Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />A A V W U A_J %./ A A AJ• L.L.L I rl—/ L W L V <br />GENERAL NOTES <br />1, Contractor shall obtain an Encroachment Permit from <br />the City of Stockton Department of Public Works prior <br />to starting any work within the City Right -of ---Way. <br />2. Contractor shall notify the City of Stockton Department <br />of Public Works at least 48 hours prior to start of <br />construction, <br />3. All work within the City's Right--of---Way shall conform <br />to Section 100 of the City's Standard Specifications. <br />4. Contractor shall. notify U.S,A. at least 48 hours prior <br />to any excavation operations by calling 1-800442-2444. <br />5. No valve or other control on. an existing system shall <br />be operated for any purpose by the Contractor. The <br />Contractor shall coordinate with City of Stockton <br />Municipal Utilities Department and/or San Joaquin County <br />Utilities Maintenance Division to operate any valve, hydrant, <br />blowoff or curbstop. <br />6. Contractor shall possess a Class A Contractors license at <br />the time this contract is awarded. <br />A <br />7 <br />-'k <br />.......... <br />TO BE SUPPLEMENTED BY STANDARD PLIVS DATED JANUARY 1.988 <br />a <br />19 <br />,it an AR ,q C <br />(3FNjA,M1N Hoi2_� <br />oA <br />ABBREVIATIONS <br />A.R. <br />Aggregate Base <br />A.C. <br />Asphalt Concrete <br />Alt, <br />4) <br />A.S. <br />CK <br />Bit, Cd, <br />Bituminous Coated <br />C.G. & S.W. <br />= Curb, Gtitter & Sidewalk <br />C/L <br />Center, Line <br />C,P, <br />= Concrete Pipe <br />UY, <br />Corrugated Steel Pipe <br />C.&HP <br />NO. DESCRIPTION <br />DR WN BY CH KD <br />BY APP BY DATE <br />DIA, <br />= Dia enter <br />NNIMMM <br />1! iiiiiiii!mIng 1 o <br />mmm�lll;ii: I I MINIMUM <br />D.P. <br />PROJECT ENGINEER DATE SENIOR ENGINEER DATE <br />APPROVAL ReECOIIED BY <br />Galvanized <br />F/L <br />= Flow Line <br />LY <br />Linear Fee <br />FILE NAME DRAWER <br />SHEET NO, <br />C.A.D. FILE <br />Non ---Reinforced Concrete Pipe <br />O,Ga <br />= Original Ground <br />\PLYMOUTH\PM,, HT <br />A <br />7 <br />-'k <br />.......... <br />TO BE SUPPLEMENTED BY STANDARD PLIVS DATED JANUARY 1.988 <br />a <br />19 <br />,it an AR ,q C <br />(3FNjA,M1N Hoi2_� <br />oA <br />ABBREVIATIONS <br />A.R. <br />Aggregate Base <br />A.C. <br />Asphalt Concrete <br />Alt, <br />4) <br />A.S. <br />CK <br />Bit, Cd, <br />Bituminous Coated <br />C.G. & S.W. <br />= Curb, Gtitter & Sidewalk <br />C/L <br />Center, Line <br />JJ _Y <br />NO M MOP 9 WA 0 10�Lkww I MW y 0� �Ww on I MW <br />HENRY M. HIRATA <br />F.C.E. 21258 <br />Director of Public Works <br />ABBREVIATIONS <br />A.R. <br />Aggregate Base <br />A.C. <br />Asphalt Concrete <br />Alt, <br />= Alternative <br />A.S. <br />Aggregate Subbase <br />Bit, Cd, <br />Bituminous Coated <br />C.G. & S.W. <br />= Curb, Gtitter & Sidewalk <br />C/L <br />Center, Line <br />C,P, <br />= Concrete Pipe <br />UY, <br />Corrugated Steel Pipe <br />C.&HP <br />Corrugated Steel Pipe Arch <br />D.I. <br />Drain Inlet <br />DIA, <br />= Dia enter <br />Dr. <br />Driveway <br />D.P. <br />Edge of Pavement <br />GALV, <br />Galvanized <br />F/L <br />= Flow Line <br />LY <br />Linear Fee <br />M,11, <br />Manhole <br />N,R.C,Pl <br />Non ---Reinforced Concrete Pipe <br />O,Ga <br />= Original Ground <br />Portland Cement Concrete <br />Pen, Tr. <br />Pentration Treatment <br />P/L <br />= Property Line <br />P, ,S, <br />Plant Mixed Surfacing <br />I.C. <br />Relative Compaction <br />R.C.P. <br />Reinforced Concrete Pipe <br />Regd. <br />Required <br />R & D <br />Remove and Dispose <br />R <br />= Remove and Salvage <br />R/W <br />Right of Way <br />S—Dr. <br />Side Drain <br />S'P, <br />Standard Plans <br />TYP, <br />Typical <br />X --Dr. <br />Cross Drain <br />W.W. <br />Walkway <br />