My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-4097
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-4096-4176
>
SU-4097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 11:56:49 AM
Creation date
10/15/2024 11:56:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I' X 1" <br />WOOD POST OR <br />STEEL POST - <br />EXPECTED WIDTH <br />OF FLOW <br />FLOW <br />+A <br />A <br />PLAN <br />FIBER ROLL <br />rrrT <br />41NCHE5 <br />6" WN. <br />SECTION A -A <br />NOTES: <br />1. FILTER ROLLS SHALL BE CONSTRUCTED LONG ENOUGH TO EXTEND ACROSS THE EXPECTED FLOW PATH. <br />2. SUPPORT POSTS SHALL BE A MINIMUM 24" LONG 1" X 1" WOOD POSTS DRIVEN A MINIMUM OF 6 <br />LACHES INTO THE GROUND. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART. <br />3. FILTER ROLL SHALL BE IMBEDDED A MINIMUM OF 4 INCHES INTO EXISTING GROUND <br />4. CONTRACTOR SHALL MANE INSPECTIONS WEEKLY DURING THE WET SEASON, MONTHLY WRING THE DRY <br />SEASON AND IMMEDIATELY AFTER EACH RAINFALL TO DETERMINE W REPAIRS AND SEDIMENT REMOVAL IS <br />REQUIRED. SEDIMENT SHALL BE REMOVED BEFORE IT HAS REACHED ONE HALF THE HEIGHT OF THE <br />I� FILTER ROLL. <br />O FIBER/STRAW ROLL DETAIL <br />GRAVEL BAGS TO <br />OVERLAP ONTO CURB <br />SPILLWAY <br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC. <br />2. CONSTRUCT ON GENTLY SLOPING STREET WHERE WATER CAN POND AND ALLOW <br />SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF BAGS TO SERVE AS <br />SPILLWAY. SPILLWAY HEIGHT SHALL BE LOWER THAN CURB HEIGHT AND SUFFICIENT IN <br />SIZE TO PASS FLOWS FROM SEVERE STORM EVENT. <br />4. PLACE TWO LAYERS OF GRAVEL BAGS. OVERLAP BAGS AND PACK THEM TIGHTLY <br />TOGETHER TO MINIMIZE THE SPACE BETWEEN BAGS. FILL BAG WITH 3/4" DRAIN ROCK. <br />5. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 <br />OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN <br />AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD. <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE <br />DEUNEATION DEVICES TO ALERT MOTORISTS, BICYCLISTS AND PEDESTRIANS. THE USE OF <br />SUCH DEVICES SHALL BE SUBJECT TO THE ENGINEER'S AND COUNTY'S APPROVAL. <br />Q CURB INLET DETAIL <br />PLACEMENT AT VERTICAL CURBS <br />FACE OF CURD 7 INLET FILTER <br />/ % GRATE <br />HUUU A <br />A <br />W <br />FILTER <br />�EE <br />N u <br />U-):5 <br />00 00 <br />MATERIAL <br />Q <br />� <br />� <br />OVERUW <br />m <br />INLET <br />0 <br />'R <br />°000°o°000 <br />00000 <br />00000 <br />i3NY) <br />VERTICAL <br />U-) <br />000000 000 <br />INN N <br />Z <br />W <br />O <br />�n <br />Mo <br />o 0 0 <br />EXTENSION <br />z <br />z <br />x� <br />OF CRATE <br />c9 <br />d3 m <br />WIRE OR <br />TO EXTEND <br />Oa- N <br />TE WRAP - <br />PAST EACH <br />(TYPICAL) <br />PLAN VIEW <br />FILTER GRATE <br />EXTENSION <br />WINE OR TE WRAP <br />r FILTER GRATE <br />L EX61INC DROP <br />INLET GRATE <br />SECTION A - A <br />PLACEMENT AT ROLLED CURBS <br />FACE OF CI1R87 -.'NL <br />. FILTER <br />B <br />PLAN VIEW <br />FILTER GRATE ��� <br />CURB -I <br />8 <br />arlu v <br />EXISTING DROP WIRE OR <br />INLET GRATE TE WRAP <br />SECTION B - B <br />NOIRES <br />1. THE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 2 ACRES <br />(0.8 HECTARES). <br />2. THE FILTER PAD SHALL BE 1 INCH (25 MM) THICK CLEANABLE POLYESTER FIBQt <br />AND ACRYLIC LATEX RESIN OR APPROVED EQUAL FILTER PAD SHALL. OVERLAP DROP <br />INLET ON ALL SIDS BY A MIN. OF 1" (25 MM). <br />3. THE FILTER GRATE SHALL BE MADE OF EXPANDED METAL OR REBAR AND BE OF <br />SUFFICIENT STRENGTH TO PREVENT BENDING WHEN DRIVEN OVER. GRATE MATERIAL <br />SHALL NOT EXCEED 0.5 INCH (13 MM) THICK. THE GRATE SIWl HAVE A MIMMUM <br />GOX OPEN AREA GRATES USED AT VERTICAL CURBS SHALL HAVE A VERTICAL <br />EXTENSION TO COVER THE CUM OPENING. THE FILTER GRATE SHALL BE THE SAME <br />SDE AS THE INLET GRATE. <br />4.7HE FILTER PAD AND GRATE SHALL BE SECURELY ATTACHED TO THE DROP INLET <br />BY WIRE OR TE -WRAPS. <br />5.INLET FILTERS SIHAIL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. <br />RWAIRS AND SEDIMENT AND DEBRIS REMOVAL SHALL BE WADE AS NECESSARY. <br />GANLET FILTERS SHALL. BE "OONSTRUC71ON" STORM DRAIN FILTERS BY POLLUTION <br />SOLUTION. <br />Q CURB INLET DETAIL <br />50 X 50 MM (2" X 2")_STME OR <br />CONSTRUCTION SITE RIGHT OF WAY 4 J -BM DRIVEN 1 INCH S OR HAY BALE <br />toot 25 MM) BELOW TOP OF BALE^ - <br />EXISTING 50 FT (15 METERS) MINIMUM PLASTIC TARP I 4 INCHES (100 MM) MIN. <br />GROUND 0 V to 1J'-4 FAAC�MED HED WEELL � BI�MDINGS I i COMPACTED SER <br />GIVM SDIE TiWP TO GWM <br />�S _T <br />Ex15nNc GROUND <br />- <br />IIEIII-ll1=1IEDII_111= II_III=111=111=111=111411=111=111=1 - - INCHES =11 <br />tEOTEXTILE MATERIAL 200 MM) <br />(156N 4 INCH (100 MM) MIN. 18 INCHES (450 MM) MIN. <br />SECTION A -A <br />SET BALE IN TRENCH <br />EXISTING SECTION A -A <br />SIM OF <br />_ RIIEEIrt <br />F3 <br />5 FEET OFT VSEL <br />1.5 METERS) o - <br />PLAN VIEW <br />NOTES <br />1. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE <br />CONSTRUCTED OF 3" TO 4" WASHED, WELL -GRADED <br />FRACTURED STONE AGGREGATE. MATERIAL SHALL BE <br />PLACED TO A MINIMUM THICKNESS OF 6 INCHES, <br />SLOPED AWAY FROM THE ROADWAY. <br />2. LENGTH OF ENTRANCE SHALL BE A MINIMUM OF 50 <br />FEET (15 METERS). WIDTH SHALL BE A MIN. OF 15 <br />FT (4.5 METERS) OR GREATER IF NECESSARY TO <br />COVER ALL VEHICULAR INGRESS AND EGRESS. <br />PROVIDE AMPLE TURNING RADII. <br />3. THE ENTRANCE SHALL BE KEPT IN GOOD CONDITION <br />BY OCCASIONAL TOP DRESSING WITH MATERIAL AS <br />SPECIFIED IN NOTE 1. <br />4. ACCESSES SHALL BE INSPECTED WEEKLY DURING <br />PERIODS OF HEAVY USAGE, MONTHLY DURING <br />NORMAL USAGE, AND AFTER EACH RAINFALL, WITH <br />MAINTENANCE PROVIDED AS NECESSARY. PERIODIC <br />TOP DRESSING SHALL BE DONE AS NEEDED. <br />A <br />Q CONSTRUCTION ENTRANCE <br />STRAW BALE ALIGNMENT <br />4" <br />2_STAKES <br />ANGLE FIRST STAKE TOWARDS <br />PRFVI FJY PIACFD TWF PREVIOUSLY PLACED BICE <br />_NIDI 1=11 V <br />I1=1IIr II <br />PLACE BALES TIGHTLY <br />TOGETHER WITH NO GAPS <br />FRONT VIEW <br />NOTES: <br />1 PLACE BALES IN 4 INCH (100 MM) DEEP TRENCH ALONG THE CONTOUR <br />IN THE SHAPE OF M ARC WITH THE ENDS UPHILL OF THE ARC'S CENTER. BINES <br />SHALL BE PLACED SO THAT BINDINGS ARE HORIZONTAL �4 <br />2. BALES SHALL BE ANCHORED BY TWO THROUGH THE BICE AND INTO THE 2GRO M A (MINIU50 X 50 ) M DEPTH OF 18STAKES 1 INCHES) (450 MM). <br />STAKES OR J -LIARS SHALL BE DRIVEN FLUSH WITH THE TOP OF THE BALE. <br />THE FIRST STAKE OR J -BAR IN EACH BINE SHALL BE DRIVEN AT M ANGLE <br />TOWARDS THE PREVIOUSLY LAID BINE TO FORCE THE BALES 7 MY TOGETHER. <br />3. AFTER BALES ARE STAKED IN PLACE, EXCAVATED SOIL SHALL BE BACKFILLED <br />AGAINST THE SIDE TO A MINIMUM HEIGHT OF 4 INCHES (100 MM). <br />4. CONTRACTOR MAY SUBSTITUE HAY BALE WITH AN EARTHEN DIKE <br />AFTER RECEIVING APPROVAL FORM A CERTIFIED PROFESSIONAL <br />IN EROSION AND SEDIMENT CONTROLCONTROL <br />5. CONTRACTOR SHALL INSPECT BALES WEEKLY AND AFTER EACH WASHIOUT. REPAIRS <br />SHALL BE MADE AS NECESSARY AND SEDIMENT SHALL BE REMOVED WHEN T HAS <br />ACCUMULATED TO A DEPTH OF 6 INCHES 150 MIN). BINES SHALL BE REPLACED WHEN <br />THEY MINE BEEN DAMAGED. COLLAPSED OR DECOMPOSED. <br />Q CONCRETE WASHOUT <br />I=1V=11I=111= <br />44IINNCCH (100 MM) <br />GRAVEL <br />SPILLWAY <br />e� <br />SPILLWAY ZrIILnnT <br />AJ <br />T <br />HT <br />PONDING _ MIN. MIN. <br />CATCH <br />BASIN <br />SECTION A -A <br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC. <br />2.CONSTRUCT ON GENTLY SLOPING STREET WHERE WATER CAN POND AND ALLOW <br />SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />J. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF BAGS TO SERVE AS SPILLWAY. <br />SPILLWAY HEIGHT SHALL BE SUFFICIENT IN SIZE TO PASS FLOWS FROM SEVER STORM EVENT, <br />4. PLACE TWO LAYERS OF GRAVEL BAGS. OVER LAP BAGS AND PACK THEM TIGHTLY <br />TOGETHER TO MINIMIZE THE SPACE BETWEEN BAGS. FILL BAG WITH 3/4" DRAIN ROCK. <br />5. INSPECT AND REPAIR FILTERS MER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 <br />OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN <br />AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT AND GRAVEL SHALL L FE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD. <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE <br />DELINEATION DEVICES TO MERIT MOTORISTS. BICYCLISTS AND PEDESTRIANS. THE USE OF <br />SUCH DEVICES SHALL BE SUBJECT TO THE ENGINEER'S AND COUNTYS APPROVAL. <br />(D INLET DETAIL <br />PLACEMENT AT ROLLED CURBS <br />FACE OF CURB INLET FILTER <br />7 � CRATE <br />FILTER <br />MATERIAL <br />DYER <br />T <br />WIRE OR <br />71E WRAP -(TYPICAL) <br />FILTER <br />PLAN VIEW <br />E1 FILTER <br />v <br />EXISTING WMK OR <br />INLET GRATE TE WRAP <br />SECTION A -A <br />NM <br />1. THE MAXIMUM DRNNAC,E AREA PER FILTER SHALL BE NO MORE THAN 2 ACRES <br />(0.8 HECTARES). <br />2. THE FILTER PAD SHALL BE 1 INCH 25 MM) THICK CLEMMBLE POLYESTER FIBER <br />AND ACRYLIC LAID( RESIN OR APPROVED EQUAL FILTER PAD SHALL OVERLAP DROP <br />INLET ON ALL SIDES BY A MN. OF 1" (25 MM). <br />3. THE FILTER GRATE SHALL BE MADE OF EXPANDED METAL OR REBAR AND BE OF <br />SUFFICIENT STRENGTH In PREVENT BENDING WHEN DRIVEN OVER. GRATE MATERIAL <br />SHALL NOT EXCEED 0.5 INCH (13 MM) THICK. THE GRATE SWILL HAVE A MINIMUM <br />WS OPEN AREAL GRATES USED AT VEKWAL CURBS SHALL HAVE A VERTICAL <br />EXTENSION TO COVER THE CURB OPENING. THE FILTER GRATE SHALLBETHHE SAME <br />SIZE AS THE INLET GRATE. <br />4. THE FILTER PAD AND GRATE SHALL BE SECURELY ATTACHED TO THE DROP INLET <br />BY WIRE OR TE -WRAPS. <br />5ANLET FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. <br />REPAIRS AND SEDIMENT AND DEBRIS REMOVAL SHALL 13E MADE AS NECESSARY. <br />6 -INLET FILTERS SHALL BE "CONSTRUCTION" STORM DRAIN FILTERS BY POLLUTION <br />SOLUTION. <br />)INLET DETAIL <br />NO. 62009 <br />EXP. 9/30/2007 <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />NTS <br />Original Drowing Scale <br />0 1 <br />LL�L.uLL.1 <br />Sheet Number <br />9 Of 10 <br />Project File No. <br />04-124 <br />z <br />W <br />�EE <br />N u <br />U-):5 <br />m <br />Q <br />� <br />� <br />O <br />m <br />'R <br />ku <br />V J <br />Q <br />U-) <br />3 <br />4* <br />Z <br />W <br />O <br />�n <br />Mo <br />Ix <br />z <br />z <br />x� <br />0 <br />c9 <br />d3 m <br />U <br />1L1 <br />Oa- N <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />NTS <br />Original Drowing Scale <br />0 1 <br />LL�L.uLL.1 <br />Sheet Number <br />9 Of 10 <br />Project File No. <br />04-124 <br />U-):5 <br />u'i <br />a <br />O <br />J <br />U-) <br />O <br />O <br />Ix <br />Q <br />CL <br />z <br />QL) <br />W <br />OZ� <br />=Z <br />WQ <br />IlItoo- <br />O <br />w <br />Lod <br />j <br />(n <br />Q <br />Q <br />Jm <br />D <br />�- <br />N <br />Z <br />Q <br />/�/ <br />M <br />Z <br />O <br />O <br />Q <br />N <br />0 <br />W <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />NTS <br />Original Drowing Scale <br />0 1 <br />LL�L.uLL.1 <br />Sheet Number <br />9 Of 10 <br />Project File No. <br />04-124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.