Laserfiche WebLink
1. <br />v <br />A <br />m <br />mm <br />�IW <br />CL <br />Q <br />a <br />z <br />U <br />N <br />�w <br />z <br />o <br />v� <br />W <br />o <br />x <br />a <br />0 <br />Q <br />\ <br />0 <br />w <br />w <br />2 <br />0 <br />w <br />1 a <br />a <br />-i <br />o <br />w <br />s <br />0 <br />Wa <br />F M <br />co <br />0 a0 <br />u, <br />U <br /><0 <br />A. ALL INDEPENDENT LABORATORY INSPECTION CALLND <br />o7� <br />� <br />6J4 ' Wm. ' <br />.,._ <br />02 (D <br />02 <br />FOR"BY THE, <br />11... <br />ALL TRE KS a BACKrILli6 M" CCOROA#1G"E <br />1. <br />OWWXR i DBViI.EIPFrIt: KIRK: i LYM <br />i <br />CITY ENGINEER WILL ,''8E PAID FOR BY THE' DWV*LOPER OR <br />U Q <br />'CITY/COUNTY STANDARDS. COMPACT OW SHA" BS ACSIZVSD BY',, <br />46750 FREM011IT BLVD. #201 <br />a. <br />CONTRACTOR. <br />N <br />owmNicAL MEAWS. No FLOODIWb, PONDl'm-OR $WTIM SHALL at <br />A•. <br />f*8MONT, CA 94538 <br />C <br />N <br />ftRMITTSD. <br />N 1 <br />(310) 656-1900 <br />cm <br />B. ROAD SUBBASE AND TRENCH BACKFILL TESTING$HALL B1S- <br />wN <br />IPI <br />PERFORMED BY A SOILS LAB. ' <br />12. <br />ALL TRENCH BACKFILL WHICH LIES WI14iIN EXISTING OR NEW R0AD%%Y <br />2. <br />CIVIL ENGINEERMAJORS ENGINEERING INC. <br />v <br />a' <br />AREAS SHALL CONFORM TO TIB ROADWAY AREAS BACKFILL " <br />100 PARK PLACEt SUITE 220 <br />C. TESTS FOR R -VALVES ARE REQUIRED PRIOR TO THE INSTALLATION <br />SPECIFICATIONS OF LATEST SAN JOAQUIW CO'UN'TY STANDARD PLAN. <br />SAN RAMON CA 94583 <br />OF BASE ROCK. <br />1 ' <br />Y <br />(510) 620-2423 <br />Q <br />13. <br />THE FOLLOWING SAN JOAQUIN COUNTY STANDARD PLANS ARE <br />3rno <br />26. <br />EXISTING CURB AND SIDEWALK WITHIN THE PROJECT LIMITS THAT ARE <br />0Q1 <br />M U N <br />APPLICABLE: <br />3. <br />SOILS ENGINEER: BERLOGER GEOTECHNICAL <br />DAMAGED OR DISPLACED, EVEN THOUGH THEY WERE NOT TO BE REMOVED, <br />i <br />5587 SUNOL BLVD. <br />SHALL BE REPAIRED OR REPLACED PER COUNTY STANDARD PLANS EVEN <br />A-3 B-6 <br />PLEASANTON, CA 94566 <br />IF DAMAGE OR DISPLACEMENT OCCURRED PRIOR TO ANY WORK PERFORMED <br />A-7 B-7 <br />(510) 484-0220 <br />BY THE CONTRACTOR UNLESS IDENTIFIED PRIOR TO START OF WORK. <br />A-8 C-1 <br />A-10 C-2 <br />4. <br />THE ENGINEER ASSUMES NO RESPONSIBILITY BEYOND THE ADEQUACY OF <br />27. <br />ALL STREET MONUMENTS, LOT CORNER, AND OTHER PERMANENT PIPE OR <br />A-11 C-4 <br />THE DESIGN CONTAINED HEREIN. <br />MONUMENTS DISTURBED DURING THE PROCESS OF CONSTRUCTION SHALL <br />B-2 C-7 <br />BE REPLACED BEFORE ACCEPTANCE OF IMPROVEMENTS BY THE CITY OF <br />5. <br />CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />TRACY: <br />THE FOLLOWING THE•CITY OF TRACY STANDARD PLANS ARE APPLICABLE: <br />FOR JOB SITE)CONDITIONS DURING THE COURSE OF CONSTRUCTION OF <br />THIS PROJECT. THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />28. <br />REFER TO THE FINAL MAP OF THIS TRACT FOR PROPERTY LINE DATA. <br />206 402 411 <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT <br />301 403 423 <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND <br />29. <br />THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS <br />302 404 501 <br />ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, <br />AND LICENSES PRIOR TO THE START OF CONSTRUCTION. <br />303 407 502 f <br />IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, <br />309 408 506 <br />EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF <br />30. <br />ALL TEST AND INSPECTIONS REQUIRED BY GOVERNING AGENCIES SHALL <br />401 409 563 <br />THE OWNER OR THE ENGINEER. <br />BE ARRANGED AND PAID FOR BY THE CONTRACTOR. <br />14. <br />BENC SHALL BE FURNISHED AND INSTALLED BY CONTRACTOR AT <br />6. <br />CONTRACTOR SHALL COMPLY WITH THE RULES AND REGULATIONS OF THE <br />31. <br />ARRANGING A PRE -CONSTRUCTION JOB SITE CONFERENCE WITH <br />LOCATIONS SHOWN. <br />STATE CONSTRUCTION SAFETY ORDERS. <br />GOVERNING AGENCIES, ALL UTILITY COMPANIES AND OWNERS <br />REPRESENTATIVES PRIOR TO COMMENCING WORK. THIS MEETING WILL <br />15. <br />STRIPING SHALL BE DONE WITH THERMOPLASTIC AND REFLECTIVE <br />7, <br />ALL CONSTRUCTION MATERIALS AND METHODS SHALL COMPLY WITH THE <br />VERIFY SCHEDULES, METHODS AND MATERIALS TO BE USED IN <br />MARKERS. <br />ORDINANCE, SPECIFICATIONS AND STANDARDS OF THE CITY OF TRACY <br />CONSTRUCTION OF THE PROJECT. <br />AND SAN JOAQUIN COUNTY. <br />16. <br />LOT SERVICES, FIRE HYDRANT LATERALS, GAS AND TELEPHONE LINES, <br />32. <br />CERTIFICATIONS TO OWNER FOR FOLLOWING STAGES OF COMPLETION: <br />AND ALL OTHER UNDERGROUND UTILITIES SHALL BE INSTALLED PRIOR <br />8. <br />DUST SHALL BE CONTROLLED BY WATERING THROUGHOUT THE GRADING <br />TO CURB, GUTTER AND SIDEWALK CONSTRUCTION AND STREET PAVING. <br />AND UNDERGROUND CONSTRUCTION OPERATIONS AS REQUIRED BY THE <br />A. ROUGH GRADE TO PLUS OR MINUS ONE -'TENTH OF A FOOT. ROUGH <br />CITY OF TRACY. THE CONTRACTOR SHALL ARRANGE AND PAY FOR <br />GRADE SOIL COMPACTION PRIOR TO ANY UNDERGROUND <br />17. <br />THE THICKNESS OF SUBBASE, BASE AND SURFACING TO BE DETERMINED <br />CONSTRUCTION WATER. <br />CONSTRUCTION. <br />BASED ON TRAFFIC INDEX AND SOIL TEST FOR "R" VALUE TAKEN AFTER <br />B. PAD LINE AND GRADE TO PLUS OR MINUS ONE-TENTH OF A FOOT. <br />ROUGH GRADING AT THE LEVEL OF THE STREET SUBGRADE. <br />9. <br />SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER <br />PAD SOIL COMPACTION PRIOR TO ANY BUILDING CONSTRUCTION. <br />RELATIVE THERETO, IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON <br />C. TRENCH BACKFILL. <br />18. <br />ASBESTOS CEMENT PIPE (ACP) OR FITTINGS SHALL NOT BE USED. <br />THESE PLANS, THE CONTRACTOR SHALL CONTACT MARY GRACE HOULIHAN <br />D. SEWER, WATER AND IRRIGATION TESTING COMPLETE AND PASSING <br />AT MAJORS ENGINEERING, INC., AT (510) 820-2423 AND THE OWNER'S <br />PRIOR TO FINE GRADING AND BASE ROCK PLACEMENT. <br />STORM DRAIN <br />REPRESENTATIVE FOR SUCH FURTHER EXPLANATIONS AS MAY BE <br />E. FINE GRADING TO PLUS OR MINUS ONE-TENTH OF A FOOT PRIOR <br />NECESSARY. <br />TO ANY BASE ROCK PLACEMENT. <br />19. <br />STORM DRAIN PIPE SHALL BE R.C.P. CLASS III OR ADS N-12. <br />F. RETAINING WALL BACKFILL COMPACTION RESULTS. <br />10. <br />IF ARCHEOLOGICAL MATERIALS ARE UNCOVERED DURING GRADING, <br />20. <br />ALL STORM DRAIN CONSTRUCTION SHALL PROCEED FROM THE DOWNSTREAM <br />TRENCHING OR OTHER ON-SITE EXCAVATION, EARTHWORK WITHIN 100 <br />THE ABOVE CERTIFICATES SHALL BE PERFORMED BY MAJORS <br />CONNECTION TO THE UPSTREAM TERMINUS. <br />FEET OF THESE MATERIALS SHALL BE STOPPED UNTIL A PROFESSIONAL <br />ENGINEERING AND THE SOILS ENGINEER AND PAID FOR BY THE OWNER. <br />ARCHAEOLOGIST WHO IS CERTIFIED BY THE SOCIETY OF CALIFORNIA <br />ANY COSTS FOR REWORKING, RETESTING, OR RESURVEYING DUE TO NON- <br />WATER <br />ARCHAEOLOGY (SCA) AND/OR THE SOCIETY OF PROFESSIONAL <br />COMPLIANCE WITH THE SPECIFICATIONS SHALL BE THE RESPONSIBILITY <br />ARfftAEOLOGY (SOPA) HAS HAD _0 '00PORTUNITY TO EVALUATE THE <br />OF THE CONTRACTOR. <br />21. <br />WATER MAINS SHALL BE CLASS 50 DUCTILE IRON PIPE WITH <br />SIGSIIFICANCE OF THE FIND AND SUGGEST APPROPRIATE MITIGATION <br />POLYETHYLENE ENCASEMENT MEETING CURRENT AWWA SPECIFICATIONS AS <br />MEA%,,1RES, IF THEY ARE DEEMED NECESSARY. <br />33. <br />CALCULATIONS NECESSARY TO DETERMINE QUANTITY OF BASE ROCK. <br />REQUIPED BY THE CITY OF TRACY. <br />COPIES OF CALCULATIONS SHALL BE FURNISHED TO OWNER AND MAJORS <br />11. <br />THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA) <br />ENGINEER. CONTRACTOR SHALL FURNISH LOAD TICKETS TO OWNER FOR <br />22. <br />ALL WATER LINES SHALL BE PRESSURE TESTED, DISINFECTED, FLUSHED <br />(800) 642-2444, TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION. <br />USE IN CHECKING QUANTITY OF BASE ROCK ACTUALLY PLACED ON JOB <br />AND TESTED FOR BACTERIA IN CONFORMANCE WITH THE CITY;OF TRACY <br />THE USA AUTHORIZATION NUMBER SHALL BE KEPT AT THE JOB SITE. <br />SITE. OWNER MAY REQUEST BORINGS BY SOILS ENGINEER TO CONFIRM <br />SPECIFICATIONS PRIOR TO FINAL ACCEPTANCE BY THE CITY. <br />THICKNESS OF BASE ROCK. <br />12. <br />THE CONTRACTOR IS RESPONSIBLE FOR MATCHING EXISTING STREETS <br />23. <br />CONCRETE THRUST BLOCKS SHALL BE INSTALLED ON ALL WATER LINES <br />SURROUNDING LANDSCAPING AND OTHER IMPROVEMENTS WITH A SMOOTH <br />TRENCH BACKFILL SHALL BE DONE IN A CONTINUOUS OPERATION AND <br />AT ALL BENDS, ELBOWS, TEES AND WHERE DIRECTED BY THE ENGINEER <br />TRANSITION IN PAVING, CURBS, GUTTERS, SIDEWALKS, GRADING, <br />COMPLETED TO SUBGRADE. AREAS OF MINIMUM COVER SHALL BE <br />AND DESIGNATED INSPECTOR. <br />ETC., AND TO AVOID ANY ABRUPT OR APPARENT CHANGES IN <br />PROTECTED. <br />APPEARANCE, GRADES, CROSS SLOPES, LOW SPOTS, OR HAZARDOUS <br />24. <br />WATER SERVICES AND METERS SHALL BE FURNISHED AND INSTALLED BY <br />CONDITIONS. <br />LANDSCAPE IRRIGATION LINES SHALL BE BURIED A MINIMUM OF TWELVE <br />THE DEVELOPER OR CONTRACTOR. <br />(12) INCHES BELOW SUBGRADE AND COMPACTED TO 90% MINIMUM. <br />13. <br />THE CONTRACTOR SHALL POST EMERGENCY TELEPHONE NUMBERS FOR <br />SANITARY <br />SEWER <br />ENGINEERING DEPARTMENT, AMBULANCE, POLICE AND FIRE DEPARTMENTS <br />34. <br />ENCROACHMENT PERMIT REQUIRED FOR ALL WORK WITHIN SAN JOAQUIN <br />AT THE FIELD OFFICE IN A VISIBLE LOCATION. <br />COUNTY ROADS. <br />25. <br />ALL SANITARY SEWER MAINS SHALL BE TELEVISION INSPECTED (TAPES <br />SHALL BE <br />TO THE CITY OF TRACY), FLUSHED WITH AN APPROVEDIMPROVEMENT <br />14. <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE <br />PLAN NOTES: <br />-GIVEN <br />SEWER BALL AND PASS A LEAKAGE TEST IN CONFORMANCE WITH CITY OF <br />ALL NECESSARY UTILITY RELOCATIONS WITH THE APPROPRIATE UTILITY <br />TRACY <br />TRACY STANDARD SPECIFICATIONS PRIOR TO ACCEPTANCE BY THE CITY. <br />COMPANIES. <br />PRIOR TO TRENCHING FOR ANY SEWER, WATER, OR STORM DRAIN PIPE, <br />ALL TESTING SHALL BE PERFORMED AFTER THE COMPACTION FOR STREET <br />15. <br />THE CONTRACTOR SHALL PROVIDE FOR INGRESS AND EGRESS TO PRIVATE <br />THE CONTRACTOR SHALL VERIFY, IN THE FIELD, THE SIZE AND <br />BASE ROCK AND PRIOR TO PAVING. <br />PROPERTY ADJACENT TO WORK THROUGHOUT THE PERIOD OF <br />LOCATION OF THE EXISTING PIPE AT THE POINT OF CONNECTION. ANY <br />CONSTRUCTION. <br />DEVIATION FROM THE PLANS SHALL BE RESOLVED BY THE DESIGN <br />26. <br />SANITARY SEWER PIPE SHALL BE VITRIFIED CLAY (VCP), OR ADS N - <br />ENGINEER PRIOR TO TRENCHING. <br />12• <br />16. <br />ALL WORK SHALL CONFORM TO THE SAN JOAQUIN COUNTY STANDARD <br />2, <br />THE CONTRACTOR SHALL COORDINATE THE SEWER, WATER AND STORM <br />27. <br />ALL SEWER CONSTRUCTION SHALL PROCEED FROM THE DOWNSTREAM <br />SPECIFICATIONS AND PLANS FOR ALL STORM DRAINAGE AND STREET <br />DRAIN CONSTRUCTION IN A MANNER TO PREVENT ANY CONFLICTS WHERE <br />CONNECTION TO THE UPSTREAM TERMINUS. <br />IMPROVEMENTS AND THE CITY OF TRACY STANDARD SPECIFICATIONS AND <br />PLANS FOR SANITARY SEWER AND WATER. THE IMPROVEMENTS ARE <br />UTILITY LINES CROSS EACH OTHER. THE SEWER, STORM DRAIN, AND <br />SUBJECT TO THE INSPECTION AND APPROVAL OF THESE PUBLIC WORKS <br />WATER CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING PLANS FOR <br />28. <br />SEWER STUBS SHALL BE PLUGGED AT THE POINT OF TERMINUS SHOWN <br />DEPARTMENT. CONTACT PUBLIC WORKS CONSTRUCTION MANAGEMENT AT <br />ALL OTHER UTILITIES FOR THESE IMPROVEMENTS AND FAMILIARIZE <br />HEREON AND THE ENTIRE SYSTEM SHALL THEN BE TESTED IN <br />(209) 14 FOR SAN COUNTY AND 20 FOR <br />THEMSELVES THEREWITH AND SHALL NOTIFY THE ENGINEER AND OWNER'S <br />ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND GOVERNING <br />F TRA WORKINGAQUIN <br />CITY OF TRACY TWO (2) WORKING DAYS (48 HOURS) PRIOR TO THE <br />URS) PRIOR <br />REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCY FROM THIS PLAN <br />AGENCY REQUIREMENTS. NO BUILDING CONNECTIONS SHALL BE MADE TO <br />START OF ANY WORK TO ARRANGE FOR INSPECTION. <br />PRIOR TO PROCEEDING. <br />THE LATERALS UNTIL THE ENTIRE SYSTEM HAS BEEN TESTED, APPROVED <br />AND ACCEPTED BY THE CITY OF TRACY. FINAL AIR LEAKAGE TESTS <br />17. <br />ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE PUBLIC <br />3. <br />MANHOLE, VALVE POT, METER BOX AND CLEANOUT RIM ELEVATIONS, <br />SHALL BE MADE AFTER ALL BACKFILL AND BASE PREPARATION <br />WORKS DEPARTMENT PRIOR TO CONSTRUCTION AND SHALL BE ACCURATELY <br />SHOWN OR NOT SHOWN HEREON ARE APPROXIMATE ONLY AND THE <br />INCLUDING COMPACTION HAS BEEN COMPLETED. <br />SHOWN ON THE REVISED PLANS STAMPED AND SIGNED BY CITY/COUNTY <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL RIMS AND <br />STAFF iAS APPLICABLE) PRIOR TO THE INSTALLATION OF THE <br />COVERS TO THE FINISHED PAVEMENT OR SIDEWALK GRADE, AS <br />APPLICABLE, AFTER THE SITE IS PAVED AND SHALL MAKE <br />2PNCfii?ACM#k61►i; <br />ii1rLLI,11 <br />L w[!R <br />IMPROVEMENTS. <br />ARRANGEMENTS FOR ANY ADDITIONAL PAVING OR CONCRETE WORK AS <br />- '-- <br />18. <br />THESE PLANS HAVE BEEN THOROUGHLY CHECKED BY SAN JOAQUIN COUNTY <br />REQUIRED. <br />30.tUPER <br />TO OFFSITE IMPROVEMENT PLAN'BPECIFICATIONS FOR FURTHER <br />AND/OR ITS AUTHORIZED REPRESENTATIVE, BUT SUCH CHECKING AND/OR <br />- <br />DETAILS OF INSTALLATION FOR ONSITE IMPROVEMENTS. <br />APPROVAL DOES NOT RELIEVE THE DEVELOPER FROM HIS <br />4. <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AMPLE COVER FOR <br />RESPONSIBILITY TO CORRECT ERRORS, OMISSIONS OR MAKE CHANGES <br />THE PROTECTION OF ALL INSTALLED UTILITIES DURING THE <br />REQUIRED BY CONDITIONS DISCOVERED IN THE FIELD DURING THE <br />CONSTRUCTION OF THIS PROJECT. <br />_ <br />COURSE OF CONSTRUCTION. <br />5. <br />THE CONTRACTOR SHALL SCHEDULE, ARRANGE AND PAY FOR ANY WORK TO <br />31. <br />CITY OF TRACY APPROVED BACKFLOW PREVENTION DEVICES SHALL <br />19. <br />ALL <br />BE DONE BY THE SERVING UTILITY COMPANIES IN CONJUNCTION WITH <br />BE INSTALLED BEFORE TIE INS OF THE WATER LATERALS FROM <br />STAKING REQUESTS SHOULD HE DIRECTED TO THE OWNER S <br />AND NECESSARY FOR THE INSTALLATION OF THE COMPLETE AND <br />THE PROPERTIES TO THE EXISTING WATER STUBS. <br />REPRESENTATIVE A MINIMUM OF TWO (2) DAYS PRIOR TO ACTUAL NEED. <br />OPERABLE UTILITY SYSTEMS SHOWN HEREON, UNLESS OTHERWISE NOTED. <br />ANY RESTAKING WILL ONLY BE DONE AS DIRECTED AND AUTHORIZED BY <br />THE OWNER OR AUTHORIZED AGENT. <br />6. <br />THE CONTRACTOR IS TO FURNISH THE OWNER WITH A COPY OF THE <br />PROPERTY OWNER/OWNERS ( KING & LYONS ) WILL OBTAIN <br />ate' <br />PERMITS AND FINAL ACCEPTANCES GRANTED BY THE UTILITY COMPANIES <br />INDIVIDUAL PERMITS FROM THE CITY FOR TIE INS TO WATER AND <br />20. <br />ALL"CONSTRUCTION STAKING FOR CURB, GUTTER, AND SIDEWALK, <br />AN/OR AGENCIES INVOLVED. <br />SEWER FROM THE EXISTING STUBS. INSTALLATION OF <br />SAW*ARY SEWERS, STORM DRAINS, WATER LINES, FIRE HYDRANTS, <br />CONNECTION SHALL COMPLY WITH THE CITY OF TRACY <br />ELEOtROLIERS, ETC., SHALL BE DONE BY A REGISTERED CIVIL <br />7. <br />THE CONTRACTOR SHALL SCHEDULE AND ARRANGE WITH THE SERVING <br />REQUIREMENTS AND THE WORK SHALL BE INSPECTED BY THE CITY. <br />ENG*ZER OR LICENSED SURVEYOR. <br />UTILITY COMPANY FOR COMPLETE GAS SERVICES TO ALL THE BUILDINGS <br />COST OF INSPECTION SHALL BE BORNE BY THE PERMITEE. <br />AND PAD AREAS SHOWN HEREON AND PAY ALL FEES AND PERFORM WORK <br />21. <br />THE- .ENGINEER ASSUMES NO RESPONSIBILITY FOR FINAL GRADE OF <br />AS NECESSARY FOR THIS INSTALLATION IN CONJUNCTION WITH ANY <br />CONCRETE UNLESS FORMS ARE CHECKED PRIOR TO POURING. <br />WORK TO BE PERFORMED BY THE GAS COMPANY. <br />22. <br />ALL EXISTING ELEVATIONS SHOWN ARE AS MEASURED IN THE FIELD, <br />8. <br />DIMENSIONS LOCATING CURB AND GUTTER ARE TO FACE OF CURB. <br />UNLESS OTHERWISE NOTED. <br />32. <br />WATER STUBS SHALL NOT STICK ABOVE GROUND AND SHALL BE <br />9. <br />WHERE PAVEMENT IS TO BE EXTENDED, EXISTING IMPROVEMENT ENDS <br />BURIED. FOR WATER STUBS, USE SIMILAR CITY STANDARD <br />23. <br />THE EXISTING UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS. <br />MUST BE SAWCUT, ANY A.C. OR P.C.C. PAVEMENT REMOVED MUST BE <br />DETAIL # 403. <br />THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT <br />SAWCUT OR REMOVED TO AN EXPANSION JOINT. <br />THNSS UTILITIES. THE CONTRACTOR SHALL NOT EXCAVATION UNTIL <br />ALL UTILITY AGENCIES AND SAN JOAQUIN COUNTY HAVE BEEN NOTIFIED <br />10. <br />ALL CURB, GUTTER AND SID=NALK WORK SHALL CONFORM TO TAE SAN <br />6 <br />AND HAVE BEEN GIVEN THE OPPORTUNITY TO MARK THEIR FACILITIES <br />JOAQUIN COUNTY STANDARD SPECIFICATIONS AND STANDARD PLANS. <br />IN THE FIELD. <br />r <br />i;4. <br />ALI. LINES ABANDONED DURING CONSTRUCTION' SHALL BE REMOVED OR' <br />OtUSHED IN PLACS WITH APPROVAL OF TME SOILS ENGINEER AND SAN <br />JW46IW COUNTY. <br />r <br />mm <br />�IW <br />CL <br />Q <br />a <br />z <br />U <br />N <br />�w <br />z <br />o <br />v� <br />W <br />o <br />x <br />a <br />0 <br />Q <br />\ <br />0 <br />w <br />w <br />2 <br />0 <br />w <br />1 a <br />a <br />-i <br />o <br />w <br />s <br />0 <br />Wa <br />F M <br />co <br />0 a0 <br />u, <br />U <br /><0 <br />Z <br />o7� <br />� <br />. <br />O <br />02 (D <br />02 <br />~Q0) <br />G <br />Q <br />a 0" <br />U Q <br />u <br />M <br />a. <br />Q N <br />N <br />• <br />0't <br />C <br />N <br />N 1 <br />cm <br />N <br />wN <br />IPI <br />F- <br />5 L0 <br />v <br />C <br />U` <br />(L <br />Y <br />Q <br />> * M <br />3rno <br />Q4. <br />0Q1 <br />M U N <br />Q <br />uGao <br />Q <br />Z <br />O <br />_ LL <br />J <br />Q <br />U <br />4c No <br />IL q* uj- <br />04 <br />y O <br />WZ O <br />zZma <br />t <br />m IC <br />calm <br />440 Q <br />z Zo <br />O W <br />Z Olga Lu Im <br />loc r1 <br />IL r/ c <br />O <br />Z <br />Q <br />Ln <br />