Laserfiche WebLink
F19P6,177,` � ! 17,9CXFD CONC. SACX <br />SLOPS PROY15-CI7/0N <br />SEF DETAIL <br />SNFF l 6 R�vER <br />;5,7 <br />t5 <br />N0. DATE <br />0 6/11/91 <br />L�j 6/26/91 <br />7/11 /91 <br />Ft, <br />S� C \ <br />may° �c <br />s°' <br />�o <br />5q <br />2ID <br />SCALE* 1'=20' <br />0 20 40 - 10 <br />This project is conditioned by California Department of Fish and <br />Game (Notification No. II -037-19) and the Department of Water <br />Resources (Application No. 15729). It is the Contractor's <br />responsibility to obtain copies of those permits and meet all <br />their requirements. <br />REVISIONS <br />See Sheet I 1; 2 <br />Lower T000 Lot <br />APPROVED BY: K. KJELDSEN <br />W.S.D. ENGINEER <br />DATE: <br />lGK 7•ir.Si <br />BY DESIGN ORAWDi--B <br />ES /) <br />E $ R� <br />E5 Sl�8TA1RED <br />R.C.E. 1 % 8 _ DATE <br />CONDITIONS <br />v <br />RECLAMATION BOARD PERMIT <br />cy <br />NO. 15729 <br />ONE: This permit is issued under the provisions of Sections <br />8700 - 8723 of the Water Code. <br />TEN: The permittee is responsible for all personal liability <br />and property damage which may arise out of failure <br />NINETEEN: That the proposed pipeline shall be installed through <br />TWO: Only work described in the subject application is <br />N0. DATE <br />0 6/11/91 <br />L�j 6/26/91 <br />7/11 /91 <br />Ft, <br />S� C \ <br />may° �c <br />s°' <br />�o <br />5q <br />2ID <br />SCALE* 1'=20' <br />0 20 40 - 10 <br />This project is conditioned by California Department of Fish and <br />Game (Notification No. II -037-19) and the Department of Water <br />Resources (Application No. 15729). It is the Contractor's <br />responsibility to obtain copies of those permits and meet all <br />their requirements. <br />REVISIONS <br />See Sheet I 1; 2 <br />Lower T000 Lot <br />APPROVED BY: K. KJELDSEN <br />W.S.D. ENGINEER <br />DATE: <br />lGK 7•ir.Si <br />BY DESIGN ORAWDi--B <br />ES /) <br />E $ R� <br />E5 Sl�8TA1RED <br />R.C.E. 1 % 8 _ DATE <br />CONDITIONS <br />RECLAMATION BOARD PERMIT <br />NO. 15729 <br />ONE: This permit is issued under the provisions of Sections <br />8700 - 8723 of the Water Code. <br />TEN: The permittee is responsible for all personal liability <br />and property damage which may arise out of failure <br />NINETEEN: That the proposed pipeline shall be installed through <br />TWO: Only work described in the subject application is <br />on the <br />Permittee's part to perform the obligations this <br />the levee section at a right angle to the centerline of the <br />authorized hereby. <br />under permit. <br />If any claim of liability is made against the State of <br />levee. <br />California, or any departments thereof, the United States of <br />THREE: This g g <br />permit does not rant a right to use or construct <br />America, a local district or other maintainin' agencies <br />TWENTY: That the waterward end of the proposed discharge pipes <br />works on land owned by the Sacramento and San Joaquin Drainage <br />g g and the <br />officers, agents or employees thereof, thepermittee shall <br />shall be constructed so as to direct the flow away from the bank <br />District or on any other land. <br />defend and shall hold each of them harmless from each claim. <br />to prevent erosion. <br />FOUR: The approved work shall be accomplished under the <br />ELEVEN: The permittee shall exercise reasonable care to <br />TWENTY-ONE: That backfill material for the excavation within <br />erection and supervision of the State Department of Water <br />operate <br />k <br />and maintain any work authorized herein to preclude injury <br />the levee section shall be placed in 4 to 6 -inch layers and <br />Resources and the permittee shall conform to all requirements of <br />to or <br />damage to any works necessary to any plan of flood control <br />compacted to a minimum of 90 percent relative compaction as per <br />the Department of The Reclamation Board. <br />adopted by the Board or the Legislature--, or interfere <br />ASTM D-1557. <br />with the <br />successful execution, functioning or operation of any <br />FIVE: Unless the work herein contemplated shall have been <br />plan of <br />flood control adopted by the Board or the Legislature. <br />TWENTY-TWO: That the backfill material for the excavation <br />commenced within onewithin <br />year after issuance of this permit, the <br />the riverbank shall be placed in layers and compacted to <br />Board reserves the right to change any conditions in this <br />TWELVE: Should any of the work not conform to <br />a density equal to that of the adjacent undisturbed material. <br />permit <br />as may be consistent with current flood control standards <br />the conditions of <br />this permitthe <br />P , permittee, upon order of The Reclamation <br />and <br />policies of The Reclamation Board. <br />Board, <br />shall in the manner prescribed by the Board be <br />TWENTY-THREE: Density tests by a certified materials laboratory <br />responsible for <br />the cost and expense to remove, alter, relocate <br />will be required to verify compaction of backfill. <br />SIX: This permit shall remain in effect until revoked. In the <br />or reconstruct <br />all or any part of the work herein approved. <br />y permit are not complied with, it <br />TWENTY-FOUR: That a suitable flap gate shall be installed on <br />�ay be revoked on 15 days notice. <br />SPECIAL CONDITIONS: <br />the waterward end of each pipe. <br />SEVEN: It is understood and agreed to by the that <br />THIRTEEN: The contractor shall arrange for an inspector <br />TWENTY-FIVE: That the proposed sacked concrete revetment shall <br />permittee the <br />,start of any work under this permit shall constitute <br />from <br />the Department of Water Resources to be at the <br />be uniformly placed and transitioned into the natural bank at <br />an <br />• acceptance of the conditions in this permit and <br />site prior to any <br />excavation and during all backfill operations. <br />both ends. <br />an agreement to <br />perform work in accordance therewith. <br />FOURTEEN: For availability and scheduling of an inspector, <br />TWENTY-SIX: That the proposed sacked concrete revetment shall <br />EIGHT: This permit does not establish any <br />the <br />applicant shall contact the Department of Water Resources <br />not contain any reinforcing steel, floatable or objectionable <br />precedent with <br />respect to any other application received by The Reclamation <br />at <br />telephone number (916) 445-3942 at least 10 working days <br />material. <br />• Board. <br />prior <br />to proposed start of work. <br />TWENTY-SEVEN: That the levee section, overflow area and <br />INE: The permittee shall, when required by law, secure the <br />FIFTEEN: That all trees and brush cleared shall be <br />riverbank shall be restored to at least the same condition that <br />ritten order or consent from all other <br />completely <br />burned or otherwise removed from the overflow <br />existed prior to commencement of work. <br />public agencies having <br />risdiction. <br />area of the <br />Mokelumne River, and no dawned trees or brush <br />shall be allowed <br />to remain in the floodway during the flood <br />TWENTY-EIGHT: That the application shall maintain the project <br />' <br />season between <br />November 1 and April 15• <br />works within the utilized area in the manner required and as <br />SIXTEEN: That no excavation <br />requested by the authorized representative of the San Joaquin <br />County Flood Control and Water Conservation District or any <br />FQ <br />shall be made or allowed to remain <br />332 <br />!/ <br />in the levee section, overflow area or riverbank between <br />November 1 <br />other agency responsible for maintenance. <br />and April 15. <br />28 s <br />SEVENTEEN: That the pipes shall be placed in an open cut with <br />2 ,9 <br />side slopes no steeper than 3 horizontal to 1 vertical. <br />vt <br />G' <br />EIGHTEEN: The reinfgrced concrete pipe shall meet ASTM <br />33y� <br />designation C-76. Reinforced concrete collars shall be <br />2 1 <br />constructed at each pipeline joint within the levee section and <br />2 .1 <br />To <br />within 10 feet of its toss. <br />?g 3 <br />l/E G E TA T! O iV - - - - - • - - _ _ _ - - ASRDwazL„ F1 RPORYB � EROSION <br />PROTFCUON PFR RF!'IAMATION <br />2201 <br />?�9 3D9 <br />?a - <br />29`s <br />`SLC ? a5 9 <br />�\ z <br />pGs-v\lie- <br />.,/>3 0. r� I '0 4 �a3 t7 b �D 0 hb <br />F -- L <br />� 460 o <br />22.` <br />r O�Cy\?fie 9 v9 <br />i <br />jq <br />7e X43 M �_ - J� l v k5 / <br />APPRCNT-D BY: Henry M. Hirata RCE No. 21258 <br />19_ <br />�v Jbnc�iul�(SiiNr'r n1R� �Pirriitc�T'c�"iu�" <br />/ BOARD STANDARD DRAW/NO <br />/ PI ATE N0. I60 f/6. 3. 6 F F <br />23.2 DFTRII SNFET 6 <br />s-` <br />-4°/s ko recr OAK <br />Eh/S t�� Oo0dc <br />C•C R toe <br />e'?ce__. 2 .o <br />BAU BACIH & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LODI, CALIF. <br />95240 PH: 209-366-66'16 <br />Q <br />�0 a "� <br />6 -, yEE 0A0, P< <br />4 Too 4 w <br />O <br />3 CIN - <br />Qq tc <br />Lcop <br />WOODBRID61- PR07ECYIOIV DISYRICr <br />6;J County) I FYFF. Replace ,aer <br />_. Goun�`y �equi�emenr°s. <br />TOPOGRAPHY WINDWOOD STORM <br />DRAIN CHANNEL 6 STORM DRAIN <br />DISCHARGE <br />30 <br />28.84 <br />du <br />O 4 <br />O <br />Ofr <br />T« <br />= o <br />SX <br />353 c�+CL <br />� o0 <br />v �J7 J/ <br />• <br />0 R1 VI: / MeWDOWS UNI: NO I <br />1 <br />S SG IW <br />CIC <br />IBOO FeeX �o W6`6?DBRID6F ROAD <br />and gale - nod normally locked. <br />"WINDWOOD" SUBDIVISION <br />STORM DRAIN 4 SANITARY <br />SEWER- IMPROVEMENTS <br />SHEET O OF ( 6 ) <br />JOB NO. 8tj'iq �� <br />FILE <br />NO. <br />6-876 <br />