Laserfiche WebLink
Q LOCATION Of °Q" VAEUE TESTI <br />R-1 R 29 <br />R -Z R Zl <br />R3 R �2L <br />0 <br />M <br />a <br />� <aur uaE> <br />0 R tH L RN 11 <br />Q -- <br />v <br />w , <br />I I � <br />VICINITY MAP <br />/0 <br />Roadway Import 388 C.Y. <br />24"' Storm Drain 406 L.F. <br />36" Storm Drain 752 L.F. <br />/ 42" Storm Drain CMP 68 Each <br />48" Storm Drain Manhole 4 Each <br />Z n7 15" Sanitary Sewer 1,893 L.F. <br />Sanitary Sewer Manhole 6 Each <br />1 , 4" Sanitary Sewer Service <br />(Wye & Stub) 25 Each <br />�m <br />�p5 Ph <br />I <br />r1 <br />i.:. w. <br />.� &ZEMEN <br />'a <br />a - <br />N�re <br />�-, <br />g .y a in- ale y all is as 6 Electric <br />i <br />GENERAL <br />Limit o <br />flood P <br />A MA <br />r <br />) <br />NOTES <br />Z <br />ti 7 <br />J / <br />Contractor shall receive an approved set of plans and specifications <br />Q(fE. <br />W <br />sere <br />prior to beginning construction. <br />19. <br />Sou <br />Qw <br />45 <br />Baumbach 6 Plana (Engineer) shall set all survey controls and <br />20. <br />Contractor shall visit site prior to bidding. Specifications are a <br />D- <br />construction stakes necessary for completion of work. The Contractor <br />�'O <br />separate document. <br />CONST�* p /� '{' �`' <br />RUCTION QUANTITIES I TIES <br />1. All Hork shall conform <br />this <br />to these pl.ns and any special provisions for <br />11. Ccntractur sl!all be responsible <br />for notifying and co-ce(rdinete all <br />^� <br />ECR <br />project, <br />2. Refer to the final <br />60 <br />destroyed due to Contractor's negligence will be set by the Engineer <br />worl; with any agency requiring <br />removal or relocation of utilities, <br />at the Contractor's expense. <br />22. <br />map <br />of this subdivision <br />for all center <br />line and <br />such as Fdtific Bell, F. G. t. E., <br />et(. <br />s <br />s <br />property line data. <br />utility agencies to -mark their facilities in the field before any <br />23. <br />12. All off -site .:;ter lines shall <br />be pressure tested, disinfected, <br />excavation. The Contractor shall notify and coordinate all work <br />3 The street It ht C stem <br />shall b �t Ii d <br />b P f 6 <br />24. <br />All work will be required to be inspected by the Department of Public <br />Roadway Import 388 C.Y. <br />24"' Storm Drain 406 L.F. <br />36" Storm Drain 752 L.F. <br />/ 42" Storm Drain CMP 68 Each <br />48" Storm Drain Manhole 4 Each <br />Z n7 15" Sanitary Sewer 1,893 L.F. <br />Sanitary Sewer Manhole 6 Each <br />1 , 4" Sanitary Sewer Service <br />(Wye & Stub) 25 Each <br />�m <br />�p5 Ph <br />I <br />r1 <br />i.:. w. <br />.� &ZEMEN <br />'a <br />a - <br />N�re <br />�-, <br />Bench Mark Datum per U.S.G.S. B. M. <br />19 - B 1907- 45. Location N W corner <br />of Masonic Building in the town of Woodbridge. <br />Elevation 45.85 is most eurrerrt Per F. G M n <br />NO, DATE REVISIONS <br />6/11/91 Move 15"55- _ _ . C.A.PFC5P <br />6/26/91 Move 15"55@ Add 55MW Ret <br />7/11/91 see Sheets 2-5 <br />O <br />20 3'bw I <br />21Z 37Z 1 <br />22 388 <br />23 <br />.� 35 '39 <br />`EWOIaB 1 <br />P4 A, <br />5 •- 26 o <br />4V, 25 <br />276 W I <br />3 p JV <br />°lig\- cx �1 <br />H tor,1 <br />Y Rei i <br />42 <br />g .y a in- ale y all is as 6 Electric <br />i <br />Approx <br />Limit o <br />flood P <br />A MA <br />r <br />) <br />Zo <br />Z <br />ti 7 <br />J / <br />Contractor shall receive an approved set of plans and specifications <br />Q(fE. <br />W <br />sere <br />prior to beginning construction. <br />19. <br />Sou <br />Qw <br />Bench Mark Datum per U.S.G.S. B. M. <br />19 - B 1907- 45. Location N W corner <br />of Masonic Building in the town of Woodbridge. <br />Elevation 45.85 is most eurrerrt Per F. G M n <br />NO, DATE REVISIONS <br />6/11/91 Move 15"55- _ _ . C.A.PFC5P <br />6/26/91 Move 15"55@ Add 55MW Ret <br />7/11/91 see Sheets 2-5 <br />O <br />20 3'bw I <br />21Z 37Z 1 <br />22 388 <br />23 <br />.� 35 '39 <br />`EWOIaB 1 <br />P4 A, <br />5 •- 26 o <br />4V, 25 <br />276 W I <br />3 p JV <br />°lig\- cx �1 <br />H tor,1 <br />Y Rei i <br />42 <br />g .y a in- ale y all is as 6 Electric <br />i <br />H <br />3 <br />' 43 <br />o, <br />Zo <br />C <br />44 <br />Contractor shall receive an approved set of plans and specifications <br />f <br />wr 2 <br />sere <br />prior to beginning construction. <br />19. <br />All off-site storm drains shall be cleaned prior to final acceptance. <br />45 <br />Baumbach 6 Plana (Engineer) shall set all survey controls and <br />ry A y <br />34 40 <br />w <br />33 4/ <br />'" 32 <br />29 30� 3/ <br />Wp��gRl� <br />Const.735LF7' <br />MOsondry Wail <br />(FUTURE) <br />BY DESIGN r P DRAWN BY <br />E5 <br />E5 SL WITTED � i <br />R.C.E. �9C� - DATE <br />i <br />w <br />01 <br />0 <br />Q <br />Q <br />w <br />APPROVI'D BY: henry M. llirata RCE No. 21258 <br />�, /,f , z� 19�r <br />CONSTRUCTION STAKING LIABILITY WAIVER <br />these improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />the purpose of construction staking, notice is hereby <br />given that the firm of Baumbach & Piazza, Inc. will not <br />assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />corrected or mitigated if Baumbach & Piazza, Inc. had <br />performed the staking work. <br />SHEET INDEX <br />1Q KEY SHEET, QUANTITIES,1✓, <br />NOTES <br />PLAN �, PROFILE <br />5O-© OUTFALL DETAIL, E, STORM <br />DRAIN DISCHARGE <br />CIVIL ENGINEERS <br />SURVEYORS <br />323 W. ELM ST. LOCI, CALIF. <br />95240 PH: 209-366-66'18 <br />KEY <br />• <br />g .y a in- ale y all is as 6 Electric <br />u <br />flushed and tested for bacteria in conformance with the San Joaquin <br />Q- <br />Company. <br />Zo <br />County Health Code kequireseots prior to connecting to existing water <br />4. <br />Contractor shall receive an approved set of plans and specifications <br />tc <br />line. <br />sere <br />prior to beginning construction. <br />19. <br />All off-site storm drains shall be cleaned prior to final acceptance. <br />5. <br />Baumbach 6 Plana (Engineer) shall set all survey controls and <br />20. <br />Contractor shall visit site prior to bidding. Specifications are a <br />D- <br />construction stakes necessary for completion of work. The Contractor <br />�'O <br />separate document. <br />Bt <br />shall be responsible for the preservation of all survey and <br />21. <br />New traffic striping and the restoration of any damaged existing <br />SC.e <br />construction stakes. Survey and construction stakes that are lost or <br />ECR <br />painted legends or signs is the responsibility of the Contractor and <br />60 <br />destroyed due to Contractor's negligence will be set by the Engineer <br />shall be included in his bid price. <br />at the Contractor's expense. <br />22. <br />Where water crosses SO or SS use an 18-20 ft. length of Cl. 200 pipe, <br />6. <br />The existing underground utilities were plotted from available <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />records. The Contractor shall be responsible for contacting all <br />b) The vertical clearance is less than 1 foot. <br />utility agencies to -mark their facilities in the field before any <br />23. <br />No materials resulting from tapping procedures may enter District <br />excavation. The Contractor shall notify and coordinate all work <br />sewer, <br />with any agency requiring removal or relocation of their utilities. <br />24. <br />All work will be required to be inspected by the Department of Public <br />Pacific Bell, P. G. 6 E., Lodi Cable T. V., Woodbridge Sanitary <br />Works. They shall be notified not less than 24 hours in advance of <br />District and Mokelumne Acres Maintenance District. U.S.A. (800) 642- <br />commencement of work. <br />2444• <br />25. <br />Eash SS service to have C.O. at property. <br />7. <br />House services, fire hydrant laterals, and street light conduit shall <br />26. <br />It is agreed that field conditions may require changes to these <br />be installed prior to curb and gutter construction. All underground <br />plans. It is further agreed that the Director of Public Works may <br />utilities within the street area, including gas and telephone lines, <br />require changes, alterations or additions to these plans, when the <br />shall be installed prior to paving. <br />Director deems them to be necessary or desirable for the proper <br />B. <br />All manholes to be set flush with the finish grade unless otherwise <br />completion of the work, provided that such changes, alterations or <br />indicated. <br />additions shall not exceed 102 of the original estimate of tho cost <br />9. <br />All water lines shall have a minimum cover of 30'• <br />for the improvements without prior approval of the surety. <br />10. <br />Water used in any phase of construction, such as backfill compaction, <br />21. <br />Fire hydrant bid shall include the followirg: Tee, 6' Lateral, 6' <br />dust control, testing or other work herein required, shall be <br />Valve and complete fire hydrant assembly. <br />included in the unit price or lump sum bid for the respective item of <br />28. <br />Prior to performing any work in Woodbridge Road, the Contractor shall <br />construction. <br />obtain an Encroachment Permit from the San Joaquin County Department <br />11. <br />Contractor agrees that he shall assume sole and complete <br />of Public Works. <br />responsibility for job site conditions during the course of <br />29. <br />Contractor shall notify Mokelumne Acres Maintenance District for <br />construction of this project, including safety for all persons and <br />approval prior to connecting water line to existing water main. <br />property; that this requirement shall apply continuously and not be <br />30. <br />Installation of all sanitary sewer improvements shall conform to the <br />limited to normal working hours and that Contractor shall defend, <br />standards of the Woodbridge Sanitary District. All such work is <br />indemnify, and hold the Owner, County and the Engineer harmless from <br />subject to inspection by the District Engineer. The Contractor shall <br />any and all liability, real or alledged, in connection with the <br />notify District Engineer 48 hours prior to the commencement of any <br />performance of work on this project, excepting for liability arising <br />work on the sanitary system. (209-946-0265) <br />from the sole negligence of the Owner or the Engineer. <br />31. <br />Contractor shall obtain a grading permit from the San Joaquin County <br />12. <br />Contractor shall give Engineer a minimum of 48 hours notification <br />Building Division. <br />prior to staking any utilities. <br />32. <br />Pipe type and strengths allowed for underground utilities, unless <br />13. <br />Sanitary sewer services shall be marked by the curb i gutter <br />otherwise specified on plans, are as follows: Storm Drain ISD) - RCP <br />contractor with an 'S' stamped on the top of curb. <br />or ACP, Cl. 11I; Sanitary Sewer (SS) - PVC, per ASTM 03034, 435; <br />14. <br />Yater services shall be marked by the curb and gutter Contractor with <br />Water (W) - PVC, Cl. 150 or greater per ANNA Std. C-900 Cl. <br />a 'W' stamped on the top of curb. Location of water markings shill <br />150 or greater per ASTM C296, Type 11. <br />be verified in the field by the Engineer. <br />33. <br />All traffic signs and markings shall conform to San Joaquin County <br />15. <br />Lot grading shall be completed before starting any underground <br />Standards and to the 'Manual of Uniform Traffic Control Devices'. <br />construction. Refer to attached grading plan. <br />34. <br />Any changes to the approved Improvement Plans and Specifications must <br />16. <br />Separation of water and sewer mains (including crossings) and sewer <br />be prepared and certified by the 'Civil Engineer' and shall be <br />laterals crossing over water mains shall meet or exceed the latest <br />approved by the 'Director' prior to implementation. <br />standards of the State of California Department of Health Services. <br />35. <br />All materials used as sanitary sewer system musthmt- vrifteri <br />approval from District Engineer prior to installation, <br />SHEET <br />L E G E N D <br />u <br />St�ees fi <br />Q- <br />Side Int Catch Basin <br />Zo <br />Low Point <br />WA <br />High Point <br />tc <br />Top of Curb <br />sere <br />Clean Out to Grade <br />-�- <br />Storm Drain Line Indicating direction of flow <br />--- <br />Sanitary Sewer Line Indicating direction of flow <br />Water Line <br />D- <br />Fire Hydrant <br />�'O <br />Street Light <br />Bt <br />elym Cure <br />_ <br />EG - <br />~ Carie <br />SC.e <br />Begin Coed 'Pe""A <br />ECR <br />EA/ Cwh Aehrn <br />60 <br />6rnde Best <br />ERVICES: <br />Street Lights Woodbridge Lighting District <br />Sewage Woodbridge Sanitary District <br />Natural Gas & Electric - P. G. & E. <br />Telephone Pacific Bell <br />Television Cable Lodi Cable T.V. <br />Water <br />Storm Drainage }--- fdokelumne Acres Maintenance District <br />APPROVED BY <br />The following approvals are only for the 15"Sanitary on( <br />Drain 5 tem in Putajr7 UGrlt No.2 <br />/ - • t «�. <br />K. kJELD5EN, W.S.D. EN EEFt <br />H. RATA, 5 JOA IN\OLNTY OIRECTOP, OF PUBLICWOPK5 <br />11W NDWOODii <br />STORM DRAIN 4 SANITARY <br />SEWER IMPROVEK4ENTS <br />Z -12 -9 -Z - <br />by <br />tion of the Storm <br />DATE <br />7- z6-;�,/ <br />DATE <br />SHEET O OF O <br />JOB NO. 8 S 8 9 <br />FILE <br />NO. <br />6 7 C/// <br />