Laserfiche WebLink
L44 <br />Z. <br />O <br />W4 <br />H <br />Q1 <br />DILL CT. <br />A.B. <br />Shoul <br />(Typ) <br />SF/?VICE 6; <br />$EWRGE SERT/C SYSTEM <br />STORM DRR/NAGE DRR/NAGE POND <br />WATER JNDIVIDURL WEI Z <br />7E1EFN49NE PRC/EJC BELL <br />4rA81E TELEVlSJON CONT/NEN7A1 CABLEY/S/ON <br />NATURAL 6%A5 � ELECTR/C P. G. �E. <br />6 <br />STRUCTURAL SECTION <br />�2°AC. • 7VPE "B„ <br />R Value = 5 9 "AB. CLASS a c" 1960/" <br />T. I. =4 8"C.O.G.@ 95% R.G. <br />LEE COURT LEE DRIVE <br />SGALE l"= /0 <br />9 <br />w g�+ <br />N <br />w X.2 <br />t� Over/ay W/ Ac. ascequired <br />WHITE <br />0 <br />0 <br />w <br />.* . <br />swRLF (Tya) <br />RePen74ion <br />PR/ME COAT RFOU/RED <br />SEE SEC 39 � 99 OF $PEGS <br />INCLUDE C057 1N 910 FOR AC. <br />W <br />0 <br />2 " A C. - r YPE '9" <br />,/ 1-4l3. Shoulder <br />2'+ <br />LEGEND: <br />APPROVED RP: <br />FOR USE OF DEPARTMENT OF RZIRZIC WORXS ONLY <br />CON S TR LIC TIO N QUAN TI T46:6 <br />Revised : ../U/y /O, /990 <br />2nd Revlslon.-July3l,/990 <br />STREET SYSTEM <br />T. I. <br />R <br />Lot Grading — <br />Lump Sum <br />Site Clearing________- <br />Lump Sum <br />Roadway Excavation_____ <br />5gbC.Y. <br />Asphalt Concrete, Type B (01'11 _ <br />`63,1005,F, <br />Aggregate Base, Cl. .I I (0,75') _ <br />58,150 S.F. <br />Survey Monument <br />5 Each <br />Dead End Barricade, Type A <br />I Each <br />Street Sign------- <br />2 Each <br />Roadway Import — <br />b5O C.Y. <br />Dead End Barricade, Type B ___ <br />I Each <br />Street Sign W53 <br />IEach <br />Asphalt Concrete, Type B (overlay)— _ <br />3,ISo5,F, <br />AC D r(vewa_y' <br />I E a <br />Aggregate Base, CI. II (1. 17') _ <br />4,g505.17, <br />Compact Original Ground <br />63J 100 S.F. <br />5>=ree>l LighP by RG E. <br />2 Each <br />12"ACR <br />65 LF <br />30 LA- <br />PAggregate <br />AggregateBase Shoulder <br />21,350,S.F <br />Z. P. <br />P. P. <br />LOW PO/NT <br />Platy POIA77 <br />T. I. <br />R <br />TRAFFIC INDEX <br />RADILIk <br />� <br />+ <br />57REE7 916N <br />A <br />DELTA <br />SRN ✓OROU/nl COUNTY FIRE WARDEN <br />_ <br />DRA/NAGE $LOPE <br />L <br />P.R.C. <br />LENGTH <br />POINT OF REVERSE <br />CURVE <br />O <br />SURVEV MONUMENT <br />BOX E.P. <br />EDGE OF PAVEMENT <br />B.C. <br />STREET L IGR7 see <br />��400ve <br />) <br />/ F.G. <br />FINISH GRADE <br />$RN ✓ORQU/N COUNTY LOGRL f/EA1T+9 DISTR/CT <br />BEGIN CURVE <br />J. P, <br />JOINT POLE <br />4 <br />E.G. <br />END CURVE <br />M. P. <br />MID POINT <br />G.B. <br />GRADE BREAK <br />L. F. <br />LINEAL FEETo4- <br />P.U.E. <br />PUBLIC UTILITY EASEMENT <br />FIRE CRIEF WR7ER100-MORADR F/RE 06R7 <br />R/W RIGHT, OF WAY <br />9 CENTERLINE <br />(� FLOWLINE <br />Inv. INVERT <br />EX.orlix-15t EXISTING <br />f� PROPERTY LINE <br />A.G. ASPHALT CONCRETE <br />A.B. AGGREGATE BASE <br />R C. RELATIVE COMPACTION <br />SNF F T INDF X <br />&—xl-y sgf-Fr <br />2o--PZRN e PROFJL F : zFF couRr <br />a --PLAN � PROFILE: mvi7.6 z,olvF, ZFF DRIVE <br />o--DFTRIL ;NFFr <br />a --GRADING PLRN - DE1/FL0PMFNT PLAN <br />L—Saw Cut ��1.3MaX. 3' �11'7 1CMin <br />LANE <br />NOTE : FOR PAVEMENT DfSJGN SEE SOI15 REPORT, AG. /2. <br />N0. I DATE I REVISIONS <br />7131 / 40 I QUANTITIES AND GRADING -ALL SHEETS <br />!Y P <br />v <br />BY DESIGN DRAWN BY R.L.S. APPROVED BY THE SAN JOAQUIN COUNTY DIRECTOR OF <br />TP '=- "j PUBLIC WORKS: <br />0 <br />s" E) <br />DR 7& <br />DATE <br />G -zk- 90 <br />,0.97E <br />VIClIV/7Y MIOP <br />NO SCALE <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LOD1, CALIF. <br />85240 PH: 209-388-6618 <br />N. <br />KEY SHEET <br />GFNFRRL NOTES <br />1. All work shall conform to these plans and any special provisions for <br />this project. <br />2. Refer to the final map of this subdivision for all center line and <br />property line data. <br />3. Contractor shall receive an approved set of plans and specifications <br />prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and <br />construction stakes necessary for completion of work, The Contractor <br />shall be responsible for the preservation of all survey and <br />construction stakes. Survey and construction stakes that are lost or <br />destroyed due to Contractor's negligence will be set by the Engineer <br />at the Contractor's expense. <br />5. The existing underground utilities were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities in the field before any <br />excavation. The Contractor shall notify and coordinate all work with <br />any agency requiring removal or relocation of their utilities. <br />Pacific Bell and P. G. & E. U.S.A. (800) 642-2444. <br />6. Water used in any phase of construction, such as backfill compaction, <br />dust control, testing or other work herein required, shall be <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />7. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety for all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner and the Engineer harmless from <br />any and all liability, real or alledged, in connection with the <br />performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />B. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety of all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours; and that the contractor shall <br />defend, indemnify and hold harmless the County of San Joaquin, its <br />elected officials, officers, employees, and agents from any and all <br />claims, costs of litigation, damages, and attorney's flees, for <br />personal injury or property damage of whatever nature which are <br />claimed to have occurred during the term of this project. <br />9. Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />10. Lot grading shall be completed before starting any underground <br />construction. Refer to attached grading plan. <br />11. Contractor shall be responsible for notifying and co -coordinate all <br />work with any agency requiring removal or relocation of utilities, <br />such as Pacific Bell, P. G. & E., etc. <br />12. Contractor shall visit site prior to bidding. Specifications are a <br />separate document. <br />13. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />shall be included in his bid price. <br />14. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 24 hours in advance of <br />commencement of work. <br />15. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />16. Prior to performing any work in White Lane, the Contractor shall <br />obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />17. All traffic signs and markings shall conform to San Joaquin County <br />Standards and to the "Manual of Uniform Traffic Control Devices". <br />18. Any changes to the approved Improvement Plans and Specifications must <br />be prepared and certified by the "Civil Engineer" and shall be <br />approved by "Director" prior to implementation. <br />19. RLL 60116 testing shall be the responsibility of the <br />Contractor. <br />CONSTRUCTION_ STAKING LIABILITY WAIVER <br />These improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not <br />assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />corrected or mitigated if Baumbach & Piazza, Inc. had <br />performed the staking work. <br />LEE ESTATES <br />SUBDIVISION IMPROVEMENTS <br />SHEET O OF $ <br />JOB NO. 99//F <br />FILE <br />NO. <br />G-943 <br />1ld 'v `� DATE <br />HENRY M. HIOTA, . .E. 21,258 <br />BMIT BY' <br />R.C.E. DATE <br />0 <br />s" E) <br />DR 7& <br />DATE <br />G -zk- 90 <br />,0.97E <br />VIClIV/7Y MIOP <br />NO SCALE <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LOD1, CALIF. <br />85240 PH: 209-388-6618 <br />N. <br />KEY SHEET <br />GFNFRRL NOTES <br />1. All work shall conform to these plans and any special provisions for <br />this project. <br />2. Refer to the final map of this subdivision for all center line and <br />property line data. <br />3. Contractor shall receive an approved set of plans and specifications <br />prior to beginning construction. <br />4. Baumbach & Piazza (Engineer) shall set all survey controls and <br />construction stakes necessary for completion of work, The Contractor <br />shall be responsible for the preservation of all survey and <br />construction stakes. Survey and construction stakes that are lost or <br />destroyed due to Contractor's negligence will be set by the Engineer <br />at the Contractor's expense. <br />5. The existing underground utilities were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities in the field before any <br />excavation. The Contractor shall notify and coordinate all work with <br />any agency requiring removal or relocation of their utilities. <br />Pacific Bell and P. G. & E. U.S.A. (800) 642-2444. <br />6. Water used in any phase of construction, such as backfill compaction, <br />dust control, testing or other work herein required, shall be <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />7. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety for all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner and the Engineer harmless from <br />any and all liability, real or alledged, in connection with the <br />performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />B. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety of all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours; and that the contractor shall <br />defend, indemnify and hold harmless the County of San Joaquin, its <br />elected officials, officers, employees, and agents from any and all <br />claims, costs of litigation, damages, and attorney's flees, for <br />personal injury or property damage of whatever nature which are <br />claimed to have occurred during the term of this project. <br />9. Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />10. Lot grading shall be completed before starting any underground <br />construction. Refer to attached grading plan. <br />11. Contractor shall be responsible for notifying and co -coordinate all <br />work with any agency requiring removal or relocation of utilities, <br />such as Pacific Bell, P. G. & E., etc. <br />12. Contractor shall visit site prior to bidding. Specifications are a <br />separate document. <br />13. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />shall be included in his bid price. <br />14. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 24 hours in advance of <br />commencement of work. <br />15. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />16. Prior to performing any work in White Lane, the Contractor shall <br />obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />17. All traffic signs and markings shall conform to San Joaquin County <br />Standards and to the "Manual of Uniform Traffic Control Devices". <br />18. Any changes to the approved Improvement Plans and Specifications must <br />be prepared and certified by the "Civil Engineer" and shall be <br />approved by "Director" prior to implementation. <br />19. RLL 60116 testing shall be the responsibility of the <br />Contractor. <br />CONSTRUCTION_ STAKING LIABILITY WAIVER <br />These improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not <br />assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />corrected or mitigated if Baumbach & Piazza, Inc. had <br />performed the staking work. <br />LEE ESTATES <br />SUBDIVISION IMPROVEMENTS <br />SHEET O OF $ <br />JOB NO. 99//F <br />FILE <br />NO. <br />G-943 <br />