Laserfiche WebLink
141706 <br />1. All MATERIAL AND WORKMANSHIP SHALL CONFORM WITH THE SPECIFICATIONS, <br />STANDARDS AND ORDINANCES OF THE SAN JOAQUIN COUNTY AND SHALL BE PART <br />OF THESE IMPROVEMENT PLANS. STANDARD SPECIFICATIONS AND DETAILS ARE <br />AVAILABLE IN THE OFFICE OF SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS. <br />2. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN <br />GENERAL, TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY <br />THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT MATERIALS AND <br />WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED. NOTED DIMENSIONS <br />TAKE PRECEDENT OVER SCALE. ANY DISCREPANCY SHALL IMMEDIATELY BE <br />BROUGHT TO THE ATTENTION OF QUARTAROLI AND ASSOCIATES, (209) 239-4908 <br />AND R.W. SIEGFRIED AND ASSOCIATES (209) 9432021. <br />3. CONTRACTORS SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING A BID. <br />4. THE EXISTING UNDERGROUND UTILITIES ARE PLOTTED FROM AVAILABLE <br />RECORDS. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT <br />'THESE UTILITIES. THE CONTRACTOR SHALL DO NO EXCAVATION UNTIL ALL <br />UTILITY AGENCIES HAVE BEEN NOTIFIED AND HAVE BEEN GIVEN THE <br />OPPORTUNITY TO MARK THEIR FACILITIES IN THE FIELD. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO VERIFY 'THE LOCATION OF ALL EXISTING <br />UTILITIES. PRIOR TO OPENING AN EXCAVATION, THE CONTRACTOR SHALL <br />DETERMINE WHETHER UNDERGROUND INSTALLATION, I.E., SEWER, WATER, STORM <br />DRAINAGE, ELECTRICAL LINES, GAS LINES, CABLE T.V. LINES, ETC. WILL BE <br />ENCOUNTERED AND, THE APPROXIMATE LOCATION OF SUCH AN INSTALLATION. <br />THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING AND, WHEN IT IS UNCOVERED, ADEQUATE PROTECTION SHALL BE <br />PROVIDED FOR THE EXISTING INSTALLATION, ALL KNOWN OWNERS OF <br />UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF <br />PROPOSED WORK AT LEAST FORTY-EIGHT (48) HOURS PRIOR TO THE START OF <br />ACTUAL EXCAVATION. CALF, U.S.A. 1-800-642-2444, P.G.&E. -- (209) <br />466-4581, PACIFIC BELL TELEPHONE (209) 811-3300, SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS - (209) 468-3000. <br />5. AN ENCROACHMENT PERMIT SHALL BE OBTAINED FROM SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS PRIOR TO ANY OFF-SITE CONSTRUCTION. ANY <br />AND ALL SPECIFIC REQUIREMENTSORCONSTRUCTION DETAILS IMPOSED BY THE <br />ENCROACHMENT PERMIT SHALL, BECOME A PART OF THESE IMPROVEMENT PLANS. <br />6. SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS SHALL, BE NOTIFIED BY <br />THE CONTRACTOR AT LEAST 48 HOURS IN ADVANCE OF' ANY OFF-SITE <br />CONSTRUCTION (209) 468-3000. <br />7. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE <br />WITHOUT THE WRITTEN AUTHORIZATION FROM QUARTAROLI AND ASSOCIATES AND <br />R.W. SIEGFRIED AND ASSOCIATES. <br />8. EACH CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE REMOVAL OR <br />RELOCATION OF ANY AND ALL, EXISTING UTILITIES WITH 'THE RESPECTIVE <br />UTILITY COMPANY. COST OF' THIS COORDINATION IS TO BE "INCLUDED IN THE <br />PRICES BID FOR THE VARIOUS IMPROVEMENTS TO COMPLETE THE PROJECT. <br />9. GENERAL CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALI, PERSONS AND <br />PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUALLY AND NOT BE <br />LIMITED TO NORMAL, WORKING HOURS; AND THAT THE CONTRACTOR SHALL <br />DEFEND, INDEMNIFY AND HOLD THE OWNER, ENGINEER AND SURVEYOR HARMLESS <br />FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE <br />PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING <br />FROM THE SOLE NEGLIGENCE OF THE OWNER, ENGINEER, OR SURVEYOR. <br />10. BENCH MARK: SAN JOAQUIN COUNTY BRASS DISC STAMPED "AA -1313-41" IN <br />CONCRETE HEADWALL OF THE BANTA CARBONA IRRIGATION BOX ON THE NORTH <br />SIDE OF VALPICO ROAD AT 'THE INTERSECTION OF FAIROAKS ROAD. <br />ELEVATION = 104.50 <br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF ALL <br />SURVEY AND CONSTRUCTION STAKES. SURVEY AND CONSTRUCTION STAKES THAT <br />ARE LOST OR DESTROYED DUE TO THE CONTRACTOR'S NEGLIGENCE WILL BE <br />RESET BY THE PROJECT SURVEYOR AT 'THE CONTRACTOR'S EXPENSE. <br />12 CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS <br />FROM DAMAGE. <br />13. CONTRACTORS SHALL BE REQUIRED TO COOPERATE WITH THEMSELVES AND <br />UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICES <br />TO THE DEVELOPMENT, AND ANY DELAY CAUSED BY SUCH INSTALLATION SHALL <br />NOT BE CONSIDERED AS RIGHT-OF-WAY DELAY, <br />14, ALL, UNDERGROUND SERVICES SHALL BE INSTALLED IN CONFORMANCE WITH THE <br />REQUIREMENTS OF' THE SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS. <br />15. GRADES SHOWN ON TE -EIS PLAN DO NOT NECESSARILY REFLECT A BALANCE EARTH- <br />WORK CUT AND FILL QUANTITIES. CONTRACTOR -SHALL IMPORTOR-EXPORT <br />P7l�T-fl--�f-AT-F,-'RI-ALS-AS--R-'*E"QU-IRE-'f)--'iN-'-C)RD-F,P, T_0C_0NSTRUG_TT`HE__ <br />IMPROVEMENTS TO <br />WHE­G_R_ADES SHOWN -AT ­ NCO EXTRA COST' TO THE OWNER. <br />16. ANY FILL PLACED SHALL BE PROPERLY COMPACTED AS REQUIRED BY THE PLANS <br />AND THESE SPECIFICATIONS. <br />A. EARTH FILL TO ESTABLISH PAVED AREA SUBGRADE SHALL BE COMPACTED TO <br />A MINIMUM RELATIVE COMPACTION OF 90% EXCEPT THAT THE AREA WITHIN <br />SIX INCHES BELOW SUBGRADE SHALL BE COMPACTED TO A MINIMUM <br />RELATIVE COMPACTION OF 95%. <br />B. EARTH FILL TO ESTABLISH FINISHED GRADE OUTSIDE THE PAVED AREAS <br />AND BUILDING AREAS SHALL BE COMPACTED TO A MINIMUM RELATIVE <br />COMPACTION OF 80% WITHIN LOT AND 90% IN ROAD RIGHT-OF-WAY, <br />C. FILL AND COMPACTION WITHIN THE BUILDING AREA SHALL BE IN <br />ACCORDANCE WITH THE BUILDING PLANS AND/OR SPECIFICATIONS. <br />D. FILL SHALL BE NON -EXPANSIVE MATERIAL AND SHALL BE FREE OF <br />VEGETATION OR DELETERIOUS MATTER. FILL SHALL BE COMPACTED IN <br />LIFTS NOT TO EXCEED EIGHT INCHES. <br />ALL AREAS TO 13E COVERED WITH ASPHALT CONCRETE PAVEMENT SHALL HAVE A <br />SUBGRADE COMPACTED TO 95% RELATIVE COMPACTION TO A POINT SIX INCHES <br />BELOW SUBGRADE. <br />17. CONTRACTOR'S BID SHALL INCLUDE THE COST OF ANY NECESSARY SOILS <br />COMPACTION AND MATERIALS TESTING. <br />18. ASPHALT CONCRETE: ASPHALT CONCRETE SHALL BE TYPE B AND SHALL CONFORM <br />TO _THE_PKdV_1SIONS OF SECTION 39 OF THE CALTRANS STANDARD SPECIFICATIONS, <br />THE PENETRATION RANGE OF PAVING ASPHALT SHALL BE AR -4000; AGGREGATE <br />SHALL BE ONE-HALF (j") INCH MAXIMUM MEDIUM GRADING FOR SURFACING, <br />PRIME COAT SHALL BE A LIQUID ASPHALT GRADE SC -250 OR SC --70 AND SHALL <br />BE APPLIED TO THE ENTIRE PAVED AREA AND THE COST SHALL BE INCLUDED IN <br />THE UNIT PRICE BID FOR ASPHALT CONCRETE. PRIME COAT SHALL BE PLACED <br />IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 39-4 OF THE CALTRANS <br />STANDARD SPECIFICATIONS. <br />AGGREGATE BASE: AGGREGATE BASE SHALL BE CLASS TWO CONFORMING TO THE <br />REQUIREMENTS OF SECTION 26-102B OF THE CALTRANS STANDARD SPECIFICATIONS. <br />SPREADING AND COMPACTING AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS <br />OF SECTION 26-1.04 OF THE CALTRANS STANDARD SPECIFICATION, <br />19. THE GRADING AND PAVING CONTRACTOR SHALL ADJUST TO FINISHED GRADE "MIE <br />TOPS OF ALL PROPOSED AND EXISTING SANITARY SEWER MANHOLES, STORM <br />DRAIN MANHOLES, VALVE BOXES AND WATER METER BOXES, ETC., AND THE COST <br />OF SUCH WORK SHALL BE INCLUDED IN THE UNIT PRICES FOR STREET WORK. <br />20. THE DOMESTIC WATER LINE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE <br />PLANS, AND SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS ADOPTED <br />UNIFORM PLUMBING CODE, AND UNIFORM BUILDING CODE. PIPE MATERIAL <br />SHALL BE THAT ALLOWED BY THE UNIFORM PLUMBING CODE AND SAN JOAQUIN <br />COUNTY DEPARTMENT OF PUBLIC WORKS. IT IS THE CONTRACTOR'S <br />RESPONSIBILITY To VERIFY THAT THE TYPE KN`DSP_ECIFICA__ <br />TIONS OF ALL <br />MATERIAL, FITTINGS, ETC. CONFORM TO SAN JOAQUIN COUNTY DEPARTMENT' OF <br />PUBLIC WORKS STANDARDS AND SPECIFICATIONS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE AND BACTERIA TESTING OF <br />WATER LINES AS REQUIRED BY SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC <br />WORKS. BACTERIA TESTS SHALL BE® TAKEN BY A CERTIFIED LABORATORY <br />TECHNICIAN. <br />REFER TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS FOR ALI, WATER <br />LINE TESTING REQUIREMENTS. <br />21. T H E S T 0 RM D RA IN PIPELINE S If A L L BE <br />CONSTRUCTED IN ACCORDANCE WITH THESE PLANS, AND SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS ADOPTED UNIFORM PLUM131NG CODE, AND UNIFORM <br />BUILDING CODE. PIPE MATERIAL SHALL BE THAT ALLOWED BY THE UNIFORM <br />PLUMBING CODE AND SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS. IT <br />IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT THE TYPE AND <br />S PEC I F I CAT I UN -SOF AI E, FITTINGS, ETC . C6 -NF'O-RM- 17 r 0 <br />SAN JOAQUIN <br />COUNTY DEPARTMENT OF PUBLIC WORKS STANDARDS AND SPECIFICATIONS. -- <br />MATERIAL SELECTION SHALL BE SUBMITTED TO THE CIVIL ENGINEER FOR REVIEW. <br />SEE NOTE 49, <br />22. GRADING AND PAVING CONTRACTOR SHALL COORDINATE THE INSTALLATION OF <br />ALL ELECTRICAL, LANDSCAPE IRRIGATION, AND UNDERGROUND UTILITY <br />CONDUITS WITH APPROPRIATE SUB -CONTRACTORS AND UTILITY COMPANIES PRIOR <br />TO CONSTRUCTION. <br />23. THE OFFICE OF QUARTAROLI AND ASSOCIATES, 310 SUN WEST PLACE, SUITE <br />"A", MANTECA, CALIFORNIA (209) 239-4908, SHALL BE NOTIFIED FIVE (5) <br />WORKING DAYS IN ADVANCE OF ANY REQUIRED CONSTRUCTION SURVEYING. <br />24. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER NINE, <br />SECTION 6705, 6706, 6707, OF THE STATE LABOR CODE. <br />25. CONTRACTORS AND SUB -CONTRACTORS BIDDING ON THIS PROPOSED PROJECT <br />SHALL CAREFULLY EXAMINE THESE PLANS AND CAREFULLY REVIEW THE <br />CONSTRUCTION SITE TO OBTAIN FIRST HAND KNOWLEDGE OF EXISTING <br />CONDITIONS AND TO DETERMINE SPECIFICALLY WHAT IS REQUIRED TO BE <br />ACCOMPLISHED IN HIS PORTION OF THE TOTAL WORK. IF ANY DOUBT EXISTS <br />TO THE INTENT OF THE PLANS, SPECIFIC DETAILS, CONSTRUCTION NOTES, OR <br />IF THE CONTRACTOR AND SUB -CONTRACTOR REQUIRES ADDITIONAL INFORMATION, <br />IT MUST BE CLARIFIED WITH QUARTAROLI AND ASSOCIATES AND R.W. <br />SIEGFRIED AND ASSOCIATES PRIOR TO BIDDING, OR HIS BID SHOULD STATE <br />ACCURATELY WHAT IS INCLUDED AND WHAT IS EXCLUDED, <br />26. CONTRACTOR AND ANY SUB -CONTRACTOR USING PLANS WHICH ARE UNAPPROVED BY <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS AND PLANNING <br />DEPARTMENTS SHALL DO SO AT THEIR OWN RISKS. QUARTAROLI AND <br />ASSOCIATES AND R.W. SIEGFRIED ASSOCIATES WILL NOT BE HELD RESPONSIBLE <br />FOR USAGE OF SUCH PLANS FOR THE CONSTRUCTION OF THIS PROJECT. <br />27. IN THE EVENT THAT QUARTAROLI AND ASSOCIATES OR R.W. SIEGFRIED AND <br />ASSOCIATES IS NOT EMPLOYED TO DO THE CONSTRUCTION SURVEYING, THIS NOTE IS <br />TO GIVE FORMAL NOTICE THAT QUARTAROLI AND ASSOCIATES AND R.W. SIEGFRIED <br />AND ASSOCIATES CANNOT, AND WILL NOT TAKE RESPONSIBILITY FOR ERRORS OR <br />OMISSIONS, IF ANY, WHICH MIGHT OCCUR AND WHICH COULD HAVE BEEN AVOIDED OR <br />DETECTED AND/OR CORRECTED OR MITIGATED HAD QUARTAROLI AND ASSOCIATES OR <br />R.W. SIEGFRIED AND ASSOCIATES DONE THE CONSTRUCTION SURVEYING. <br />28. INSPECTION DURING CONSTRUCTION: <br />ANY IMESROVFEMENTS CONSTRUCTED TO THE SPECIFICATIONS AND WHICH IT IS <br />INTENDED THAT SAN JOAQUIN COUNTY WILL ASSUME MAINTENANCE <br />RESPONSIBILITY, MUST BE INSPECTED DURING CONSTRUCTION BY AN <br />AUTHORIZED AGENT OF SAN JOAQUIN COUNTY. EACH PHASE OF CONSTRUCTION <br />MUST 13E INSPECTED AND APPROVED PRIOR TO PROCEEDING TO THE SUBSEQUENT <br />PHASES. ANY IMPROVEMENTS CONSTRUCTED WITHOUT INSPECTION AS PROVIDED <br />ABOVE OR CONSTRUCTED CONTRARY' TO THE ORDER OR INSTRUCTIONS OF THE <br />AUTHORIZED AGENT OF SAN JOAQUIN COUNTY WILL BE DEEMED AS NOT <br />COMPLYING WITH SAN JOAQUIN COUN'T'Y STANDARDS AND SPECIFICATIONS, AND <br />WILL NOT BE ACCEPTED BY SAN JOAQUIN COUNTY FOR MAINTENANCE PURPOSES. <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS WILL, PERFORM FIELD <br />INSPECTIONS FOR THIS PROJECT. <br />29. CHANGES ON PLANS AND SPECIFICATIONS <br />ANY CHANGES TO THE _APPR_0V_ED -IMPROVEMENT PLANS AND SPECIFICATIONS MUST <br />BE PREPARED AND APPROVED BY R.W. SIEGFRIED AND ASSOCIATES AND SHALL <br />BE SUBMITTED TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS FOR <br />APPROVAL PRIOR TO IMPLEMENTATION, <br />30. A GEOTECHNICAL INVESTIGATION WAS PREPARED FOR THIS PROJECT SITE BY <br />J.H. KLEINFELDER AND ASSOCIATES DATED FEBRUARY 22, 1990, FILE NO. <br />20--2983-02 AND IS MADE A PART OF THESE PLANS BY REFERENCE. <br />31. THIS SITE CONTAINS 27.47i ACRES. <br />32. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO SAN JOAQUIN COUNTY <br />STANDARDS AND TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES,LATEST <br />EDITION. <br />33. CONTRACTOR AGREES THAI' HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE, CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL, PERSONS AND <br />PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE <br />LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL <br />DEFEND, INDEMNIFY AND HOLD HARMLESS, THE COUNTY OF SAN JOAQUIN, ITS <br />ELECTED OFFICIALS, OFFICERS, EMPLOYEES AND AGENTS FROM ANY AND ALL, <br />CLAIMS, COSTS OF LITIGATION, DAMAGES, AND ATTORNEYS FEES, FOR <br />PERSONAL INJURY OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH AIRE <br />CLAIMED TO HAVE OCCURRED DURING THE TERM OF THIS PROJECT. <br />34. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MARKING ALL <br />LANDSCAPE IRRIGATION AND PARKING LOU' ELECTRICAL CONDUITS PRIOR TO <br />LAYING OF PARKING LOT ASPHALT. <br />35. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PARKING STALL <br />WIDTHS, DRIVEWAY WIDTHS, AND PLANTER WIDTHS AFTER THE CONCRETE FORMS <br />ARE SET AND PRIOR TO POURING OF CONCRETE TO INSURE CONFORMANCE WITH <br />PLANS, AND SAN JOAQUIN COUNTY PARKING REQUIREMENTS AND STANDARDS. <br />ANY DISCREPANCY MUST BE BROUGHT TO THE ENGINEERS AND SURVEYORS <br />ATTENTION IN WRITING. <br />36. CONTRACTOR SHALL, BE RESPONSIBLE FOR ADEQUATELY MARKING THE INSTALLED <br />LOCATION OF ALL SANITARY SEWER, WATER SERVICES AND FIRE LINE SERVICES <br />AT THE TIME OF INSTALLATION. <br />37. ALL UTILITIES SHALL BE UNDERGROUND, UNLESS SPECIFICALLY NOTED <br />OTHERWISE ON PLANS. <br />38. ALI, HANDICAPPED RAMPS, PARKING STALLS, SIGNAGE, AND STRIPING SHALL BE <br />PER STATE OF CALIFORNIA STANDARDS AND SPECIFICATIONS. <br />39. THE SITE ADDRESS IS: <br />40. THE ASSESSORS PARCEL NUMBERS ARE 248-200-1, 248-200-2, 248-200-3, <br />248-200--4, 248200-5, 248-200-6, 248-200-7, 248-200-8, 248200-9, <br />248-20010, 248-200-11, 248-100-21, 248-200-12, 248-20013, <br />248-200-14, AND 248-200--15. <br />41. THIS PROJECT SHALL IMPLEMENT THE AIR POLLUTION CONTROL DISTRICT'S <br />FUGITIVE DUST CONTROL MEASURES AND OZONE EMISSION MEASURES DURING <br />CONSTRUCTION. <br />42. ALL, EARTHWORK AND GRADING SHALL, BE IN CONFORMANCE WITH CHAPTERS 29 <br />AND 70 OF THE UNIFORM BUILDING CODE. <br />43. THE INTENT OF THE GRADING PLAN IS TO PROVIDE GRADES TO RECEIVE <br />PAVEMENT, STORM DRAINAGE FACILITIES AND BUILDING PAD. <br />44 THE TOTAL EARTHWORK QUANTITY IS APPROXIMATELY <br />VOLUME OF CUT = 18,000 CY + <br />VOLUME OF FILL = 0 <br />THESE EARTHWORK QUANTITIES ARE COMPUTED FOR THE GRADING PERMIT <br />APPLICATION PURPOSES ONLY. THESE EARTHWORK QUANTITIES ARE NOT BID <br />QUANTITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL <br />QUANTITIES. (REFER TO NOTE No. 15) <br />45. THE SAN JOAQUIN COUNTY SITE APPROVAL APPLICATION NUMBER IS SU -91-17. <br />46. CONTRACTORS SHALL FOLLOW SAN JOAQUIN COUNTY STANDARD CONSTRUCTION <br />PLANS AND SPECIFICATIONS AND PROJECT SPECIFICATIONS IF ANY. SAN <br />JOAQUIN COUNTY STANDARD CONSTRUCTION PLANS AND SPECIFICATIONS ARE <br />AVAILABLE FROM THE SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS, <br />1810 HAZELTON AVENUE, STOCKTON, CA. AND PROJECT SPECIFICATIONS ARE <br />AVAILABLE FROM QUARTAROLI & ASSOCIATES, INC., 310 SUN WEST PLACE, <br />SUITE A, MANTECA, CA, <br />47. CONTRACTOR SHALL SUBMIT TO QUAFMROLI & ASSOCIATES FOR APPROVAL <br />EQUIPMENT AND MATERIAL SPECIFICATION OF ITEMS HE WISHES TO SUBSTITUTE <br />FROM THAT WHICH IS SPECIFIED ON THE IMPROVEMENT PLANS, SAN JOAQUIN <br />COUNTY STANDARD PLANS AND SPECIFICATIONS AND PROJECT SPECIFICATIONS,. <br />i <br />48. CONTRACTOR SHALL OBTAIN A GRAD;NG PERMIT FOR THIS PROJECT PRIOR TO <br />BEGINNING ANY GRADING ON-SITE OR OFF-SITE. <br />49 STORM DRAIN PIPE 12'' DIAMETER AND SMA,I_LER MAY RE PVC SDR 35 PIPE I PER <br />ASTM F-679 AND ASTM D3034 <br />Immms,71 <br />I <br />CB <br />TC <br />F/C <br />H, R <br />L, P. <br />L. F <br />I NV, <br />RU,E, <br />B,V, C, <br />E ,V, C. <br />E, C, <br />B,C, <br />B, C, R. <br />E, C. R, <br />P u R . C, <br />0 <br />0--# <br />TYPE I CURB INLET CATCH BASIN <br />TOP OF CURB <br />FACE OF CURB (DIKE) ELEVATION <br />HIGH POINT <br />LOW POINT <br />LEACH FIELD <br />INVERT ELEVATION <br />PUBLIC UTILITY EASEMENT <br />BEGINNING OF VERTICAL CURVE <br />END OF VERTICAL CURVE <br />END OF CURVE (HORIZONTAL) <br />BEGINNING OF CURVE (HORIZONTAL.) <br />BEGINNING OF CURVE RETURN <br />END OF CURVE RETURN <br />POINT ON REVERSE CURVE (HORIZONTAL <br />BLUE STREET REFLECTOR <br />THRUST BLOCK DETAIL <br />FIRE HYDRANT <br />STREET LIGHT <br />COURT PLAN & PROFILE. <br />VICINITY MAP <br />:yr i <br />w Z <br />ca <br />u <br />ix CCJ <br />uj <br />z <br />- z <br />0 0 <br />z <br />LIJ <br />0 <br />0 <br />LIJ <br />< <br />V) <br />uj <br />tt UJ <br />> <br />(j < <br />ti - <br />V) <br />I's <br />SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br />APPROVED: ENVIRONMENTAL HEALTH DIVISION <br />DATE <br />APPROVED: SAN JOAQUIN COUNTY BUREAU OF FIRE PREVENTION <br />IN <br />APPROVED: TRA\( -'l RURALARE DISTRICT <br />NATURAL GAS & ELECTRICITY: PACIFIC GAS & ELECTRIC--, COUNTY OF SAN JOAQUIN <br />(209) 4662261 <br />IRRIGATION DISTRICT: BANTA CARBONA IRRIGATION DI STRICT DEPARTMENT OF PUBLIC WORKS <br />(209) 835-4670 <br />BOUNDARY LINE <br />RIGHT OF WAY LINE <br />FIRE DISTRICT: <br />PROPERTY LINE <br />CURB LINE <br />TRACY JOINT UNION AND <br />EARTH SWALE DIRECTIONAL FLOW <br />90-\ <br />EXISTING CONTOUR LINE <br />SCHOOL DISTRICTS (209) <br />831-5032 <br />CATCH BASIN <br />INDIVIDUAL SEPTIC TANKS AND LEACH FIELDS <br />COUNTY SERVICE AREA NO, 44 <br />STORM DRAIN MANHOLE <br />50 - <br />STORM DRAIN PIPE <br />FLOW LINE <br />OUTFALL STRUCTURE <br />R I. V, C. <br />POINT OF INTERSECTION OF VERT, CURVE' <br />RO.vC, <br />POINT ON VERTICAL CURVE <br />PR,VC, <br />POINT ON REVERSE VERTICAL CURVE <br />SHEETINDEX. <br />'COVER SHEET, GENERAL NOTES <br />2 'GRADING PLAN <br />3. WALNUT COURT, HILLVIEW STREET,4. <br />ERB WAY PLAN & PROFILE <br />a. 7'M <br />5. DETAILS <br />6. DETAILS <br />7. GRADING PLAN <br />DATE <br />8. 06:77A / L G <br />I <br />CB <br />TC <br />F/C <br />H, R <br />L, P. <br />L. F <br />I NV, <br />RU,E, <br />B,V, C, <br />E ,V, C. <br />E, C, <br />B,C, <br />B, C, R. <br />E, C. R, <br />P u R . C, <br />0 <br />0--# <br />TYPE I CURB INLET CATCH BASIN <br />TOP OF CURB <br />FACE OF CURB (DIKE) ELEVATION <br />HIGH POINT <br />LOW POINT <br />LEACH FIELD <br />INVERT ELEVATION <br />PUBLIC UTILITY EASEMENT <br />BEGINNING OF VERTICAL CURVE <br />END OF VERTICAL CURVE <br />END OF CURVE (HORIZONTAL) <br />BEGINNING OF CURVE (HORIZONTAL.) <br />BEGINNING OF CURVE RETURN <br />END OF CURVE RETURN <br />POINT ON REVERSE CURVE (HORIZONTAL <br />BLUE STREET REFLECTOR <br />THRUST BLOCK DETAIL <br />FIRE HYDRANT <br />STREET LIGHT <br />COURT PLAN & PROFILE. <br />VICINITY MAP <br />:yr i <br />w Z <br />ca <br />u <br />ix CCJ <br />uj <br />z <br />- z <br />0 0 <br />z <br />LIJ <br />0 <br />0 <br />LIJ <br />< <br />V) <br />uj <br />tt UJ <br />> <br />(j < <br />ti - <br />V) <br />I's <br />SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br />APPROVED: ENVIRONMENTAL HEALTH DIVISION <br />DATE <br />APPROVED: SAN JOAQUIN COUNTY BUREAU OF FIRE PREVENTION <br />IN <br />APPROVED: TRA\( -'l RURALARE DISTRICT <br />NATURAL GAS & ELECTRICITY: PACIFIC GAS & ELECTRIC--, COUNTY OF SAN JOAQUIN <br />(209) 4662261 <br />IRRIGATION DISTRICT: BANTA CARBONA IRRIGATION DI STRICT DEPARTMENT OF PUBLIC WORKS <br />(209) 835-4670 <br />FIRE DISTRICT: <br />TRACY RURAL FIRE DISTRICT (209) 835-1883 <br />SCHOOL DISTRICT: <br />TRACY JOINT UNION AND <br />JEFFERSON ELEMENTARY <br />APPROVED <br />SCHOOL DISTRICTS (209) <br />831-5032 <br />SANITARY SERVICE: <br />DOMESTIC WATER: <br />INDIVIDUAL SEPTIC TANKS AND LEACH FIELDS <br />COUNTY SERVICE AREA NO, 44 <br />STORM DRAINAGE. <br />COUNTY SERVICE AREA NO. <br />44 <br />HENRY HIRATA <br />DIRECTOR OF PUBLIC WORKS <br />a. 7'M <br />APPROVED REVISION <br />DATE <br />DATE <br />R.C.E. NO. 2125 <br />p <br />CD <br />z <br />2 <br />Lu <br />Cr <br />monummm <br />DATE <br />DRAWN BY <br />mm <br />CHF. KED BY <br />JOB NO, <br />