My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-3502
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-3452-3683
>
SU-3502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 9:48:47 AM
Creation date
10/15/2024 11:34:32 AM
Metadata
Document Relationships
SU3496-SU3551
(Attachment)
Path:
\VAULT MAPS\Subdivision - SU\SU3200 - SU3624
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r. <br />NOTES: <br />I. For additional details of Terminal System (Type ET), refer to the manufacturer's installation instructions. <br />2. Terminal System (Type ET) must be constructed so that the full length of the terminal system guard railing is in <br />straight alignment. The Guard Rail Extruder head of the terminal system shall not encroach upon the adjacent paved <br />shoulder or lane. A traffic approach flare of 50:1 for the full length of Terminal System (Type ET) installation shall be <br />used where the Guard Rail Extruder head would encroach upon the adjacent paved shoulder or lane. 150 mm x 200 mm x 355 mm PLANS APPROVAL DATE <br />3. Slide Guard Rail Extruder over the end of the rail element and attach to Post No.l with lag screws. Do not bolt rail wood block XP. 12 -3I -o3 <br />The State of CalifCallfornla or Its officers or CIVIL <br />agents shall nor be responsible for the accuracy sT <br />element to post. Guard Rail Extruder attachment brackets have 3 holes in each bracket to provide tolerance adjustment. MBGR element 185 mm x 135 mm x 1145 mm or completeness of electronic copies of this plan qrF OF CAL,FO�� <br />Use the holes in the bracket closest to center of Post No. 1. Drill 6 mm pilot holes to accommodate lag screws. wood post sheet_ <br />Top of rail <br />4. Attach strut to Post Nos. I and 2 foundation tubes with hex head bolts, washers and hex nuts. Bolts extend To accompany plans dated <br />through the strut, steel foundation tube, and wood posts. Channel side of strut to face downward. Pavement or — Hex nut and washer <br />ground line Lr on threaded end MBGR elements 150 mm x 200 mm x 355 mm <br />etric <br />5. <br />For length and type of guard railing or barrier the terminal system is attached to, see Project Plans. For <br />minimum <br />length of guard railing used with terminal system end treatments, see Standard Plans A77D and A77E. <br />GUARD <br />6. <br />Attach rail element to this post and block. Payment for this post, block and hardware included in payment <br />for the type <br />of railing or barrier the terminal system is attached to, not part of the payment for Terminal System (Type ET). <br />7. <br />Yellow retroreflective sheeting, as provided by Terminal System (Type ET) manufacturer, shall be adhered to <br />the face <br />of extruder head. The sheeting shall be consistent with the design pattern and colors of a Type P object <br />marker panel. <br />8. <br />Attach rail to Post No.2 (no wood block) in same manner shown in section A -A. Do not bolt rail to Post No.l, <br />See Note 3. <br />9. <br />Terminal System (Type ET) is an in-line end treatment for guard rolling or single faced barrier railing where <br />site <br />conditions will not accomodate use of a flared end treatment. Do not use Terminal System (Type ET) where <br />extrusion <br />of the rail on the back side of the installation would be in the path of pedestrian or vehicular traffic. <br />10. <br />A continuous rail element section between Post Nos.l and 5 (no intermediate rail splices) may continue to be <br />used in <br />existing installations. New installations shall be constructed ds shown. <br />1 I. <br />A 1830 mm length steel foundation tube, TS 203 x 152 x 4.8, without a soil plate, may be furnished and installed in place <br />of the 1375 mm length steel foundation tube and soil plate shown. Minimum embedment of the 1830 mm length tube shall <br />be 1760 mm. A 16 mm 0 hex head bolt and nuts shall be installed in the hole in the 1830 mm length tube to keep <br />the wood <br />post from dropping into the tube. <br />Limits of guard <br />rolling or barrier <br />railing See Note 5 <br />5 <br />Ln <br />0 <br />N <br />1905 <br />1905 <br />RaiI splice j RaiI splice <br />13 mm 0 Hex head bolt Top of rail \ wood block <br />190 (No washer on bolt head) <br />Pavement or LH(ex nut and washer <br />60 mm 0 hole ground line -- threaded end <br />F j j 'r -d-6 mm thick steel plate o 16 mm Hex head bolt <br />I 460 mm x 610 mm head) on bolt <br />- j I Attach steel soil plate to steel foundation <br />E I I tube with 16 mm 0 x 190 mm hex head bolts I 90 mm holes <br />I I with hex nuts (21 mm 0 holes in plate and <br />o <br />I 1 in two sides of tube to accommodate hex bolt). i C <br />rn I I <br />Steel foundation tubei-K-- 200 <br />TS 203 x 152 x 4.8, 1375 mm I I <br />length, See Note 11. 150 mm x 200 mm x 1.83 m <br />SECTION A -A ! _! wood post <br />Soil plate and wood post attachment <br />to steel foundation tube similar SECTION B -B <br />for Post Nos. 1, 2 and 4. Wood blocks not Post Nos. 5, 7 and 8 similar except rail <br />used with Post Nos.I and 2. See Note 8. elements are not attached to Post Nos.5 and 7 <br />Pay limits for Terminal System (Type ET) <br />Extend bolt through post <br />and block but not through <br />rail elements at <br />Post Nos. 3, 5 and 7: <br />1905 1905 _ <br />See Note I 0 <br />Rail splice <br />(See Note 2) <br />PLAN Edge of paved shou I der or offset <br />line of edge of traveled way. <br />One continuous length of guard rail element <br />1905 , _ 1905 <br />Attach strut to foundation tube with <br />bolt head on this side. See Note 4. <br />o-� -- Guard Roll Element Exit Slot (Positioned <br />Strut /I to exit rail element away from traffic) <br />See Notes 2 and 7 <br />650 Guard Rail Extruder <br />See Note 10 <br />Rail splice (bracket -., <br />able <br />nchor <br />� Anchor <br />cab I e <br />I i � See Note 6 I I � Wood Post I I Wood Post I 1 Wood Post I I Wood Post 11 1 Wood Post 11 Ij Wood Post <br />Pavement or I I I I No. 8, See I I No. 7, See I I No. 6 1 I No. 5, See ALJ No. 4, See LJI No. 3 <br />ground line i i i i Section B -B i i Section B -B i i j j Section B -B j1 Section A -A <br />B i i i Soi I plate/ i i_ <br />GHJ <br />I I I I I I I I I I I Steel 1 <br />LJ LJ L1 L1 LJ I foundation 1 I <br />tube L_J <br />ELEVATION <br />TERMINAL SYSTEM (TYPE ET) <br />See Notes 9 and 10 <br />53 <br />i�00000� <br />�— Direction of Travel <br />1905 <br />See Note 3 <br />11 Ii Wood Post II II <br />III- No. 2, See JI <br />�I I Section A -A ,L11 <br />Soil Plate <br />1 <br />I I 1 <br />Wood Post <br />No. 1. See <br />Section A -A <br />Strut <br />Bearing plate <br />for anchor <br />cable <br />�—Stee I I STATE OF CALIFORNIA <br />I j foundation I I DEPARTMENT OF TRANSPORTATION <br />I J tube— <br />METAL <br />ube <br />METAL <br />TERMINAL <br />BEAM <br />GUARD <br />RAILING <br />TREATMENT <br />AND <br />SINGLE <br />FACED <br />BARRIER <br />RAILING <br />TERMINAL <br />SYSTEM <br />END <br />TREATMENT <br />NO SCALE <br />ALL DIMENSIONS ARE IN <br />MILLIMETERS UNLESS OTHERWISE SHOWN <br />RSP A77M DATED OCTOBER 26,2000 SUPERSEDES STANDARD PLAN A77M <br />DATED JULY 1,1999 -PAGE 53 OF THE STANDARD PLANS BOOK DATED JULY 1999. <br />CID <br />m <br />CID <br />N <br />v <br />r <br />a <br />z <br />Al <br />
The URL can be used to link to this page
Your browser does not support the video tag.