Laserfiche WebLink
GENERAL NOTES: <br />1) All IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE <br />WITH THE LATEST ADDITION OF THE COUNTY OF SAN JOAQUIN STANDARD <br />SPECIFICATIONS AND ALL AMENDMENTS THERETO TO DATE. ALL WORK <br />SHALL BE UNDER THE INSPECTION OF THE COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS. (SEE 'SANITARY SEWER NOTES" <br />REGARDING SEWER WORK. <br />2) IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS <br />REQUIRE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE <br />WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN <br />ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING <br />ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST IN THE <br />PLANS AND SPECIFICATIONS. THE ENGINEER'S INTERPRETATION OR <br />CORRECTION THEREOF SHALL BE CONCLUSIVE. <br />3) WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS <br />OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, <br />IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO <br />PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE <br />FIRST QUALITY ARE TO BE USED. <br />4) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS <br />AND LICENSES REQUIRED FOR THE CONSTRUCTION AND COMPLETION <br />OF THE PROJECT. <br />5) THE CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY-EIGHT <br />HOURS IN ADVANCE OF HIS NEED FOR CONSTRUCTION STAKING. <br />6) THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL <br />CAREFULLY PRESERVE BENCH MARKS, REFERENCE POINTS AND ALL <br />SURVEY STAKES, AND SHALL BEAR ALL EXPENSES FOR REPLACEMENT <br />AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTUR- <br />BANCE. <br />7) THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY <br />FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION FROM THE <br />COUNTY ENGINEER. <br />8) ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO <br />INSTALLATION OF CURB, GUTTER, SIDEWALK AND STREET PAVING. <br />9) DRIVEWAYS ON STREETS TO BE LOCATED IN THE FIELD BY <br />THE ENGINEER AT THE TIME OF CONSTRUCTION. <br />10) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS. BARRICADES, <br />SIGNS, FLAGMEN OR OTHER DEVICES NECESSARY FOR PUBLIC <br />SAFETY. <br />11) DRAWING NUMBERS SHOWN ON THE PLANS REFER TO DRAWINGS <br />CONTAINED IN THE COUNTY OF SAN JOAQUtN STANDARD SPECS. <br />SHOW THUS: DWG. NO. EXCEPT SANITARY SEWER WORK WHICH IS <br />PER CITY OF STOCKTON STANDARD PLANS AND SPECIFICATIONS. <br />12) ALL STATIONS REFER TO DISTANCES ALONG STREET CENTER- <br />LINE, UNLESS OTHERWISE NOTED, ALL STATIONS ON THE CURBS <br />ARE PERPENDICULAR TO OR RADIALLY OPPOSITE CENTERLINE <br />STATIONS. <br />13) THE CONTRACTOR SHALL CHECK WITH THE UTILITY COMPANIES <br />AND VERIFY ALL UTILITY LOCATIONS. IT SHALL BE THE <br />CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING <br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE <br />PERFORMANCE OF HIS CONTRACT. THE CONTRACTOR SHALL BE <br />REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY <br />COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE <br />TO THE DEVELOPMENT. <br />14) CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING <br />EXISTING IMPROVEMENTS FROM DAMAGE . COST OF REPLACING <br />EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT PRICE <br />BID FOR ITEMS REQUIRING REMOVAL AND REPLACEMENT OF <br />EXISTING IMPROVEMENTS, <br />15) WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLA- <br />TION OF THE WORK COVERED BY THESE SPECIFICATIONS, THE <br />PAVEMENT SHALL BE REPLACED, AFTER PROPER BACKFILLING. WITH <br />PAVEMENT MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS <br />USED IN THE ORIGINAL PAVING. THE FINISHED PAVEMENT SHALL <br />BE SUBJECT TO THE APPROVAL OF THE COUNTY ENGINEER. <br />16) PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS <br />SHOWN ON PLANS. REPLACEMENT OF PAVEMENT WHICH IS BROKEN <br />OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THESE <br />SPECIFICATIONS, AND WHICH LIES OUTSIDE OF SAID AREAS, <br />SHALL BE INCLUDED IN THE STREET CONTRACTOR'S UNIT PRICE <br />FOR PAVEMENT, AND NO ADDITIONAL PAVEMENT SHALL BE MADE FOR <br />SUCH WORK. <br />1/) CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND <br />COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING THE <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY <br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL <br />APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING <br />HOURS: AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND <br />HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL <br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE <br />PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR <br />LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR <br />THE ENGINEER. <br />18) EXCAVATIONS OF 5 FEET OR MORE IN DEPTH WILL REQUIRE <br />AN EXCAVATION PERMIT FROM THE STATE OF CALIFORNIA DEPART- <br />MENT OF INDUSTRIAL SAFETY. FOR TRENCHES, 5 FEET OR MORE <br />IN DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A <br />OF THE CALTRANS STANDARDS, CHAPTER 9 OF THE STATE OF <br />CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES. <br />19) WE CALL ATTENTION TO: <br />SECTION 1540 (a) (1) OF THE CONSTRUCTION SAFETY ORDERS <br />(TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540) , <br />ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS <br />BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND <br />HEALTH ACT OF 1973 AS AMENDED WHICH STATES: <br />(1) PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE <br />TO DETERMINE WHETHER UNDERGROUND INSTALLATIONS: I. E.. <br />SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE EN- <br />COUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS <br />ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE <br />APPROXIMATE LOCATION OF SUCH AN INSTALLATION, THE EXACT <br />LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING: AND, WHEN IT IS UNCOVERED, ADEQUATE PROTECTION <br />SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALL <br />KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA <br />CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 <br />HOURS PRIOR TO THE START OF ACTUAL EXCAVATION. <br />20) THE ENGINEER SHALL SUBMIT AS -BUILT DRAWINGS OF THE <br />STREET LIGHT LAYOUT PLAN SHOWING LOCATION OF LIGHTS. <br />CONDUITS, CONDUCTORS, POINTS OF CONNECTIONS TO P.G.&E. <br />SERVICES, PULLBOXES, AND WIRE SIZES. <br />21) CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FOR <br />ANY WORK DONE WITHIN COUNTY RIGHT OF WAY FROM COUNTY OF SAN <br />JOAQUIN PUBLIC WORKS DEPARTMENT, AND NOTIFY COUNTY 24 HRS. <br />IN ADVANCE OF STARTING ANY WORK REQUIRED IN THE PLANS. <br />22) WORK IN STREET RIGHT-OF-WAY IS SUBJECT TO THE <br />APPROVAL AND ACCEPTANCE OF ThE COUNTY OF SAN JOAQUIN PUBLIC <br />WORKS DEPARTMENT EXCEPT FOR SANITARY SEWER WHICH SHALL BE <br />APPROVED BY THE CITY OF STOCKTON PUBLIC WORKS DEPARTMENT. <br />23) THE CONTRACTOR SHALL CONTACT THE COUNTY OF SAN <br />JOAQUIN PUBLIC WORKS DEPARTMENT AND THE CITY OF STOCKTON, <br />DEPARTMENT OF PUBLIC WORKS (944-8275) FOR A PRECONSTRUCTION <br />MEETING. <br />24) PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY TO HAVE EACH UTILITY COMPANY <br />LOCATE IN THE FIELD THEIR MAIN AND SERVICE LINES. THE <br />CONTRACTOR SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE <br />ALERT (U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING EXCAVA- <br />TION WORK BY CALLING THE TOLL-FREE NUMBER (800) 642-24U4. <br />25) THIS SUBDIVISION WILL NOT BE SUBMITTED <br />FOR ACCEPTANCE OF IMPROVEMENTS UNTIL ALL STREET <br />LIGHTS ARE INSTALLED AND ENERGIZED. COMPLETE AS -BUILT <br />PLANS ARE ALSO REQUIRED PRIOR TO INSPECTION. <br />26) "CLASS A SUBGRADE" DENOTES GRADED SUBGRADE WITH <br />RELATIVE COMPACTION OF NOT LESS THAN 95% OBTAINED FOR A <br />MINIMUM DEPTH OF 6". <br />27) ALL A.C. PAVING SHALL BE FOG SEALED.. <br />28) THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST <br />24 HOURS PRIOR TO BACKFILLING OF ANY PIPE WHICH STUBS <br />TO A FUTURE PHASE OF CONSTRUCTION FOR INVERT VERIFICATION. <br />29) ELEVATIONS REFER TO U.S.G.S. DATUM BENCH MARK 200 ELEV. <br />34.145. BRASS DISK MARKING CITY OF STOCKTON TRAVERSE CON- <br />TROL MONUMENT STAMPED 6S -12 IN MONUMENT BOX AT THE <br />INTERSECTION OF CENTERLINES OF CARDINAL AND MAIN STREET. <br />30) IF ALL UNITS INCLUDED IN THESE PLANS ARE NOT <br />CONSTRUCTED SIMULTANEOUSLY, BARRICADES, BLOW -OFFS. PLUGS, <br />ETC. SHALL BE INSTALLED AT EACH UNIT LINE. <br />31) AT THE CONCLUSION OF CONSTRUCTION, THE ENGINEER WHO <br />PREPARED THE IMPROVEMENT PLANS WILL ADD TO THE PLANS, FOR <br />CITY RECORD PURPOSES, CONSTRUCTION DATA BASED ON INFORMATION <br />COMPILED AND FURNISHED BY THE ENGINEER, CONTRACTORS, <br />INSPECTORS, AND OTHERS. <br />ON THOSE FACILITIES THAT WILL BE EXTENDED IN THE FUTURE <br />(SUCH AS SANITARY SEWER LINES. STORM DRAIN LINES, WATER LINES <br />AND CURB AND GUTTER INSTALLATIONS), THE ENGINEER SHALL SHOOT <br />THE GRADES AT THE END OF THE FACILITIES AND INCLUDE THESE <br />"AS CONSTRUCTED" GRADES ON THE RECORD DRAWINGS. <br />92) ALL EXISTING GROUND ELEVATIONS ARE BASED ON TOPOGRAPHIC <br />SURVEY DATED DECEMBER 1990 <br />STAKING NOTES: <br />1) 48 HOURS NOTICE IS REQUIRED FOR ANY STAKING <br />2) THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL STAKES <br />AND CONTROL PINS (FOR WHICH THEY CAN BE HELD LIABLE FOR <br />REPLACEMENT COST). <br />3) THE ENGINEER WILL PROVIDE ROUGH GRADE STAKES OF CONTROL <br />POINTS, LOT CORNER'S, COMMERCIAL DRIVEWAYS. LOT PAD <br />ELEVATIONS. ETC. <br />4) THE ENGINEER WILL STAKE STREET LIGHT LOCATIONS <br />(AFTER MEETING WITH STREET LIGHT CONTRACTOR IN ORDER TO <br />AVOID CONFLICTS IN LOCATION). <br />5) THE ENGINEER WILL STI,KE FIRE HYDRANT LOCATIONS, BUT <br />WILL NOT BE HELD LIABLE FOR PROVIDING GRADE UNTIL CURB, <br />GUTTER. & SIDEWALK IS IN PLACE. <br />7) THE ENGINEER WILL STAKE ALL STORM, SANITARY, & WATER <br />LINE LOCATIONS AT THE REQUEST OF THE DEVELOPER OR CONTRACTOR <br />WITH A 48 HOUR NOTICE OF STAKING REQUEST, AND A OFFSET <br />DISTANCE IS TO BE PROVIDED AT TIME OF REQUEST. <br />8) ALL ROUGH GRADE STAKES AND FINAL GRADE STAKES WILL BE <br />STAKED ON PROPERTY LINE UNLESS OTHERWISE APPROVED BY <br />ALBERT R. SANGUINETTI PRIOR TO STAKING. <br />9) THE ENUINEEH WILL STAKE ALL CURB, GUTTER, & SIDEWALK <br />PROVIDED THE DIRT PILES ARE LEVELED, AND ALL UNDERGROUND <br />UTILITIES ARE CLEANED UP. <br />10) THE ENGINEER WILL STAKE ALL SEWER & WATER SERVICE <br />LOCATIONS AS INDICATED ON THE PLANS. ANY DEVIATION IS <br />SUBJECT TO A. R. SANGUINETTI'S AND/OR COUNTY OF SAN JOAQUIN <br />APPROVAL, OR CITY OF STOCKTON FOR SANITARY SEWER ONLY, <br />11) ALL STORM, SEWER. AND WATER STUB OUTS MUST BE VERIFIED <br />BY A.R.S. SURVEY CREW PRIOR TO BACKFILLING. <br />12) PRIOR TO THE BACKFILLING OF STREET LIGHTING TRENCHES, <br />ALL TRENCH LOCATIONS AND CONDUIT WILL BE INSPECTED BY A.R. <br />SANGUINETTI PERSONNEL. <br />GRADING & DRAINAGE NOTES: <br />1) THE CONTRACTOR SHALL REVIEW SITE PRIOR TO BIDDING. <br />ALL VEGETATION AND DELETERIOUS MATERIALS SHALL BE REMOVED <br />FROM THE SITE AT THE EXPENSE OF THE CONTRACTOR AND SHALL <br />BE INCLUDED IN THE LUMP SUM CLEARING COSTS. <br />2) APPROPRIATE DUST CONTROL SHALL BE PROVIDED AT THE <br />CONTRACTOR'S EXPENSE, TO MINIMIZE ANY DUST NUISANCE AND <br />SHALL BE IN ACCORDANCE WITH SECTION 10 OF CALTRANS <br />STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF THE <br />COUNTY OF SAN JOAQUIN. <br />3) LOTS SHALL BE GRADED TO THE ELEVATIONS AS STAKED OR <br />DIRECTED BY THE ENGINEER. <br />4) PROPOSED ELEVATIONS SHOWN ARE MINIMUMS AND IN SOME <br />INSTANCES. FINISHED LOT ELEVATIONS MAY BE HIGHER. <br />5) ALL EXISTING WELLS AND SEPTIC TANKS SHALL BE REMOVED <br />AND/OR ABANDONED PER THE REQUIREMENTS OF THE SAN JOAQUIN <br />COUNTY LOCAL HEALTH DISTRICT. THIS WORK SHALL BE INCLUDED IN <br />THE LUMP SUM CLEARING COST. <br />6) THE CONTRACTOR SHALL INCLUDE IN THE BID PRICE FOR SUB - <br />GRADE PREPARATION THE COST FOR LEVELING A IO FOOT WIDE <br />AREA BEHIND THE SIDEWALK TO FACILITATE THE TRENCHING FOR <br />UNDERGROUND UTILITIES BY P.G. & E. THIS LEVELING IS <br />TO TAKE PLACE ON THE SIDE OF THE STREET WHERE P.G. & E. <br />IS TO INSTALL THEIR UTILITIES. <br />O¢pcirtm¢n+ aF" Public Works, Ci -F -c, 0, Stockl-oc, <br />Cc 11-P. "For Sgry,TA2Y SE ALER �e+�� " p p <br />u1 S¢.nmi bough, Ct+'�/d Eno ir-) r, Sto�.k-ton. Calf. <br />STREET NOTES <br />1) SUBGRADE PREPARATION: SUBGRADE SHALL BE COMPACTED TO 95X <br />RELATIVE COMPACTION TO A DEPTH OF 6" <br />2) AGGREGATE SUB -BASE: AGGREGATE SUB -BASE SHALL BE CLASS 4 <br />CLASS 4 AGGREGATE SUB -BASE MATERIAL <br />SHALL BE CLEAN AND FREE FORM VEGETABLE MATTER AND OTHER <br />DELETERIOUS SUBSTANCES. THE PERCENTAGES COMPOSITION BY WEIGHT <br />OF CLASS 4 AGGREGATE BACKFILL MATERIAL SHALL CONFORM TO THE <br />FOLLOWING GRADING WHEN DETERMINED BY TEST NO. CALIFORNIA 202. <br />SIEVE SIZES PERCENTAGE PASSING <br />2 1/2 100% <br />NO. 200 2-35% <br />CLASS 4 AGGREGATE SUB -BASE MATERIAL SHALL ALSO CONFORM TO THE <br />QUALITY REQUIREMENTS SHOWN IN THE FOLLOWING TABLE: <br />TESTS TEST METHOD NO. CALIF. REQUIREMENTS <br />SAND EQUIVALENT 217 IS MIN. <br />RESISTANCE (R -VALUE) 301 &0 MIN. <br />3) AGGREGATE BASE: AGGREGATE BASE SHALL BE CLASS 2 WITH A <br />MAXIMUM AGGREGATE SIZE OF 3/4" <br />4) PRIME COAT: PRIME COAT SHALL BE LIQUID ASPHALT GRADE SC - <br />250 AND SHALL BE APPLIED TO THE ENTIRE ROADWAY TO BE PAVED. <br />(0.2 GAL. PER YARD) <br />5) ASPHALT CONCRETE: ASPHALT CONCRETE SHALL BE CLASS "B" <br />THE VISCOSITY GRADE OF PAVING ASPHALT SHALL <br />BE AR -4000 AND THE AGGREGATE SHALL BE 1/2 MAXIMUM, MEDIUM <br />GRADE. <br />6) FOG SEAL: FOG SEAL SHALL CONFORM TO THE <br />STANDARD SPECIFICATIONS. <br />7) THERE SHALL BEIY2%CROSS SLOPE ON THE CONSTRUCTION OF ALL <br />NEW STREETS. <br />8) PARKING SHALL BE PROHIBITED TO PROVIDE ADEQUATE STOPPING <br />SIGHT DISTANCE AT INTERSECTIONS. WITHIN 15 FT. ON EITHER SIDE <br />OF FIRE HYDRANTS AND WITHIN 22 FT. OF ANY CROSSWALKS. <br />SANITARY SEWER NOTES: (CITY OF STOCKTON) <br />1) SANITARY SEWER CONSTRUCTION, MATERIALS, AND WORKMANSHIP <br />SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY <br />OF STOCKTON's STANDARD SPECIFICATIONS AND PLANS. <br />2) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, <br />SIGNS, FLAGMEN, AND OTHER DEVICES NECESSARY FOR PUBLIC <br />SAFETY. <br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING <br />OR PROVISIONS TO PROTECT WORKMEN FOR ALL AREAS TO BE <br />EXCAVATED TO A DEPTH OF FIVE FEET OR MORE. SAID PROTECTION <br />TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF COUNTY OF <br />SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS, AND STATE <br />REGULATIONS. <br />4) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY MARKING <br />INSTALLED LOCATIONS OF SERVICE LATERALS. <br />5) SEWER SERVICE LATERALS ARE 4" IN DIAMETER ANDS SHALL <br />EXTEND TO A POINT 3.5 FEET BEHIND THE BACK OF THE <br />SIDEWALK AND SHALL BE LOCATED AT THE LOT CENTERLINE UNLESS <br />OTHERWISE NOTED. (SEE DETAIL DRAWING NUMBER 63.) THE UNIT <br />COST OF THE SEWER LATERAL INCLUDES CONNECTION TO THE SEWER <br />MAIN. THE CLEANOUT RISER SHALL BE INSTALLED <br />BY THE HOME BUILDER. <br />6) ALL MANHOLE RIMS AND LAMPHOLES TO BE ADJUSTED TO FINISH <br />GRADE AFTER STREET PAVING. COST FOR RAISING FACILITIES TO <br />BE INCLUDED IN UNIT PRICES FOR MANHOLES AND LAMPHOLES. <br />7) SEWER SERVICES IN NEW SUBDIVISIONS SHALL BE MARKED BY THE <br />CONCRETE CONTRACTOR WITH THE LETTER "S" STAMPED ON THE <br />BACK OF SIDEWALK OR ON THE TOP OF CURB. THE UNDERGROUND <br />CONTRACTOR SHALL PROVIDE SUFFICIENT RECORDS AND SHALL <br />LEAVE ADEQUATE MARKS IN THE FIELD FOR THE CONCRETE <br />CONTRACTOR TO ACCURATELY STAMP THE LETTER "S" FOR ALL <br />SEWER SERVICES. PRIOR TO THE PLACING OF ANY SIDEWALK OR <br />CURB AND GUTTER, THE CONCRETE CONTRACTOR SHALL FURNISH <br />DATA TO THE CITY OF STOCKTON'S FIELD INSPECTOR SHOWING HE <br />HAD ADEQUATE INFORMATION TO ACCURATELY FIELD LOCATE AND <br />MARK THE LETTER "S" TO BE STAMPED IN HIS WORK. PRIOR TO <br />THE FINAL TROWELING OF THE CONCRETE, THE COUNTY OF SAN <br />JOAQUIN's FIELD INSPECTOR SHALL DETERMINE THAT THE LETTER <br />"S" HAS BEEN STAMPED IN THE PROPER LOCATION. <br />8) AFTER THE SANITARY SEWER PIPE HAS BEEN LAID AND <br />BACKFILLED, A LOW PRESSURE AIR TEST SHALL BE MADE ON EACH <br />SECTION OF PIPE BETWEEN MANHOLES. THE PRESSURE TESTS SHALL <br />BE CONDUCTED AS PRESCRIBED BY THE CITY ENGINEER AND SHALL <br />MEET AIR PRESSURE LOSS PER TIME PERIOD IN ACCORDANCE WITH <br />THE CITY OF STOCKTON's STANDARD SPECIFICATIONS. SHOULD ANY <br />TEST ON ANY SECTION OR PIPELINE DISCLOSE AN AIR LOSS <br />GREATER THAN THAT PERMITTED. THE CONTRACTOR SHALL. AT HIS <br />OWN EXPENSE, LOCATE AND REPAIR THE DEFECTIVE JOINTS OR <br />PIPE AND RETEST UNTIL THE AIR LOSS IS WITHIN THE SPECIFIED <br />ALLOWANCE. ANY DEFECTS FOUND BY THE CITY OF STOCKTON's <br />TELEVISION INSPECTION, SHALL BE REPAIRED BY THE <br />CONTRACTOR, PRIOR. TO CONSTRUCTION OF THE STREET PAVEMENT <br />PER CITY OF STOCKTON SPEC. 71-I.IIG <br />9) THE CONTRACTOR SHALL EXPOSE EXISTING SANITARY SEWER WHERE <br />CONNECTION IS TO BE MADE, SO THAT THE ENGINEER CAN VERIFY <br />EXISTING FLOW LINES AND LOCATIONS BEFORE START OF <br />CONSTRUCTION. <br />10) A41- <br />11) <br />LZ11) SEE SHEETS 5 Fo12 CITY OF s-T'oCKT01 <br />pETgl LS . <br />DEWATERING NOTES: <br />1) THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE AND <br />MAINTAIN ALL MACHINERY, APPLIANCES, AND EQUIPMENT TO <br />MAINTAIN ALL EXCAVATIONS FREE FROM WATER DURING <br />CONSTRUCTION, AND SHALL DEWATER AND DISPOSE OF THE WATER <br />SO AS NOT TO CAUSE INJURY TO PUBLIC OR PRIVATE PROPERTY, <br />OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC. THE <br />DEWATERING SYSTEM SHALL BE INSTALLED AND OPERATED SO THAT <br />THE GROUNDWATER LEVEL OUTSIDE THE EXCAVATION IS NOT <br />REDUCED TO THE EXTENT WHICH WOULD CAUSE DAMAGE OR ENDANGER <br />ADJACENT STRUCTURES OR PROPERTY. ALL COSTS FOR DEWATERING <br />SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ALL PIPE <br />CONSTRUCTION. THE STATIC WATER LEVEL SHALL BE DRAWN DOWN A <br />MINIMUM OF 1 FOOT BELOW THE BOTTOM OF EXCAVATION TO <br />MAINTAIN THE UNDISTURBED STATE OF NATURAL SOILS AND ALLOW <br />THE PLACEMENT OF ANY FILL TO THE SPECIFIED DENSITY. <br />DISPOSAL OF WATER SHALL NOT DAMAGE PROPERTY, CREATE A <br />PUBLIC NUISANCE OR VIOLATE THE LAW. THE CONTRACTOR SHALL <br />HAVE ON HAND, PUMPING EQUIPMENT AND MACHINERY IN GOOD <br />WORKING CONDITION FOR EMERGENCIES AND SHALL HAVE WORKMEN <br />AVAILABLE FOR ITS OPERATION. DEWATERING SYSTEM SHALL <br />OPERATE CONTINUOUSLY UNTIL BACKFILL HAS BE COMPLETED TO 1 <br />FCOT ABOVE THE NORMAL STATIC GROUNDWATER LEVEL, <br />2) THE CONTRACTOR SHALL CONTROL SURFACE WATER TO PREVENT <br />ENTRY INTO EXCAVATIONS. AT EACH EXCAVATION, A SUFFICIENT <br />NUMBER OF TEMPORARY OBSERVATION WELLS TO CONTINUOUSLY <br />CHECK THE GROUNDWATER LEVEL SHALL BE PROVIDED. <br />3) SUMPS SHALL BE NO DEEPER THAT 5 FEET AND SHALL BE AT THE <br />LOW POINT OF EXCAVATION. EXCAVATION SHALL BE GRADED TO <br />DRAIN TO THE SUMPS. <br />4) THE CONTROL OF GROUNDWATER SHALL BE SUCH THAT SOFTENING OF <br />THE BOTTOM OF EXCAVATION, OR FORMATIONS OF "QUICK" <br />CONDITIONS OR "BOILS," DOES NOT OCCUR. DEWATERING SYSTEMS <br />SHALL BE DESIGNED AND OPERATED SO AS TO PREVENT REMOVAL OF <br />THE NATURAL SOILS. THE RELEASE OF GROUNDWATER AT ITS <br />STATIC LEVEL SHALL BE PERFORMED IN SUCH A MANNER AS TO <br />MAINTAIN THE UNDISTURBED STATE OF THE NATURAL FOUNDATION <br />SOILS, PREVENT DISTURBANCE OF COMPACTED BACKFILL, AND <br />PREVENT FLOTATION OR MOVEMENT OF STRUCTURES, PIPELINES AND <br />SEWERS. IF AN NPDES (NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM) PERMIT IS REQUIRED FOR DISPOSAL OF <br />WATER FROM CONSTRUCTION DEWATERING ACTIVITIES, IT SHALL BE <br />OBTAINED BY THE CONTRACTOR PRIOR TO ANY DEWATERING <br />ACTIVITIES. <br />5) ONE HUNDRED PERCENT STANDBY PUMPING CAPACITY SHALL BE <br />AVAILABLE ON SITE AT ALL TIMES AND SHALL BE CONNECTED TO <br />THE DEWATERING SYSTEM PIPING TO PERMIT IMMEDIATE USE. IN <br />ADDITION, STANDBY AUXILIARY EQUIPMENT AND APPLIANCES FOR <br />ALL ORDINARY EMERGENCIES, AND COMPETENT WORKMEN FOR <br />OPERATION AND MAINTENANCE OF ALL DEWATERING EQUIPMENT <br />SHALL BE ON SITE AT ALL TIMES. STANDBY EQUIPMENT SHALL <br />INCLUDE EMERGENCY POWER GENERATION AND AUTOMATIC <br />SWITCH OVER TO THE EMERGENCY GENERATOR WHEN NORMAL POWER <br />FAILS. DEWATERING SYSTEMS SHALL NOT BE SHUT DOWN BETWEEN <br />SHIFTS, ON HOLIDAYS, ON WEEKENDS, OR DURING WORK <br />STOPPAGES. <br />DESCRIPTION <br />DATE <br />STREET LIGHT NOTES: <br />1) ALL STREET LIGHTS SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE COUNTY OF SAN JOAQUIN, <br />2) INSTALL A CONCRETE PULL BOX BY EACH ELECTROLIER PER COUNTY OF <br />SAN JOAQUIN STANDARD - MINIMUM SIZE NO. 3 1/2 - LID <br />MARKING "STREET LIGHT." <br />3) FUSED SPLICE CONNECTORS SHALL BE INSTALLED IN THE PULL BOX <br />ADJACENT TO THE LIGHT STANDARD, PSR SEC-rlON Be. of <br />CAL �RANS STANDARD SPEC. OATEO JAN. 1988. <br />4) ALL STREET LIGHTS SHALL BE 100 WATT HPS UNLESS OTHERWISE <br />NOTED. yyy{{{ <br />5) STREET LIGHTS ARE SHOWN THUS: 0—{ ) <br />6) THE ENGINEER SHALL SUBMIT AS -BUILT DRAWINGS OF THE STREET <br />LIGHT LAYOUT SHOWING THE LOCATIONS OF ALL STREET LIGHTS, <br />PG&E SERVICE POINTS, PULL BOXES, CONDUIT RUNS AND WIRE <br />SIZES. <br />7) CONDUIT FOR ALL STREET LIGHTS SHALL BE P.V.C., SCHEDULE <br />40. <br />8) ALL STREET LIGHTS SHALL CONFORM TO COUNTY OF SAN JOAQUIN <br />STANUARD SPECIFICATIONS. <br />WIRE IN UNDERGROUND CONDUIT SHALL NOT BE SMALLER THAN <br />#10 COPPER WIRE SERVING A SINGLE LUMINAIRE WITHIN 150 FEET <br />OF THE SERVICE POINT. <br />9) ALL OVERHEAD PG&E LINES ARE TO BE PLACED UNDERGROUND. <br />10) UNDERGROUND UTILITY TRENCHES SHALL BE PER COUNTY OF <br />SAN JOAQUIN STANDARD DRWG. A-7 <br />II) IF ONLY ONE IODW-HPS OR 150W-HPS STREET LIGHT IS <br />SERVED FROM A PG&E SERVICE POINT, THE SERVICE SHALL BE <br />120V. IF TWO OR MORE 20OW-HPS STREET LIGHTS ARE SERVED <br />FROM A PG&E SERVICE POINT, THE SERVICE SHALL BE 240V <br />(UNLESS OTHERWISE INDICATED ON THESE PLANS). <br />STORM DRAIN NOTES: <br />1) ALL STORM DRAIN CONSTRUCTION, MATERIALS, AND WORKMANSHIP, <br />SHALL BE IN ACCORDANCE WITH THE STANDARD SUBDIVISION <br />IMPROVEMENTS OF COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC <br />WORKS SPECIFICATIONS AND IMPROVEMENT STANDARDS. <br />2) THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, <br />BARRICADES, FLAGMEN, OR OTHER DEVICES NECESSARY FOR PUBLIC <br />SAFETY. <br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING <br />OR PROVISIONS TO PROTECT WORKMEN FOR ALL AREAS TO BE <br />EXCAVATED TO A DEPTH OF FIVE FEET OR MORE. SAID PROTECTION <br />TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF COUNTY OF SAN <br />JOAQUIN DEPARTMENT OF PUBLIC WORKS, AND STATE <br />REGULATIONS. <br />4) THE UNDERGROUND CONTRACTOR SHALL EXPOSE EXISTING STORM <br />DRAINS, WHERE CONNECTION IS TO BE MADE, SO THAT THE <br />ENGINEER CAN VERIFY EXISTING FLOW LINES AND LOCATIONS <br />BEFORE START OF CONSTRUCTION. <br />5) CONTRACTOR TO BE RESPONSIBLE FOR ALL TESTING OF STORM <br />DRAIN FACILITIES. <br />6) ALL MANHOLE RIMS TO BE ADJUSTED TO FINISH GRADE AFTER <br />STREET PAVING. COST FOR RAISING FACILITIES TO BE INCLUDED <br />IN UNIT PRICES FOR MANHOLES. <br />r) ON PRECAST PIPES, RUBBER GASKET JOINTS SHALL BE USED IN <br />HIGH GROUND WATER CONDITIONS. <br />AAA A.R. SANGU <br />CONS U t <br />5651 N. PERISHING (< <br />,L <br />C <br />ALBERT R, SANGUINET <br />Indemnification Clause: Contractor agrees that he shall assume sole <br />and complete responsibility for the job site conditions during <br />the course of construction of this project, including safety of <br />all persons and property; that requirement shall apply <br />continuously and not be limited to normal working hours; and <br />that contractor shall defend, indemnify and hold harmless, the <br />County of San Joaquin, its elected officials, officers, employees <br />and agents from any and all claims, costs of litigation, damages, <br />and attorney's fees, for personal injury or property damage of <br />whatever nature which are claimed to have occurred during the <br />term of this project. <br />.SAl O ��z ASSOCIATES <br />C � NGINEERS <br />B ` <br />-30-93STOCKTON, CA 95207 <br />- <br />DATE 2-19-91 <br />MEADOWOOD <br />IMPROVEMENT PLANS <br />NOTES <br />DEPARTMENT OF PUBLIC WORKS <br />COUNTY OF SAN JOAQUIN <br />SCALE APPROVED BY: DATE: <br />DESIGNED BY <br />DRAWN BY <br />CHECKED BY <br />DIRECTOR OF PUBLIC WORKS <br />AS BUILT BY COUNTY OF SAN JOAQUIN <br />NO. <br />JOB NO. <br />