Laserfiche WebLink
SEE TECHNICAL SPECIFICATI❑NS FOR AGGREGATE BASE AND ASPHALT CONCRETE <br />TO BE C❑NST, <br />LEGEND <br />DESCRIPTI❑N <br />EXISTING <br />OO <br />MONUMENT FRAME & COVER <br />O <br />D.I.P. <br />DUCTILE IRON PIPE <br />CATCH BASIN <br />C.L. <br />CENTERLINE <br />- <br />- <br />EP <br />EDGE OF PAVEMENT <br />(N) <br />NORTH <br />(S) <br />CURB, GUTTER & SIDEWALK <br />(E) <br />EAST <br />(W) <br />WITH HANDICAP RAMP <br />— — — — <br />FLOW LINE <br />AGGREGATE BASE <br />FIRE HYDRANT <br />INV. <br />INVERT <br />SURVEY MONUMENT <br />f <br />S.P.N. <br />DRIVEWAY <br />Z S = <br />SANITARY SEWER MAINTENANCE HOLE <br />TC <br />TOP OF CURB <br />FENCE <br />TYPICAL <br />TBM <br />A. 1* 1* A, w <br />100 WATT ELECTROLIER <br />0_0 <br />�- pp <br />UTILITY POLE <br />--o-PP <br />RIGHT -❑F -WAY <br />TELEPHONE CABLE <br />—T— — <br />T <br />TV <br />CABLE TELEVISION <br />— —T V— — <br />8' W — <br />WATER LINE – <br />–28 } – <br />WATER VALVE <br />WATER BLOWOFF <br />— --0 <br />FH <br />FIRE HYDRANT <br />WATER SERVICE <br />— —�— — <br />FYI <br />WATER METER <br />12'S <br />SEWER LINE — <br />—=I 2S — <br />SANITARY MAINTENANCE HOLE <br />0 <br />SANITARY MAIN CLEAN OUT <br />— __x <br />SEWER LATERAL- <br />24'D�-- <br />STORM DRAIN LINE — <br />—=2 4'D — <br />STORM MAINTENANCE HOLE <br />O <br />CURB INLET OR CATCH BASIN <br />E� <br />GAS LINE <br />G <br />G <br />G-/4 <br />GAS VALVE <br />G -P^_ <br />19.8 <br />PAD GRADE <br />GRADING NOTES, <br />1, LUMIUM BID FOR GRADING AND LAND STABILIZATION SHALL INCLUDE EXCAVATION <br />AND `ILL OF PAVED AREAS WITHIN THE SITE AND ANY EXCESS EXCAVATION SHALL <br />BE DISPOSED OF BY THE CONTRACTOR. <br />2. EARTHWORK: THE CONTRACTOR SHALL EXCAVATE, FILL AND GRADE THE PROJECT SITE <br />IN ORDER THAT SITE IMPROVEMENTS CAN BE CONSTRUCTED TO THE GRADES AND <br />SLOPES SHOWN ON THESE PLANS, ALTHOUGH NO ATTEMPT HAS BEEN MADE TO <br />BALANCE EARTH CUT AND FILL QUANTITIES, DUE TO THE APPROXIMATIONS OF <br />EXISTING GRADES AND OTHER CONDITIONS NOT PRECISELY KNOWN THE ENGINEER <br />DOES NOT GUARANTEE THAT SUCH CUT AND FILL QUANTITIES WILL BALANCE, AS <br />EARTH WORK OPERATIONS PROGRESS, MINOR ADJUSTMENTS IN GRADES MAY BE MADE <br />IN ORDER TO BRING THE CUT AND FILL QUANTITIES MORE IN BALANCE, BUT SUCH <br />CHANGES CAN ONLY BE MADE AFTER APPROVAL OF THE OWNER AND THE ENGINEER, <br />THE COST OF SUCH ADJUSTMENTS SHALL BE PAID BY THE CONTRACTOR AND NO <br />EXTRA PAYMENT WILL BE ALLOWED, ANY SURPLUS EARTH MATERIAL SHALL BE <br />DISPOSED OF AS DIRECTED BY THE ENGINEER AT THE CONTRACTOR'S EXPENSE. <br />ANY ADDITIONAL EARTH MATERIAL NEEDED TO COMPLETE THE ONSITE GRADING SHALL <br />BE PROVIDED AND PAID FOR BY THE CONTRACTOR, ANY FILL PLACED SHALL BE <br />PROPERLY COMPACTED AS REQUIRED BY THE PLANS AND THESE SPECIFICATI❑N& <br />A. EARTH FILL TO ESTABLISH PAVED AREA SUBGRADE SHALL BE <br />COMPACTED TO A MINIMUM RELATIVE COMPACTION OF 90% EXCEPT <br />THAT THE AREA WITHIN 6' BELOW SUBGRADE SHALL BE COMPACTED TO A <br />MINIMUM RELATIVE COMPACTION OF 95% <br />B. EARTH FILL TO ESTABLISH FINISHED GRADE OUTSIDE THE PAVED AREAS <br />SHALL BE COMPACTED TO A MINIMUM RELATIVE COMPACTION OF 80% <br />C. FILL AND COMPACTION IN THE BUILDING AREA SHALL BE IN <br />ACCORDANCE WITH THE UNIFORM BUILDING CODE. <br />CONTRACTOR TO PERFORM COMPACTION TESTS TO CONFORM TO SECTION 2(A -C) <br />3. ALL GRADING SHALL COMPLY WITH 1997 U,B,C, CHAPTER 18 AND APPENDIX CHAPTER 33. <br />4, NO SLOPE SHALL BE STEEPER THAT 2 HORIZONTAL TO 1 VERTICAL. <br />5, REFER TO GEOTECHNICAL INVESTIGATION REPORT BY KLEINFELDER (FILE NO. 20-3470-01) <br />TO DETERMINE LOT GRADING, SITE PREPARATION AND FOUNDATION RECOMMENDATION, <br />SANITARY SEWER ONLY <br />Agee ED <br />200L <br />FINBARR J. O'REGAN, CITY ENGIN <br />CITY OF STOCKTON <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED ,i�lL ilii_<� <br />SENIOR CIVIL ENGINEER DATE <br />R.C.E. NO. 33 17 Z EXP, DATE: <br />COUNTY OF SAS� JOAQUIN <br />DEPARTMENT MFjPUBLIC WORKS <br />APPROVED <br />DIRECT F PUBLIC WORKS DATE <br />R.C,E. NO, 2:rjt/ EXP. DATE: <br />APPROVED 200 s <br />STEVE DALTON <br />SAN JOAQUIN FIRE BUREAU OF FIRE PROTECTION <br />APPROVED BY, MONTtZUMA FIRE DISTRICT <br />SIGNATURE DATE <br />APPROVED �' �, �� k 200– <br />CALIFORNIA WATER SERVICE <br />REFER TO CALIFORNIA WATER SERVICE PLAN <br />(FACILITIES -STK 8191) <br />DESCRIPTION <br />MICHAEL ESTATES IMPROVEMENT PLANS <br />CHARTER WAY <br />W <br />LJ <br />3 � <br />EIGHTH` <br />STREET <br />BENCHMARK <br />NO. 175 <br />� U <br />E7 <br />ED T.B.M. O_ <br />E $ THIRTEENTH ST, <br />SIT <br />Q IMICHAEL AVE. <br />RALPH AVE, Fz <br />—DUCK G <br />VICINITY MAP <br />NOT TO SCALE <br />• <br />.• <br />ellikKi <br />A.C. <br />ASPHALTIC CONCRETE <br />A.B. <br />AGGREGATE BASE <br />C,B, <br />CATCH BASIN <br />C.L. <br />CENTER LINE <br />CONST. <br />CONSTRUCT <br />C.D.s. <br />CITY OF STOCKTON <br />(N) <br />NORTH <br />(S) <br />SOUTH <br />(E) <br />EAST <br />(W) <br />WEST <br />F.L. <br />FLOW LINE <br />F.H. <br />FIRE HYDRANT <br />INV. <br />INVERT <br />SDMH <br />STORM DRAIN MAINTENANCE HOLE <br />S.P.N. <br />STANDARD PLAN NUMBER <br />SSMH <br />SANITARY SEWER MAINTENANCE HOLE <br />TC <br />TOP OF CURB <br />(TYP.) <br />TYPICAL <br />TBM <br />TEMPORARY BENCHMARK <br />BM <br />BENCHMARK <br />D.I.P. <br />DUCTILE IRON PIPE <br />R.O.W. <br />RIGHT -❑F -WAY <br />N.T.S. <br />NOT TO SCALE <br />CITY OF STOCKT❑N—SANITARY SEWER N❑TES1 <br />1, SANITARY SEWER IMPROVEMENTS SHOWN SHALL BE CONSTRUCTED IN <br />STRICT ACCORDANCE WITH THE CITY OF STOCKTON STANDARD <br />SPECIFICATIONS AND PLANS, 2002 EDITION, AND AMENDMENTS TO DATE, <br />SANITARY SEWER LINE WORK SHALL BE DONE UNDER THE INSPECTION <br />OF THE CITY OF STOCKTON PUBLIC WORKS DEPARTMENT OR BUILDING <br />DEPARTMENT, TRENCHING AND BACKFILL SHALL BE DONE UNDER THE <br />INSPECTION OF THE CITY OF STOCKTON AND SAN JOAQUIN COUNTY <br />AND SHALL COMPLY WITH THE SAN JOAQUIN COUNTY STANDARDS. <br />2. THE CONTRACTOR SHALL CONTACT KEN MOECKEL AT 937-8381 AT <br />THE CITY OF STOCKTON AND SAN JOAQUIN COUNTY REPRESENTATIVE <br />FOR A PRECONSTRUCTION CONFERENCE 72 HRS IN ADVANCE. <br />3. CONTRACTOR TO OBTAIN PERMIT FROM THE CITY OF STOCKTON FOR <br />CONSTRUCTION OF THE SANITARY SEWER IMPROVEMENTS. <br />1. STORM DRAINAGE1 SAN JOAQUIN COUNTY <br />2. STREET LIGHTING: ASH STREET LIGHTING MAINTENANCE DISTRICT <br />3. ELECTRICITY: P•G.&E, <br />4, NATURAL GAS: P,G,&E. <br />5. TELEPHONE: PACIFIC BELL <br />6. SANITARY SEWER: CITY OF STOCKTON <br />7. WATER; CALIFORNIA WATER SERVICE COMPANY <br />UNAUTHORIZED CHANGES AND USES, <br />THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR <br />LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL <br />CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY <br />THE PREPARER OF THESE PLANS. <br />H <br />z <br />W N0. 14,269 <br />K EXPIRES. 3-31-2005 <br />COUNTY APPROVAL WONG ENGINEERS, INC, <br />APPROVED BY DATE I ' g PLANNING ENGINEERING SURVEYING <br />}`J{ 4578 FEATHER RIVER DRIVE, SUITE A <br />STOCKTON, CALIFORNIA <br />(209)476-0011 <br />OF CA\-\ <br />V <br />B -Il -o3 <br />800-227-2600 <br />�, 48 HOURS PR/OR TO WORK <br />GENERAL N❑TESi <br />1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH COUNTY OF <br />SAN JOAQUIN STANDARD SPECIFICATION AND PLANS, 1997 EDITION, AND ALL <br />AMENDMENTS THERETO TO DATE. ALL WORK SHALL BE DONE UNDER THE <br />INSPECTION OF THE COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS OR <br />BUILDING DEPARTMENT. <br />2, ELEVATIONS SHOWN ARE 1929 NGVD DATUM (CITY OF STOCKTON BENCHMARK), <br />BENCHMARK IS AS SHOWN ON SHEET 2. <br />3, DRAWING NUMBERS SHOWN ON PLAN REFER TO COUNTY OF SAN JOAQUIN STANDARD <br />DETAILS. <br />4, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FROM DAMAGE ALL <br />EXISTING IMPROVEMENTS THAT ARE TO REMAIN, SUCH IMPROVEMENTS THAT ARE <br />DAMAGED BY THE CONTRACTOR, SHALL BE REPLACED AT HIS EXPENSE. <br />5. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE COUNTY OF SAN <br />J❑AQUIN PUBLIC WORKS DEPARTMENT, AND SHALL NOTIFY COUNTY 24 HOURS IN <br />ADVANCE OF PERFORMING ANY WORK REQUIRED WITHIN THE PUBLIC RIGHT -❑F -WAY, <br />6. WORK IN STREET RIGHT-OF-WAY IS SUBJECT T❑ THE APPROVAL AND ACCEPTANCE OF <br />THE COUNTY OF SAN JOAQUIN PUBLIC WORKS DEPARTMENT, <br />7, CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE AND DISPOSE OF ANY EXISTING <br />CONCRETE OR ASPHALT CONCRETE PAVING, CONCRETE CURB, GUTTER AND SIDEWALK <br />AND DELETERIOUS MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT WORK, ALL <br />EXCESS MATERIAL GENERATED BY DEMOLITION, EXCAVATION AND GRADING SHALL BE <br />DISPOSED OF BY THE CONTRACTOR, <br />8. EXCAVATION OF 5' OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM <br />THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. <br />9. THE PRICE BID FOR THIS WORK SHALL INCLUDE THE COST FOR ANY AND ALL <br />PERMITS REQUIRED TO COMPLETE THE PROJECT WORK. <br />10, EXISTING UTILITIES ARE SHOWN AS THEY ARE BELIEVED TO EXIST. THE OWNER <br />AND THE ENGINEER D❑ NOT ACCEPT RESPONSIBILITY FOR THEIR ACCURACY, PRIOR <br />TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />LOCATE THE EXISTING MAIN AND SERVICE LINES. <br />11. PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS SHOWN ON THE PLANS. <br />REPLACEMENT OF PAVEMENT WHICH IS BROKEN OR CUT IN THE INSTALLATION OF THE <br />WORK COVERED IN THESE SPECIFICATIONS, AND WHICH LIES OUTSIDE OF SAID <br />AREAS, SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE OF PAVEMENT, AND <br />NO ADDITIONAL PAYMENT SHALL BE MADE FOR SUCH WORK. <br />12. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />FOR JOBSITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, <br />INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT <br />SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND <br />THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, COUNTY <br />AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN <br />CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR <br />LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER, <br />13, WE CALL YOUR ATTENTION TO: SECTION 1540(a)(1) OF THE CONSTRUCTION <br />SAFETY ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), <br />ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS, BOARD PURSUANT <br />TO THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS <br />AMENDED, WHICH STATESI 'PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE <br />MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I,E, SEWER, WATER, <br />FUEL, ELECTRIC LINES, ETC, WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH <br />UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES <br />THE APPROXIMATE LOCATION OF SUCH INSTALLATION, THE EXACT LOCATION SHALL <br />BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING, AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING <br />INSTALLATI❑N, ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE <br />AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS <br />PRIOR TO THE START OF ACTUAL EXCAVATI❑N', <br />14, PRIOR TO FINAL INSPECTION CONTRACTOR SHALL SUBMIT AS -BUILT INFORMATION <br />FOR ANY CHANGES TO WONG ENGINEERS, INC, <br />15. DUST CONTROL SHALL BE PERFORMED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, <br />TO MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF <br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />THE CONTRACTOR SHALL OBTAIN A PERMIT OR PERMISSION FROM THE CALIFORNIA WATER <br />SERVICE COMPANY FOR USE OF WATER FROM FIRE HYDRANTS FOR CONSTRUCTION <br />PURPOSES. THE PERMIT OR APPROVAL SHALL BE APPROVED BY THE FIRE DEPARTMENT. <br />16, A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED ACCEPTABLE BY <br />COUNTY PRIOR TO START OF WORK. THIS SHALL ADDRESS ALL PHASES OF WORK, WHICH <br />WILL IMPACT PUBLIC TRAFFIC. CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL <br />TIMES. <br />17, ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO THE 'MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES AND SAN JOAQUIN COUNTY STANDARDS' AND AS SHOWN ON THE PLANS. <br />CONSTRUCTION STAKINGI <br />1. CONSTRUCTION STAKING IS NORMALLY PERFORMED BY THE ENGINEER WHO PREPARED <br />THE PLAN. THIS PERMITS APPROPRIATE ON-SITE INTERPRETATION AND ADJUSTMENT <br />OF THE PLANS, IF NECESSARY. THIS NOTE GIVES FORMAL NOTICE THAT THE FIRM <br />OF WONG ENGINEERS, INC., CANNOT AND WILL NOT, TAKE RESPONSIBILITY FOR <br />ERRORS OR ❑MISSIONS, IF ANY, WHICH MIGHT OCCUR AND WHICH COULD HAVE BEEN <br />AVOIDED OR DETECTED AND/OR CORRECTED AND MITIGATED HAD WONG ENGINEERS, <br />2 INC„ PERFORMED THE CONSTRUCTION STAKING WORK. <br />ALL REFERENCES TO CONTRACTOR SHALL MEAN CONTRACTOR FOR SITEWORK SHOWN <br />3 ON THESE CIVIL PLANS ONLY, <br />IF WONG ENGINEERS, INC. IS RETAINED TO D❑ THE CONSTRUCTION STAKING, WONG <br />ENGINEERS, INC. WILL SET ALL STAKES AND PROVIDE CUT SHEETS FOR THIS <br />PROJECT, IT IS EXPECTED THAT ONE SET OF STAKES WILL BE SUFFICIENT FOR <br />EACH PHASE OF THE PROJECT. CARE SHOULD BE TAKEN TO PROTECT STAKES, THE <br />COST OF STAKING IS BORNE BY THE DEVELOPER. THE CONTRACTOR SHALL REQUEST <br />STAKES FROM WONG ENGINEERS, INC, WHEN HE IS READY TO USE THEM AND SHALL <br />BE RESPONSIBLE FOR THEIR PRESERVATION FOR HIS FUTURE USE. SAID REQUEST <br />MUST BE MADE AT LEAST 72 HOURS PRIOR TO THE TIME THE STAKES WILL BE <br />REQUIRED. SHOULD THE WORK NEED TO BE RESTAKED, FOR THE CONTRACTOR'S USE, <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO WONG ENGINEERS, INC. FORTHECOST <br />OF RESTAKING, SHOULD THE CONTRACTOR DESTROY STAKES WHICH ARE NEEDED <br />FOR IMPROVEMENTS OTHER THAN HIS OWN, HE SHALL ALSO BE RESPONSIBLE FOR THE <br />COST OF RESTAKING TO RETURN THE JOB TO ITS ORIGINAL CONDITION, <br />ASSESSOR'S <br />JOB NO., <br />3338 <br />REFER <br />DATE: <br />JULY 2002 <br />SHEET <br />SCALE: <br />NONE <br />SHEET <br />DRAWNs <br />WMK/SE <br />DATE 8-7-2002 <br />DESIGN: <br />WE <br />R.C.E. 14269 <br />CHECKED, <br />ZCW <br />GENERAL N❑TESi <br />1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH COUNTY OF <br />SAN JOAQUIN STANDARD SPECIFICATION AND PLANS, 1997 EDITION, AND ALL <br />AMENDMENTS THERETO TO DATE. ALL WORK SHALL BE DONE UNDER THE <br />INSPECTION OF THE COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS OR <br />BUILDING DEPARTMENT. <br />2, ELEVATIONS SHOWN ARE 1929 NGVD DATUM (CITY OF STOCKTON BENCHMARK), <br />BENCHMARK IS AS SHOWN ON SHEET 2. <br />3, DRAWING NUMBERS SHOWN ON PLAN REFER TO COUNTY OF SAN JOAQUIN STANDARD <br />DETAILS. <br />4, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FROM DAMAGE ALL <br />EXISTING IMPROVEMENTS THAT ARE TO REMAIN, SUCH IMPROVEMENTS THAT ARE <br />DAMAGED BY THE CONTRACTOR, SHALL BE REPLACED AT HIS EXPENSE. <br />5. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE COUNTY OF SAN <br />J❑AQUIN PUBLIC WORKS DEPARTMENT, AND SHALL NOTIFY COUNTY 24 HOURS IN <br />ADVANCE OF PERFORMING ANY WORK REQUIRED WITHIN THE PUBLIC RIGHT -❑F -WAY, <br />6. WORK IN STREET RIGHT-OF-WAY IS SUBJECT T❑ THE APPROVAL AND ACCEPTANCE OF <br />THE COUNTY OF SAN JOAQUIN PUBLIC WORKS DEPARTMENT, <br />7, CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE AND DISPOSE OF ANY EXISTING <br />CONCRETE OR ASPHALT CONCRETE PAVING, CONCRETE CURB, GUTTER AND SIDEWALK <br />AND DELETERIOUS MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT WORK, ALL <br />EXCESS MATERIAL GENERATED BY DEMOLITION, EXCAVATION AND GRADING SHALL BE <br />DISPOSED OF BY THE CONTRACTOR, <br />8. EXCAVATION OF 5' OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM <br />THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. <br />9. THE PRICE BID FOR THIS WORK SHALL INCLUDE THE COST FOR ANY AND ALL <br />PERMITS REQUIRED TO COMPLETE THE PROJECT WORK. <br />10, EXISTING UTILITIES ARE SHOWN AS THEY ARE BELIEVED TO EXIST. THE OWNER <br />AND THE ENGINEER D❑ NOT ACCEPT RESPONSIBILITY FOR THEIR ACCURACY, PRIOR <br />TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />LOCATE THE EXISTING MAIN AND SERVICE LINES. <br />11. PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS SHOWN ON THE PLANS. <br />REPLACEMENT OF PAVEMENT WHICH IS BROKEN OR CUT IN THE INSTALLATION OF THE <br />WORK COVERED IN THESE SPECIFICATIONS, AND WHICH LIES OUTSIDE OF SAID <br />AREAS, SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE OF PAVEMENT, AND <br />NO ADDITIONAL PAYMENT SHALL BE MADE FOR SUCH WORK. <br />12. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />FOR JOBSITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, <br />INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT <br />SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND <br />THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, COUNTY <br />AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN <br />CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR <br />LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER, <br />13, WE CALL YOUR ATTENTION TO: SECTION 1540(a)(1) OF THE CONSTRUCTION <br />SAFETY ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), <br />ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS, BOARD PURSUANT <br />TO THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS <br />AMENDED, WHICH STATESI 'PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE <br />MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I,E, SEWER, WATER, <br />FUEL, ELECTRIC LINES, ETC, WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH <br />UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES <br />THE APPROXIMATE LOCATION OF SUCH INSTALLATION, THE EXACT LOCATION SHALL <br />BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING, AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING <br />INSTALLATI❑N, ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE <br />AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS <br />PRIOR TO THE START OF ACTUAL EXCAVATI❑N', <br />14, PRIOR TO FINAL INSPECTION CONTRACTOR SHALL SUBMIT AS -BUILT INFORMATION <br />FOR ANY CHANGES TO WONG ENGINEERS, INC, <br />15. DUST CONTROL SHALL BE PERFORMED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, <br />TO MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF <br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />THE CONTRACTOR SHALL OBTAIN A PERMIT OR PERMISSION FROM THE CALIFORNIA WATER <br />SERVICE COMPANY FOR USE OF WATER FROM FIRE HYDRANTS FOR CONSTRUCTION <br />PURPOSES. THE PERMIT OR APPROVAL SHALL BE APPROVED BY THE FIRE DEPARTMENT. <br />16, A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED ACCEPTABLE BY <br />COUNTY PRIOR TO START OF WORK. THIS SHALL ADDRESS ALL PHASES OF WORK, WHICH <br />WILL IMPACT PUBLIC TRAFFIC. CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL <br />TIMES. <br />17, ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO THE 'MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES AND SAN JOAQUIN COUNTY STANDARDS' AND AS SHOWN ON THE PLANS. <br />CONSTRUCTION STAKINGI <br />1. CONSTRUCTION STAKING IS NORMALLY PERFORMED BY THE ENGINEER WHO PREPARED <br />THE PLAN. THIS PERMITS APPROPRIATE ON-SITE INTERPRETATION AND ADJUSTMENT <br />OF THE PLANS, IF NECESSARY. THIS NOTE GIVES FORMAL NOTICE THAT THE FIRM <br />OF WONG ENGINEERS, INC., CANNOT AND WILL NOT, TAKE RESPONSIBILITY FOR <br />ERRORS OR ❑MISSIONS, IF ANY, WHICH MIGHT OCCUR AND WHICH COULD HAVE BEEN <br />AVOIDED OR DETECTED AND/OR CORRECTED AND MITIGATED HAD WONG ENGINEERS, <br />2 INC„ PERFORMED THE CONSTRUCTION STAKING WORK. <br />ALL REFERENCES TO CONTRACTOR SHALL MEAN CONTRACTOR FOR SITEWORK SHOWN <br />3 ON THESE CIVIL PLANS ONLY, <br />IF WONG ENGINEERS, INC. IS RETAINED TO D❑ THE CONSTRUCTION STAKING, WONG <br />ENGINEERS, INC. WILL SET ALL STAKES AND PROVIDE CUT SHEETS FOR THIS <br />PROJECT, IT IS EXPECTED THAT ONE SET OF STAKES WILL BE SUFFICIENT FOR <br />EACH PHASE OF THE PROJECT. CARE SHOULD BE TAKEN TO PROTECT STAKES, THE <br />COST OF STAKING IS BORNE BY THE DEVELOPER. THE CONTRACTOR SHALL REQUEST <br />STAKES FROM WONG ENGINEERS, INC, WHEN HE IS READY TO USE THEM AND SHALL <br />BE RESPONSIBLE FOR THEIR PRESERVATION FOR HIS FUTURE USE. SAID REQUEST <br />MUST BE MADE AT LEAST 72 HOURS PRIOR TO THE TIME THE STAKES WILL BE <br />REQUIRED. SHOULD THE WORK NEED TO BE RESTAKED, FOR THE CONTRACTOR'S USE, <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO WONG ENGINEERS, INC. FORTHECOST <br />OF RESTAKING, SHOULD THE CONTRACTOR DESTROY STAKES WHICH ARE NEEDED <br />FOR IMPROVEMENTS OTHER THAN HIS OWN, HE SHALL ALSO BE RESPONSIBLE FOR THE <br />COST OF RESTAKING TO RETURN THE JOB TO ITS ORIGINAL CONDITION, <br />ASSESSOR'S <br />PARCEL NO. 171-180-41 <br />REFER <br />TO MAJOR SUBDIVISION APPLICATION N0, SU -01-5 <br />SHEET <br />INDEX, <br />SHEET <br />1 <br />TITLE SHEET <br />SHEET <br />2 <br />GRADING PLAN <br />SHEET <br />3 <br />THIRTEENTH STREET STA 5+18.94 TO STA <br />11+49,16 0 <br />BIEGHLE STREET STA 0+00 TO 1+89.79 <br />N <br />SHEET <br />4 <br />EROSION C❑NTR❑L/DETAIL SHEET <br />¢L,� <br />o <br />SHEET <br />5 <br />DETAIL SHEET <br />N -Q <br />SHEET <br />6 <br />DETAIL SHEET <br />ado <br />L M J <br />C7 M IL <br />TRACT 3172 SAN JOAQUIN COUNTY, SHEET <br />MICHAEL ESTATES CALIFORNIA <br />TITLE SHEET 1 <br />OF SIX <br />FILE <br />