z
<br />INSTALL DRAIR.
<br />INSTALL DRAIN
<br />o,
<br />IL
<br />JQ, 7_..
<br />420;6
<br />t I �•
<br />I
<br />It
<br />I I I 1 r�• `?�I I I I I
<br />T I I I
<br />�`a —_J L_ J L — — — — — — — -ANSTALL FIBER -ROLL J L_
<br />MAINTAIN UNTIL
<br />---- ----------- -- NECESS Y------- �_
<br />-----— — — — — — — — — — — — — — — — ------------------------\ \\ ii
<br />10
<br />vs
<br />Fq
<br />TO
<br />TOURER
<br />oil n ov IL9rgnu- l.31yn/,���,
<br />AREA_—T6 aPED 13Y''-/
<br />MIkIMUM 6" B�IbLjl
<br />COTR 'CTOR
<br />j T RELOCATE IA INEC SMY \'
<br />of I I o-5ss
<br />p1 I L--- Ja-----`-
<br />L--------------- — — — — -
<br />ME
<br />A DETAILED INSTALLATION AND MAINTENANCE SCHEDULE DURING
<br />THE VAROUS PHASES OF CONSTRUCTION SHALL BE OUTLINED IN
<br />THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BOOK.
<br />ROUGH GRADING: INSTALL CATCHBASIN INLET PROTECTION, INSTALL
<br />STRAW OR FILTER ROLLS AT BACK OF WALK
<br />AND AT EDGE OF GRADING. THE EXISTING
<br />GROUND DOES NOT HAVE A DEFINED DIRECTION
<br />OF FLOW. A CONSTRUCTION ENTRANCE SHALL
<br />BE INSTALLED PRIOR TO COMMENCING GRADING
<br />OPERATIONS.
<br />PAVII G: INSTALL STRAW OR FILTER ROLLS AT NEW BACK OF
<br />WALK, MAINTAIN PROTECTION AT CATCHBASIN, INSTALL
<br />ROCK BAGS IN GUTTER PAN. HYDROSEED OR STABILIZE
<br />WITH OTHER METHODS DISTURBED SOIL PRIOR TO WET
<br />SEASON. ALLOW FOR VEGETATION TO DEVELOP IF
<br />HYDROSEEDING.
<br />I FENn
<br />------ INSTALL STRAW ROLL OR FILTER ROLL O
<br />INSTALL CONSTRUCTION 4
<br />ENTRANCE PROTECTION O
<br />INSTALL CONCRETE WASHOUT AREA IN OO
<br />LOCATIONS APPROVED BY A CERTIFIED PROFESSIONAL
<br />IN EROSION & SEDIMENT CONTROL
<br />INSTALL GRAVEL BAGS AND FILTER FABRICS OO
<br />TO PROTECT ALL INLETS (TYP ALL INLETS) OO
<br />CONTRACTOR TO STABILIZE DISTURBED SOIL PRIOR
<br />®TO RAIN EVENT THROUGH SOIL BINDERS, STRAW MULCH
<br />AND/OR EROSION CONTROL BLANKETS
<br />CALTRANS STD. SS -3, SS -6, SS -7
<br />0S
<br />a,
<br />� S
<br />4 1
<br />BLE
<br />'•, I I
<br />1 1 I I I
<br />------�I�--------------J
<br />STORM WATER POLLUTION PREVENTION PLAN
<br />7.9,
<br />Cn
<br />L'1
<br />LA
<br />1
<br />c'
<br />z.6.
<br />z.s
<br />-------------,--------------- I-,-----------I-----------I--------
<br />WITH THE EXCEPTION OF PROPERLY DESILTED WATER FROM SITE DEWATERING, THE
<br />CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AND/OR LIQUIDS TO THE STORM
<br />DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE-
<br />A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK CLEAN—OUT AREA. COUNTY INSPECTOR
<br />APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY IMPLEMENTED AT
<br />AND AROUND THE CLEAN—OUT AREA.
<br />B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY
<br />EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER METHODS.
<br />C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO AVOID
<br />SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY IN
<br />ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES SHALL BE
<br />EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT.
<br />D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING
<br />SAWCUTTING ACTIVITIES
<br />GENERAL:
<br />1. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF THE
<br />ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL CONSTRUCTION
<br />TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE.
<br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PIAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY
<br />WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEASON, PUBLIC
<br />ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO THAT A
<br />MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS
<br />PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL
<br />PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED.
<br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN
<br />ADDITION, AFTER EACH STORM.
<br />4. ALL EROSION CONTROL BMPs SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS
<br />5. CONTRACTOR SHALL USE A WATER TRUCK DURING GRADING TO MINIMIZE WIND EROSION AND REDUCE DUST
<br />6. IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR
<br />TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY
<br />WILL BE DESIGNED IF THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THE
<br />PROPOSED METHOD FAILS TO THE SATISFACTION OF THE INSPECTOR.
<br />BMP NOTES:
<br />1. ALL ON—SITE MATERIALS WILL BE STORED IN LOCK BOX
<br />2. USE WATERING TRUCK FOR DUST CONTROL
<br />3. ALL PLANTER AREAS TO RECEIVE STRAW AND TACKIFIER AFTER PAVING ACTIVITIES ARE COMPLETE
<br />4. ALL DEBRIS AND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUMPSTER
<br />5. ALL SPOIL PILES TO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL AREAS TO BE
<br />SURROUNDED WITH STRAW/FILTER ROLLS.
<br />6. NO VEHICLES OR MACHINERY TO BE STORED, FUELED OR WASHED ON PROJECT SITE. ALL VEHICLE AND
<br />MACHINERY MAINTENANCE TO BE PERFORMED OFF—SITE.
<br />7. ALL WATER PUMPED FROM TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR
<br />FILTRATION BEFORE IT IS DISCHARGED ON PROPERTY.
<br />8• DURING ROUGH GRADING CONTRACTOR TO INSTALL EARTH DIKE AND STRAW/FILTER ROLLS AT PERIMETER OF
<br />THE PROPERTY TO MAINTAIN RUN—OFF ON SITE
<br />9. IN CASE COLLOIDAL SUSPENSION NEEDS TO BE REMOVED PRIOR TO DISCHARGE, THE CONTRACTOR WILL
<br />DESIGN AND CONSTRUCT TEMPORARY HOLDING BASINS. THE DESIGN OF THE BASIN WILL BE ADDRESSED IF
<br />THE NEED ARISES.
<br />10. ALL LANDSCAPED AREAS ARE GRADED TO DRAIN IN THE DIRECTION OF THE DRAIN INLET. REFER TO
<br />LANDSCAPING AND GRADING PLAN FOR DRAINAGE PATTERNS.
<br />EROSION CONTROL NOTES:
<br />WDID NUMBER
<br />RESPONSIBLE INDIVIDUAL
<br />DAVE STROBEL - 601 -8222
<br />1.
<br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND
<br />6.
<br />II
<br />1JJ
<br />MAINTAINED IN ACCORDANCE WITH THIS PLANS AND SPECIFICATIONS AND THE
<br />I
<br />SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT CONTROL BMPs
<br />w
<br />CAI -TRANS STORM WATER QUALITY HANBOOKS, CURRENT EDITION (MARCH 2003).
<br />SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS DRAIN INTO SENSITIVE
<br />II
<br />i
<br />' I
<br />OR PRESERVED VEGETATION AREAS
<br />2,
<br />I
<br />7.
<br />SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE
<br />�
<br />MAINTAINED DURING THE WET SEASON (OCTOBER 15 THROUGH APRIL 30). SEDIMENT
<br />J
<br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPs SHALL BE MAINTAINED YEAR
<br />IL
<br />JQ, 7_..
<br />420;6
<br />t I �•
<br />I
<br />It
<br />I I I 1 r�• `?�I I I I I
<br />T I I I
<br />�`a —_J L_ J L — — — — — — — -ANSTALL FIBER -ROLL J L_
<br />MAINTAIN UNTIL
<br />---- ----------- -- NECESS Y------- �_
<br />-----— — — — — — — — — — — — — — — — ------------------------\ \\ ii
<br />10
<br />vs
<br />Fq
<br />TO
<br />TOURER
<br />oil n ov IL9rgnu- l.31yn/,���,
<br />AREA_—T6 aPED 13Y''-/
<br />MIkIMUM 6" B�IbLjl
<br />COTR 'CTOR
<br />j T RELOCATE IA INEC SMY \'
<br />of I I o-5ss
<br />p1 I L--- Ja-----`-
<br />L--------------- — — — — -
<br />ME
<br />A DETAILED INSTALLATION AND MAINTENANCE SCHEDULE DURING
<br />THE VAROUS PHASES OF CONSTRUCTION SHALL BE OUTLINED IN
<br />THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BOOK.
<br />ROUGH GRADING: INSTALL CATCHBASIN INLET PROTECTION, INSTALL
<br />STRAW OR FILTER ROLLS AT BACK OF WALK
<br />AND AT EDGE OF GRADING. THE EXISTING
<br />GROUND DOES NOT HAVE A DEFINED DIRECTION
<br />OF FLOW. A CONSTRUCTION ENTRANCE SHALL
<br />BE INSTALLED PRIOR TO COMMENCING GRADING
<br />OPERATIONS.
<br />PAVII G: INSTALL STRAW OR FILTER ROLLS AT NEW BACK OF
<br />WALK, MAINTAIN PROTECTION AT CATCHBASIN, INSTALL
<br />ROCK BAGS IN GUTTER PAN. HYDROSEED OR STABILIZE
<br />WITH OTHER METHODS DISTURBED SOIL PRIOR TO WET
<br />SEASON. ALLOW FOR VEGETATION TO DEVELOP IF
<br />HYDROSEEDING.
<br />I FENn
<br />------ INSTALL STRAW ROLL OR FILTER ROLL O
<br />INSTALL CONSTRUCTION 4
<br />ENTRANCE PROTECTION O
<br />INSTALL CONCRETE WASHOUT AREA IN OO
<br />LOCATIONS APPROVED BY A CERTIFIED PROFESSIONAL
<br />IN EROSION & SEDIMENT CONTROL
<br />INSTALL GRAVEL BAGS AND FILTER FABRICS OO
<br />TO PROTECT ALL INLETS (TYP ALL INLETS) OO
<br />CONTRACTOR TO STABILIZE DISTURBED SOIL PRIOR
<br />®TO RAIN EVENT THROUGH SOIL BINDERS, STRAW MULCH
<br />AND/OR EROSION CONTROL BLANKETS
<br />CALTRANS STD. SS -3, SS -6, SS -7
<br />0S
<br />a,
<br />� S
<br />4 1
<br />BLE
<br />'•, I I
<br />1 1 I I I
<br />------�I�--------------J
<br />STORM WATER POLLUTION PREVENTION PLAN
<br />7.9,
<br />Cn
<br />L'1
<br />LA
<br />1
<br />c'
<br />z.6.
<br />z.s
<br />-------------,--------------- I-,-----------I-----------I--------
<br />WITH THE EXCEPTION OF PROPERLY DESILTED WATER FROM SITE DEWATERING, THE
<br />CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AND/OR LIQUIDS TO THE STORM
<br />DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE-
<br />A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK CLEAN—OUT AREA. COUNTY INSPECTOR
<br />APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY IMPLEMENTED AT
<br />AND AROUND THE CLEAN—OUT AREA.
<br />B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY
<br />EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER METHODS.
<br />C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO AVOID
<br />SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY IN
<br />ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES SHALL BE
<br />EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT.
<br />D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING
<br />SAWCUTTING ACTIVITIES
<br />GENERAL:
<br />1. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF THE
<br />ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL CONSTRUCTION
<br />TRAFFIC ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE.
<br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PIAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY
<br />WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEASON, PUBLIC
<br />ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO THAT A
<br />MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS
<br />PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE RESUBMITTED FOR APPROVAL
<br />PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED.
<br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN
<br />ADDITION, AFTER EACH STORM.
<br />4. ALL EROSION CONTROL BMPs SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS
<br />5. CONTRACTOR SHALL USE A WATER TRUCK DURING GRADING TO MINIMIZE WIND EROSION AND REDUCE DUST
<br />6. IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR
<br />TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY
<br />WILL BE DESIGNED IF THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THE
<br />PROPOSED METHOD FAILS TO THE SATISFACTION OF THE INSPECTOR.
<br />BMP NOTES:
<br />1. ALL ON—SITE MATERIALS WILL BE STORED IN LOCK BOX
<br />2. USE WATERING TRUCK FOR DUST CONTROL
<br />3. ALL PLANTER AREAS TO RECEIVE STRAW AND TACKIFIER AFTER PAVING ACTIVITIES ARE COMPLETE
<br />4. ALL DEBRIS AND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUMPSTER
<br />5. ALL SPOIL PILES TO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL AREAS TO BE
<br />SURROUNDED WITH STRAW/FILTER ROLLS.
<br />6. NO VEHICLES OR MACHINERY TO BE STORED, FUELED OR WASHED ON PROJECT SITE. ALL VEHICLE AND
<br />MACHINERY MAINTENANCE TO BE PERFORMED OFF—SITE.
<br />7. ALL WATER PUMPED FROM TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR
<br />FILTRATION BEFORE IT IS DISCHARGED ON PROPERTY.
<br />8• DURING ROUGH GRADING CONTRACTOR TO INSTALL EARTH DIKE AND STRAW/FILTER ROLLS AT PERIMETER OF
<br />THE PROPERTY TO MAINTAIN RUN—OFF ON SITE
<br />9. IN CASE COLLOIDAL SUSPENSION NEEDS TO BE REMOVED PRIOR TO DISCHARGE, THE CONTRACTOR WILL
<br />DESIGN AND CONSTRUCT TEMPORARY HOLDING BASINS. THE DESIGN OF THE BASIN WILL BE ADDRESSED IF
<br />THE NEED ARISES.
<br />10. ALL LANDSCAPED AREAS ARE GRADED TO DRAIN IN THE DIRECTION OF THE DRAIN INLET. REFER TO
<br />LANDSCAPING AND GRADING PLAN FOR DRAINAGE PATTERNS.
<br />EROSION CONTROL NOTES:
<br />WDID NUMBER
<br />RESPONSIBLE INDIVIDUAL
<br />DAVE STROBEL - 601 -8222
<br />1.
<br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND
<br />6.
<br />SENSITIVE AREAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED
<br />1JJ
<br />MAINTAINED IN ACCORDANCE WITH THIS PLANS AND SPECIFICATIONS AND THE
<br />N
<br />�a
<br />m
<br />SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT CONTROL BMPs
<br />w
<br />CAI -TRANS STORM WATER QUALITY HANBOOKS, CURRENT EDITION (MARCH 2003).
<br />SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS DRAIN INTO SENSITIVE
<br />Ln
<br />4.
<br />OR PRESERVED VEGETATION AREAS
<br />2,
<br />EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHALL BE INSTALLED AND
<br />7.
<br />SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE
<br />z
<br />MAINTAINED DURING THE WET SEASON (OCTOBER 15 THROUGH APRIL 30). SEDIMENT
<br />J
<br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPs SHALL BE MAINTAINED YEAR
<br />o
<br />CONTROL BMP9 SHALL BE INSTALLED AND MAINTAINED ALL YEAR.
<br />w
<br />ROUND UNTIL THE CONSTRUCTION IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN
<br />3.
<br />ALL DRAINAGE INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS AND
<br />CHANGED AND NO LONGER LEAVES THE SITE.
<br />WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT CONTROL AND
<br />8.
<br />THE FOLLOWING AREA ARE TO RECEIVE HYDROSEEDING OR OTHER EROSION CONTROL:
<br />$
<br />INLET FILTER BAGS, YEAR ROUND. INLET FILTER BAGS SHALL BE REMOVED
<br />W
<br />LOT FRONT YARD BEHIND SIDEWALK — THE FIRST 18 FEET OR TOP OF SLOPE
<br />FROM THE DRAINAGE INLETS UPON ACCEPTANCE OF THE PUBLIC
<br />(WHICHEVER IS GREATER)
<br />a
<br />IMPROVEMENTS.
<br />SIDEYARDS BEHIND THE SIDEWALK — THE FIRST 7.5 FEET OR TOP OF SLOPE
<br />4.
<br />ALL STABILIZED CONSTRUCTION ACCESS LOCATIONS SHALL BE CONSTRUCTED PER
<br />Z
<br />(WHICHEVER IS GREATER)
<br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS. THE
<br />SLOPES — ALL SLOPES GRATER THAT 10:1
<br />=
<br />STABILIZED ACCESS SHALL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL COMPLETION
<br />9,
<br />EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT SHALL BE IN
<br />F-
<br />OF CONSTRUCTION
<br />SUBSTANTIAL COMPLIANCE AT ALL TIME WITH THE STORM WATER POLLUTION
<br />5.
<br />ALL AREAS DISTURBED DURING CONSTRUCTION, BY GRADING, TRENCHING, OR OTHER ACTIVITIES,
<br />PREVENTION PLAN (SWPPP) PREPARED FOR THE PROJECT IN ACCORDANCE WITH
<br />SHALL BE PROTECTED FROM EROSION DURING THE WET SEASON (OCTOBER 15 THROUGH
<br />W
<br />�J
<br />THE STATE OF CALIFORNIA GENERAL CONSTRUCTION PERMIT. THIS PERMIT
<br />�o
<br />APRIL 30). HYDROSEED, IF UTILIZED, MUST BE PLACED BY SEPTEMBER 15. HYDROSEED
<br />REQUIRES THAT THE SWPPP BE KEPT UP TO DATE TO REFLECT THE CHANGING
<br />Jm
<br />PLACED DURING THE WET SEASON SHILL USE A SECONDARY EROSION PROTECTION METHOD
<br />o
<br />SITE CONDITIONS AND THE SWPPP IS TO BE AVAILABLE ON SITE AT ALL TIMES FOR
<br />IL
<br />SUCH AS EROSION CONTROL BLANKETS OR STRAW MULCH
<br />Z
<br />REVIEW BY STATE AND LOCAL INSPECTORS.
<br />NO. 62009
<br />EXP. 9/30/2007
<br />1-6
<br />Z
<br />N
<br />1JJ
<br />N
<br />�a
<br />m
<br />w
<br />In
<br />Ln
<br />4.
<br />LU
<br />42
<br />z
<br />CIS
<br />J
<br />o
<br />,r)
<br />w
<br />o
<br />C)
<br />I
<br />O
<br />c�
<br />$
<br />U
<br />W
<br />OCLN
<br />Design
<br />AMC
<br />Check
<br />AMC
<br />Date
<br />06/02/06
<br />Scale
<br />1 " = 30'
<br />Original Drawing Scale
<br />'0 1
<br />LJ_L_LJ_LJ_�
<br />Sheet Number
<br />8 Of 10
<br />Project File No.
<br />04-124
<br />1!5
<br />In
<br />4.
<br />L0
<br />I
<br />J
<br />,r)
<br />0
<br />C)
<br />I
<br />~
<br />14
<br />z
<br />U
<br />a
<br />I
<br />i_
<br />0
<br />Z
<br />:3
<br />=
<br />Z
<br />W
<br />0
<br />F-
<br />2
<br />:DE)
<br />0
<br />Q
<br />>-
<br />W
<br />�J
<br />�o
<br />Jm
<br />o
<br />IL
<br />Z
<br />�
<br />Q
<br />�
<br />Z
<br />0
<br />0
<br />Q
<br />N
<br />0
<br />ixW
<br />Design
<br />AMC
<br />Check
<br />AMC
<br />Date
<br />06/02/06
<br />Scale
<br />1 " = 30'
<br />Original Drawing Scale
<br />'0 1
<br />LJ_L_LJ_LJ_�
<br />Sheet Number
<br />8 Of 10
<br />Project File No.
<br />04-124
<br />
|