Laserfiche WebLink
f <br />COUNTY OF SAN JOAQUIN PUBLIC IMPROVEMENT REQUIREMENTS <br />GENERAL NOTES GRADING NOTES CONTINUE <br />1. ALL CONSTRUCTION SHALL CONFORM TO THESE PLANS, THE COUNTY OF <br />SAN JOAQUIN STANDARD SPECIFICATIONS (DATED FEBRUARY 1986, REV. 7. ALL GRADING SHALL COMPLY WITH 1994 U.B.C. CHAPTER 29 <br />DECEMBER 1992), THE COUNTY OF SAN JOAQUIN IMPROVEMENT STANDARDS AND APPENDIX CHAPTER 70. <br />(DATED MAY 1997) AND THE COUNTY OF SAN JOAQUIN CONSTRUCTION <br />STANDARDS (DATED AUGUST 1997). 8. NO SLOPE SHALL BE STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL. <br />2. THE COUNTY OF SAN JOAQUIN IS A MEMBER OF THE UNDERGROUND SERVICE 9. REFER TO GEOTECHNICAL INVESTIGATION REPORT BY KLEINFELDER, INC. <br />ALERT (U.S.A.) ONE CALL SYSTEM. THE CONTRACTORS SHALL NOTIFY THE (SEPT. 14, 2000) TO DETERMINE LOT GRADING, SITE PREPARATION <br />U.S.A. CENTER 48 HOURS IN ADVANCE OF PERFORMING ANY EXCAVATION AND FOUNDATION RECOMMENTDATION. <br />WORK BY CALLING 1-800-642-2444. <br />3. THE CONTRACTOR SHALL MARK IN WHITE PAINT ALL AREAS TO BE DRAINAGE NOTES <br />HE <br />GRADING NOTES <br />1. GRADING SHALL CONFORM TO CHAPTER 70 UBC, LATEST EDITION, AND TO <br />THE RECOMMENDATION OF THE GEOTECHNICAL ENGINEERING REPORT <br />BY KLEINFELDER. KLEINFELDER FILE NO. 20-4476-01.GO1 <br />2. ALL EROSION CONTROL SHALL BE PLACED AS SPECIFIED ON THESE PLANS <br />OR AS DETERMINED BY THE COUNTY. <br />3. NON -POTABLE WATER SHALL BE SPRAYED ON ALL EXPOSED EARTH <br />SURFACES DURING CLEARING GRADING, EARTH MOVING, AND OTHER SITE <br />PREPARATION ACTIVITIES. THE EXPOSED EARTH SHALL BE WATERED <br />THROUGHOUT THE DAY TO MINIMIZE DUST. <br />4. THE COUNTY SHALL HAVE THE AUTHORITY TO STOP ALL GRADING OPERATIONS, <br />IF, IN OPINION OF COUNTY STAFF, INADEQUATE DUST CONTROL MEASURES ARE <br />BEING PRACTICED OR EXCESSIVE WIND CONDITIONS CONTRIBUTE TO <br />FUGITIVE DUST EMISSIONS. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING CONSTRUCTION <br />VEHICLES LEAVING THE SITE ON A DAILY BASIS TO PREVENT DUST, <br />SILT AND DIRT FROM BEING RELEASED OR TRACKED OFFSITE. <br />6. THE HOURS OF PROJECT CONSTRUCTION SHALL BE: <br />7:00 AM TO 7:00 PM (MONDAY THRU FRIDAY) <br />8:00 AM TO 8:00 PM (SATURDAY, SUNDAY & HOLIDAYS) <br />• <br />DEVELOPMENT FOR MAINTENANCE AND STORAGE OF EQUIPMENT OR ANY <br />OTHER ACTIVITY THAT MAY ADVERSELY CONTRIBUTE TO THE WATER <br />QUALITY OF THE RUNOFF. THIS AREA SHALL HAVE A BERM LOCATED <br />AROUND ITS PERIMETER. THIS AREA SHALL BE RESTORED TO <br />ACCEPTABLE CONDITION UPON COMPLETION OF PROJECT. <br />10. HYDRO SEEDING MAY BE CONSIDERED AS AN ALTERNATIVE TO <br />BROADCAST STRAW SUBJECT TO THE COUNTY BASED ON <br />A REVIEW OF THE EXISTING SITE CONDITIONS (LOCATION, SLOPES, <br />PROXIMITY TO STREAMS) AND TIME OF THE YEAR. <br />12.5' 25' <br />P.U.EJ <br />L►i 5' 4' 41� <br />DITCH GRADE___/A" A.B. <br />10" A.B. - <br />BITUMINOUS PRIME <br />COAT <br />_ 40' ESMT. <br />f PL -- -----� <br />- 20 20' <br />1' (TYP.) r-1_0 01 <br />(EX.) GRADE- -_ <br />1' MAX.L�_> <br />3 <br />1'- <br />2:1 MAX. <br />SECTION "A" "A" <br />N.T.S. <br />(SEE SHEETS 6 & 8) <br />CL 40' ESMT. <br />20' 20' <br />1' (TYP.)J I- <br />r 1' (TYP.) <br />1' MAX. <br />6" CL II A.B. 0 95% RELATIVE <br />COMPACTION OVER 12" SCARIFIED <br />NATIVE SUB -BASE. SUB -BASE TO BE <br />COMPACTED 0 90% RELATIVE DRY DENSITY <br />PRIME COAT CL II AB SURFACE WITH <br />AR 4000 ASPHALT EMULSION AT A RATE <br />OF 0.33 GALLONS PER SQUARE YARD <br />OF SURFACE <br />10.0' 5.0' <br />2.0' 1' (TYP.) <br />- 17. MAX 1' - (EX.) GRADE <br />3 <br />SECTION "B" "B" <br />N. T. S. <br />(SEE SHEETS 6 & 9) <br />PL 12.5' <br />(EX.) GRADE <br />5$ -Mau �5q MAXL <br />SECTION "C" "C" <br />N.T.S. <br />(SEE SHEET 9) <br />_ 40' ESMT. <br />CL <br />20' J 20' <br />7.5' 10.0' <br />VARIES <br />(EX.) GRADES ._i -_`1 ' MAX <br />1'j- <br />7.5' <br />VARIES <br />-I 1' (TYP.) <br />TJ1' MAX. <br />SECTION "D" "D" <br />N.T.S. <br />(SEE SHEETS 6, 7, 8 & 9) <br />RF' 4'19'4' 75' Rn' a 7 11 n'+ <br />EXCAVATED PRIOR TO CONTACTING U.S.A. ANY AREAS NOT MARKED WILL <br />9.2' <br />NOT BE SUBJECT TO U.S.A., AND THE CONTRACTOR SHALL BE <br />o <br />A <br />RESPONSIBLE FOR ANY DAMAGE RESULTING FROM EXCAVATION. <br />1. <br />STORM DRAIN REQUIREMENTS SHALL BE PER THE COUNTY OF SAN JOAQUIN STANDARD <br />0 0 <br />SPECIFICATIONS INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. <br />4. <br />THE CONTRACTOR SHALL EXPOSE AND VERIFY LOCATIONS AND <br />PIPE ALTERNATIVES, UNLESS OTHERWISE SHOWN, SHALL BE: <br />ELEVATIONS OF EXISTING UNDERGROUND UTILITIES PRIOR TO <br />- CONCRETE PIPE <br />FL. <br />CONSTRUCTION OF THE NEW IMPROVEMENTS CONNECTING TO OR IN THE <br />ASTM -C14 CLASS 3 FOR SIZES 10" AND SMALLER (12" MIN IN COUNTY R.O.W.) <br />6" <br />VICINITY OF THE SAME. <br />M <br />ASTM -C76 CLASS 3 (UNLESS OTHERWISE SHOWN ON PLANS) <br />5. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL <br />LL <br />O <br />- CAST -IN-PLACE CONCRETE PIPE <br />0o <br />EXISTING MONUMENTS AND OTHER SURVEY MARKERS ON THE JOB SITE. <br />N <br />(PER CALTRANS STANDARD, SECTION 63 , JULY 1992) <br />6. <br />A.C. SURFACE SHALL BE CUT TO A NEAT, STRAIGHT LINE PARALLEL WITH <br />F- <br />w <br />- HDPE TYPE S (PER STANDARD DRAWING CST TB -2) <br />THE STREET CENTERLINE AND THE EXPOSED EDGE SHALL BE TACKED <br />w <br />2 <br />WITH EMULSION PRIOR TO PAVING. THE EXPOSED BASE MATERIAL SHALL <br />2. <br />THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES <br />BE GRADED, RECOMPACTED, AND RESEALED PRIOR TO PAVING. <br />WITHIN THE CONSTRUCTION AREA UNTIL NEW DRAINAGE IMPROVEMENTS ARE <br />a <br />ACCEPTED. <br />7. <br />ANY EXISTING CONCRETE SURFACE TO BE REMOVED SHALL BE SAW CUT <br />3. <br />EXISTING STORM DRAIN FACILITIES SHALL BE EXPOSED AND INVERT VERIFIED <br />TO A NEAT, STRAIGHT LINE. <br />PRIOR TO PLACEMENT OF PIPE. ALL CONSTRUCTION SHALL CONFORM TO <br />BARS @ 12" <br />3 <br />12" 2-1/2" <br />MANUFACTURERS SPECIFICATIONS AND TO REQUIREMENTS OF THE COUNTY OF <br />8. <br />THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN WHICH <br />SAN JOAQUIN STANDARD SPECIFICATIONS. <br />ALL REBAR <br />SHALL BE APPROVED BY THE COUNTY BEFORE START OF WORK <br />OUTLET <br />WEIR <br />NO.1 <br />IN RIGHT-OF-WAY AND SHALL BE IN ACCORDANCE WITH CALTRANS <br />TRAFFIC MANUAL. IF, AS A PART OF TRAFFIC CONTROL MEASURES, A <br />EROSION CONTROL NOTES <br />ROADWAY CLOSURE HAS BEEN APPROVED, THE CONTRACTOR SHALL <br />NOTIFY THE COUNTY 72 HOURS IN ADVANCE OF SETTING UP <br />THIS CLOSURE. <br />1. <br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE <br />9. <br />ALL UNDERGROUND UTILITIES WITHIN EXISTING OR PROPOSED COUNTY OF <br />IMPLEMENTED BY OCTOBER 5 OR AS APPROVED BY THE COUNTY <br />SAN JOAQUIN EASEMENTS SHALL REQUIRE A MINIMUM OF 90% COMPACTION <br />AND SPECIFIED ON THE GRADING PLANS. <br />ON THE TRENCH BACKFILL. COMPACTION OF BACKFILL BY JETTING IS NOT <br />PERMITTED IN COUNTY OF SAN JOAQUIN RIGHT-OF-WAY AREAS OR WITHIN <br />2, <br />STRAW BALES SHALL BE STOCKPILED ON SITE AT A RATE OF 1.5 BALES <br />DEDICATED RECLAIMED WATER, STORM, SEWER OR WATER EASEMENTS AND MAINS. <br />PER ACRE BY SEPTEMBER 25. MEASURES SHALL BE PROVIDED TO KEEP <br />STRAW DRY. <br />10. <br />PRIOR TO EXCAVATION OF TRENCHES 5 FEET OR DEEPER, THE <br />CONTRACTOR SHALL SUBMIT TO THE PUBLIC WORKS DEPARTMENT OR <br />3. <br />ALL SLOPES GREATER THAN 10:1 SHALL BE COVERED WITH BROADCAST <br />ENVIRONMENTAL UTILITIES DEPARTMENT INSPECTOR A COPY OF THE <br />STRAW AT A RATE OF 50 BALES OR 4000 POUNDS PER ACRE. FOR SLOPES <br />COMPANY'S ANNUAL CALOSHA TRENCHING PERMIT AND A COPY OF THE <br />4:1 OR STEEPER, STRAW SHALL BE PRESSED IN PLACE. OTHER METHODS <br />COMPANY'S LETTER INFORMING CALOSHA OF THE TIME OF TRENCHING IS <br />SHALL BE APPROVED BY THE COUNTY. <br />COMMENCING AND THE LOCATION OF THE WORK. <br />4. <br />ALL BARE AREAS, REGARDLESS OF SLOPE, WITHIN 50 FEET OF NATURAL <br />11. <br />ALL PAINTED TRAFFIC STRIPES, ARROWS, AND PAVEMENT MARKINGS <br />DRAINAGES SHALL BE COVERED WITH STRAW AND PRESSED IN PLACE. <br />SHALL BE CONSTRUCTED WITH THERMOPLASTIC MATERIAL TO THE <br />SPECIFICATIONS SET FORTH IN SECTION 84 OF THE STATE OF CALIFORNIA <br />5. <br />WHERE REQUIRED, BROADCAST SEED SHALL BE APPLIED AS FOLLOWS: <br />DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD <br />BLANDO BROME 12 LBS/ACRE <br />SPECIFICATIONS (LATEST EDITION) NON -REFLECTIVE PAVEMENT <br />ROSE CLOVER 9 LBS/ACRE <br />MARKINGS SHALL CONSIST OF CERAMIC MARKERS ONLY CONFORMING TO <br />SECTION 85-1.04A OF CALTRANS STANDARD SPECIFICATIONS. <br />AREAS WITH SANDY, DRY SOIL SHALL BE: <br />ZORRO ANNUAL FESCUE 6 LBS/ACRE <br />12. <br />THE CONTRACTOR SHALL TAKE EXTREME CARE TO PROTECT EXISTING <br />ROSE CLOVER 9 LBS/ACRE <br />SITE AND ADJACENT IMPROVEMENTS FROM DAMAGE. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE <br />16-20-0 FERTILIZER OR EQUIVALENT SHALL BE APPLIED AT A RATE OF 500 <br />CONSTRUCTION AND SHALL REPAIR OR MAKE REPLACEMENT TO CURRENT <br />POUNDS PER ACRE. IF HYDRO SEEDING/MULCHING IS USED, SEED <br />COUNTY STANDARDS AND AT THEIR OWN EXPENSE. <br />QUANTITIES SHALL BE INCREASED BY 30 PERCENT. <br />13. <br />ALL TRAFFIC SIGNS, MARKINGS AND STRIPING SHALL CONFORM <br />TO THE "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND <br />SAN JOAQUIN COUNTY STANDARDS" AND AS SHOWN ON THESE PLANS. <br />6. <br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED <br />FOLLOWING ALL STORMS TO ENSURE THAT ALL MEASURES ARE <br />14. <br />AN ENCROACHMENT PERMIT WILL BE REQUIRED PRIOR TO ANY <br />FUNCTIONING PROPERLY. <br />WORK WITHIN THE EXISTING COUNTY RIGHT-OF-WAY. <br />17. <br />CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />7. <br />SEDIMENT AND TRASH ACCUMULATED IN DRAINAGES OR DETENTION <br />BASINS SHALL BE REMOVED AS SOON AS POSSIBLE. IN ADDITION, OIL AND <br />FOR JOB SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION <br />MATERIAL FLOATING ON WATER SURFACE MUST BE SKIMMED WEEKLY <br />OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; <br />AND THE DEBRIS PROPERLY DISPOSED OF. <br />THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO <br />NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, <br />8. <br />CONSTRUCTION ACTIVITIES OCCURRING BETWEEN OCTOBER 15 AND <br />INDEMNIFY AND HOLD HARMLESS, THE CONSULTING ENGINEER AND THE <br />APRIL 1 SHALL HAVE EROSION AND SEDIMENT CONTROL MEASURES IN <br />COUNTY OF SAN JOAQUIN, ITS ELECTED OFFICIALS, OFFICERS, EMPLOYEES, <br />PLACE OR CAPABLE OF BEING PLACED WITHIN 24 HOURS. THE <br />AND AGENTS FROM ANY AND ALL CLAIMS, COSTS OF LITIGATION, DAMAGES, <br />CONTRACTOR SHALL ENSURE THAT THE CONSTRUCTION SITE IS <br />AND ATTORNEY'S FEES, FOR PERSONAL INJURY OR PROPERTY DAMAGE OF <br />PREPARED PRIOR TO THE ONSET OF ANY STORM. <br />WHATEVER NATURE WHICH ARE CLAIMED TO HAVE OCCURRED DURING THE <br />TERM OF THIS PROJECT. <br />9 <br />THE CONTRACTOR SHALL ESTABLISH A SPECIFIC SITE WIHIN T T <br />HE <br />GRADING NOTES <br />1. GRADING SHALL CONFORM TO CHAPTER 70 UBC, LATEST EDITION, AND TO <br />THE RECOMMENDATION OF THE GEOTECHNICAL ENGINEERING REPORT <br />BY KLEINFELDER. KLEINFELDER FILE NO. 20-4476-01.GO1 <br />2. ALL EROSION CONTROL SHALL BE PLACED AS SPECIFIED ON THESE PLANS <br />OR AS DETERMINED BY THE COUNTY. <br />3. NON -POTABLE WATER SHALL BE SPRAYED ON ALL EXPOSED EARTH <br />SURFACES DURING CLEARING GRADING, EARTH MOVING, AND OTHER SITE <br />PREPARATION ACTIVITIES. THE EXPOSED EARTH SHALL BE WATERED <br />THROUGHOUT THE DAY TO MINIMIZE DUST. <br />4. THE COUNTY SHALL HAVE THE AUTHORITY TO STOP ALL GRADING OPERATIONS, <br />IF, IN OPINION OF COUNTY STAFF, INADEQUATE DUST CONTROL MEASURES ARE <br />BEING PRACTICED OR EXCESSIVE WIND CONDITIONS CONTRIBUTE TO <br />FUGITIVE DUST EMISSIONS. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING CONSTRUCTION <br />VEHICLES LEAVING THE SITE ON A DAILY BASIS TO PREVENT DUST, <br />SILT AND DIRT FROM BEING RELEASED OR TRACKED OFFSITE. <br />6. THE HOURS OF PROJECT CONSTRUCTION SHALL BE: <br />7:00 AM TO 7:00 PM (MONDAY THRU FRIDAY) <br />8:00 AM TO 8:00 PM (SATURDAY, SUNDAY & HOLIDAYS) <br />• <br />DEVELOPMENT FOR MAINTENANCE AND STORAGE OF EQUIPMENT OR ANY <br />OTHER ACTIVITY THAT MAY ADVERSELY CONTRIBUTE TO THE WATER <br />QUALITY OF THE RUNOFF. THIS AREA SHALL HAVE A BERM LOCATED <br />AROUND ITS PERIMETER. THIS AREA SHALL BE RESTORED TO <br />ACCEPTABLE CONDITION UPON COMPLETION OF PROJECT. <br />10. HYDRO SEEDING MAY BE CONSIDERED AS AN ALTERNATIVE TO <br />BROADCAST STRAW SUBJECT TO THE COUNTY BASED ON <br />A REVIEW OF THE EXISTING SITE CONDITIONS (LOCATION, SLOPES, <br />PROXIMITY TO STREAMS) AND TIME OF THE YEAR. <br />12.5' 25' <br />P.U.EJ <br />L►i 5' 4' 41� <br />DITCH GRADE___/A" A.B. <br />10" A.B. - <br />BITUMINOUS PRIME <br />COAT <br />_ 40' ESMT. <br />f PL -- -----� <br />- 20 20' <br />1' (TYP.) r-1_0 01 <br />(EX.) GRADE- -_ <br />1' MAX.L�_> <br />3 <br />1'- <br />2:1 MAX. <br />SECTION "A" "A" <br />N.T.S. <br />(SEE SHEETS 6 & 8) <br />CL 40' ESMT. <br />20' 20' <br />1' (TYP.)J I- <br />r 1' (TYP.) <br />1' MAX. <br />6" CL II A.B. 0 95% RELATIVE <br />COMPACTION OVER 12" SCARIFIED <br />NATIVE SUB -BASE. SUB -BASE TO BE <br />COMPACTED 0 90% RELATIVE DRY DENSITY <br />PRIME COAT CL II AB SURFACE WITH <br />AR 4000 ASPHALT EMULSION AT A RATE <br />OF 0.33 GALLONS PER SQUARE YARD <br />OF SURFACE <br />10.0' 5.0' <br />2.0' 1' (TYP.) <br />- 17. MAX 1' - (EX.) GRADE <br />3 <br />SECTION "B" "B" <br />N. T. S. <br />(SEE SHEETS 6 & 9) <br />PL 12.5' <br />(EX.) GRADE <br />5$ -Mau �5q MAXL <br />SECTION "C" "C" <br />N.T.S. <br />(SEE SHEET 9) <br />_ 40' ESMT. <br />CL <br />20' J 20' <br />7.5' 10.0' <br />VARIES <br />(EX.) GRADES ._i -_`1 ' MAX <br />1'j- <br />7.5' <br />VARIES <br />-I 1' (TYP.) <br />TJ1' MAX. <br />SECTION "D" "D" <br />N.T.S. <br />(SEE SHEETS 6, 7, 8 & 9) <br />RF' 4'19'4' 75' Rn' a 7 11 n'+ <br />EXISTING - / 91.0 <br />GROUND OUTLET WEIR NO.2 .L. 1 <br />SEE DETAIL ABOVE RIGHT <br />ZUTLET WEIR N0.1 <br />SEE DETAIL ABOVE RIGHT <br />SECTION "E" 'E" <br />N.T.S. <br />(SEE SHEET 8) <br />C. L. PROP. R/W <br />R/W AND PL <br />50' 1 - <br />- 25' _ 25' DEDICATION <br />12' 12' 4' 4' 5 12.5' I E 20' R <br />P.U.E. 1 5' 4' 1 16' <br />2% 2% 8% <br />Vey <br />JDITCH GRADE --'2" A. C. TI=4.0 <br />R-VALUE=10 <br />CHERRY GLEN COURT <br />TYPICAL SECTION <br />N. T. S. <br />DITCH GRADE J' 6" A.B�-j <br />2" A. C. 0' <br />13.5" A.B. <br />12" MIN <br />T <br />C.L. <br />R <br />45' /W <br />(E). 20' <br />12' - <br />- BITUMINOUS PRIME COAT <br />FINE ROAD <br />TYPICAL SECTION <br />N.T.S. <br />9.2' <br />o <br />0 <br />0 <br />0 0 <br />EXISTING - / 91.0 <br />GROUND OUTLET WEIR NO.2 .L. 1 <br />SEE DETAIL ABOVE RIGHT <br />ZUTLET WEIR N0.1 <br />SEE DETAIL ABOVE RIGHT <br />SECTION "E" 'E" <br />N.T.S. <br />(SEE SHEET 8) <br />C. L. PROP. R/W <br />R/W AND PL <br />50' 1 - <br />- 25' _ 25' DEDICATION <br />12' 12' 4' 4' 5 12.5' I E 20' R <br />P.U.E. 1 5' 4' 1 16' <br />2% 2% 8% <br />Vey <br />JDITCH GRADE --'2" A. C. TI=4.0 <br />R-VALUE=10 <br />CHERRY GLEN COURT <br />TYPICAL SECTION <br />N. T. S. <br />DITCH GRADE J' 6" A.B�-j <br />2" A. C. 0' <br />13.5" A.B. <br />12" MIN <br />T <br />C.L. <br />R <br />45' /W <br />(E). 20' <br />12' - <br />- BITUMINOUS PRIME COAT <br />FINE ROAD <br />TYPICAL SECTION <br />N.T.S. <br />N.T.S. <br />OUTLET WEIR NO.2 <br />N.T.S. <br />R <br />7.5' 10' I 5' VARIES <br />z BENCH <br />112" MIN. <br />t <br />NSTALL ARMOR FLEX <br />SLOPE PROTECTION <br />J <br />92.0 � <br />F. S. O <br />0o i 010,���G <br />EXIST. <br />3:1 GRADE <br />(TYP.) <br />_ _91.0 F.L. <br />WEIR <br />HGL 10 =91.4 <br />SECTION "F" "F" <br />N.T.S. <br />(SEE SHEETS 7&8) <br />36' 15' <br />91.0 <br />X EXIST. <br />i -3:1 (TYP.) GRADE <br />�- INSTALL ARMOR F X <br />PROTECTION. (TYP.) <br />EMBEDDED 12" MIN. (TYP.) <br />4: 1(TYP . ) <br />SECTION "G" "G" <br />N.T.S. <br />(SEE SHEETS 7&8) <br />3:1 (TYP.) <br />EXIST. <br />1' 4:1(TYP.) GRADE <br />TLENGTH=105' <br />82.0 <br />F. G. <br />12FILL TRENCH WITH CLEAN SAND <br />AS DIRECTED BY THE SOIL ENGINEER. <br />SAND TRENCH DETAIL <br />[� (�(�( %� N.T.S..1 <br />R-VALUE=10 RECORD O D UR/'1� M <br />t Fny P'EfSOr. JS! -^4: '�hoUid VeM <br />o � <br />N Z m <br />3 0 <br />J Q m <br />D <br />41 <br />l Z Z Y: <br />3 S2 u <br />Z o <br />W z <br />W xN <br />o <br />wrno� <br />n N <br />W 0 v <br />m 00 <br />ow�� <br />Q y> t <br />w CD <br />r7J t p <br />rnwaw <br />U <br />o Z <br />O <br />LL Lu <br />Z <br />ZJO Q <br />a�y W <br />O <br />ru <br />m�� W <br />Ld <br />m <br />F - <br />ch Vi z <br />z1 <br />9.2' <br />O <br />o. <br />91.0 <br />ziD <br />O <br />FL. <br />U <br />6" <br />a <br />M <br />z <br />M <br />LL <br />O <br />6„ <br />0o <br />N <br />X <br />CL <br />N <br />F- <br />w <br />w <br />2 <br />a <br />a <br />e <br />#4 <br />BARS @ 12" <br />3 <br />12" 2-1/2" <br />MIN. CLEAR <br />OC <br />BOTH WAYS <br />AROUND <br />ALL REBAR <br />OUTLET <br />WEIR <br />NO.1 <br />N.T.S. <br />OUTLET WEIR NO.2 <br />N.T.S. <br />R <br />7.5' 10' I 5' VARIES <br />z BENCH <br />112" MIN. <br />t <br />NSTALL ARMOR FLEX <br />SLOPE PROTECTION <br />J <br />92.0 � <br />F. S. O <br />0o i 010,���G <br />EXIST. <br />3:1 GRADE <br />(TYP.) <br />_ _91.0 F.L. <br />WEIR <br />HGL 10 =91.4 <br />SECTION "F" "F" <br />N.T.S. <br />(SEE SHEETS 7&8) <br />36' 15' <br />91.0 <br />X EXIST. <br />i -3:1 (TYP.) GRADE <br />�- INSTALL ARMOR F X <br />PROTECTION. (TYP.) <br />EMBEDDED 12" MIN. (TYP.) <br />4: 1(TYP . ) <br />SECTION "G" "G" <br />N.T.S. <br />(SEE SHEETS 7&8) <br />3:1 (TYP.) <br />EXIST. <br />1' 4:1(TYP.) GRADE <br />TLENGTH=105' <br />82.0 <br />F. G. <br />12FILL TRENCH WITH CLEAN SAND <br />AS DIRECTED BY THE SOIL ENGINEER. <br />SAND TRENCH DETAIL <br />[� (�(�( %� N.T.S..1 <br />R-VALUE=10 RECORD O D UR/'1� M <br />t Fny P'EfSOr. JS! -^4: '�hoUid VeM <br />o � <br />N Z m <br />3 0 <br />J Q m <br />D <br />41 <br />l Z Z Y: <br />3 S2 u <br />Z o <br />W z <br />W xN <br />o <br />wrno� <br />n N <br />W 0 v <br />m 00 <br />ow�� <br />Q y> t <br />w CD <br />r7J t p <br />rnwaw <br />U <br />o Z <br />O <br />LL Lu <br />Z <br />ZJO Q <br />a�y W <br />O <br />ru <br />m�� W <br />Ld <br />m <br />F - <br />ch Vi z <br />z1 <br />z <br />Q <br />O <br />ziD <br />O <br />U <br />M <br />z <br />M <br />LL <br />O <br />0o <br />N <br />X <br />CL <br />N <br />F- <br />w <br />w <br />2 <br />