My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2667
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-2523-2737
>
SU-2667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 9:28:46 AM
Creation date
10/15/2024 9:28:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DETENTION <br />BASIN <br />PATTERSON PASS BUSINESS <br />SUBDIVISION OF TRACT NO. 2450 <br />SHEET INDEX <br />SHEET NO. <br />TITLE <br />1 <br />COVER SHEET <br />2 <br />SURVEY BASELINE SHEET <br />3-7 <br />GENERAL NOTES & DETAILS <br />8-9 <br />BASIN IMPROVEMENT PLAN <br />EARTHWORK SUMMARY TABLE <br />NOTE: THESE QUANTITIES ARE PROVIDED FOR REFERENCE ONLY <br />IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY <br />QUANTITIES. <br />SAN JOAQUIN COUNTY CALIFORNIA <br />VICINITY MAP <br />NOT TO SCALE <br />r + <br />SHEET 8 <br />F <br />7t <br />7. <br />t . <br />I. <br />I r <br />SyEET 9 <br />i <br />INDEX MAP <br />SCALE: 1 300' <br />LEGEND <br />EXISTING PROPOSED I DESCRIPTION <br />SUBDIVISION BOUNDARY <br />RIGHT OF WAY <br />LOT LINE <br />it CENTERLINE <br />CONTOUR LINE <br />CONCRETE CURB, GUTTER AND <br />SIDEWALK <br />TC=50.00 TOP OF CURB ELEVATION <br />EASEMENT <br />STIRM DRAIN MANHOLE, LINE <br />AND CATCH BASIN <br />— 0 EARTH DITCH <br />GRAVEL ROAD <br />82 LOT NUMBER <br />CUT(CU.YDS) <br />FILL(CU.YDS) <br />RAW YARDAGE <br />20= <br />62100 <br />SHRINK (13%) <br />2600 <br />BC <br />UTILITY SPOILS (SD) <br />5000 <br />END CURVE <br />GB <br />GRADE BREAK <br />CB <br />CATCH BASIN <br />MH <br />MANHOLE <br />EX. OR (E) <br />EXISTING <br />GR <br />GRATE <br />A <br />FIELD INLET <br />TOTAL <br />27,600 <br />62,100 <br />NOTE: THESE QUANTITIES ARE PROVIDED FOR REFERENCE ONLY <br />IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY <br />QUANTITIES. <br />SAN JOAQUIN COUNTY CALIFORNIA <br />VICINITY MAP <br />NOT TO SCALE <br />r + <br />SHEET 8 <br />F <br />7t <br />7. <br />t . <br />I. <br />I r <br />SyEET 9 <br />i <br />INDEX MAP <br />SCALE: 1 300' <br />LEGEND <br />EXISTING PROPOSED I DESCRIPTION <br />SUBDIVISION BOUNDARY <br />RIGHT OF WAY <br />LOT LINE <br />it CENTERLINE <br />CONTOUR LINE <br />CONCRETE CURB, GUTTER AND <br />SIDEWALK <br />TC=50.00 TOP OF CURB ELEVATION <br />EASEMENT <br />STIRM DRAIN MANHOLE, LINE <br />AND CATCH BASIN <br />— 0 EARTH DITCH <br />GRAVEL ROAD <br />82 LOT NUMBER <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLC WORKS <br />DATE <br />ETD'. <br />REVIEWED WITH RESPECT TO GEOTECHNICAL <br />CRI TERIA:OUTLINED IN THE REPORT ENTITLED <br />GEOTECHNICAL INVESTIGATION 35 — ACRE PARCEL <br />PATTERSON PASS INDUSTRIAL PARK SCHULTE ROAD. <br />SAN JOAOUIN COUNTY, CALIFORNIA. FOR KING AND <br />LYONS, JULY 25,1991 <br />PREPARED BY BERLOGAR GEOTECHNICAL <br />CONSULTANTS. <br />BERLOGAR GEOTECHNICAL CONSULTANTS <br />PATTERSON P SS PARK <br />DATE 7-24-92 <br />y � <br />RcE No 4Y.Z3 7 <br />SOILS ENOINEER� .r p} <br />EXP. DATE 6-3o-9,3 <br />MAJORS ENGINEERING INC. <br />PATTERSON PASS BUSINESS PARK <br />/ ^ DATE <br />KEVIN CARTER V <br />Upon review with the Owner, the General Contractor, the Construction Surveyor and a <br />visual review of the site, we conclude that the information contained on these plans <br />generally depicts the post -construction conditions of this site. A post -construction survey <br />was not completed All information should be field verified prior to undertaking any <br />future work on this site. <br />Kevin C. Carter, P.E. C44665 <br />Kerry Engineering and Surveying, Inc. <br />24 / No. C44/6`65 <br />`/-4' fr <br />Date s, <br />Vi <br />EXP. DATE 3/94 <br />3A/ <br />Illllliz <br />CY, <br />JUNCTION STRUCTURE <br />• <br />MONUMENT <br />R/W <br />RIGHT OF WAY <br />TC <br />TOP OF CURB <br />BC <br />BEGIN CURVE <br />EC <br />END CURVE <br />GB <br />GRADE BREAK <br />CB <br />CATCH BASIN <br />MH <br />MANHOLE <br />EX. OR (E) <br />EXISTING <br />GR <br />GRATE <br />A <br />FIELD INLET <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLC WORKS <br />DATE <br />ETD'. <br />REVIEWED WITH RESPECT TO GEOTECHNICAL <br />CRI TERIA:OUTLINED IN THE REPORT ENTITLED <br />GEOTECHNICAL INVESTIGATION 35 — ACRE PARCEL <br />PATTERSON PASS INDUSTRIAL PARK SCHULTE ROAD. <br />SAN JOAOUIN COUNTY, CALIFORNIA. FOR KING AND <br />LYONS, JULY 25,1991 <br />PREPARED BY BERLOGAR GEOTECHNICAL <br />CONSULTANTS. <br />BERLOGAR GEOTECHNICAL CONSULTANTS <br />PATTERSON P SS PARK <br />DATE 7-24-92 <br />y � <br />RcE No 4Y.Z3 7 <br />SOILS ENOINEER� .r p} <br />EXP. DATE 6-3o-9,3 <br />MAJORS ENGINEERING INC. <br />PATTERSON PASS BUSINESS PARK <br />/ ^ DATE <br />KEVIN CARTER V <br />Upon review with the Owner, the General Contractor, the Construction Surveyor and a <br />visual review of the site, we conclude that the information contained on these plans <br />generally depicts the post -construction conditions of this site. A post -construction survey <br />was not completed All information should be field verified prior to undertaking any <br />future work on this site. <br />Kevin C. Carter, P.E. C44665 <br />Kerry Engineering and Surveying, Inc. <br />24 / No. C44/6`65 <br />`/-4' fr <br />Date s, <br />Vi <br />EXP. DATE 3/94 <br />3A/ <br />Illllliz <br />CY, <br />N <br />� <br />_g <br />SOS <br />O <br />U <br />Ma <br />4f <br />_ <br />N <br />rn <br />04LLJ <br />U <br />N <br />_ <br />Iwo <br />�= <br />W <br />•C.)Oma <br />Z <br /><OI <br />C <br />O <br />i <br />02 o <br />I.-: <br />0o <br />t <br />016 <br />d0 <br />< <br />i <br />C <br />W <br />LL) <br />Ic <br />= <br />r0 <br />O <br />N <br />—M <br />w <br />Z <br />p C4 <br />U <br />.. <br />N O <br />O <br />N.' <br />04Ln0 <br />z <br />In <br />i <br />ICOL <br />o <br />a <br />]C <br />In <br />d M <br />w <br />w <br />O <br />Ono <br />O<I <br />la1 <br />Z <br />K U N <br />0OGp <br />Y <br />t- r. <br />LO <br />L0>� <br />Z v <br />< <br />N <br />< <br />W <br />O <br />< <br />U <br />La <br />n! <br />S <br />ma: <br />0 <br />N <br />0 <br />0 <br />0 <br />Q. <br />r�L <br />N <br />� <br />_g <br />SOS <br />O <br />U <br />Ma <br />_ <br />N <br />rn <br />04LLJ <br />C7 <br />3 <br />W <br />Iwo <br />�= <br />N <br />•C.)Oma <br />Z <br /><OI <br />C <br />O <br />i <br />02 o <br />t <br />016 <br />d0 <br />< <br />C <br />W <br />LL) <br />Ic <br />LO <br />P0 <br />r0 <br />O <br />N <br />—M <br />� <br />p C4 <br />CY< <br />_C <br />C <br />N O <br />O <br />04Ln0 <br />z <br />In <br />a <br />]C <br />In <br />d M <br />d <br />N <br />San <br />O <br />Ono <br />O<I <br />K U N <br />0OGp <br />t- r. <br />LO <br />L0>� <br />Z v <br />r�L <br />N <br />� <br />z <br />of <br />SOS <br />O <br />U <br />Ma <br />_ <br />N <br />rn <br />04LLJ <br />C7 <br />3 <br />W <br />Iwo <br />�= <br />N <br />Z <br />t <br />O <br />Z <br />Li -O <br />016 <br />d0 <br />00 <br />W <br />:o <br />N~ <br />z <br />r0 <br />O <br />—M <br />� <br />CY< <br />dM <br />O <br />z <br />In <br />N <br />� <br />' <br />I <br />w <br />W <br />to <br />_ <br />N <br />rn <br />04LLJ <br />C7 <br />3 <br />Iwo <br />N <br />_J <br />O <br />Z <br />Li -O <br />oU <br />00 <br />Cn <br />U< <br />O <br />—M <br />
The URL can be used to link to this page
Your browser does not support the video tag.