0
<br />EROSION / SEDIMENT CONTROL NOTES:
<br />U
<br />to "
<br />--�_ 270 _ 94.08 95 i-_-%"9Q'Z] '""�.. .� }Y'Sf'. .-_-14•
<br />9427 9s.°5,ia SUBDIVISION ae.sA
<br />BOUNDARY LINE
<br />93.94
<br />Js3.6t � �,
<br />0 rn -i 6
<br />()5.. 97.65
<br />.__.._ - - -_._ „ - Ha.60 ^-_..,-' --- PR(tp:F`FFiRAVEL - _-.., l \ / Aa
<br />a° =aI BAG (TYP.) F.0.
<br />" F
<br />4+btl .................. Tg zz6 ",
<br />9259 - _�_--
<br />_ // �,� -------T�� "�'------�92_ <. - 9zst.4 _
<br />m
<br />6 97.5 \
<br />i q7,321
<br />9+
<br />34
<br />96.11
<br />\ -----------+ ----- 1 r
<br />%'1. I A• I ` i / A �A7
<br />17 93.94 �� _ __ 96.56
<br />I
<br />LOT 11 L 12 �_..__.- i. I 4.41 _ �/
<br />92LOT / T f 3 LOT 14
<br />96.75
<br />1 \ ''\ . , I
<br />I ' i
<br />_
<br />:
<br />(�12s7 97.0 .4� 9 5U
<br />97.0� LOT 1 �. 5
<br />DETENTION, \v. ' 9' / 94.86
<br />BASIN T r v Tj i A DITCH B
<br />•V A \ 1 /� A�\ PC - 10+18.67
<br />• \ \ { � r 93.5 r
<br />97.0 97.0 99.10 Y
<br />3.29 r�
<br />T --
<br />c.
<br />T -------------------------------- \1
<br />\ \ l 72 r
<br />\ 94.68 r r T I r
<br />9�\ 297 •\ \\\\ i / +I a3.e0 94.5 1T. 4 6 IQ ~' ,� j T
<br />9& 95.5 a r .0 r LOT Y
<br />1 94. T T T LL
<br />\ j�, `\ 1 '•,,\\ 9fi.6'
<br />952tl .'� r I I -
<br />C T r r rp,
<br />\\� \ 94 .oA d 9e 99.0 ZIF5 r_._ _ 95.5 95.5 r r ml
<br />.92nd .., 1
<br />y... \-.... y... y... y... y "�., y.. y y �l']," J\ ` 94.5 \\ r r
<br />94.94 \� X2.215• A 93.4 T �• %• T ��
<br />\ \ 94. 1 94-11~I
<br />1 r 1
<br />166 \\\ \ i 2. GC 1 94_57 r 94-33 r 23 7 r �i3.97 94.70 �i r
<br />/ V 92 53.., j T ti r r ti
<br />f v \ 1
<br />94.02 \� A V I r r�-
<br />S � y 3i r
<br />SP t \ \ .22 53.20 j �•"�.
<br />\ 9,:.6, PROP. GRAVEL �i I
<br />9, s• \\�'' \ 92.20 936 \ BAG (TYP.) + PROP GRAVEL BAG I r1
<br />---- ----- - ---� - ---- --- _ -- -TYP.)
<br />.4e t/ 9329�� a7 9a t�e � (TYP.� I
<br />_
<br />55.6092.6a\ \\ L_-_...._ / •-.. •-....-... ,-... �.. ,-... c-_. �...�... 4-.. �... ,-.. a-.. i-....-..
<br />F.G. .-...�.. +_
<br />\ 9\'d .
<br />a5
<br />�\ / r... r. 95.39 1 a' �...�. y.. y y.. y..• y
<br />- - - - - - - - - - - - - -
<br />F.0. T y
<br />/ Y
<br />95.5 93 i - - - - - - 50,
<br />� 5z /
<br />r i
<br />95.83 / I
<br />r
<br />94.61 LOT 10 9567 PROP GRAVEL BAG \s
<br />y r
<br />T�^ r
<br />LOT_9I, f y 1 PROP GRAVEL BAG T r r �76-7 F. r.
<br />ItY 95,4 TYP. r F.o. F.G. r j T.
<br />9h 59
<br />GRAVEL BAG
<br />FILTERED FILTERED
<br />4" RUNOFF RUNOFF
<br />v d
<br />EMBEDDINGDETAIL
<br />SEDIMENTGRAVEL BAG
<br />N.T.S.
<br />SCSA NOTES:
<br />ACCESS (SCSA)
<br />1. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE
<br />CONSTRUCTED OF 40 MM (1.5
<br />r
<br />r
<br />/
<br />T
<br />TO A MINIMUM THICKNESS
<br />96.02
<br />METHOD OF PLACING,
<br />T
<br />AGGREGATE BASE MATERIAL
<br />SHALL CONFORM TO SECTION
<br />26 OF THE STATE
<br />SPECIFICATIONS.
<br />95I
<br />2. LENGTH OF ENTRANCE SHALL
<br />�
<br />ga,e6
<br />-
<br />T 94.7F.
<br />r
<br />r
<br />/
<br />TURNING RADII.
<br />�.
<br />\.
<br />SCSA NOTES CONTINUATION:
<br />-
<br />Z
<br />j
<br />/ .C.
<br />T
<br />F.C. . 96.3
<br />T
<br />G.
<br />F.C.
<br />r
<br />O
<br />OCCASIONAL TOP DRESSING WITH AGGREGATE BASE
<br />r
<br />/
<br />J
<br />U
<br />MATERIAL OR CLEANED AS DIRECTED BY THE DIRECTOR.
<br />r
<br />r
<br />�O
<br />M
<br />96.5t •s 9e
<br />11.06
<br />S�-
<br />�;
<br />o
<br />4. ACCESSES SHALL BE INSPECTED WEEKLY DURING
<br />��\ so
<br />Z
<br />LL -
<br />PERIODS OF HEAVY USAGE, MONTHLY DURING NORMAL
<br />W y m
<br />O
<br />••
<br />�.._-
<br />1334
<br />NE 30,
<br />r
<br />9a.o
<br />9a.0 r,
<br />--T
<br />2002 #
<br />r
<br />SHALL BE DONE AS NEEDED.
<br />meq,_ 0/m
<br />\
<br />r
<br />T
<br />T
<br />,
<br />r
<br />r
<br />r
<br />�
<br />r
<br />T
<br />F.G.
<br />F.G. i
<br />t
<br />, r, T
<br />r
<br />r
<br />r
<br />ssrl3
<br />�-�
<br />I
<br />7.S
<br />97.5j
<br />j
<br />Sao
<br />Sao
<br />95.9, t-
<br />- y
<br />y
<br />r
<br />- ,-
<br />LOT 3
<br />�-\'
<br />T
<br />'Z
<br />r
<br />Sao 98.0 r
<br />. 98.56
<br />9722
<br />96.9j /
<br />\
<br />I
<br />r
<br />_. --- -
<br />LOT 4
<br />-
<br />96.92
<br />v7 94
<br />LOT 0
<br />LOT 3
<br />�
<br />98.36-
<br />Lora
<br />_ -___
<br />Lor � _
<br />-
<br />\
<br />72`
<br />(r 88.112
<br />98.45
<br />'_......,��....
<br />. 9Z41'
<br />97,76
<br />GRAVEL BAG
<br />FILTERED FILTERED
<br />4" RUNOFF RUNOFF
<br />v d
<br />EMBEDDINGDETAIL
<br />SEDIMENTGRAVEL BAG
<br />N.T.S.
<br />SCSA NOTES:
<br />ACCESS (SCSA)
<br />1. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE
<br />CONSTRUCTED OF 40 MM (1.5
<br />INCH) MAXIMUM AGGREGATE
<br />BASE MATERIAL CONFORMING
<br />TO COUNTY STANDARDS.
<br />MATERIAL SHALL BE PLACED
<br />TO A MINIMUM THICKNESS
<br />OF 150 MM (6 INCHES). THE
<br />METHOD OF PLACING,
<br />SPREADING AND COMPACTING
<br />AGGREGATE BASE MATERIAL
<br />SHALL CONFORM TO SECTION
<br />26 OF THE STATE
<br />SPECIFICATIONS.
<br />ul C NC
<br />2. LENGTH OF ENTRANCE SHALL
<br />BE A MINIMUM LENGTH OF
<br />15 METERS (50 FEET). WIDTH
<br />SHALL BE A MINIMUM
<br />OF 15 FEET, OR GREATER IF NECCESSARY TO COVER
<br />ALL VEHICULAR INGRESS AND
<br />EGRESS. PROVIDE AMPLE
<br />TURNING RADII.
<br />F.O. '�� F.C.
<br />Jam.
<br />• 99.20 . �.3H 100.0 100.0 •
<br />r
<br />/ 10 25
<br />I
<br />' whi nu r
<br />RCE
<br />DE IGNATED
<br />BDrvISION s;U.2 \
<br />RY LINE i0040 ? \ REM INDER54
<br />1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
<br />IMPLEMENTED BY OCTOBER 5 OR AS APPROVED BY THE COUNTY ENGINEER
<br />AND SPECIFIED ON THE GRADING PLANS.
<br />96.68
<br />'RIQ W 2. STRAW BALES SHALL BE STOCKPILED ON SITE AT A RATE OF 1.5 BALES
<br />PER ACRE BE SEPTEMBER 25. MEASURES SHALL BE PROVIDED TO KEEP
<br />7S STRAW DRY.
<br />99. 7
<br />T 3. ALL SLOPES GREATER THAN 10:1 SHALL BE COVERED WITH BROADCAST
<br />1 ! STRAW AT A RATE OF 50 BALES OR 4000 POUNDS PER ACRE. FOR SLOPES
<br />a'90 4:1 OR STEEPER, STRAW SHALL BE PRESSED IN PLACE. OTHER METHODS
<br />oo� SHALL BE APPROVED BE THE ENGINEERING DIVISION.
<br />/ 4. SLOPES STEEPER THAN 4:1 AND ADJACENT TO COUNTY RIGHT-OF-WAY, FLOOD
<br />PLAINS, NATURAL DRAINAGES, PARK LAND OR DESIGNATED OPEN SPACE
<br />SHALL BE HYDRO SEEDED.
<br />5. ALL BARE AREAS, REGARDLESS OF SLOPE, WITHIN 50 FEET OF NATURAL
<br />DRAINAGES SHALL BE COVERED WITH STRAW AND PRESSED IN PLACE.
<br />x.04
<br />6. WHERE REQUIRED, BROADCAST SEED SHALL BE APPLIED AS FOLLOWS:
<br />BLANDO BROME 12 LBS/ACRE
<br />297.97 ROSE CLOVER 9 LBS/ACRE
<br />AREAS WITH SANDY, DRY SOIL SHALL BE:
<br />ZORRO ANNUAL FESCUE 6 LBS/ACRE
<br />ROSE CLOVER 9 LBS/ACRE
<br />.03 16-20-0 FERTILIZER OR EQUIVALENT SHALL BE APPLIED AT A RATE OF 500
<br />POUNDS PER ACRE. IF HYDRO SEEDING/MULCHING IS USED, SEED
<br />QUANTITIES SHALL BE INCREASED BY 30 PERCENT. >
<br />oA
<br />7. NO GRADING OR TRENCHING, EXCEPT AS REQUIRED FOR EROSION, SHALL m
<br />j OCCUR WITHIN 35 FEET FROM THE CENTERLINE OR PERENNIAL AND
<br />INTERMITTENT DRAINAGE SWALE BETWEEN OCTOBER 5 AND APRIL 1 N a`
<br />j 91 EXCEPT AS APPROVED BY THE DEPARTMENT OF FISH AND GAME. SII h
<br />%i
<br />B. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED r
<br />f/'j � FOLLOWING ALL STORMS TO ENSURE THAT ALL MEASURES ARE B
<br />9e.v118 ,O FUNCTIONING PROPERLY. cxi
<br />9. SEDIMENT AND TRASH ACCUMULATED IN DRAINAGES OR DETENTION
<br />BASINS SHALL BE REMOVED AS SOON AS POSSIBLE. IN ADDITION, OIL AND
<br />MATERIAL FLOATING ON WATER SURFACE MUST BE SKIMMED WEEKLY
<br />AND THE DEBRIS PROPERLY DISPOSED OF. Z a
<br />95.45
<br />10. CONSTRUCTION ACTIVITIES OCCURRING BETWEEN OCTOBER 15 AND
<br />APRIL 1 SHALL HAVE EROSION AND SEDIMENT CONTROL MEASURES IN zv
<br />.17 PLACE OR CAPABLE OF BEING PLACED WITHIN 24 HOURS. THE Z o�
<br />CONTRACTOR SHALL ENSURE THAT THE CONSTRUCTION SITE IS j rn M
<br />PREPARED PRIOR TO THE ONSET OF ANY STORM.
<br />STABILIZED L�7 Lu u
<br />ACCESS 11. THE CONTRACTOR SHALL ESTABLISH A SPECIFIC SITE WITHIN THE w e
<br />DEVELOPMENT FOR MAINTENANCE AND STORAGE OF EQUIPMENT OR ANY -j01oo
<br />OTHER ACTIVITY THAT MAY ADVERSELY CONTRIBUTE TO THE WATER '`'6
<br />QUALITY OF THE RUNOFF. THIS AREA SHALL HAVE A BERM LOCATED MJCO
<br />.3 AROUND ITS PERIMETER. THIS AREA SHALL BE RESTORED TO 0Li0-
<br />f ACCEPTABLE CONDITION UPON COMPLETION OF PROJECT.
<br />12. HYDRO SEEDING MAY BE CONSIDERED AS AN ALTERNATIVE TO
<br />BROADCAST STRAW SUBJECT TO THE ENGINEERING DIVISION BASED ON
<br />A REVIEW OF THE EXISTING SITE CONDITIONS (LOCATION, SLOPES, 60
<br />PROXIMITY TO STREAMS) AND TIME OF THE YEAR.
<br />95.44
<br />CONSTRUCTION SITE
<br />EXISTING 15 METERS (50 FEET) MINIMUM
<br />GROUND OR AS APPROVED BY THE ADMINISTRATOR
<br />40 MM (1.5 INCH) MAXIMUM
<br />AGGREGATE BASE
<br />GEOTEXTILE MATERIAL STABILIZED ACCESS
<br />96.95 SECTION A -A
<br />97.86
<br />PAVEMENT
<br />a
<br />ol J
<br />HES) MIN a
<br />L- J
<br />Ul dam
<br />Z�o 0
<br />5 �H
<br />0-
<br />F- ZZic O
<br />LLJ
<br />wccm U
<br />0> oz
<br />:DGy0E OF � V
<br />'AVEMENT - is
<br />w
<br />W _
<br />3
<br />cyQ
<br />O
<br />7
<br />Z
<br />STABILIZED CONSTRUCTION SITE
<br />ACCESS (SCSA)
<br />e a
<br />N
<br />k.
<br />V
<br />N.T.S.
<br />Do m
<br />C
<br />ul C NC
<br />00 06
<br />is
<br />L
<br />O
<br />i6 c
<br />C C .
<br />99.75
<br />SCSA NOTES CONTINUATION:
<br />Z
<br />10
<br />,Oo.sz 3. THE ENTRANCE SHALL BE KEPT IN GOOD CONDITION BY
<br />O
<br />OCCASIONAL TOP DRESSING WITH AGGREGATE BASE
<br />U
<br />MATERIAL OR CLEANED AS DIRECTED BY THE DIRECTOR.
<br />QRpFESS/pN
<br />�O
<br />M
<br />11.06
<br />S�-
<br />�;
<br />o
<br />4. ACCESSES SHALL BE INSPECTED WEEKLY DURING
<br />��\ so
<br />Z
<br />LL -
<br />PERIODS OF HEAVY USAGE, MONTHLY DURING NORMAL
<br />W y m
<br />O
<br />USAGE, AND AFTER EACH RAINFALL, WITH MAINTENANCE
<br />1334
<br />NE 30,
<br />0
<br />w
<br />PROVIDED AS NECESSARY. PERIODIC TOP DRESSING
<br />2002 #
<br />SHALL BE DONE AS NEEDED.
<br />meq,_ 0/m
<br />3
<br />N L
<br />Of- CAL1F0� a w
<br />2
<br />!n
<br />a�
<br />e a
<br />4
<br />k.
<br />V
<br />Do m
<br />C
<br />ul C NC
<br />�0)
<br />r
<br />is
<br />L
<br />O O
<br />U Z
<br />i6 c
<br />C C .
<br />
|