Laserfiche WebLink
44 <br />Ru�usrA , I <br />VICINITY MAP <br />NO 5 G'AL P <br />cm®L.P a <br />CTMV <br />WOOD PR/D EE <br />ORIr- P/V i' <br />WOOD; <br />KEY MAP__ <br />4nqz Lc /00, <br />LOof <br />LA66 <br />7 <br />N <br />x <br />R <br />S rRFFr <br />BEiCIOM DAIm per U.S.G.S B.M. • <br />H19 -ll 1907-45. Location N.N. cornet <br />of Masonic Building in the torn of, <br />lloodbridge. Elevation: 45.85 per F.E.M.A. <br />SERVICES <br />Sewage Woodbridge Sanitary District <br />Natural Gas &� <br />Electric <br />Telephone Pacific Bell <br />Television CableLodi Cable T. V. <br />Water <br />Storm DrainageMokelumne Acres Maintenance district <br />LEGEND <br />C.I.C.B., or <br />Curb Inlet Catch Basin <br />L.P. <br />Low Point <br />H.P. <br />High Point <br />T.C. <br />Top of Curb <br />FL <br />Flow line <br />Storm Drain Line Indicating Direction of Flow <br />Sanitary Sewer Line Indicating Direction of Flow <br />Water Line <br />F. N. CF- <br />Fire Hydrant <br />S. i. <br />Street Light <br />-' <br />Existing Manhole <br />-pa - <br />Water Valve <br />-- <br />Property Line FI Right of Way Line (R/W) <br />[� <br />Gas Line <br />cl-- <br />Blowoff (B.0.) <br />NOTE' <br />Woodbridge Sanitary District Fees Shall be paid <br />by effected owner prior to any sewer work. <br />CONSTRUCTION STAKING LIABILITY WAIVER <br />!These improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />,performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />,the purpose of construction staking, notice is hereby <br />gqiven that the firm of Baumbach & Piazza, Inc. will not <br />!assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />Corrected or mitigated if Baumbach & Piazza, Inc. had <br />performed the staking work. <br />GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for <br />this project. <br />2. Baumbach & Piazza (Engineer) shall set all survey controls and <br />construction stakes necessary for completion of work. The Contractor <br />shall be responsible for the preservation of all survey and <br />construction Stakes. Survey and construction stakes that are lost or <br />destroyed due. to Contractor's negligence will be set by the Engineer <br />at the Contrabtor's expense. <br />3. The existing underground utilities were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities in the field before any <br />excavation. The Contractor shall notify and coordinate all work <br />with any agency requiring removal or relocation of their utilities. <br />Pacific Bell, P. G. & E., Lodi Cable T. V., Woodbridge Sanitary <br />District and Mokelumne Acres Maintenance District. U.S.A. (800) 642- <br />2444. <br />4. House services shall be installed prior to curb and gutter <br />construction. All underground utilities within the street area shall <br />be installed prior to paving. <br />5. All manholes to be set flush with the finish grade unless otherwise <br />indicated. <br />6. All water lines shall have a minimum cover of 30". <br />7. Water used in any phase of construction, such as backfill compaction, <br />dust control, testing or other work herein required, shall be <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />e. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety for all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner, County and the Engineer harmless from <br />any and all liability, real or alledged, in connection with the <br />performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />9. Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />10. Sanitary sewer services shall be marked by the curb & gutter <br />contractor with an "S" stamped on the top of curb. <br />11. Water services shall be marked by the curb and gutter Contractor with <br />a "W" stamped on the top of curb. Location of water markings shall <br />be verified in the field by the Engineer. <br />12. Separation of water and sewer mains (including crossings) and sewer <br />laterals crossing over water mains shall meet or exceed the latest <br />standards of the State of California Department of Health Services. <br />13. Contractor shall be responsible for notifying and co -coordinate all <br />work with any agency requiring removal or relocation of utilities, <br />such as Pacific Bell, P. G. & E., etc. <br />14. All off-site water lines shall be pressure tested, disinfected, <br />flushed and tested for bacteria in conformance with the San Joaquin <br />County Health Code Requirements prior to connecting to existing water <br />line. <br />15. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />shall be included in his bid price. <br />16. Where water crosses SD or SS use an 18-20 ft. length of Cl. 200 pipe, <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />b) The vertical clearance is less than 1 foot. <br />17. No materials resulting from tapping procedures may enter District <br />sewer. <br />IB. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 48 hours in advance of <br />commencement of work. <br />19. Eash SS service to have C.O. at property line. <br />20. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />21. Prior to performing any work in the roadway, the Contractor shall <br />obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />22. Contractor shall notify Mokelumne Acres Maintenance District for <br />approval prior to connecting water line to existing water main. <br />23. Installation of all sanitary sewer improvements shall conform to the <br />standards of the Woodbridge Sanitary District. All such work is <br />subject to inspection by the District Engineer. The Contractor shall <br />notify District Engineer 4e hours prior to the commencement of any <br />work on the sanitary system. (209) 946-0268) <br />24. Pipe type and strengths allowed for underground utilities, unless <br />otherwise specified on plans, are as follows: Storm Drain (SD) - RCP <br />or ACP, Cl. III; Sanitary Sewer (SS) - PVC, per ASTM D3034, SDR35; <br />Water (W) - PVC, Cl. 150 or greater per AWWA Std. C-900 or ACP., Cl. <br />150 or greater per -ASTM C296, Type Il. <br />25. All traffic signs and markings shall conform to San Joaquin County <br />Standards and to the "Manual of Uniform Traffic Control Devices". <br />26. Any changes to the approved Improvement Plans and Specifications must <br />be prepared and certified by the "Civil Engineer" and shall be <br />approved by the "Director" prior to implementation. <br />27. All materials used as sanitary sewer system must have written <br />approval from the District Engineer prior to installation. <br />2B. Thrust blocks to be placed as required by County Standaru <br />Drawing W -S. <br />29. Where as referred to Standard Plan it means San Joaquin <br />County Standard Drawing. <br />!SHEET INDEX <br />Oj kEY SHEET, QUANTITIES & <br />GENERAL NOTES <br />OO 3O ® PLAN & PROFILE <br />© CONSTRUCTION . DETAILS <br />0 <br />CONSTRUCTION SPECIFICATIONS <br />'APPROVED SY <br />`. .Y _V V .. I L.. <br />CAEIF,RIDGE DI TRICT DATE <br />!ENGINEER, WOODBRIDgE SANITARY DISTRICT DATE <br />NO. DATE REVISIONS BY DESIGN YR DRAWN BY R. 1.E APPROVED BY: HENRY M NIR4" <br />> R.CF. No..: 21,258 SHEETOOF <br />exp DArF: BAUMBACH � P�AzzA NU <br />DaF: IQ '?Z- CIVIL EEgS KEY SHEET AUGUSTA STREET JOB NO.937, <br />9202 <br />SURVEYORS <br />S BMIYY By FXA. DAYS � 9-30-93 <br />323 W. ELM ST. LOOI, CALIF. - STREET IMPROVEMENTS FILE <br />R.C.E. 79635 DATE /,�/7�9L SAN JOAQUINVCOUNTY DIRECTOR OF PUBLIC WORKS 96240 PH:209-3BB-8618 NO. <br />N <br />f <br />TniazzA <br />,'wY <br />�5'4'� ' i.�_'\ st x�C i} n eI <br />( i i ih ^' ^ <br />I <br />n, g.''(:•.,,' <br />NOTE' <br />Woodbridge Sanitary District Fees Shall be paid <br />by effected owner prior to any sewer work. <br />CONSTRUCTION STAKING LIABILITY WAIVER <br />!These improvement plans have been prepared with the <br />intent that the firm of Baumbach & Piazza, Inc. will be <br />,performing the construction staking for the complete <br />project. If, however, another engineering and/or <br />surveying firm should be employed to use these plans for <br />,the purpose of construction staking, notice is hereby <br />gqiven that the firm of Baumbach & Piazza, Inc. will not <br />!assume any responsibility for errors or omissions, if <br />any, which might occur and which could have been avoided, <br />Corrected or mitigated if Baumbach & Piazza, Inc. had <br />performed the staking work. <br />GENERAL NOTES <br />1. All work shall conform to these plans and any special provisions for <br />this project. <br />2. Baumbach & Piazza (Engineer) shall set all survey controls and <br />construction stakes necessary for completion of work. The Contractor <br />shall be responsible for the preservation of all survey and <br />construction Stakes. Survey and construction stakes that are lost or <br />destroyed due. to Contractor's negligence will be set by the Engineer <br />at the Contrabtor's expense. <br />3. The existing underground utilities were plotted from available <br />records. The Contractor shall be responsible for contacting all <br />utility agencies to mark their facilities in the field before any <br />excavation. The Contractor shall notify and coordinate all work <br />with any agency requiring removal or relocation of their utilities. <br />Pacific Bell, P. G. & E., Lodi Cable T. V., Woodbridge Sanitary <br />District and Mokelumne Acres Maintenance District. U.S.A. (800) 642- <br />2444. <br />4. House services shall be installed prior to curb and gutter <br />construction. All underground utilities within the street area shall <br />be installed prior to paving. <br />5. All manholes to be set flush with the finish grade unless otherwise <br />indicated. <br />6. All water lines shall have a minimum cover of 30". <br />7. Water used in any phase of construction, such as backfill compaction, <br />dust control, testing or other work herein required, shall be <br />included in the unit price or lump sum bid for the respective item of <br />construction. <br />e. Contractor agrees that he shall assume sole and complete <br />responsibility for job site conditions during the course of <br />construction of this project, including safety for all persons and <br />property; that this requirement shall apply continuously and not be <br />limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner, County and the Engineer harmless from <br />any and all liability, real or alledged, in connection with the <br />performance of work on this project, excepting for liability arising <br />from the sole negligence of the Owner or the Engineer. <br />9. Contractor shall give Engineer a minimum of 48 hours notification <br />prior to staking any utilities. <br />10. Sanitary sewer services shall be marked by the curb & gutter <br />contractor with an "S" stamped on the top of curb. <br />11. Water services shall be marked by the curb and gutter Contractor with <br />a "W" stamped on the top of curb. Location of water markings shall <br />be verified in the field by the Engineer. <br />12. Separation of water and sewer mains (including crossings) and sewer <br />laterals crossing over water mains shall meet or exceed the latest <br />standards of the State of California Department of Health Services. <br />13. Contractor shall be responsible for notifying and co -coordinate all <br />work with any agency requiring removal or relocation of utilities, <br />such as Pacific Bell, P. G. & E., etc. <br />14. All off-site water lines shall be pressure tested, disinfected, <br />flushed and tested for bacteria in conformance with the San Joaquin <br />County Health Code Requirements prior to connecting to existing water <br />line. <br />15. New traffic striping and the restoration of any damaged existing <br />painted legends or signs is the responsibility of the Contractor and <br />shall be included in his bid price. <br />16. Where water crosses SD or SS use an 18-20 ft. length of Cl. 200 pipe, <br />centered over the SS or SD if: a) The water is under the SS or SD. <br />b) The vertical clearance is less than 1 foot. <br />17. No materials resulting from tapping procedures may enter District <br />sewer. <br />IB. All work will be required to be inspected by the Department of Public <br />Works. They shall be notified not less than 48 hours in advance of <br />commencement of work. <br />19. Eash SS service to have C.O. at property line. <br />20. It is agreed that field conditions may require changes to these <br />plans. It is further agreed that the Director of Public Works may <br />require changes, alterations or additions to these plans, when the <br />Director deems them to be necessary or desirable for the proper <br />completion of the work, provided that such changes, alterations or <br />additions shall not exceed 10% of the original estimate of the cost <br />for the improvements without prior approval of the surety. <br />21. Prior to performing any work in the roadway, the Contractor shall <br />obtain an Encroachment Permit from the San Joaquin County Department <br />of Public Works. <br />22. Contractor shall notify Mokelumne Acres Maintenance District for <br />approval prior to connecting water line to existing water main. <br />23. Installation of all sanitary sewer improvements shall conform to the <br />standards of the Woodbridge Sanitary District. All such work is <br />subject to inspection by the District Engineer. The Contractor shall <br />notify District Engineer 4e hours prior to the commencement of any <br />work on the sanitary system. (209) 946-0268) <br />24. Pipe type and strengths allowed for underground utilities, unless <br />otherwise specified on plans, are as follows: Storm Drain (SD) - RCP <br />or ACP, Cl. III; Sanitary Sewer (SS) - PVC, per ASTM D3034, SDR35; <br />Water (W) - PVC, Cl. 150 or greater per AWWA Std. C-900 or ACP., Cl. <br />150 or greater per -ASTM C296, Type Il. <br />25. All traffic signs and markings shall conform to San Joaquin County <br />Standards and to the "Manual of Uniform Traffic Control Devices". <br />26. Any changes to the approved Improvement Plans and Specifications must <br />be prepared and certified by the "Civil Engineer" and shall be <br />approved by the "Director" prior to implementation. <br />27. All materials used as sanitary sewer system must have written <br />approval from the District Engineer prior to installation. <br />2B. Thrust blocks to be placed as required by County Standaru <br />Drawing W -S. <br />29. Where as referred to Standard Plan it means San Joaquin <br />County Standard Drawing. <br />!SHEET INDEX <br />Oj kEY SHEET, QUANTITIES & <br />GENERAL NOTES <br />OO 3O ® PLAN & PROFILE <br />© CONSTRUCTION . DETAILS <br />0 <br />CONSTRUCTION SPECIFICATIONS <br />'APPROVED SY <br />`. .Y _V V .. I L.. <br />CAEIF,RIDGE DI TRICT DATE <br />!ENGINEER, WOODBRIDgE SANITARY DISTRICT DATE <br />NO. DATE REVISIONS BY DESIGN YR DRAWN BY R. 1.E APPROVED BY: HENRY M NIR4" <br />> R.CF. No..: 21,258 SHEETOOF <br />exp DArF: BAUMBACH � P�AzzA NU <br />DaF: IQ '?Z- CIVIL EEgS KEY SHEET AUGUSTA STREET JOB NO.937, <br />9202 <br />SURVEYORS <br />S BMIYY By FXA. DAYS � 9-30-93 <br />323 W. ELM ST. LOOI, CALIF. - STREET IMPROVEMENTS FILE <br />R.C.E. 79635 DATE /,�/7�9L SAN JOAQUINVCOUNTY DIRECTOR OF PUBLIC WORKS 96240 PH:209-3BB-8618 NO. <br />