Laserfiche WebLink
FLOW A <br />PLAN A <br />EX. FACE OF CURB <br />INLET FILTER <br />GRATE <br />1"x1" WOOD EXISTING OPEN BACK HOOD <br />POST OR STEEL FILTER MATERIAL <br />POST TO OVERLAP DROP <br />INLET BY 1" (25 MM) <br />FLOW MINIMUM <br />WIRE OR TIE <br />661 4„ WRAP (TYP.) <br />VERTICAL EXTENSION <br />OF GRATE TO <br />EXTEND <br />SECTION A- <br />A PAST EACH SIDE OF PLAN VIEW <br />CURB OPENING <br />TIPICAL FIBER ROLL DETAIL <br />NOT TO SCALE <br />NOTES: <br />1. <br />1. <br />FILTER ROLLS SHALL BE CONSTRUCTED <br />LONG ENOUGH TO EXTEND ACROSS THE EXPECTED <br />FLOW PATCH. <br />2. <br />SUPPORT POSTS SHALL BE A MINIMUM <br />24" LONG 1"x1" WOOD POSTS DRIVEN A MINIMUM <br />OF 6" INTO <br />THE GROUND. POSTS SHALL BE SPACED <br />A MAXIMUM OF 4 FEET APART. <br />3. <br />3. <br />FILTER ROLL SHALL BE IMBEDDED A MINIMUM OF 3" INTO EXISTING GROUND. <br />4. <br />CONTRACTOR SHALL MAKE INSPECTIONS <br />WEEKLY DURING THE WET SEASON, MONTHLY DURING THE DRY <br />THE GRATE SHALL HAVE A MINIMUM <br />SEASON, AND IMMEDIATELY AFTER EACH <br />RAINFALL TO DETERMINE IF REPAIRS AND SEDIMENT <br />REMOVAL IS <br />CURB OPENING. THE FILTER GRATE SHALL BE THE SAME SIZE AS <br />REQUIRED. SEDIMENT SHALL BE REMOVED BEFORE IT HAS REACHED ONE HALF THE HEIGHT <br />OF THE FILTER <br />ROLL. <br />THE FILTER PAD AND GRATE SHALL <br />BE SECURELY ATTACHED TO THE DROP INLET BY WIRE OR TIE -WRAPS. <br />2"x2" (50x50 MM) STAKE OR - <br />#4 J -BAR DRIVEN 25 MM (1") <br />BELOW TOP OF BALE <br />PLASTIC TARP <br />NYLON OR WIRE BINDI <br />EX. GROUND--\ <br />4" (100 MM) MIN. I <br />SET BALE IN TRENCH <br />A <br />STRAW BALE ALIGNMENT <br />STRAW OR HAY BALE <br />4" (100 MM) MIN. <br />COMPACTED SOIL <br />-STAKE TARP TO GROUND <br />MM) <br />18" (450 MM) MIN. <br />SECTION A -A <br />2 STAKES PER <br />BALE <br />ANGLE FIRST STAKE TOWARD <br />PREVIOUSLY LAID BALE <br />--- --][ ----- -- <br />------ -- --- 4" (100 MM) <br />--- -- ----- -- -- ------ --- TRENCH <br />j <br />PLACE BALES TIGHTLY <br />TOGETHER WITH NO GAPS <br />FRONT VIEW <br />CONCRETE WASHOUT <br />NOT TO SCALE <br />NOTES: <br />1. PLACE BALES IN A 4" (100 MM) DEEP TRENCH. BALES SHALL BE PLACED SO THAT BINDINGS ARE HORIZONTAL. <br />2. BALES SHALL BE ANCHORED BY TWO 2"x2" (50x50 MM) STAKES OR #4 J -BAR DRIVEN THROUGH THE BALE <br />AND INTO THE GROUND A MINIMUM DEPTH OF 18" (450 MM). STAKES OR J -BARS SHALL BE DRIVEN FLUSH WITH <br />THE TOP OF THE BALE. THE FIRST STAKE OR J -BAR IN EACH BALE SHALL BE DRIVEN AT AN ANGLE TOWARDS <br />THE PREVIOUSLY LAID BALE TO FORCE THE BALES TIGHTLY TOGETHER. <br />3. AFTER BALES ARE STAKED IN PLACE, EXCAVATED SOIL SHALL BE BACKFILLED AGAINST THE SIDE TO A MINIMUM <br />HEIGHT OF 4" (100 MM). <br />4. CONTRACTOR SHALL INSPECT BALES WEEKLY AND AFTER EACH WASHOUT. REPAIRS SHALL BE MADE AS NECESSARY <br />AND SEDIMENT SHALL BE REMOVED WHEN IT HAS ACCUMULATED TO A DEPTH OF 6" (150 MM). BALES SHALL BE <br />REPLACED WHEN THEY HAVE BEEN DAMAGED, COLLAPSED, OR DECOMPOSED. <br />BEFORE YOU DIG <br />CALL USA UNDERGROUND SERVICE ALERT <br />48 HOURS PRIOR TO CONSTRUCTION. CALL <br />r TOLL FREE 1-800-227-2600 <br />KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND <br />PEOPLE 10 FEET FROM POWER LINES, IF YOU <br />MUST WORK WITHIN 10 FEET OF POWER LINES <br />PLEASE CALL PG&E 0 800-743-5000 <br />EXISTING OPEN <br />BACK HOOD FILTER GRATE <br />EXTENSION <br />WIRE OR TIE WRAP <br />FILTER GRATE <br />FILTER MATERIAL <br />`EXISTING DROP <br />INLET GRATE <br />SECTION A -A <br />PLACEMENT AT VERTICAL CURBS <br />NOT TO SCALE <br />FILTER GRATE <br />ROLLED CURB -\ <br />EX. FACE OF CURB <br />INLET FILTER <br />GRATE <br />PLAN VIEW <br />WIRE OR TIE WRAP <br />/�- FILTER MATERIAL <br />7EXI=STING DROP <br />INLET GRATE <br />SECTION B -B <br />PLACEMENT AT ROLLED CURBS <br />NOT TO SCALE <br />NOTES: <br />1. <br />THE MAXIMUM DRAINAGE AREA PER <br />FILTER SHALL BE NO MORE THAN 2 ACRES (0.8 HECTARES). <br />2. <br />THE FILTER PAD SHALL BE 1" (25 <br />MM) THICK CLEANABLE POLYESTER FIBER AND ACRYLIC LATEX <br />RESIN OR APPROVED EQUAL. FILTER <br />PAD SHALL OVERLAP DROP INLET ON ALL SIDES MY A MINIMUM <br />OF 1- (25 MM). <br />3. <br />THE FILTER GRATE SHALL BE MADE <br />OF EXPENDED METAL OR REBAR AND BE OF SUFFICIENT STRENGTH <br />TO PREVENT BENDING WHEN DRIVEN <br />OVER. GRATE MATERIAL SHALL NOT EXCEED 0.5" (13 MM) THICK. <br />THE GRATE SHALL HAVE A MINIMUM <br />60% OPEN AREA. GRATES USED AT VERTICAL CURBS SHALL HAVE A <br />VERTICAL EXTENSION TO COVER THE <br />CURB OPENING. THE FILTER GRATE SHALL BE THE SAME SIZE AS <br />THE INLET GRATE. <br />4. <br />THE FILTER PAD AND GRATE SHALL <br />BE SECURELY ATTACHED TO THE DROP INLET BY WIRE OR TIE -WRAPS. <br />5. <br />INLET FILTERS SHALL BE INSPECTED <br />WEEKLY AND AFTER EACH RAINFALL. REPAIRS, AS WELL AS SEDIMENT <br />AND DEBRIS REMOVAL SHALL BE MADE <br />AS NECESSARY. <br />6. <br />INLET FILTERS SHALL BE "CONSTRUCTION" STORM DRAIN FILTERS BY POLLUTION SOLUTION. <br />CATCHBASIN AND GRAVEL BAG DETAIL <br />NOTES: NOT TO SCALE <br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC. (12"x18"± AND 15 LBS± OF 1" MAX. ROCK). <br />2. CONSTRUCT ON GENTLY SLOPING STREET WHERE WATER CAN POND AND ALLOW SEDIMENT TO <br />SEPARATE OUT OF SUSPENSION. <br />3. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 OF THE <br />FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY <br />TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />4. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD. <br />5. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE DELINEATION DEVICES <br />TO ALERT MOTORISTS. BICYCLISTS AND PEDESTRIANS. THE USE OF SUCH DEVICES SHALL BE SUBJECT TO <br />THE ENGINEERS APPROVAL. <br />CONSTRUCTION SITE I EX. <br />50' (15 Meters) MIN. <br />6" TO 12" DEPTH OF WASHED WELL <br />EX. GROUND GRADED 3"-4" FRACTURED STONE <br />AGGREGATE <br />-11 11_I <br />1 - <br />III III I I I� II SIJ <br />II EX. A.C. <br />il; I I <br />I 1 <br />GEOTEXTILE MATERIAL 6" (150 MM) MIN. <br />SECTION A -A <br />L� <br />0 <br />UJ <br />Z <br />A o:2 A <br />ww <br />X Q <br />b ? DIRECTION OF TRAVEL w a <br />Lo <br />PLAN VIEW <br />CONSTRUCTION ENTRANCE <br />NOT TO SCALE <br />NOTES: <br />1. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE CONSTRUCTED OF 3" TO 4" <br />WASHED, WELL -GRADED FRACTURED STONE AGGREGATE. MATERIAL SHALL BE PLACED <br />TO A MINIMUM THICKNESS OF 6", SLOPED AWAY FROM THE ROADWAY. <br />2. LENGTH OF ENTRANCE SHALL BE A MINIMUM OF 50' (15 METERS). WIDTH SHALL BE <br />A MINIMUM 50' (15 METERS) OR GREATER IF NECESSARY TO COVER ALL VEHICULAR <br />INGRESS AND EGRESS. PROVIDE AMPLE TURNING RADII. <br />3. THE ENTRANCE SHALL BE KEPT IN GOOD CONDITION BY OCCASIONAL TOP DRESSING <br />WITH MATERIAL AS SPECIFIED IN NOTE 1. <br />4. ACCESSES SHALL BE INSPECTED WEEKLY DURING PERIODS OF HEAVY USAGE, MONTHLY <br />DURING NORMAL USAGE, AND AFTER EACH RAINFALL, WITH MAINTENANCE PROVIDED AS <br />NECESSARY. PERIODIC TOP DRESSING SHALL BE DONE AS NEEDED. <br />5. ANY DEBRIS, SEDIMENT OR ROCK TRACKED ONTO PUBLIC STREETS WILL BE SWEPT UP <br />BY THE END OF EACH WORKDAY. <br />STEEL HARDWARE CLOTH <br />1/2" SQUARE <br />INNER SUPPORTS <br />3/4" REBAR <br />OUTER DIAMETER OF <br />FRAME 1/2" REBAR <br />noon uu I <br />INLET DETAIL <br />NOT TO SCALE <br />DROP INLET CATCH <br />BASIN PERIMETER <br />NOTES: <br />1. DEVELOPER IS RESPONSIBLE FOR REPLACEMENT OF MISSING AND DAMAGED FILTER SCREENS <br />UNTIL THE PROJECT IS ACCEPTED. A ROUTINE MAINTENANCE SCHEDULE IS TO BE MAINTAINED. <br />FILTER SCREENS SHALL BE SECURED TO THE CATCH BASIN DURING THIS PERIOD. <br />2. COMPRESSED BETWEEN REBAR FRAME AND DICB IS 1" THICK FILTER PAD MATERIAL. FILTER <br />PAD MATERIAL IS DENSE TO RETAIN SILT YET POROUS ENOUGH TO ALLOW WATER DRAINAGE. THE <br />FILTER SYSTEM IS WIRE TIED TO THE DICB IN 2 OR MORE PLACES TO PREVENT SLIPPAGE OR <br />REMOVAL OF UNIT FROM DICB <br />3. THE FILTER PAD AND GRATE SHALL BE SECURELY ATTACHED TO THE DROP INLET BY WIRE OR <br />TIE -WRAPS. <br />4. INLET FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. REPAIRS AND SEDIMENT <br />AND DEBRIS REMOVAL SHALL BE MADE AS NECESSARY <br />5. INLET FILTERS SHALL BE "CONSTRUCTION" STORM DRAIN FILTERS BY POLLUTION SOLUTION OR <br />APPROVED EQUIVALENT. <br />DIUON & MURPHY <br />CONSUL TING CIVIL ENGINEERS <br />ENGINEERING PLANNING SURVEYING <br />1820 W KETTLEMAN LANE, SUITE E, LODI, CALIFORNIA 95242 (209) 334-6613 <br />t III IMPROVEMENT PLANS FOR TRACT NO. 3404 <br />LINDLY ESTATES <br />EROSION AND SEDIMENT CONTROL DETAILS <br />JUNE, 2005 <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />REV. NO. DESCRIPTION DATE SCALE: AS NOTED BENCH MARK:88-42 EL: 138.58 SHEET <br />DRAWN BY: EK DESCRIPTION: 12 <br />DESIGNED BY: BG BRASS CAP S/W CORNER OF OF 15 SHEE <br />CONCRETE CULVERT 114' NORTH <br />CHECKED BY: OF LINNE RD. ON THE WEST SIDE JOB NO. <br />AS BUILT BY: OF MAC ARTHUR DR. 0559 <br />