Laserfiche WebLink
Am <br />1. ALL NEW IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND <br />SPECIFICATIONS, AND THE LATEST EDITION OF THE COUNTY OF SAN JOAQUIN STANDARD PLANS AND SPECIFICATIONS <br />AND THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (WITH EXCEPTION THAT <br />ENGLISH UNITS ARE TO BE USED IN PLACE OF METRIC). <br />2. THE INTENT IS THAT THESE PLANS REQUIRE ALL LABOR AND MATERIALS (EXCEPT AS SPECIFIED IN THE SPECIAL <br />PROVISIONS) NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN <br />ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY <br />REGARDING ANY DISCREPANCIES AND AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS IF THE PLANS <br />DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY <br />THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY <br />ARE TO BE USED. <br />3. THE TYPES, LOCATION, SIZES AND/OR DEPTHS OF EXISTING UNDERGROUND UTIUTIES AS SHOWN ON THESE PLANS <br />WERE OBTAINED FROM "OUTSIDE SOURCES". THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL <br />REVEAL THE TYPES, EXTENT, SIZES, LOCATION, AND DEPTHS OF SUCH UNDERGROUND UTIUTIES CONTI do ASSOCIATES, <br />INC. CAN ASSUME NO RESPONSIBIUTY FOR THE COMPLETENESS OR ACCURACY OF ITS DELINEATION OF SUCH <br />UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED BUT WHICH ARE NOT SHOWN ON THESE DRAWINGS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES <br />AND SHALL CONTACT THE RESPECTIVE UTILITY COMPANIES PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE LOCATION AND PRESERVATION OF ALL SUCH FACIUTIES IN THE AREA OF <br />CONSTRUCTION, AND SHALL NOTIFY USA (UNDERGROUND SERVICE ALERT 11-800-642-2444) 48 HOURS PRIOR TO <br />BEGIN CONSTRUCTION <br />5. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 1540 (A)(1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE <br />8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS <br />BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS AMENDED, WHICH STATE: <br />PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATION:I.E., <br />SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND <br />INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING AND/OR DIGGING; AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FROM THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF <br />UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS <br />PRIOR TO THE START OF ACTUAL EXCAVATION. <br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE REMOVAL AND/OR RELOCATION OF ALL EXISTING <br />UTILITIES WITH RESPECTIVE UTILITY COMPANIES. <br />7, FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN THE ROAD RIGHT-OF-WAY PRIOR TO COMPLETION OF UTILITY <br />RELOCATION WITHOUT SPECIFIC APPROVAL OF THE COUNTY OF SAN JOAQUIN. <br />8. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION <br />FROM THE OWNER'S REPRESENTATIVE. <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE SITE AND SURROUNDING AREAS RESULTING <br />FROM OPERATIONS PRIOR TO ACCEPTANCE OF HIS WORK. <br />10. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF EXISTING FACILITIES. THE CONTRACTOR <br />IS RESPONSIBLE TO REPAIR, TO THE SATISFACTION OF THE COUNTY OF SAN JOAQUIN, ANY FACILITIES DAMAGED <br />DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />11. CONTRACTOR TO REFERENCE AND RESTORE ALL "RECORDED" EXISTING MONUMENTS AND/OR PROPERTY CORNER <br />REFERENCES DESTROYED, REMOVED OR DISTURBED DURING THE COURSE OF CONSTRUCTION <br />12. DRAINAGE FACIUTIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT WEATHER AND RESTORED TO THEIR <br />PCOMPLETION <br />ORIGINAL CONDITIONS U ONF THE WORK. <br />O <br />13. CONTRACTOR SHALL VERIFY ALL STREET NAMES AND BLOCK NUMBERS WITH THE COMMUNITY DEVELOPMENT <br />DEPARTMENT BEFORE ORDERING STREET SIGNS. <br />14. WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THE SPECIFICATIONS, <br />THE PAVEMENT SHALL BE REPLACED, AFTER PROPER BACKFILLING, WITH PAVEMENT MATERIALS EQUAL TO OR BETTER <br />THAN THE MATERIALS USED IN THE ORIGINAL PAVING. <br />15. ANY CONSTRUCTION ACTIVITY THAT RESULTS IN THE DISTURBANCE OF AT LEAST ONE (1) ACRE OF SOIL SHALL <br />REQUIRE A STATE NATIONAL POLLUTANT DISCHARGE EUMINATION SYSTEM CONSTRUCTION PERMIT. <br />CONSTRUCTM NM <br />1. THE CENTERLINE STATIONING SHOWN IS FOR REFERENCE ONLY. THE CONTRACTOR SHALL LAYOUT IMPROVEMENTS <br />FROM THE DIMENSIONS SHOWN ON THE PLANS. ANY CLARIFICATION ON CONFLICTS, DISCREPANCIES OR AMBIGUITIES <br />SHOULD BE DIRECTED TO THE "ENGINEER" PRIOR TO THE CONSTRUCTION OF THE IMPROVEMENTS. <br />2. WHERE PAVEMENT IS TO BE EXTENDED, EXISTING PAVEMENT SHALL BE SAWCUT. <br />3. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SIGNS FOR ALL REGULATORY TRAFFIC SIGNS REMOVED <br />DURING THE COURSE OF CONSTRUCTION. <br />4. THE CONTRACTOR SHALL PROVIDE OWN CONSTRUCTION WATER. <br />5. CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES AT ALL TIMES DURING CONSTRUCTION AS PER SECTION 10 <br />OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA PER SAN JOAQUIN COUNTY DEPARTMENT OF PUBUC <br />WORKS REQUIREMENTS. <br />1. CONTRACTOR AGREES;TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING THE <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THIS <br />REQUIREMENT SHALL APPLY CONTINUOSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS, THE COUNTY OF SAN JOAQUIN, ITS ELECTED <br />OFFICIALS, OFFICERS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS, COSTS OF LITIGATION, DAMAGES, AND <br />ATTORNEY'S FEES, FOR PERSONAL INJURY OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH ARE CLAIMED TO <br />HAVE OCCURRED DURING THE TERM OF THIS PROJECT. <br />2. ANY CHANGES TO THE APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS MUST BE PREPARED AND CERTIFIED BY <br />THE "ENGINEER", AND SHALL BE SUBMITTED TO THE DIRECTOR OF PUBUC WORKS FOR APPROVAL PRIOR TO <br />IMPLEMENTATION, <br />3. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM THE TO "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" <br />(MUTCD), AND THE MUTCD CALIFORNIA SUPPLEMENT AND SAN JOAQUIN COUNTY STANDARDS AND AS SHOWN ON THE <br />PLANS. <br />SECTION 3-4 GUARANTEE. --THE COMPLETED PROJECT, INCLUDING ALL WORK MATERIALS, DEVICES AND EQUIPMENT, <br />SHALL BE GUARANTEED BY THE DEVELOPER AGAINST FAULTY WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR <br />AFTER FINAL ACCEPTANCE BY THE BOARD OF SUPERVISORS. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL REPAIR <br />AND/OR REPLACEMENTS INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, DEVICES, PLANT AND OTHER ITEMS OF WORK <br />NECESSARY. TO SECURE THIS GUARANTEE, A BOND OR OTHER SECURITY SHALL BE PROVIDED IN THE AMOUNT OF 100% <br />(DEPARTMENT OF PUBLIC WORKS DETERMINES IF 100% PEERFORMANCE CAN BE REDUCED TO 20%) OF THE VALUE OF <br />WORK ESTIMATED BY THE ENGINEER. SAID BOND SHALL CONTINUE IN FULL FORCE AND EFFECT FOR A PERIOD OF ONE <br />V4116-NYEAR FROM THE DATE OF THE FORMAL ACCEPTANCE OF THE WORK BY THE BOARD OF SUPERVISORS. <br />SECTION 3-5 INSPECTION DURING CONSTRUCTION.-- ANY IMPROVEMENTS CONSTRUCTED TO THESE SPECIFICATIONS AND <br />WHICH IT IS INTENDED THAT THE COUNTY WILL ASSUME MAINTENANCE RESPONSIBIUTY, MUST BE INSPECTED DURING <br />CONSTRUCTION BY AN AUTHORIZED AGENT OF THE DEVELOPER AND DIRECTOR. EACH PHASE OF CONSTRUCTION MUST BE <br />INSPECTED AND APPROVED PRIOR TO PROCEEDING TO THE SUBSEQUENT PHASES. <br />ANY IMPROVEMENTS CONSTRUCTED WITHOUT INSPECTION AS PROVIDED ABOVE OR CONSTRUCTED CONTRARY TO THE <br />ORDERS OR INSTRUCTIONS OF THE AUTHORIZED AGENT OF THE DEVELOPER AND DIRECTOR WILL BE DEEMED AS NOT <br />COMPLYING WITH SAN JOAQUIN COUNTY STANDARDS AND SPECIFICATIONS, AND WILL NOT BE ACCEPTED BY SAN JOAQUIN <br />COUNTY FOR MAINTENANCE PURPOSES. THE DEVELOPER WILL HAVE COMPACTION TESTS TAKEN ON ALL LOTS WHERE THE <br />DEPTH OF FILL IS GREATER THAN SEVEN (7") INCHES AND WITHIN THE STREETS. RE -TEST THAT ARE THE RESULT OF <br />THE CONTRACTOR'S FAILURE TO COMPACT THESE AREAS AS REQUIRED WILL BE BORNE BY THE CONTRACTOR. THE <br />COUNTY DEPARTMENT OF PUBUC WORKS WILL PERFORM FIELD INSPECTION FOR THIS PROJECT. THE CML ENGINEER, <br />DIRECTOR AND DEVELOPER, OR THEIR AGENTS, SHALL AT ALL TIMES, HAVE ACCESS TO THE WORK DURING ITS <br />CONSTRUCTION, AND SHALL BE FURNISHED WITH EVERY REASONABLE FACILITY FOR ASCERTAINING THAT THE MATERIALS <br />AND THE WORKMANSHIP ARE IN ACCORDANCE WITH THE REQUIREMENTS AND INTENTIONS OF THESE SPECIFICATIONS, <br />SPECIAL PROVISIONS. AND PLANS. ALL WORK DONE AND ALL MATERIALS FURNISHED SHALL BE SUBJECT TO REVIEW. THE <br />REVIEW OF THE WORK OR MATERIALS SHALL NOT RELIEVE THE CONTRACTOR AND DEVELOPER OF ANY OF THEIR <br />OBLIGATIONS TO FULFILL THEIR CONTRACT AS PRESCRIBED. <br />SECTION 3-6 FINAL REVIEW. --UPON COMPLETION OF ALL IMPROVEMENTS WHICH ARE CONSTRUCTED UNDER AND IN <br />CONFORMANCE WITH THESE STANDARDS AND SPECIFICATIONS, AND PRIOR TO REQUESTING FINAL INSPECTION, THE AREA <br />SHALL BE THOROUGHLY CLEANED OF ALL RUBBISH, EXCESS MATERIAL AND EQUIPMENT; AND ALL PORTIONS OF THE WORK <br />SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION, SATISFACTORY TO THE DIRECTOR AND THE DEVELOPER. <br />SECTION 3-7 RECORD DRAWINGS. --THE CIVIL ENGINEER SHALL KEEP AN ACCURATE RECORD OF ALL APPROVED <br />DEVIATIONS FROM THE PLANS AND SHALL PROVIDE A COPY OF THESE RECORDS TO THE DIRECTOR UPON COMPLETION <br />OF OF THE WORK. THESE ARE TO BE UTIUZED WITH THE INSPECTOR'S PLANS FOR PREPARING A COMPLETE AND <br />ACCURATE SET OF "RECORD DRAWINGS" FOR THE PERMANENT RECORDS OF THE COUNTY. PREPARATION OF THE "RECORD <br />DRAWINGS" IS THE RESPONSIBILITY OF THE DEVELOPER AND HIS CIVIL ENGINEER. "RECORD DRAWINGS" SHALL BE <br />SUBMITTED TO THE DIRECTOR PRIOR TO ACCEPTANCE OF WORK AS COMPLETE. APPROVED DEVIATIONS SHALL BE <br />RECORDED IN RED INK ON THE ORIGINAL APPROVED PLANS, NOT REPRODUCIBLE COPIES. THE ORIGINAL PLANS SHALL <br />NOT BE REMOVED FROM THE DEPARTMENT OF PUBUC WORKS FOR PREPARATION OF "RECORD DRAWINGS". A WORK <br />AREA WILL BE AVAILABLE FOR MAKING ADDITIONS OR CORRECTIONS, AS WILL THE "RECORD DRAWING" STAMP AND PEN <br />WITH RED INK, IF REQUESTED. <br />SECTION 7 ALTERNATE A. MAINTAINING TRAFFIC.—ATTENTION IS DIRECTED TO SECTIONS 7-1.08, "PUBUC CONVENIENCE, <br />"7-1.09, "PUBUC SAFETY," AND 12, "CONSTRUCTION AREA TRAFFIC CONTROL DEVICES," OF THE STANDARD <br />SPECIFICATIONS AND THESE SPECIAL PROVISIONS. CONSTRUCTION AREA TRAFFIC CONTROL DEVICES SHALL BE IN <br />ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE MUTCD CAUFORNIA <br />SUPPLEMENT AND THE CURRENT WORK AREA TRAFFIC CONTROL HANDBOOK. (BUILDING NEWS). THROUGH PUBUC TRAFFIC <br />SHALL BE PERMITTED TO PASS THROUGH CONSTRUCTION OPERATIONS AT ALL TIMES WITH AS UTILE INCONVENIENCE AND <br />DELAY AS POSSIBLE. THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN ALL CONSTRUCTION AREA TRAFFIC CONTROL <br />DEVICES WITHIN THE PROJECT AND AT ALL PUBLIC ROAD ENTRANCES TO THE PROJECT. <br />SECTION 10 DUST CONTROL. --DUST CONTROL SHALL CONFORM TO THE REQUIREMENTS IN SECTION 10, "DUST CONTROL," <br />OF THE STANDARD SPECIFICATIONS. <br />SECTION 16 ALTERNATE A CLEARING AND GRUBBING. --CLEARING AND GRUBBING SHALL CONFORM TO THE <br />REQUIREMENTS IN SECTION 16, "CLEARING AND GRUBBING," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL <br />PROVISIONS. <br />TREE BRANCHES EXTENDING OVER THE ROADWAY PAVEMENT AND WHICH HANG WITHIN 15 FEET OF FINISHED GRADE <br />SHALL BE CUT OFF IN A WORKMANLIKE MANNER. <br />BURNING WILL BE ALLOWED WHEN PERMITTED BY THE SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br />SECTION 19 ALTERNATE A EARTHWORK. --EARTHWORK SHALL CONFORM TO THE REQUIREMENTS IN SECTION 19, <br />"EARTHWORK." OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALL RELATIVE COMPACTION <br />REQUIREMENTS OF SECTION 19-5, "COMPACTION," OF THE STANDARD SPECIFICATIONS, SHALL BE NOT LESS THAN 90 <br />PERCENT. THE REQUIREMENT OF THE SECOND PARAGRAPH OF SECTION 19-5.03, "RELATIVE COMPACTION (95 PERCENT), <br />OF THE STANDARD SPECIFICATIONS, WILL BE REQUIRED ONLY IN THOSE AREAS SHOWN ON THE PLANS. IN LIEU OF <br />THE TOLERANCE SPECIFIED IN SECTION 19-1.03B, "GRADE TOLERANCE," OF THE STANDARD SPECIFICATIONS, THE SURFACE <br />OF THE GRADING PLANE SHALL NOT BE MORE THAN 0.05 FOOT ABOVE OR BELOW THE GRADE ESTABUSHED BY THE <br />ENGINEER. BEFORE GRADE IS APPROVED BY THE COUNTY, ALL EARTHWORK (INCLUDING DRIVEWAYS AND SLOPES) SHALL <br />BE COMPACTED TO GRADE. UNLESS OTHERWISE SHOWN ON THE PLANS, ALL SURPLUS MATERIALS NOT TO BE SALVAGED, <br />STOCKPILED OR DISPOSED OF AS PROVIDED IN SECTION 19-2.06, "SURPLUS MATERIAL," OF THE STANDARD <br />SPECIFICATIONS, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF AS PROVIDED IN SECTION <br />7-1.13, "DISPOSAL OF MATERIAL OUTSIDE THE HIGHWAY RIGHT OF WAY," OF THE STANDARD SPECIFICATIONS. UNLESS <br />OTHERWISE SHOWN ON THE PLANS, THE EXISTING PAVEMENT, WHEN USED AS EMBANKMENT, SHALL BE BROKEN UP INTO <br />PIECES NOT LARGER THAN 0.33 FOOT IN GREATEST DIMENSION. <br />SECTION 19 ALTERNATE C EARTHWORK (STRUCTURE EXCAVATION & BACKFILL). --STRUCTURE EXCAVATION AND BACKFILL <br />SHALL CONFORM TO THE REQUIREMENTS IN SECTION 19-3, "STRUCTURE EXCAVATION AND BACKFILL,' OF THE STANDARD <br />SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALL REFERENCES TO CULVERT EXCAVATION AND CULVERT BACKFILL ON <br />THE PLANS SHALL BE DEEMED TO MEAN STRUCTURE EXCAVATION AND STRUCTURE BACKFILL, RESPECTIVELY, IN THE <br />STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. STRUCTURE BACKFILL WHICH IS OUTSIDE OF THE PAVED <br />PORTIONS OF THE ROADWAY, UNLESS OTHERWISE SPECIFIED ON THE PLANS, SHALL BE NATIVE MATERIAL SELECTED FOR <br />ITS RESISTANCE TO EROSION. COMPACTION REQUIREMENTS: UNLESS OTHERWISE SHOWN ON THE PLANS, THE COMPACTION <br />REQUIREMENTS WITHIN THE LIMITS OF STRUCTURE EXCAVATION FOR PIPES AND ARCHES SHALL BE AS SHOWN ON <br />STANDARD DRAWINGS. PONDING AND JETTING WILL BE PERMITTED ONLY IF A MAINTENANCE BOND IN THE AMOUNT OF <br />TWENTY PERCENT (20%) OF THE ENGINEER'S ESTIMATE WITH A CORPORATE SURETY APPROVED BY THE COUNTY IS <br />PROVIDED. SUCH A BOND SHALL BE PROVIDED BEFORE FINAL ACCEPTANCE OF THE PROJECT BY THE COUNTY AND SHALL <br />GUARANTEE THE REPAIR OF ALL DAMAGES DUE TO FAULTY MATERIALS OR WORKMANSHIP PROVIDED OR DONE BY THE <br />CONTRACTOR. THE GUARANTEE SHALL REMAIN IN EFFECT FOR A PERIOD OF THREE (3) YEARS AFTER THE DATE OF FINAL <br />ACCEPTANCE OF THE PROJECT BY THE COUNTY OR BOARD OF SUPERVISORS. <br />SECTION 22 FINISHING ROADWAY. --FINISHING ROADWAY SHALL CONFORM TO THE REQUIREMENTS IN SECTION 22, <br />"FINISHING ROADWAY," OF THE STANDARD SPECIFICATIONS. <br />SECTION 26 ALTERNATE A AGGREGATE BASE. --AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS IN SECTION 26, <br />"AGGREGATE BASES," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. AGGREGATE BASE SHALL BE <br />CLASS 2. THE COMBINED AGGREGATE SHALL CONFORM TO THE GRADING SPECIFIED FOR THE 3/4 -INCH MAXIMUM <br />AGGREGATE. THE R -VALUE REQUIREMENT MAY BE WANED, PROVIDING THE AGGREGATE BASE COMFORMS TO THE SPECIFIED <br />GRADING AND DURABILITY AND HAS A SAND EQUIVALENT VALUE OF 33 OR MORE. <br />SECTION 39 ALTERNATE A ASPHALT CONCRETE. --ASPHALT CONCRETE SHALL CONFORM TO THE REQUIREMENTS IN SECTION <br />39, "ASPHALT CONCRETE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />ASPHALT CONCRETE SHALL BE TYPE "B". AGGREGATE SHALL CONFORM TO THE 1/2 -INCH MAXIMUM, COARSE OR MEDIUM <br />GRADING AS DETERMINED BY THE ENGINEER AND DIRECTOR. AT THE CONTRACTOR'S OPTION, AND WITH APPROVAL OF THE <br />ENGINEER AND DIRECTOR, AGGREGATE MAY BE 3/4 -INCH MAXIMUM, MEDIUM GRADING WITH THE EXCEPTION OF THE FINAL <br />FINISH COURSE. <br />AGGREGATE CONFORMING TO THE 3/8 -INCH MAXIMUM GRADING WILL BE PERMITTED FOR USE IN DRIVEWAYS, DIKES AND <br />OTHER AREAS WITH APPROVAL OF THE ENGINEER AND DIRECTOR. <br />THE AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE SHALL BE BETWEEN 50 AND 7% BY WEIGHT OF <br />THE DRY AGGREGATE. THE EXACT AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE WILL BE DETERMINED <br />BY THE ENGINEER. THE AR VISCOSITY GRADE OF THE ASPHALT BINDER SHALL BE 4,000 UNLESS OTHERWISE SHOWN ON <br />THE PLANS. THE PROVISIONS OF PARAGRAPHS 5 THROUGH 8 OF SECTION 39.03, "PROPORTIONING," OF THE STANDARD <br />SPECIFICATIONS, SHALL NOT APPLY TO THIS PROJECT. <br />WHEN THE ASPHALT CONCRETE IS TO BE PRODUCED IN A BATCH PLANT, THE ASPHALT CONCRETE SHALL BE <br />PROPORTIONED AND MIXED BY THE AUTOMATIC METHOD. <br />WHEN SHOWN IN THE ENGINEER'S ESTIMATE PRIME COAT, UQUID ASPHALT PENETRATION GRADE SHALL BE SC -70 OR <br />SC -250 AS DIRECTED BY THE ENGINEER AND DIRECTOR. THE PLACEMENT OF ASPHALT CONCRETE SHALL NOT BEGIN <br />UNTIL 24 HOURS AFTER THE PRIME COAT IS APPLIED. <br />PAINT BINDER (TACK COAT) SHALL BE APPLIED AT A RATE OF APPROXIMATELY 0.05 GALLON PER SQUARE YARD, UNLESS <br />OTHERWISE SHOWN ON THE PLANS. <br />ALL STEEL -TIRED ROLLERS SHALL BE OF THE TANDEM TYPE. THE THIRD PARAGRAPH OF SECTION 39-5.02, "COMPACTING <br />EQUIPMENT," OF THE STANDARD SPECIFICATIONS, SHALL BE DELETED. <br />THE DUMPING OF MATERIAL IN A WINDROW, IN ACCORDANCE WITH SECTION 39-6.01, "GENERAL REQUIREMENTS," OF THE <br />STANDARD SPECIFICATIONS, SHALL BE LIMITED TO 750 FEET IN ADVANCE OF THE PAVING MACHINE. <br />THE SIXTH PARAGRAPH IN SECTION 39-6.01, "GENERAL REQUIREMENTS," OF THE STANDARD SPECIFICATIONS, SHALL BE <br />AMENDED BY DELETING THE SECOND FOOTNOTE, WHICH READS, "AT THE OPTION OF THE CONTRACTOR, [0.25' OVERLAY] <br />MAY BE PLACED IN ONE LAYER 0.25' THICK." <br />THE TENTH PARAGRAPH OF SECTION 39-6.03, "COMPACTING," OF THE STANDARD SPECIFICATIONS, ALLOWING THE USE OF <br />"ALTERNATIVE COMPACTING EQUIPMENT" SHALL BE DELETED. <br />UNLESS OTHERWISE SHOWN ON THE PLANS, ASPHALT PAVER EQUIPMENT USED TO PLACE ASPHALT CONCRETE SHALL BE <br />EQUIPPED WITH FULL AUTOMATIC SCREED AND GRADE SENSING CONTROLS WHICH SHALL CONTROL THE LONGITUDINAL <br />GRADE AND TRANSVERSE SLOPE OF THE SCREED. THE CONTROLS SHALL BE ACTUATED BY GRADE AND SLOPE <br />REFERENCES. CORRECTIONS ON ACCOUNT OF DEVIATIONS FROM THE REFERENCES SHALL BE AUTOMATIC. GUIDES AND <br />REFERENCES REQUIRED TO CONTROL THE LONGITUDINAL GRADE AND TRANSVERSE SLOPES SHALL BE FURNISHED AND <br />INSTALLED BY THE CONTRACTOR. <br />SHOULD THE CONTRACTOR ELECT TO USE A SKI DEVICE FOR LONGITUDINAL CONTROL, THE MINIMUM LENGTH OF THE <br />DEVICE SHALL BE 30 FEET. THE DEVICE SHALL BE A RIGID UNIT MOUNTED ON MULTIPLE SUPPORTS. EACH SUPPORT <br />SHALL ACT INDEPENDENTLY OF OTHERS AND THE FINISHED GRADE SHALL NOT BE AFFECTED BY THE ACTION OF A SINGLE <br />SUPPORT. <br />WHEN ASPHALT CONCRETE GUTTERS ARE DESIGNATED ON THE PLANS, A STRINGUNE OR WIRE GRADE REFERENCE SHALL <br />BE REQUIRED TO CONTROL LONGITUDINAL GRADE OF THE GUTTER. THE GUTTER SHALL BE WATER TESTED BEFORE <br />ACCEPTANCE. THE MAXIMUM DEVIATION FROM A TRUE GRADE SHALL NOT RESULT IN PONDING WATER FOR DEPTH <br />EXCEEDING 0.04 FOOT. <br />SURFACING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT, AT THE END OF EACH DAY'S WORK, THE <br />DISTANCE BETWEEN THE ENDS OF ADJACENT SURFACED LANES SHALL NOT BE GREATER THAN CAN BE COMPLETED IN <br />THE FOLLOWING DAY OF NORMAL SURFACING OPERATIONS. <br />PORTABLE DELINEATORS IN CONFORMANCE WITH SECTION 12-3.04, "PORTABLE DELINEATORS," OF THE STANDARD <br />SPECIFICATIONS SHALL BE FURNISHED AND PLACED AT A MAXIMUM SPACING OF 300 FEET ON TANGENTS AND 100 FEET <br />ON CURVES ALONG ANY EDGE OF NEW SURFACING WHICH HAS A DROP OFF OF MORE THAN 0.10 FOOT. DEUNEATORS <br />SHALL BE STAGGERED WHEN REQUIRED ON BOTH SIDES OF TRAFFIC.EXISTING PAVEMENT MARKERS SHALL BE REMOVED <br />AND DISPOSED OF, UNLESS OTHERWISE SHOWN ON THE PLANS. <br />DURING THE REMOVAL OF CERAMIC TYPE PAVEMENT MARKERS, SCREENS, OR OTHER PROTECTIVE DEVICES SHALL BE <br />FURNISHED TO CONTAIN ANY FRAGMENTS AS PROVIDED FOR IN SECTION 7-1.09, "PUBUC SAFETY," OF THE STANDARD <br />SPECIFICATIONS. <br />SECTION 39 ALTERNATE E UQUID ASPHALT (PRIME COAT).--UQUID ASPHALT (PRIME COAT) SHALL CONFORM TO THE <br />REQUIREMENTS IN SECTIONS 39, "ASPHALT CONCRETE," AND 93, "LIQUID ASPHALT," OF THE STANDARD SPECIFICATIONS <br />AND THESE SPECIAL PROVISIONS. UQUID ASPHALT SHALL BE GRADE SC -70 OR SD -250 AND SHALL BE APPLIED AT THE <br />APPROXIMATE TOTAL RATE OF 0.25 GALLON PER SQUARE YARD IN ONE APPLICATION, THE GRADE AND EXACT RATE OF <br />APPLICATION WILL BE DETERMINED BY THE ENGINEER AND THE DIRECTOR. LIQUID ASPHALT SHALL NOT BE APPLIED WHEN <br />THE ATMOSPHERIC TEMPERATURE IS BELOW 50' F. AT LOCATIONS WHERE PUBLIC TRAFFIC IS BEING ROUTED OVER THE <br />ROADBED TO BE TREATED, THE PRIME COAT SHALL NOT BE APPLIED TO MORE THAN ONE-HALF THE WIDTH OF THE <br />TRAVELED WAY AT A TIME, AND THE REMAINING WIDTH SHALL BE KEPT FREE OF OBSTRUCTIONS AND OPEN FOR USE BY <br />PUBLIC TRAFFIC UNTIL THE TREATMENT FIRST APPLIED IS READY FOR USE BY PUBLIC TRAFFIC. LIQUID ASPHALT SHALL <br />NOT BE APPLIED UNTIL A MINIMUM OF 24 HOURS AFTER THE COUNTY HAS ACCEPTED THE AGGREGATE BASE FOR <br />SURFACE TOLERANCES AND COMPACTION REQUIREMENTS. <br />NO. 62009 <br />EXP. 9/30/2007 <br />Design <br />DMA <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />AS SHOWN <br />Original Drawing Scale <br />ID �„ 1„ <br />LJ_LJ_LJ_LJ� <br />Sheet Number <br />2 Of 10 <br />Project File No. <br />04-124 <br />N <br />W <br />U <br />L0 <br />0 <br />z <br />0 <br />O <br />dE <br />W <br />In <br />N <br />Na <br />m <br />Q <br />0 <br />U <br />W <br />Q <br />U <br />Y <br />d <br />\J <br />/ <br />0 <br />IU <br />Q <br />Z <br />3 <br />} <br />0 <br />H <br />N <br />I— <br />W <br />O <br />z <br />0 <br />z <br />(� <br />—n <br />UW�N <br />m <br />Q <br />Design <br />DMA <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />AS SHOWN <br />Original Drawing Scale <br />ID �„ 1„ <br />LJ_LJ_LJ_LJ� <br />Sheet Number <br />2 Of 10 <br />Project File No. <br />04-124 <br />N <br />W <br />L0 <br />0 <br />0 <br />O <br />In <br />0 <br />Q <br />Y <br />d <br />\J <br />/ <br />0 <br />z <br />U <br />=0 <br />H <br />N <br />0 <br />> <br />0 <br />J <br />m <br />Q <br />CL <br />i= <br />0 <br />Z <br />Q <br />rW^ <br />v <br />W <br />Design <br />DMA <br />Check <br />AMC <br />Date <br />06/02/06 <br />Scale <br />AS SHOWN <br />Original Drawing Scale <br />ID �„ 1„ <br />LJ_LJ_LJ_LJ� <br />Sheet Number <br />2 Of 10 <br />Project File No. <br />04-124 <br />