per ASTM C296, Type II. <br />24. All traffic signs and markings shall conform to San Joaquin County <br />Standards and to the "Manual of Uniform Traffic Control Devices". <br />25. Any changes to the approved Improvement Plans and Specifications must <br />be prepared and certified by the "Civil Engineer" and shall be <br />approved by "Director" prior to implementation. <br />26. Materials samp/iny ¢ t'estiny shall he the respo//sibi/ity of Me GpntraCtor. <br />NO. <br />DATE <br />REVISIONS <br />BY <br />DESIGN DRAWN BY <br />-- <br />_ "ZpLQ7� <br />SUB TED BY <br />R. .E. DATE 8 <br />APPROVED BY THE SAN JOt{QUIN COUNTY DIxHc1Ox OF PUBLIC WORKS <br />HE`NRU- M /I/RAfg2I25B DgrE: 9 �gB9 <br />, J <br />B A U M B A C H & P I A Z Z A <br />KEY SHEET <br />RANCHO MORAOA ESTATES <br />SHEET OF <br />sO <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LOO1, CALIF. <br />98240 PH: 209-388-8818 <br />JOB N0. $$ll <br />FILE q► <br />N0. <br />G-896 <br />t <br />