NOTES
<br />All miscellaneous metal parts in the wet well shall be fabricated from stain
<br />steel.
<br />N'
<br />The electrical control panel shall have a programmable process control panel,
<br />radio telemetry provisions, a motor control center suitable for the pump motors,
<br />AM
<br />a transfer switch, a run time meter for each pump, a run light for each pump,
<br />a "Hand -Off -Auto" switch for each pump, a 120 volt convenience outlet with
<br />1, 500 watt capacity and two receptacles, and a switch to control the overhead
<br />light.
<br />3. The programmable process control panel shall match the existing control panels
<br />used by the City of Tracy at similar lift stations and shall be a "Liquitronic IV"
<br />as manufactured by Tesco. No substitutions will be allowed. The
<br />programmable process control panel shall be programmed to match the control
<br />method and alarm indications of similar duplex lift stations installations in the
<br />City of Tracy.
<br />4. The programmable process control panel shall be programmed to turn on the
<br />lead pump at an elevation of 90.7', turn on the lag pump at a water elevation
<br />of 91.2', actuate an alarm at a water elevation of 91.7', and turn off any
<br />pumps running at a water elevation of 86.0'. The lead pump shall be
<br />alternated each time the pump off elevation is reached.
<br />5. Alarm indications shall be as follows:
<br />o High water level.
<br />o Low or high voltage or phase disturbance.
<br />o North pump overheat.
<br />o South pump overheat.
<br />o North pump seal leakage.
<br />o South pump seal leakage.
<br />o Generator alarms (detailed in electrical specifications).
<br />Each indication shall cause the radio telemetry equipment to send an alarm and
<br />shall cause a corresponding labeled light to turn on in the control panel. The
<br />light shall remain on until it is manually reset. Activation of an alarm shall not
<br />• change the control logic.
<br />6. The radio telemetry equipment shall match the existing radio telemetry
<br />equipment used by the City of Tracy at similar lift stations and shall be as
<br />manufactured by Tesco. No substitutions will be allowed.
<br />7. The transfer switch shall be an automatic switch to turn on the emergency
<br />generator in the event of a power failure. The switch shall meet all applicable
<br />PG&E standards and shall prevent any possibility of a simultaneous connection
<br />of the generator and the power grid.
<br />8. The electrical equipment shall be housed in a NEMA 4X enclosure or enclosures
<br />1
<br />1 fabricated from cold rolled steel with padlocking closures and a padlock keyed
<br />to the City Standard.
<br />9. The conduits for the power cables leading from the control panel to the pumps
<br />shall be 2" diameter schedule 40 rigid conduit. The bubbler conduit shall be
<br />1/2" diameter schedule 40 rigid conduit. Conduit from the electrical control
<br />panel to the wet well shall be threaded galvanized steel or threaded galvanized
<br />iron. The bubbler conduit inside the wet well shall be glued socket PVC. On
<br />the horizontal run, the conduits shall have 18" of cover. Conduits shall be
<br />tightly sealed around the cables at both ends with non -hardening sealant.
<br />Power cables shall be provided with a cord grip at the wet well end of the
<br />conduit. There shall be no splices in any of the cables or air lines running
<br />-inside the conduits between the electrical control panel and the associated
<br />device.
<br />10. The level sensor shall be a reactive air level monitoring system as manufactured
<br />by Tesco. The transmitter shall be mounted to the wet well wall in accordance
<br />with the manufacturer's recommendations in an indentation in the grout fillet,
<br />which will be formed to provide a 6 inch minimum clearance around the
<br />' transmitter.
<br />1. The pumps shall be non -clog submersible pumps designed for use with a guide
<br />rail system. No entry of the wet well shall be necessary to connect the pumps
<br />or remove the pumps for maintenance. Each pump shall deliver at least 250
<br />gpm at a total dynamic head of 48 feet and shall not deliver more than 310
<br />" gpm at a total dynamic head of 48 feet. Each pump shall be capable of at least
<br />10 starts per hour on a continuing basis without damage and shall be capable
<br />of passing a 3" sphere. The pump efficiency at a 250 gpm flow rate shall be
<br />at least 50%. The pumps shall use 7.5 horsepower motors wired for 1750
<br />rpm operation with 230 volt 3 phase power and shall be non -overloading over
<br />the entire pumping range. The pumps shall have high temperature sensors with
<br />n associated automatic shut-off and shall have a seal failure sensor. Th
<br />ps shall be S4MX pumps with 7.88' impeller and the "Dual Rail
<br />Iffigactured by Aurora/Hydromatic
<br />r]
<br />,%
<br />r
<br />2. Ductile iron pipes and fittings shall meet the applicable portions of the latest
<br />revisions of the AWWA C110, C111, C115, C151 and C153 standards. The
<br />ductile iron pipe and fittings shall be cement mortar lined in accordance with
<br />the latest revision of AWWA C104. Buried ductile iron piping shall have a
<br />bituminous external coating at least 1 mil thick. Ductile iron pipe which is not
<br />buried shall be painted brown with a high solids epoxy.
<br />13. All mechanical joint fittings shall have locking wedge retaining glands. Locking
<br />wedge retaining glands shall be Megalug as manufactured by EBAA Iron Sales,
<br />Inc. or approved equal.
<br />14. Where a pipe or conduit penetrates a manhole ring, a clean hole large enough
<br />to allow grout to be tightly packed around the pipe for the full thickness of the
<br />manhole wall shall be cut. Where a pipe penetrates the valve vault a clean hole
<br />large enough to allow grout to be tightly packed around the pipe for the full
<br />thickness of the valve vault wall shall be cast in or a knockout provided. The
<br />clearance between the wall and the pipe shall not exceed 2". A sand cement
<br />grout shall be used to seal the space between the pipes and the precast wall
<br />and shall be tightly packed for the full thickness of the wall.
<br />15. Submittals shall be provided for the precast valve vault, the valve vault cover,
<br />the wet well cover, electrical control panel and all associated equipment called
<br />out in note 3., the electrical conduit, the bubbler, the overhead light, the
<br />pumps, the piping and fittings, the check valves and the gate valves. The
<br />submittals shall contain enough information to show that the proposed
<br />equipment is exactly the make and model specified or is the equal in every
<br />respect of the make and model specified, or, where no make and model has
<br />been specified, that the proposed equipment meets the requirements listed and
<br />is suitable for the intended use. The Contractor shall submit 5 copies of each
<br />submittal to the Engineer. The Engineer shall evaluate the submittals and mark
<br />them with the stamp shown below. Within 5 working days of the receipt of
<br />a given submittal, the Engineer will send 1 copy to the Owner, send 1 copy to
<br />the City of Tracy, and send the remaining two to the'Contractor. Until the
<br />Contractor has received a submittal marked with either "No Exceptions Taken"
<br />or "Make Correction Noted" the Contractor shall not proceed with any portion
<br />of the work which would be adversely affected by the rejection of the
<br />submittal.
<br />SIJBM!TTAL REVIEW
<br />BISSELL & KARN, INC. - CIVIL ENGINEERS
<br />TVIO A 4.113K L INE. SUITE 210 SAN RAMON, CA 94583
<br />n=.iiEVJ GE%ERAL CC"APUANCE WITH DESIGN
<br />AND NTEPJT O= CONTRACT DOCUMENTS REVIEW By
<br />E'G NEEP DOES NOT REiJEVE THE CONTRACTOR
<br />F;C.dA.Nv AE2PCHS181UTIESOF THE CONTRACT.
<br />❑ No Exceptions Taken
<br />❑ Make Correction Noted
<br />❑ Amend and Resubmit
<br />❑ Reject —See Remarks
<br />gy Date
<br />16. The Contractor shall provide the Owner with 4 copies of an operations and
<br />maintenance manual. The manual shall contain detailed instructions on
<br />equipment set up, adjustment, suggested settings, normal use,
<br />ocZl
<br />cedures and intervals, inspection procedures
<br />l
<br />DRAWING INDEX
<br />SHT. NO. TITLE
<br />49 NOTES AND DRAWING INDEX
<br />50 SITE PLAN AND SECTION
<br />51 DETAILS
<br />0\
<br />1
<br />K
<br />K
<br />>.
<br />Z
<br />N a
<br />N
<br />CL
<br />L)
<br />w N
<br />N
<br />LLJ
<br />>
<br />W
<br />Q
<br />2
<br />t n
<br />r
<br />W
<br />0
<br />= N
<br />U
<br />U in
<br />Q
<br />U
<br />Z
<br />w M
<br />co
<br />¢
<br />UJ
<br />a 9)
<br />Q Cat
<br />20.
<br />The control panel shall consist of two Tesco type 24-000NR panels with
<br />UJ
<br />ventilated roofs mounted back to back. The front panel shall be 12.65 inches
<br />Z
<br />deep and shall provide mounting surfaces for all equipment indicated in Notes
<br />w
<br />Ir
<br />Q O
<br />2,3,4,5,6 and alarms from Notes 7 and 18. The rear panel shall be 16 inches
<br />J ❑
<br />deep and shall provide mounting surfaces for the transfer switch (Note 7) and
<br />ac
<br />U
<br />{
<br />the following accessories for the transfer switch and diesel generator (Note
<br />Z
<br />z
<br />x
<br />18):
<br />w
<br />M
<br />O
<br />,
<br />SYSTEMS CONTROL
<br />UJ
<br />X Z
<br />LED status lights.
<br />a
<br />N N
<br />Engine warmup timer.
<br />c
<br />Engine warmup bypass.
<br />=
<br />a
<br />Generator voltage set.
<br />L
<br />rn
<br />¢ UJ
<br />r
<br />Generator frequency set.
<br />Z N
<br />Return
<br />to Utility delay.
<br />�
<br />_
<br />a ui
<br />Engine cool down.■
<br />ii a
<br />Minimum run.
<br />W
<br />Exercise load switch.
<br />N m
<br />7 -DAY EXERCISER
<br />to
<br />w z
<br />UTILITY VOLTAGE SENSOR
<br />(n
<br />z a
<br />Line failure sensing.
<br />M
<br />z 3
<br />Utility interrupt delay.
<br />W
<br />w H
<br />14 -LIGHT REMOTE ANNUNCIATOR
<br />10 -AMP DUAL RATE BATTERY CHARGER
<br />Z
<br />cc
<br />21.
<br />The overhead light shall be a vandal resistant, weather proof, 100 watt, high
<br />O
<br />pressure sodium floodlight. General Electric model SBFF10S1 H16X6DB with
<br />LLJ
<br />model LVS-SBF lexan vandal shield or approved equal.
<br />Q
<br />j
<br />U
<br />.:
<br />22.
<br />All galvanized items shall be hot dipped galvanized after fabrication in
<br />b
<br />accordance with ASTM A120. All galvanized items except the fencing fabric
<br />1 --
<br />shall have a minimum of 2 ounces of zinc per square foot applied in theQ
<br />x
<br />Z
<br />galvanizing process. The fencing fabric shall have a minimum of 1.2 of zinc
<br />a ZO
<br />per square foot applied in the galvanizing process.
<br />cc O Q
<br />W
<br />U
<br />~ Z
<br />23.
<br />The supplier of the radio telemetry equipment shall take all necessary action to
<br />Zcna
<br />acquire the necessary FCC permits and licenses for the radio telemetry
<br />W W H
<br />C3
<br />a0
<br />equipment.
<br />N
<br />} F- Z
<br />24.
<br />The existing anchor for the existing power pole onsite shall be potholed to
<br />W N LL
<br />Z
<br />determine the exact location of the anchor. If it appears that any portion of the
<br />Z cc J �
<br />N
<br />anchor will be less than 3 feet away from the outside edge of any equipment
<br />= H Q
<br />installed under this contract (except the fencing, which shall be placed in a
<br />m LL,I IM
<br />fashion which will not damage the anchor), the Contractor shall immediately
<br />3
<br />N Q
<br />notify the Engineer and Catherine L. Doo of PG&E at (209) 836-0440.
<br />Q Z W
<br />aCnZ
<br />Q
<br />Z
<br />25.
<br />The Pac-Bell line on the eastern edge of the lift station shall be potholed to
<br />¢
<br />determine the exact location of the Pac-Bell line. If it appears that any portion
<br />O W Q
<br />of the Pac Bell line will be less than 3 feet away from the outside edge of any
<br />3
<br />W W CA
<br />equipment installed under this contract (except the fencing, which shall be
<br />N Z
<br />W
<br />placed in a fashion which will not damage the Pac Bell line), the Contractor
<br />I—
<br />Z H
<br />shall immediately notify the Engineer.
<br />Q ¢
<br />a�� Q
<br />Q
<br />Z
<br />2
<br />cc
<br />Q
<br />F—
<br />N
<br />LL
<br />0
<br />.
<br />F—
<br />U
<br />Q
<br />O
<br />LL
<br />l
<br />DRAWING INDEX
<br />SHT. NO. TITLE
<br />49 NOTES AND DRAWING INDEX
<br />50 SITE PLAN AND SECTION