Laserfiche WebLink
EXISTING GROUND <br />FILTER FABRIC (SHALL BE <br />EQUIVALENT TO -TYPAR' <br />3401 WITH MIN, STRENGTH <br />OF 1351 & SIEVE OPENING <br />70-100). <br />EXISTING GROUND <br />3Q� <br />'�. 30° min. + <br />Top of curb <br />rnT <br />Top <br />of % T <br />gutter -�'+ Expansion o <br />Expansion <br />1 Joint <br />joint \ �' <br />Lip of gutter <br />Catchbasin assembly to be set <br />PLAN 1" below flow line of gutter <br />Sidewalk 9 4" throat <br />�2" Min. opening �24"� <br />_ <br />;- co <br />1/2 dia. <br />bolt " <br />Ln <br />Boss to hold x <br />grate in place E E GRATE <br />24" dia. conc.12" dia. N `t <br />pipe (see note min. <br />no. 5) S= .01 min. <br />12" 25 1/2" <br />._._ 6.. <br />SECTION <br />NOTES: <br />1. All exposed steel shall be dipped with PLAN OF FRAME <br />2 coats of coal tar pitch heated to a <br />3" <br />minimum of 180' or galvanized. <br />2. Grate, frame and side inlet shall conform to <br />South Bay Foundry A-645 frame with either A-390 <br />rivited or A -390-M fabricated steel grate. <br />3. Grate shall be chained to frame. <br />4. Grate shall be depressed 1" below gutter <br />profile grade. <br />5. 24' pipe barrel shall be class II R.C.P., or <br />class 2 or 3 non -reinforced concrete pipe. <br />Ne. W.d..a By Awand by <br />TYPE 1 <br />D'^'^ 4JLD CURB INLET CATCHBASIN <br />Chl by COUNTY OF SAN JOAQUIN Dl SEPT. 1991 <br />scow NONE DEPWRDAENT OF PUBLIC WORKS Dm wq D - 13 <br />PROFILE VIEW <br />cm, MTN <br />�- PROVIDE TRANSITION <br />BETWEEN STABILIZED <br />CONSTRUCTION ENTRANCE <br />AND PUBLIC RIGHT-OF-WAY <br />PUBLIC R,O.W, <br />8' MIN. (2'-3') <br />CLEAN CRUSHED ROCK <br />40' MIN. <br />PLAN VIEW <br />STABILIZED CONSTRUCTI❑N ENTRANCE <br />N.T.S. <br />TEMPORARY STABILIZED CONSTRUCTION ENTRANCE <br />DESIGN AND CONSTRUCTI❑N SPECIFICATIONS <br />1. THE MATERIAL FOR CONSTRUCTION OF THE PAD SHALL BE 2 TO 3 INCH STONE, <br />2. THE THICKNESS OF THE PAD SHALL NOT BE LESS THAN 8 INCHES, <br />3. THE WIDTH OF THE PAD SHALL NOT BE LESS THAN THE FULL WIDTH OF <br />ALL POINTS OF INGRESS OR EGRESS. <br />4, THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 50 FEET <br />5. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT <br />TRACKING OR FL❑WING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY <br />REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS <br />DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP <br />SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC <br />RIGHT-OF-WAY SHALL BE REMOVED IMMEDIATELY, <br />6. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO <br />ENTRANCE ONTO PUBLIC RIGHT OF WAY, WHEN WASHING IS REQUIRED, IT SHALL <br />BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INT❑ AN <br />APPROVED SEDIMENT TRAP, OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE <br />PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH OR WATERCOURSE <br />THROUGH USE OF SANDBAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS, <br />7. CONTRACTOR TO REMOVE AND DISPOSE OF STABILIZED CONSTRUCTION ENTRANCE <br />UPON COMPLETION OF CONSTRUCTION, <br />UNAUTHORIZED CHANGES AND USESI <br />THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR <br />LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL <br />CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY <br />THE PREPARER OF THESE PLANS. <br />3/4" DIA. <br />I <br />X5/8" 5/8!i -I -� <br />3 7/16" �- - 19"--I 3 7/16" <br />25 7/8" <br />HOOD <br />24" <br />GRATE <br />HOOP <br />1 1/4 <br />3 1/ <br />5 1/4 <br />5/8� <br />END VIEW OF HOOD <br />SECTION A <br />NOTES: <br />' <br />1. <br />FRAME AND HOOD A <br />A <br />c IMU <br />BOLT FOR <br />2) THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE NYLON, POLYESTER, OR ETHYLENE FABRIC WITH <br />A MIN, TENSILE STRENGTH OF 50 LBS. PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GRATER THAN 20 SIEVE AND WITH <br />A MIN, FLOW RATE OF 40 GALLONS/ MINUTE/ SOFT. <br />3) THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY EXISTING INLET GRATE, PROVIDED NO MODIFICATION OR <br />DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME, THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 1,3CM <br />(,5') ABOVE THE INLET FRAME (SEE DETAIL A ) <br />4) THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED. <br />5) FLOWS SHALL NOT BE ALLOWED TO BYPASS THE FILTER BAG, THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF <br />THE INLET EXCEPT AS SHOWN FOR FLOOD RELEASE <br />6) INLET FILTERBAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT DURING THE WET SEASON AND MONTHLY <br />DURING THE DRY SEASON, SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE <br />DEPTH IF THE BAG, BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS, <br />STORM DRAINAGE SYSTEM CONSTRUCTION NOTES, <br />STANDARD <br />OF CAST IRON CONFORMING <br />°i <br />CHAIN <br />TO ASTM A -48 -CLASS 30. <br />VALVE BOX <br />2. <br />M <br />a 4"CLEARANCE <br />QROFESS/p4 <br />SHALL BE HS20-44 RATED. 33" <br />Na IN <br />N N <br />NOTES: <br />' <br />1. <br />FRAME AND HOOD A <br />A <br />20" MAX, 1- <br />SHALL BE MANUFACTURED <br />2) THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE NYLON, POLYESTER, OR ETHYLENE FABRIC WITH <br />A MIN, TENSILE STRENGTH OF 50 LBS. PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GRATER THAN 20 SIEVE AND WITH <br />A MIN, FLOW RATE OF 40 GALLONS/ MINUTE/ SOFT. <br />3) THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY EXISTING INLET GRATE, PROVIDED NO MODIFICATION OR <br />DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME, THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 1,3CM <br />(,5') ABOVE THE INLET FRAME (SEE DETAIL A ) <br />4) THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED. <br />5) FLOWS SHALL NOT BE ALLOWED TO BYPASS THE FILTER BAG, THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF <br />THE INLET EXCEPT AS SHOWN FOR FLOOD RELEASE <br />6) INLET FILTERBAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT DURING THE WET SEASON AND MONTHLY <br />DURING THE DRY SEASON, SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE <br />DEPTH IF THE BAG, BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS, <br />STORM DRAINAGE SYSTEM CONSTRUCTION NOTES, <br />STANDARD <br />OF CAST IRON CONFORMING <br />REQUIREMENTS. <br />8 <br />TO ASTM A -48 -CLASS 30. <br />VALVE BOX <br />2. <br />FRAME, GRATE, AND HOOD <br />a 4"CLEARANCE <br />QROFESS/p4 <br />SHALL BE HS20-44 RATED. 33" <br />y <br />3. <br />GRATE SHALL BE RIVITED STEEL, PLAN OF FRAME <br />SHEET <br />HOT -DIPPED GALVANIZED AND CHAINED TO <br />PLANNING ENGINEERING SURVEYING <br />I <br />MECHANICAL <br />FRAME WITH 18" OF 1/4" HEAT-TREATED CHAIN. <br />STATE <br />4. <br />FRAME AND HOOD SHALL BE <br />' <br />4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA <br />SCALD AS SHOWN <br />COATED WITH BITUMINOUS <br />PERMIT <br />Q <br />MATERIAL CONFORMING TO <br />(209)476-0011 <br />4. <br />A.W.W.A. C203. <br />/ <br />5 <br />5. <br />FRAME SHALL WEIGH 154 LBS., <br />� <br />GRATE SHALL WEIGH 42 LBS., <br />OF SIX <br />HOOD SHALL WEIGH 100 LBS. <br />����/*_}'_-�� <br />6. <br />COUNTRY OF ORIGIN AND MANUFACTURER SHALL BE CAST INTO FRAME AND HOOD. <br />REVISION DATE <br />COUNTYWIDE IMPROVEMENT STANDARDS <br />COUNTY OF SAN JOAQUIN <br />APPROVED BY <br />FRAME & GRATE <br />SAN JOAQUIN COUNTY DATE <br />TYPE 1 CURB INLET <br />CATCHBASIN <br />DIRECTOR OF PUBLIC WORKS <br />P <br />IMPROVEMENT CW -M9 <br />STANDARD NO. <br />EROSION CONTROL DETAILS <br />2' X 4' - 4' LONG WOOD <br />STAKE 2 PER BALE ❑R <br />4' LONG #4 REBAR <br />/STAKED AND ENTRENCHED <br />STRAW BALE <br />BINDING WIRE <br />❑R TWINE SEDIMENT LADEN RUN-OFF <br />FILTERED RUN-OFF <br />COMPACTED SOIL TO <br />/),-- <br />PREVENT RUN-OFF <br />ZI ER❑SI❑N CONTROL NOTES, <br />1, CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS FOR EROSION, <br />AND STORM WATER C❑TR <br />TYPICAL STRAW <br />BALE DETAIL <br />-� 3 I STRAW BALE (TYPJ <br />- T2' <br />STAKED PER TYPICAL T <br />STRAW BALE DETAIL .` I <br />TYPICAL INLET DETAIL <br />N.T.S. <br />REVISIONS <br />HYDRANT <br />PUMPER OUTLET FACING STREET <br />16" MIN. 2" MIN. <br />4" MAX. <br />' <br />STORM DRA/N INLET F/L TER BAG NOTES' <br />DISCHARGE ELIMINATION SYSTEM BEST MANAGEMENT PRACTICE REQUIREMENTS. <br />1) <br />20" MAX, 1- <br />7 <br />2) THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE NYLON, POLYESTER, OR ETHYLENE FABRIC WITH <br />A MIN, TENSILE STRENGTH OF 50 LBS. PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GRATER THAN 20 SIEVE AND WITH <br />A MIN, FLOW RATE OF 40 GALLONS/ MINUTE/ SOFT. <br />3) THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY EXISTING INLET GRATE, PROVIDED NO MODIFICATION OR <br />DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME, THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 1,3CM <br />(,5') ABOVE THE INLET FRAME (SEE DETAIL A ) <br />4) THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED. <br />5) FLOWS SHALL NOT BE ALLOWED TO BYPASS THE FILTER BAG, THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF <br />THE INLET EXCEPT AS SHOWN FOR FLOOD RELEASE <br />6) INLET FILTERBAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT DURING THE WET SEASON AND MONTHLY <br />DURING THE DRY SEASON, SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE <br />DEPTH IF THE BAG, BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS, <br />STORM DRAINAGE SYSTEM CONSTRUCTION NOTES, <br />STANDARD <br />SPECIFICATIONS AND STANDARD PLANS FOR MATERIALS AND INSTALLATION <br />REQUIREMENTS. <br />8 <br />VALVE BOX <br />CONTRACTOR SHALL PREVENT POSSIBLE STORM WATER POLLUTION <br />STORM DRAINAGE <br />FROM ENTERING <br />a 4"CLEARANCE <br />QROFESS/p4 <br />W ❑ N G ENGINEERS, INC, <br />"T" <br />CATCH BASINS DURING CONSTRUCTION. <br />SAN JOAQUIN COUNTY, <br />SHEET <br />HYDRANT <br />PLANNING ENGINEERING SURVEYING <br />I <br />MECHANICAL <br />JOINT <br />STATE <br />WATER RESOURCES <br />' <br />4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA <br />SCALD AS SHOWN <br />CONTROL BOARD (SWRCB) ORDER NO. 99-08-DWQ, NPDES GENERAL <br />PERMIT <br />Q <br />- <br />(209)476-0011 <br />4. <br />� <br />/ <br />5 <br />IT <br />� <br />OF SIX <br />����/*_}'_-�� <br />THRUST BLOCK <br />❑ <br />FILE <br />CONCRETE BLOCK -� THRUST <br />SECTION GATE VALVE BLOCK <br />NOTES: <br />1. HYDRANT MODEL TO BE APPROVED BY AGENCY. <br />2. SEE STANDARDS FOR LOCATION OF HYDRANT. <br />3. HYDRANTS SHALL BE CLEAN AND FREE OF CONCRETE. <br />4. HYDRANTS SHALL BE PAINTED YELLOW, IN ACCORDANCE WITH AGENCY STANDARDS. <br />5 6" DIA. PVC PIPE (AWWA C-900 WITH CIP EQUIVALENT O.D.) <br />6 FIRE HYDRANT LATERALS GREATER THAN 100 LF, SHALL HAVE A GATE VALVE INSTALLED <br />NEAR THE FIRE HYDRANT AS APPROVED BY THE AGENCY. <br />❑7 BREAK AWAY SPOOL WITH HOLLOW BREAK -OFF BOLTS WITH NUT ON BOTTOM AT <br />CONNECTION TO HYDRANT. <br />® EXPANSION JOINT MATERIAL WHERE HYDRANT IS PLACED IN CONCRETE. <br />REVISION I DATE COUNTYWIDE IMPROVEMENT STANDARDS APPROVED BY <br />COUNTY OF SAN JOAQUIN <br />SAN JOAQUIN COUNTY DATE <br />FIRE HYDRANT DIRECTOR OF PUBLIC WORKS JUNE 1997 <br />ASSEMBLY IMPROVEMENT CW -W18 <br />STANDARD N0. <br />5 CM (2) EX/ST/NG L <br />EXISTING OPEN MIN/MUM /NL ET GRA <br />BACK HOOD PERFORA TED 4 " PVC <br />CURB <br />DETAIL A <br />d. <br />5CM(2) <br />MIN/MUM <br />AT BACK <br />(FL OOD <br />RELEASE) <br />MAXIMUM/ <br />BAG WIDTH <br />MINIMUM <br />I BAG WIDTH <br />\ (BACK OF <br />GRA TE) / <br />CONTACT <br />A T FRONT <br />AND SIDES <br />CONTACT <br />ALL SIDES <br />DETAIL A <br />OUTLET PIPE OUTLET PIPE <br />STORM DRA/N INLET f TER BAG <br />NO SCALE <br />EXISTING DROP <br />INLET GRA -- <br />FIL TER <br />FRAME <br />(OPTIONAL) <br />1.3 CU 5') <br />MAXIMUM <br />EXISTING DROP <br />INLET GRATE <br />DETAIL "A " <br />NO SCALE <br />OL LAWS AND REGULATIONS IN EFFECT AT TIME <br />OF CONSTRUCTION, SUCH AS BUT NOT LIMITED TO THE NATIONAL POLLUTION <br />AND EROSION CONTROL PERMIT COMPLETED. <br />STORM DRA/N INLET F/L TER BAG NOTES' <br />DISCHARGE ELIMINATION SYSTEM BEST MANAGEMENT PRACTICE REQUIREMENTS. <br />1) <br />THE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 2 ACRES, <br />FE -R-11 STRAW BALE DIKE <br />CONSTRUCTIONSPECIFICATIONS: <br />1. BALES SHALLLLBBE <br />E PLACED INA ROW WITH ENDS TIGHTLY ABUTTING. <br />2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM ❑F 4 INCHES, <br />3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES OR <br />REBAR DRIVEN THROUGH THE BALES. THE FIRST STAKE IN EACH BALE <br />SHALL BE DRIVEN TOWARD THE PREVI❑SLY LAID BALE TO FORCE <br />THE BALES TOGETHER. <br />4, THE DIKE SHALL BE INSPECTED AFTER EACH STORM, AND REPAIR OR <br />REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED, <br />5. BALES SHALL BE REMOVED WHEN THEY SERVED THEIR PURPOSE <br />S❑ AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE, <br />2) THE FILTER BAG SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE NYLON, POLYESTER, OR ETHYLENE FABRIC WITH <br />A MIN, TENSILE STRENGTH OF 50 LBS. PER LINEAL FOOT, AN EQUIVALENT OPENING SIZE NOT GRATER THAN 20 SIEVE AND WITH <br />A MIN, FLOW RATE OF 40 GALLONS/ MINUTE/ SOFT. <br />3) THE FILTER BAG MAY BE SUSPENDED FROM OR HELD IN PLACE BY EXISTING INLET GRATE, PROVIDED NO MODIFICATION OR <br />DAMAGE SHALL BE DONE TO THE INLET GRATE OR FRAME, THE INLET GRATE SHALL NOT BE CAUSED TO REST MORE THAN 1,3CM <br />(,5') ABOVE THE INLET FRAME (SEE DETAIL A ) <br />4) THE FILTER BAG MAY EXTEND TO THE BOTTOM OF THE INLET BOX PROVIDED THE OUTLET PIPE IS UNOBSTRUCTED. <br />5) FLOWS SHALL NOT BE ALLOWED TO BYPASS THE FILTER BAG, THE BAG OR ITS FRAME SHALL CATCH FLOWS AT ALL SIDES OF <br />THE INLET EXCEPT AS SHOWN FOR FLOOD RELEASE <br />6) INLET FILTERBAGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT DURING THE WET SEASON AND MONTHLY <br />DURING THE DRY SEASON, SEDIMENT AND DEBRIS SHALL BE REMOVED BEFORE ACCUMULATIONS HAVE REACHED ONE THIRD THE <br />DEPTH IF THE BAG, BAGS SHALL BE REPAIRED OR REPLACED AS SOON AS DAMAGE OCCURS, <br />STORM DRAINAGE SYSTEM CONSTRUCTION NOTES, <br />I NO. DESCRIPTION J DATE I BY I <br />W HIN THESE PLANS cu <br />W N0. 14,269 m n°Fly ARE TO BE CONSIDERED AS 'REFERENCE DETAILS' ONLY AND THE CITY'S APPROVAL OF THESE <br />Or EXPIRES: 3-31-20053,... ' , {�"'-"O PLANS AND 'REFERENCE DETAILS' DOES NOT RELIEVE THE OWNER/DEVELOPER FROM COMPLIANCE < Qom' <br />WITH THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AS APPROVED BY THE CITY'S <br />CIVIL <br />STORMWATER DIVISION, a <br />�Tqj P SCO5. IN ADDITION TO ALL THE OTHER REQUIRED PERMITS, THE CONTRACTOR SHALL HAVE A GRADING NwQ <br />F OF CAUFO <br />AND EROSION CONTROL PERMIT COMPLETED. <br />1, <br />STORM DRAINAGE PIPES AND MAINTENANCE HOLES SHALL CONFORM <br />TO THE <br />SAN JOAQUIN COUNTY <br />6. PROJECT UNDER 5.00 ACRES; THEREFORE, NO <br />SWPPP NUMBER REQUIRED FOR THIS PROJECT, <br />SPECIFICATIONS AND STANDARD PLANS FOR MATERIALS AND INSTALLATION <br />REQUIREMENTS. <br />llo <br />2. <br />CONTRACTOR SHALL PREVENT POSSIBLE STORM WATER POLLUTION <br />STORM DRAINAGE <br />FROM ENTERING <br />INT❑ <br />QROFESS/p4 <br />W ❑ N G ENGINEERS, INC, <br />JOB 13338 TRACT 3172 <br />CATCH BASINS DURING CONSTRUCTION. <br />SAN JOAQUIN COUNTY, <br />SHEET <br />��O C CHANCE µ.ON�(� <br />PLANNING ENGINEERING SURVEYING <br />I <br />3. <br />THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE <br />STATE <br />WATER RESOURCES <br />' <br />4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA <br />SCALD AS SHOWN <br />CONTROL BOARD (SWRCB) ORDER NO. 99-08-DWQ, NPDES GENERAL <br />PERMIT <br />NO. CAS000002, <br />- <br />(209)476-0011 <br />4. <br />ANY AND ALL SEDIMENT AND/OR EROSION CONTROL DETAILS CONTAINED <br />SHEET <br />IT <br />W HIN THESE PLANS cu <br />W N0. 14,269 m n°Fly ARE TO BE CONSIDERED AS 'REFERENCE DETAILS' ONLY AND THE CITY'S APPROVAL OF THESE <br />Or EXPIRES: 3-31-20053,... ' , {�"'-"O PLANS AND 'REFERENCE DETAILS' DOES NOT RELIEVE THE OWNER/DEVELOPER FROM COMPLIANCE < Qom' <br />WITH THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AS APPROVED BY THE CITY'S <br />CIVIL <br />STORMWATER DIVISION, a <br />�Tqj P SCO5. IN ADDITION TO ALL THE OTHER REQUIRED PERMITS, THE CONTRACTOR SHALL HAVE A GRADING NwQ <br />F OF CAUFO <br />AND EROSION CONTROL PERMIT COMPLETED. <br />a C:� LJ <br />6. PROJECT UNDER 5.00 ACRES; THEREFORE, NO <br />SWPPP NUMBER REQUIRED FOR THIS PROJECT, <br />llo <br />CL <br />W ❑ N G ENGINEERS, INC, <br />JOB 13338 TRACT 3172 <br />SAN JOAQUIN COUNTY, <br />SHEET <br />PLANNING ENGINEERING SURVEYING <br />I <br />DATEI JULY 2002 MICHAEL <br />ESTATES <br />CALIFORNIA <br />' <br />4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA <br />SCALD AS SHOWN <br />4 <br />(209)476-0011 <br />NI <br />DRAWSE <br />ER❑SI❑N C❑NTR❑L/DETAIL <br />SHEET <br />DATEI 8-7-2002 DESIGNI <br />OF SIX <br />����/*_}'_-�� <br />R.C.E. 14269 CHECKEDI ZCW <br />FILE <br />