1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM WITH THE <br />SPECIFICATIONS, STANDARDS AND ORDINANCES OF SAN JOAQUIN <br />COUNTY AND SHALL BE PART OF THESE IMPROVEMENT PLANS. <br />2. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK <br />IN GENERAL TERM'S BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD <br />THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT <br />MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED. <br />NOTED DIMENSIONS TAKE PRECEDENT OVER SCALE. ANY DISCREPANCY <br />SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF DILLON & <br />MURPHY, 1820 W. KETTLEMAN LANE, SUITE E, LODI, CA, (209) 334-6613. <br />3. CONTRACTORS SHALL BE RESPONSIBLE TO VISIT THE SITE AND VERIFY ALL <br />EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. <br />4. THE EXISTING UNDERGROUND UTILITIES ARE PLOTTED FROM AVAILABLE <br />RECORDS. CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO <br />PROTECT THESE UTILITIES. THE CONTRACTOR SHALL DO NO EXCAVATION <br />UNTIL ALL UTILITY AGENCIES HAVE BEEN NOTIFIED AND HAVE BEEN GIVEN <br />THE OPPORTUNITY TO MARK THEIR FACILITIES IN THE FIELD. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL <br />EXISTING UTILITIES. PRIOR TO OPENING AN EXCAVATION, THE <br />CONTRACTOR SHALL DETERMINE WHETHER UNDERGROUND <br />INSTALLATIONS, I.E., SEWER, WATER, STORM DRAINAGE, ELECTRICAL <br />LINES, GAS LINES, CABLE TV LINES, ETC. WILL BE ENCOUNTERED AND, THE <br />APPROXIMATE LOCATION OF SUCH AN INSTALLATION. THE EXACT <br />LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING AND, WHEN IT IS UNCOVERED, ADEQUATE PROTECTION SHALL BE <br />PROVIDED FOR THE EXISTING INSTALLATION. <br />5. SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS AND/OR THE CITY <br />OF TRACY OF PUBLIC WORKS SHALL BE NOTIFIED BY THE CONTRACTOR AT <br />LEAST 48 HOURS IN ADVANCE OF ANY OFF-SITE CONSTRUCTION. <br />6. DILLON & MURPHY SHALL PROVIDE ALL CONSTRUCTION STAKING. FIELD <br />CHANGES MADE BY OTHERS SHALL BE DONE AT THEIR OWN RISK. <br />7. EACH CONTRACTOR IS RESPONSIBLE FOR ANY COORDINATION OF THE <br />REMOVAL OR RELOCATION OF ANY AND ALL EXISTING UTILITIES WITH THE <br />RESPECTIVE UTILITY COMPANY. COST OF THIS COORDINATION IS TO BE <br />INCLUDED IN THE PRICES BID FOR THE VARIOUS IMPROVEMENTS TO <br />COMPLETE THE PROJECT. <br />B. SAN JOAQUIN COUNTY BRASS DISC STAMPED "BB -42" ON SOUTHWEST <br />CORNER CONCRETE CULVERT 114 FEET NORTH OF LINNE ROAD ON THE <br />WEST SIDE OF MAC ARTHUR ROAD. ELEVATION = 138.584 <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF <br />ALL SURVEY AND CONSTRUCTION STAKES. SURVEY AND <br />CONSTRUCTION STAKES THAT ARE LOST OR DESTROYED DUE TO THE <br />CONTRACTOR'S NEGLIGENCE WILL BE RESET BY DILLON & MURPHY AT <br />THE CONTRACTOR'S EXPENSE. <br />10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING <br />IMPROVEMENTS FROM DAMAGE. <br />11. CONTRACTOR AND SUBCONTRACTOR SHALL COOPERATE WITH <br />THEMSELVES AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, <br />UTILITIES AND SERVICES TO THE DEVELOPMENT. <br />12. ALL UNDERGROUND SERVICES SHALL BE INSTALLED IN CONFORMANCE <br />WITH THE REQUIREMENTS OF THE SAN JOAQUIN COUNTY DEPARTMENT <br />OF PUBLIC WORKS. <br />13. GRADES SHOWN ON THIS PLAN ARE INTENDED TO REFLECT A BALANCE <br />OF EARTHWORK CUT AND FILL QUANTITIES. CONTRACTOR IS <br />RESPONSIBLE FOR PERFORMING AN INDEPENDENT BALANCE PRIOR TO <br />BEGINNING CONSTRUCTION. ANY DISCREPANCY BETWEEN THE <br />CONTRACTOR'S BALANCE AND THESE PLANS SHALL BE RESOLVED PRIOR <br />TO COMMENCEMENT OF WORK. FAILURE BY THE CONTRACTOR TO <br />RECTIFY ANY DIFFERENCES SHALL SHIFT THE RESPONSIBILITY (AND <br />COSTS FOR ADDITIONAL EARTHWORK) ENTIRELY TO HIM. <br />14. ANY FILL PLACE SHALL BE PROPERLY COMPACTED AS REQUIRED BY THE <br />PLANS AND THESE AND THE SOILS REPORT. <br />A. EARTH FILL TO ESTABLISH FINISHED GRADE OUTSIDE THE PAVED <br />AREAS A; ) D'_!!;,DINGS AREAS SHALL BE COMPACTED TO A <br />MINIMUM RFLATIVE COMPACTION OF 90% ON THE LOTS. <br />B. FILL SHALL BE NON -EXPANSIVE MATERIAL AND SHALL BE FREE OF <br />VEGETATION OR DELETERIOUS MATTER. FILL SHALL BE COMPACTED <br />TO A POINT SIX INCHES BELOW SUBGRADE. <br />15. CONTRACTOR'S BID SHALL INCLUDE THE COST OF ANY NECESSARY <br />SOILS COMPACTION AND MATERIALS TESTING. <br />GENERAL NOTES AND SPECIFICATIONS <br />16. CONCRETE 22. THE OFFICE OF DILLON & MURPHY, 1820 W. KETTLEMAN LANE, SUITE E, 38. PRIOR TO ACCEPTANCE OF IMPROVEMENTS, STREET LIGHTS SHALL BE <br />A. GENERAL - ALL CONCRETE WORK SHALL BE PERFORMED IN LODI, CA, SHALL BE NOTIFIED 48 HOURS (MINIMUM) IN ADVANCE OF INSTALLED AND ENERGIZED. PG&E WILL, MAINTAIN ALL STREET LIGHTS <br />ACCORDANCE WITH ACI AND UBC CODES. ANY REQUIRED CONSTRUCTION SURVEYING. AND STANDARDS UPON ACCEPTANCE OF PROJECT AS COMPLETE. <br />B. CONCRETE STRENGTH - UNLESS OTHERWISE NOTED ON THE PLANS, 23. CONTRACTOR'S AND SUB -CONTRACTORS BIDDING ON THIS PROPOSED 39. CONTRACTOR SHALL OBTAIN A GRADING PERMIT FOR THIS PROJECT <br />CONCRETE SHALL OBTAIN A MINIMUM OF DESIGN STRENGTH OF PROJECT SHALL CAREFULLY EXAMINE THESE PLANS AND CAREFULLY PRIOR TO BEGINNING ANY GRADING ON-SITE OR OFF-SITE. <br />2500 PSI. REVIEW THE CONSTRUCTION SITE TO DETERMINE SPECIFICALLY WHAT IS <br />REQUIRED TO BE ACCOMPLISHED IN HIS PORTION OF THE TOTAL WORK. <br />1. CEMENT - 5.5 SACKS MINIMUM PER YARD. IF ANY DOUBT EXISTS TO THE INTENT OF THE PLANS, SPECIFIC DETAILS, <br />CONSTRUCTION NOTES, OR IF THE CONTRACTOR AND SUB -CONTRACTOR 40. AN ENCROACHMENT PERMIT SHALL BE ACQUIRED FROM THE CITY OF <br />2. WATER - MAXIMUM 7 GALS. PER SACK OF CEMENT. REQUIRES ADDITIONAL INFORMATION, IT MUST BE CLARIFIED WITH TRACY FOR WORK IN PORTION OF MAC ARTHUR DRIVE WHICH IS <br />DILLON & MURPHY. WITHIN THE CITY LIMITS. <br />3. AGGREGATE -MAXIMUM SIZE 3/4" <br />24. CONTRACTOR AND ANY SUB -CONTRACTOR USING PLANS WHICH ARE 41. NONPOTABLE WATER SHALL BE USED ON THIS PROJECT. THE <br />4. SLURRY - 5" MAXIMUM. UNAPPROVED BY SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING OF THE <br />WORKS SHALL DO SO AT THEIR OWN RISKS. DILLON & MURPHY WILL INTENDED SOURCE PRIOR TO CONSTRUCTION. <br />5. CURING - KEEP WET MINIMUM OF 7 DAYS, OR APPLY MEMBRANE NOT BE HELD RESPONSIBLE FOR USAGE OF SUCH PLANS FOR THE <br />CURING COMPOUND APPROVED BY THE ENGINEER. CONSTRUCTION OF THIS PROJECT. 42. INSTALL TWO (2) BACTERIOLOGICAL SAMPLE SITES ON THE WATER' <br />SYSTEM. <br />6. VIBRATION - ALL CONCRETE SHALL BE VIBRATED INTO PLACE <br />WITH A MECHANICAL VIBRATOR. <br />7. FORM REMOVAL - SIDE FORMS OF FOUNDATIONS AND SLABS, <br />MINIMUM OF 2 DAYS. <br />8. TESTING IN ACCORDANCE WITH ACI -301-72, CHAPTER 16. <br />C. REINFORCING MATERIALS: <br />1. DEFORMED BARS - ASTM A615, GR.60. <br />2. ELECTRIC WELDED WIRE FABRIC (WWF) ASTM A-185. <br />17. ASPHALT CONCRETE: ASPHALT CONCRETE SHALL BE TYPE B AND <br />SHALL CONFORM TO THE PROVISIONS OF SECTION 39 OF THE CALTRANS <br />STANDARD SPECIFICATIONS. THE PENETRATION RANGE OF PAVING <br />ASPHALT SHALL BE AR -4000; AGGREGATE SHALL BE ONE-HALF (1/2") <br />INCH MAXIMUM MEDIUM GRADING FOR SURFACING. <br />PRIME COAT SHALL BE A LIQUID ASPHALT GRADE SC -250 OR SC -70 AND <br />SHALL BE APPLIED TO THE ENTIRE PAVED AREA AND THE COST SHALL BE <br />INCLUDED IN THE UNIT PRICE BID FOR ASPHALT CONCRETE. PRIME COAT <br />SHALL BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF <br />SECTION 39-4 OF THE CALTRANS STANDARD SPECIFICATIONS. <br />AGGREGATE BASE: AGGREGATE BASE SHALL 1 F CLASS TWO <br />CONFORMING TO THE REQUIREMENTS OF SEC -1:0N 26-1.02A OF THE <br />CALTRANS STANDARD SPECIFICATIONS. SPR.EA`DING AND COMPACTING <br />AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS OF SECTION <br />26-1.04 OF THE CALTRANS STANDARD SPECIFICATION. <br />18. THE GRADING AND PAVING CONTRACTOR SHALL ADJUST TO FINISHED <br />GRADE THE TOPS OF ALL PROPOSED AND EXISTING MANHOLES, VALVE <br />BOXES AND WATER METER BOXES, ETC. THE COST OF SUCH WORK <br />SHALL BE INCLUDED IN THE UNIT PRICES FOR STRFFT WORK. <br />19. THE DOMESTIC WATER LINE SHALL BE CONSTRUCTED IN ACCORDANCE <br />WITH THESE PLANS, AND SAN JOAQUIN COUNTY DEPARTMENT OF <br />PUBLIC WORKS ADOPTED IMPROVEMENT STANDARDS, AND UNIFORM <br />BUILDING CODE. PIPE MATERIAL SHALL BE THAT ALLOWED BY THE <br />PLUMBING CODE AND SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC <br />WORK IMPROVEMENT STANDARDS. IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO VERIFY THAT THE TYPE AND SPECIFICATIONS OF ALL <br />MATERIAL, FITTINGS, ETC. CONFORM TO SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS STANDARDS AND SPECIFICATIONS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE AND BACTERIA <br />TESTING OF WATER LINES AS REQUIRED BY SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS. BACTERIA TESTS SHALL BE TAKEN BY <br />A CERTIFIED LABORATORY TECHNICIAN. <br />REFER TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS FOR <br />ALL WATER LINE TESTING REQUIREMENTS. <br />20. THE STORM DRAIN PIPELINE SHALL BE CONSTRUCTED IN ACCORDANCE <br />WITH THESE PLANS, AND SAN JOAQUIN COUNTY DEPARTMENT OF <br />PUBLIC WORKS ADOPTED IMPROVEMENT STANDARDS. PIPE MATERIAL <br />SHALL BE THAT ALLOWED BY THE SAN JOAQUIN COUNTY DEPARTMENT <br />OF PUBLIC WORKS IMPROVEMENT STANDARDS OR AS SHOWN ON THE <br />PLANS. IT IS THE CONTRACTOF'S RESPONSIBILITY TO VERIFY THAT THE <br />TYPE AND SPECIFICATIONS OF ALL MATERIALS, FITTINGS, ETC. <br />CONFORM TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />STANDARDS AND SPECIFICATIONS. MATERIAL SELECTION SHALL BE <br />SUBMITTED TO THE CIVIL ENGINEER FOR REVIEW. <br />21. GRADING AND PAVING CONTRACTOR SHALL COORDINATE THE <br />INSTALLATION OF ALL ELECTRICAL, LANDSCAPE, IRRIGATION, AND <br />UNDERGROUND UTILITY CONDUITS WITH APPROPRIATE SUB- <br />CONTRACTORS AND UTILITY COMPANIES PRIOR TO CONSTRUCTION. <br />25. DILLON & MURPHY SHALL NOT BE RESPONSIBLE FOR ANY SURVEYING OR <br />FIELD CHANGES MADE BY ANY OTHER SURVEYING OR ENGINEERING <br />FIRMS. ANY ERRORS OR OMISSIONS DETECTED SHALL BE MITIGATED BY <br />DILLON & MURPHY. <br />26. SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS WILL PERFORM <br />FIELD INSPECTIONS FOR THIS PROJECT: ANY IMPROVEMENTS <br />CONSTRUCTED TO THE SPECIFICATIONS AND WHICH IT IS INTENDED <br />THAT SAN JOAQUIN COUNTY WILL ASSUME MAINTENANCE <br />RESPONSIBILITY, MUST BE INSPECTED DURING CONSTRUCTION BY AN <br />AUTHORIZED AGENT OF SAN JOAQUIN COUNTY. <br />27. CHANGES ON PLANS AND SPECIFICATIONS: ANY CHANGES TO THE <br />APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS MUST BE <br />PREPARED AND APPROVED BY DILLON & MURPHY AND SHALL BE <br />SUBMITTED TO SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOR APPROVAL PRIOR TO IMPLEMENTATION. <br />28. THIS SITE CONTAINS 101.59 ACRES GROSS. <br />29. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO SAN JOAQUIN <br />COUNTY STANDARDS AND TO THE MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES (CALTRANS) AND AS SHOWN ON THE PLANS. <br />30. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSON <br />AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE <br />CONTRACTOR SHALL DEFEND; INDEMNIFY AND HOLD HARMLESS, THE <br />COUNTY OF SAN JOAQUIN, ITS ELECTED OFFICIALS, OFFICERS, <br />EMPLOYEES AND DILLON & MURPHY FROM ANY AND ALL CLAIMS, COSTS <br />OF LITIGATION, DAMAGES, AND ATTORNEY'S FEES, FOR PERSONAL <br />INJURY OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH ARE <br />CLAIMED TO HAVE OCCURRED DURING THE TERM OF THIS PROJECT. <br />31. ALL UTILITIES SHALL BE UNDERGROUND, UNLESS SPECIFICALLY NOTED <br />OTHERWISE ON PLANS. <br />32. THIS PROJECT SHALL IMPLEMENT THE AIR POLLUTION CONTROL <br />DISTRICT'S FUGITIVE DUST CONTROL MEASURES AND OZONE EMISSION <br />MEASURES DURING CONSTRUCTION. <br />33. ALL EARTHWORK AND GRADING SHALL BE IN CONFORMANCE WITH <br />CHAPTERS QQAND 70OF THE UNIFORM BUILDING CODE, DATED 1994. <br />34. THE TOTAL EARTHWORK QUANTITY IS: <br />VOLUME OF CUT= 321130 CYD <br />THESE EARTHWORK QUANTITIES ARE NOT BID QUANTITIES. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL QUANTITIES. <br />35. CONTRACTOR SHALL SUBMIT TO DILLON & MURPHY FOR APPROVAL <br />EQUIPMENT AND MATERIAL SPECIFICATION OF ITEMS HE WISHES TO <br />SUBSTITUTE FROM THAT WHICH IS SPECIFIED ON THE IMPROVEMENT <br />PLANS, SAN JOAQUIN COUNTY STANDARD PLANS AND SPECIFICATIONS <br />AND PROJECT SPECIFICATIONS. SAN JOAQUIN COUNTY SHALL HAVE <br />THE FINAL SAY. <br />36. CONTRACTOR SHALL NOT CAUSE THE CONSTRUCTION SURVEY STAKES <br />TO BE DESTROYED OR REMOVED UNTIL THE IMPROVEMENTS HAVE BEEN <br />ACCEPTED BY THE INSPECTOR. CONTRACTOR SHALL COORDINATE <br />ACCEPTANCE OF IMPROVEMENTS BY THE INSPECTOR SO THAT THE <br />PREVIOUS SET OF CONSTRUCTION STAKES DO NOT CONFLICT WITH THE <br />NEXT PHASE OF CONSTRUCTION. <br />37. ALL LINEAR FOOTAGES, AREAS OR VOLUMETRIC AMOUNTS OF PIPING <br />MATERIAL, CONCRETE, ASPHALT CONCRETE, EXCAVATION AND IMPORT <br />FILL MATERIAL SHOWN ON THESE IMPROVEMENT PLANS ARE <br />APPROXIMATE. ACTUAL AS -BUILT FIELD MEASUREMENTS SHALL <br />PREVAIL. <br />43. TREATED WASTEWATER EFFLUENT IS DISPERSED BY SUB -SURFACE <br />IRRIGATION INTO THE PROPOSED EARTH BERM AT THE SOUTHERN <br />BOUNDARY OF THE PROJECT. (PLANS BY OTHERS) <br />ol <br />�"r!ZcJr <br />ir p <br />DILLON & MURPHY <br />CONSULTING CIVIL ENGINEERS <br />ENGINEERING • PLANNING • SURVEYING <br />1820 W. KETTLEMAN LANE, SUITE E, LODI, CALIFORNIA 95242 (209) 334-6613 <br />IMPROVEMENT PLANS FOR TRACT NO. 2927 <br />CASTELLO ESTATES <br />GENERAL NOTES AND SPECIFICATIONS <br />REV. N0. I DESCRIPTION DATE SCALE: 1'. = 50' <br />DRAWN BY: SM/BH <br />DESIGNED BY: CD <br />CHECKED BY: <br />AS BUILT BY: <br />JANUARY, 2000 <br />SAN JOAQUIN COUNTY <br />BENCH MARK: EL: <br />DESCRIPTION: <br />SHEET <br />2 <br />JOB NO. <br />9877 <br />Caur. FU 96MPD <br />