<br />1. ALL NEW IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND
<br />SPECIFICATIONS, AND THE LATEST EDITION OF THE COUNTY OF SAN JOAQUIN STANDARD PLANS AND SPECIFICATIONS
<br />AND THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (WITH EXCEPTION THAT
<br />ENGLISH UNITS ARE TO BE USED IN PLACE OF METRIC).
<br />2. THE INTENT IS THAT THESE PLANS REQUIRE ALL LABOR AND MATERIALS (EXCEPT AS SPECIFIED IN THE SPECIAL
<br />PROVISIONS) NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN
<br />ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY
<br />REGARDING ANY DISCREPANCIES AND AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS IF THE PLANS
<br />DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY
<br />THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY
<br />ARE TO BE USED.
<br />3. THE TYPES, LOCATION, SIZES AND/OR DEPTHS OF EXISTING UNDERGROUND UTIUTIES AS SHOWN ON THESE PLANS
<br />WERE OBTAINED FROM "OUTSIDE SOURCES". THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL
<br />REVEAL THE TYPES, EXTENT, SIZES, LOCATION, AND DEPTHS OF SUCH UNDERGROUND UTIUTIES CONTI do ASSOCIATES,
<br />INC. CAN ASSUME NO RESPONSIBIUTY FOR THE COMPLETENESS OR ACCURACY OF ITS DELINEATION OF SUCH
<br />UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED BUT WHICH ARE NOT SHOWN ON THESE DRAWINGS.
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES
<br />AND SHALL CONTACT THE RESPECTIVE UTILITY COMPANIES PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR THE LOCATION AND PRESERVATION OF ALL SUCH FACIUTIES IN THE AREA OF
<br />CONSTRUCTION, AND SHALL NOTIFY USA (UNDERGROUND SERVICE ALERT 11-800-642-2444) 48 HOURS PRIOR TO
<br />BEGIN CONSTRUCTION
<br />5. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 1540 (A)(1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE
<br />8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS
<br />BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS AMENDED, WHICH STATE:
<br />PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATION:I.E.,
<br />SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND
<br />INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN
<br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING AND/OR DIGGING; AND WHEN IT IS
<br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FROM THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF
<br />UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS
<br />PRIOR TO THE START OF ACTUAL EXCAVATION.
<br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE REMOVAL AND/OR RELOCATION OF ALL EXISTING
<br />UTILITIES WITH RESPECTIVE UTILITY COMPANIES.
<br />7, FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN THE ROAD RIGHT-OF-WAY PRIOR TO COMPLETION OF UTILITY
<br />RELOCATION WITHOUT SPECIFIC APPROVAL OF THE COUNTY OF SAN JOAQUIN.
<br />8. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION
<br />FROM THE OWNER'S REPRESENTATIVE.
<br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE SITE AND SURROUNDING AREAS RESULTING
<br />FROM OPERATIONS PRIOR TO ACCEPTANCE OF HIS WORK.
<br />10. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF EXISTING FACILITIES. THE CONTRACTOR
<br />IS RESPONSIBLE TO REPAIR, TO THE SATISFACTION OF THE COUNTY OF SAN JOAQUIN, ANY FACILITIES DAMAGED
<br />DURING CONSTRUCTION AT NO COST TO THE OWNER.
<br />11. CONTRACTOR TO REFERENCE AND RESTORE ALL "RECORDED" EXISTING MONUMENTS AND/OR PROPERTY CORNER
<br />REFERENCES DESTROYED, REMOVED OR DISTURBED DURING THE COURSE OF CONSTRUCTION
<br />12. DRAINAGE FACIUTIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT WEATHER AND RESTORED TO THEIR
<br />PCOMPLETION
<br />ORIGINAL CONDITIONS U ONF THE WORK.
<br />O
<br />13. CONTRACTOR SHALL VERIFY ALL STREET NAMES AND BLOCK NUMBERS WITH THE COMMUNITY DEVELOPMENT
<br />DEPARTMENT BEFORE ORDERING STREET SIGNS.
<br />14. WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THE SPECIFICATIONS,
<br />THE PAVEMENT SHALL BE REPLACED, AFTER PROPER BACKFILLING, WITH PAVEMENT MATERIALS EQUAL TO OR BETTER
<br />THAN THE MATERIALS USED IN THE ORIGINAL PAVING.
<br />15. ANY CONSTRUCTION ACTIVITY THAT RESULTS IN THE DISTURBANCE OF AT LEAST ONE (1) ACRE OF SOIL SHALL
<br />REQUIRE A STATE NATIONAL POLLUTANT DISCHARGE EUMINATION SYSTEM CONSTRUCTION PERMIT.
<br />CONSTRUCTM NM
<br />1. THE CENTERLINE STATIONING SHOWN IS FOR REFERENCE ONLY. THE CONTRACTOR SHALL LAYOUT IMPROVEMENTS
<br />FROM THE DIMENSIONS SHOWN ON THE PLANS. ANY CLARIFICATION ON CONFLICTS, DISCREPANCIES OR AMBIGUITIES
<br />SHOULD BE DIRECTED TO THE "ENGINEER" PRIOR TO THE CONSTRUCTION OF THE IMPROVEMENTS.
<br />2. WHERE PAVEMENT IS TO BE EXTENDED, EXISTING PAVEMENT SHALL BE SAWCUT.
<br />3. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SIGNS FOR ALL REGULATORY TRAFFIC SIGNS REMOVED
<br />DURING THE COURSE OF CONSTRUCTION.
<br />4. THE CONTRACTOR SHALL PROVIDE OWN CONSTRUCTION WATER.
<br />5. CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES AT ALL TIMES DURING CONSTRUCTION AS PER SECTION 10
<br />OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA PER SAN JOAQUIN COUNTY DEPARTMENT OF PUBUC
<br />WORKS REQUIREMENTS.
<br />1. CONTRACTOR AGREES;TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING THE
<br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THIS
<br />REQUIREMENT SHALL APPLY CONTINUOSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE
<br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS, THE COUNTY OF SAN JOAQUIN, ITS ELECTED
<br />OFFICIALS, OFFICERS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS, COSTS OF LITIGATION, DAMAGES, AND
<br />ATTORNEY'S FEES, FOR PERSONAL INJURY OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH ARE CLAIMED TO
<br />HAVE OCCURRED DURING THE TERM OF THIS PROJECT.
<br />2. ANY CHANGES TO THE APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS MUST BE PREPARED AND CERTIFIED BY
<br />THE "ENGINEER", AND SHALL BE SUBMITTED TO THE DIRECTOR OF PUBUC WORKS FOR APPROVAL PRIOR TO
<br />IMPLEMENTATION,
<br />3. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM THE TO "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES"
<br />(MUTCD), AND THE MUTCD CALIFORNIA SUPPLEMENT AND SAN JOAQUIN COUNTY STANDARDS AND AS SHOWN ON THE
<br />PLANS.
<br />SECTION 3-4 GUARANTEE. --THE COMPLETED PROJECT, INCLUDING ALL WORK MATERIALS, DEVICES AND EQUIPMENT,
<br />SHALL BE GUARANTEED BY THE DEVELOPER AGAINST FAULTY WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR
<br />AFTER FINAL ACCEPTANCE BY THE BOARD OF SUPERVISORS. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL REPAIR
<br />AND/OR REPLACEMENTS INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, DEVICES, PLANT AND OTHER ITEMS OF WORK
<br />NECESSARY. TO SECURE THIS GUARANTEE, A BOND OR OTHER SECURITY SHALL BE PROVIDED IN THE AMOUNT OF 100%
<br />(DEPARTMENT OF PUBLIC WORKS DETERMINES IF 100% PEERFORMANCE CAN BE REDUCED TO 20%) OF THE VALUE OF
<br />WORK ESTIMATED BY THE ENGINEER. SAID BOND SHALL CONTINUE IN FULL FORCE AND EFFECT FOR A PERIOD OF ONE
<br />V4116-NYEAR FROM THE DATE OF THE FORMAL ACCEPTANCE OF THE WORK BY THE BOARD OF SUPERVISORS.
<br />SECTION 3-5 INSPECTION DURING CONSTRUCTION.-- ANY IMPROVEMENTS CONSTRUCTED TO THESE SPECIFICATIONS AND
<br />WHICH IT IS INTENDED THAT THE COUNTY WILL ASSUME MAINTENANCE RESPONSIBIUTY, MUST BE INSPECTED DURING
<br />CONSTRUCTION BY AN AUTHORIZED AGENT OF THE DEVELOPER AND DIRECTOR. EACH PHASE OF CONSTRUCTION MUST BE
<br />INSPECTED AND APPROVED PRIOR TO PROCEEDING TO THE SUBSEQUENT PHASES.
<br />ANY IMPROVEMENTS CONSTRUCTED WITHOUT INSPECTION AS PROVIDED ABOVE OR CONSTRUCTED CONTRARY TO THE
<br />ORDERS OR INSTRUCTIONS OF THE AUTHORIZED AGENT OF THE DEVELOPER AND DIRECTOR WILL BE DEEMED AS NOT
<br />COMPLYING WITH SAN JOAQUIN COUNTY STANDARDS AND SPECIFICATIONS, AND WILL NOT BE ACCEPTED BY SAN JOAQUIN
<br />COUNTY FOR MAINTENANCE PURPOSES. THE DEVELOPER WILL HAVE COMPACTION TESTS TAKEN ON ALL LOTS WHERE THE
<br />DEPTH OF FILL IS GREATER THAN SEVEN (7") INCHES AND WITHIN THE STREETS. RE -TEST THAT ARE THE RESULT OF
<br />THE CONTRACTOR'S FAILURE TO COMPACT THESE AREAS AS REQUIRED WILL BE BORNE BY THE CONTRACTOR. THE
<br />COUNTY DEPARTMENT OF PUBUC WORKS WILL PERFORM FIELD INSPECTION FOR THIS PROJECT. THE CML ENGINEER,
<br />DIRECTOR AND DEVELOPER, OR THEIR AGENTS, SHALL AT ALL TIMES, HAVE ACCESS TO THE WORK DURING ITS
<br />CONSTRUCTION, AND SHALL BE FURNISHED WITH EVERY REASONABLE FACILITY FOR ASCERTAINING THAT THE MATERIALS
<br />AND THE WORKMANSHIP ARE IN ACCORDANCE WITH THE REQUIREMENTS AND INTENTIONS OF THESE SPECIFICATIONS,
<br />SPECIAL PROVISIONS. AND PLANS. ALL WORK DONE AND ALL MATERIALS FURNISHED SHALL BE SUBJECT TO REVIEW. THE
<br />REVIEW OF THE WORK OR MATERIALS SHALL NOT RELIEVE THE CONTRACTOR AND DEVELOPER OF ANY OF THEIR
<br />OBLIGATIONS TO FULFILL THEIR CONTRACT AS PRESCRIBED.
<br />SECTION 3-6 FINAL REVIEW. --UPON COMPLETION OF ALL IMPROVEMENTS WHICH ARE CONSTRUCTED UNDER AND IN
<br />CONFORMANCE WITH THESE STANDARDS AND SPECIFICATIONS, AND PRIOR TO REQUESTING FINAL INSPECTION, THE AREA
<br />SHALL BE THOROUGHLY CLEANED OF ALL RUBBISH, EXCESS MATERIAL AND EQUIPMENT; AND ALL PORTIONS OF THE WORK
<br />SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION, SATISFACTORY TO THE DIRECTOR AND THE DEVELOPER.
<br />SECTION 3-7 RECORD DRAWINGS. --THE CIVIL ENGINEER SHALL KEEP AN ACCURATE RECORD OF ALL APPROVED
<br />DEVIATIONS FROM THE PLANS AND SHALL PROVIDE A COPY OF THESE RECORDS TO THE DIRECTOR UPON COMPLETION
<br />OF OF THE WORK. THESE ARE TO BE UTIUZED WITH THE INSPECTOR'S PLANS FOR PREPARING A COMPLETE AND
<br />ACCURATE SET OF "RECORD DRAWINGS" FOR THE PERMANENT RECORDS OF THE COUNTY. PREPARATION OF THE "RECORD
<br />DRAWINGS" IS THE RESPONSIBILITY OF THE DEVELOPER AND HIS CIVIL ENGINEER. "RECORD DRAWINGS" SHALL BE
<br />SUBMITTED TO THE DIRECTOR PRIOR TO ACCEPTANCE OF WORK AS COMPLETE. APPROVED DEVIATIONS SHALL BE
<br />RECORDED IN RED INK ON THE ORIGINAL APPROVED PLANS, NOT REPRODUCIBLE COPIES. THE ORIGINAL PLANS SHALL
<br />NOT BE REMOVED FROM THE DEPARTMENT OF PUBUC WORKS FOR PREPARATION OF "RECORD DRAWINGS". A WORK
<br />AREA WILL BE AVAILABLE FOR MAKING ADDITIONS OR CORRECTIONS, AS WILL THE "RECORD DRAWING" STAMP AND PEN
<br />WITH RED INK, IF REQUESTED.
<br />SECTION 7 ALTERNATE A. MAINTAINING TRAFFIC.—ATTENTION IS DIRECTED TO SECTIONS 7-1.08, "PUBUC CONVENIENCE,
<br />"7-1.09, "PUBUC SAFETY," AND 12, "CONSTRUCTION AREA TRAFFIC CONTROL DEVICES," OF THE STANDARD
<br />SPECIFICATIONS AND THESE SPECIAL PROVISIONS. CONSTRUCTION AREA TRAFFIC CONTROL DEVICES SHALL BE IN
<br />ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE MUTCD CAUFORNIA
<br />SUPPLEMENT AND THE CURRENT WORK AREA TRAFFIC CONTROL HANDBOOK. (BUILDING NEWS). THROUGH PUBUC TRAFFIC
<br />SHALL BE PERMITTED TO PASS THROUGH CONSTRUCTION OPERATIONS AT ALL TIMES WITH AS UTILE INCONVENIENCE AND
<br />DELAY AS POSSIBLE. THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN ALL CONSTRUCTION AREA TRAFFIC CONTROL
<br />DEVICES WITHIN THE PROJECT AND AT ALL PUBLIC ROAD ENTRANCES TO THE PROJECT.
<br />SECTION 10 DUST CONTROL. --DUST CONTROL SHALL CONFORM TO THE REQUIREMENTS IN SECTION 10, "DUST CONTROL,"
<br />OF THE STANDARD SPECIFICATIONS.
<br />SECTION 16 ALTERNATE A CLEARING AND GRUBBING. --CLEARING AND GRUBBING SHALL CONFORM TO THE
<br />REQUIREMENTS IN SECTION 16, "CLEARING AND GRUBBING," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL
<br />PROVISIONS.
<br />TREE BRANCHES EXTENDING OVER THE ROADWAY PAVEMENT AND WHICH HANG WITHIN 15 FEET OF FINISHED GRADE
<br />SHALL BE CUT OFF IN A WORKMANLIKE MANNER.
<br />BURNING WILL BE ALLOWED WHEN PERMITTED BY THE SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT
<br />SECTION 19 ALTERNATE A EARTHWORK. --EARTHWORK SHALL CONFORM TO THE REQUIREMENTS IN SECTION 19,
<br />"EARTHWORK." OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALL RELATIVE COMPACTION
<br />REQUIREMENTS OF SECTION 19-5, "COMPACTION," OF THE STANDARD SPECIFICATIONS, SHALL BE NOT LESS THAN 90
<br />PERCENT. THE REQUIREMENT OF THE SECOND PARAGRAPH OF SECTION 19-5.03, "RELATIVE COMPACTION (95 PERCENT),
<br />OF THE STANDARD SPECIFICATIONS, WILL BE REQUIRED ONLY IN THOSE AREAS SHOWN ON THE PLANS. IN LIEU OF
<br />THE TOLERANCE SPECIFIED IN SECTION 19-1.03B, "GRADE TOLERANCE," OF THE STANDARD SPECIFICATIONS, THE SURFACE
<br />OF THE GRADING PLANE SHALL NOT BE MORE THAN 0.05 FOOT ABOVE OR BELOW THE GRADE ESTABUSHED BY THE
<br />ENGINEER. BEFORE GRADE IS APPROVED BY THE COUNTY, ALL EARTHWORK (INCLUDING DRIVEWAYS AND SLOPES) SHALL
<br />BE COMPACTED TO GRADE. UNLESS OTHERWISE SHOWN ON THE PLANS, ALL SURPLUS MATERIALS NOT TO BE SALVAGED,
<br />STOCKPILED OR DISPOSED OF AS PROVIDED IN SECTION 19-2.06, "SURPLUS MATERIAL," OF THE STANDARD
<br />SPECIFICATIONS, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF AS PROVIDED IN SECTION
<br />7-1.13, "DISPOSAL OF MATERIAL OUTSIDE THE HIGHWAY RIGHT OF WAY," OF THE STANDARD SPECIFICATIONS. UNLESS
<br />OTHERWISE SHOWN ON THE PLANS, THE EXISTING PAVEMENT, WHEN USED AS EMBANKMENT, SHALL BE BROKEN UP INTO
<br />PIECES NOT LARGER THAN 0.33 FOOT IN GREATEST DIMENSION.
<br />SECTION 19 ALTERNATE C EARTHWORK (STRUCTURE EXCAVATION & BACKFILL). --STRUCTURE EXCAVATION AND BACKFILL
<br />SHALL CONFORM TO THE REQUIREMENTS IN SECTION 19-3, "STRUCTURE EXCAVATION AND BACKFILL,' OF THE STANDARD
<br />SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALL REFERENCES TO CULVERT EXCAVATION AND CULVERT BACKFILL ON
<br />THE PLANS SHALL BE DEEMED TO MEAN STRUCTURE EXCAVATION AND STRUCTURE BACKFILL, RESPECTIVELY, IN THE
<br />STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. STRUCTURE BACKFILL WHICH IS OUTSIDE OF THE PAVED
<br />PORTIONS OF THE ROADWAY, UNLESS OTHERWISE SPECIFIED ON THE PLANS, SHALL BE NATIVE MATERIAL SELECTED FOR
<br />ITS RESISTANCE TO EROSION. COMPACTION REQUIREMENTS: UNLESS OTHERWISE SHOWN ON THE PLANS, THE COMPACTION
<br />REQUIREMENTS WITHIN THE LIMITS OF STRUCTURE EXCAVATION FOR PIPES AND ARCHES SHALL BE AS SHOWN ON
<br />STANDARD DRAWINGS. PONDING AND JETTING WILL BE PERMITTED ONLY IF A MAINTENANCE BOND IN THE AMOUNT OF
<br />TWENTY PERCENT (20%) OF THE ENGINEER'S ESTIMATE WITH A CORPORATE SURETY APPROVED BY THE COUNTY IS
<br />PROVIDED. SUCH A BOND SHALL BE PROVIDED BEFORE FINAL ACCEPTANCE OF THE PROJECT BY THE COUNTY AND SHALL
<br />GUARANTEE THE REPAIR OF ALL DAMAGES DUE TO FAULTY MATERIALS OR WORKMANSHIP PROVIDED OR DONE BY THE
<br />CONTRACTOR. THE GUARANTEE SHALL REMAIN IN EFFECT FOR A PERIOD OF THREE (3) YEARS AFTER THE DATE OF FINAL
<br />ACCEPTANCE OF THE PROJECT BY THE COUNTY OR BOARD OF SUPERVISORS.
<br />SECTION 22 FINISHING ROADWAY. --FINISHING ROADWAY SHALL CONFORM TO THE REQUIREMENTS IN SECTION 22,
<br />"FINISHING ROADWAY," OF THE STANDARD SPECIFICATIONS.
<br />SECTION 26 ALTERNATE A AGGREGATE BASE. --AGGREGATE BASE SHALL CONFORM TO THE REQUIREMENTS IN SECTION 26,
<br />"AGGREGATE BASES," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. AGGREGATE BASE SHALL BE
<br />CLASS 2. THE COMBINED AGGREGATE SHALL CONFORM TO THE GRADING SPECIFIED FOR THE 3/4 -INCH MAXIMUM
<br />AGGREGATE. THE R -VALUE REQUIREMENT MAY BE WANED, PROVIDING THE AGGREGATE BASE COMFORMS TO THE SPECIFIED
<br />GRADING AND DURABILITY AND HAS A SAND EQUIVALENT VALUE OF 33 OR MORE.
<br />SECTION 39 ALTERNATE A ASPHALT CONCRETE. --ASPHALT CONCRETE SHALL CONFORM TO THE REQUIREMENTS IN SECTION
<br />39, "ASPHALT CONCRETE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS.
<br />ASPHALT CONCRETE SHALL BE TYPE "B". AGGREGATE SHALL CONFORM TO THE 1/2 -INCH MAXIMUM, COARSE OR MEDIUM
<br />GRADING AS DETERMINED BY THE ENGINEER AND DIRECTOR. AT THE CONTRACTOR'S OPTION, AND WITH APPROVAL OF THE
<br />ENGINEER AND DIRECTOR, AGGREGATE MAY BE 3/4 -INCH MAXIMUM, MEDIUM GRADING WITH THE EXCEPTION OF THE FINAL
<br />FINISH COURSE.
<br />AGGREGATE CONFORMING TO THE 3/8 -INCH MAXIMUM GRADING WILL BE PERMITTED FOR USE IN DRIVEWAYS, DIKES AND
<br />OTHER AREAS WITH APPROVAL OF THE ENGINEER AND DIRECTOR.
<br />THE AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE SHALL BE BETWEEN 50 AND 7% BY WEIGHT OF
<br />THE DRY AGGREGATE. THE EXACT AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE AGGREGATE WILL BE DETERMINED
<br />BY THE ENGINEER. THE AR VISCOSITY GRADE OF THE ASPHALT BINDER SHALL BE 4,000 UNLESS OTHERWISE SHOWN ON
<br />THE PLANS. THE PROVISIONS OF PARAGRAPHS 5 THROUGH 8 OF SECTION 39.03, "PROPORTIONING," OF THE STANDARD
<br />SPECIFICATIONS, SHALL NOT APPLY TO THIS PROJECT.
<br />WHEN THE ASPHALT CONCRETE IS TO BE PRODUCED IN A BATCH PLANT, THE ASPHALT CONCRETE SHALL BE
<br />PROPORTIONED AND MIXED BY THE AUTOMATIC METHOD.
<br />WHEN SHOWN IN THE ENGINEER'S ESTIMATE PRIME COAT, UQUID ASPHALT PENETRATION GRADE SHALL BE SC -70 OR
<br />SC -250 AS DIRECTED BY THE ENGINEER AND DIRECTOR. THE PLACEMENT OF ASPHALT CONCRETE SHALL NOT BEGIN
<br />UNTIL 24 HOURS AFTER THE PRIME COAT IS APPLIED.
<br />PAINT BINDER (TACK COAT) SHALL BE APPLIED AT A RATE OF APPROXIMATELY 0.05 GALLON PER SQUARE YARD, UNLESS
<br />OTHERWISE SHOWN ON THE PLANS.
<br />ALL STEEL -TIRED ROLLERS SHALL BE OF THE TANDEM TYPE. THE THIRD PARAGRAPH OF SECTION 39-5.02, "COMPACTING
<br />EQUIPMENT," OF THE STANDARD SPECIFICATIONS, SHALL BE DELETED.
<br />THE DUMPING OF MATERIAL IN A WINDROW, IN ACCORDANCE WITH SECTION 39-6.01, "GENERAL REQUIREMENTS," OF THE
<br />STANDARD SPECIFICATIONS, SHALL BE LIMITED TO 750 FEET IN ADVANCE OF THE PAVING MACHINE.
<br />THE SIXTH PARAGRAPH IN SECTION 39-6.01, "GENERAL REQUIREMENTS," OF THE STANDARD SPECIFICATIONS, SHALL BE
<br />AMENDED BY DELETING THE SECOND FOOTNOTE, WHICH READS, "AT THE OPTION OF THE CONTRACTOR, [0.25' OVERLAY]
<br />MAY BE PLACED IN ONE LAYER 0.25' THICK."
<br />THE TENTH PARAGRAPH OF SECTION 39-6.03, "COMPACTING," OF THE STANDARD SPECIFICATIONS, ALLOWING THE USE OF
<br />"ALTERNATIVE COMPACTING EQUIPMENT" SHALL BE DELETED.
<br />UNLESS OTHERWISE SHOWN ON THE PLANS, ASPHALT PAVER EQUIPMENT USED TO PLACE ASPHALT CONCRETE SHALL BE
<br />EQUIPPED WITH FULL AUTOMATIC SCREED AND GRADE SENSING CONTROLS WHICH SHALL CONTROL THE LONGITUDINAL
<br />GRADE AND TRANSVERSE SLOPE OF THE SCREED. THE CONTROLS SHALL BE ACTUATED BY GRADE AND SLOPE
<br />REFERENCES. CORRECTIONS ON ACCOUNT OF DEVIATIONS FROM THE REFERENCES SHALL BE AUTOMATIC. GUIDES AND
<br />REFERENCES REQUIRED TO CONTROL THE LONGITUDINAL GRADE AND TRANSVERSE SLOPES SHALL BE FURNISHED AND
<br />INSTALLED BY THE CONTRACTOR.
<br />SHOULD THE CONTRACTOR ELECT TO USE A SKI DEVICE FOR LONGITUDINAL CONTROL, THE MINIMUM LENGTH OF THE
<br />DEVICE SHALL BE 30 FEET. THE DEVICE SHALL BE A RIGID UNIT MOUNTED ON MULTIPLE SUPPORTS. EACH SUPPORT
<br />SHALL ACT INDEPENDENTLY OF OTHERS AND THE FINISHED GRADE SHALL NOT BE AFFECTED BY THE ACTION OF A SINGLE
<br />SUPPORT.
<br />WHEN ASPHALT CONCRETE GUTTERS ARE DESIGNATED ON THE PLANS, A STRINGUNE OR WIRE GRADE REFERENCE SHALL
<br />BE REQUIRED TO CONTROL LONGITUDINAL GRADE OF THE GUTTER. THE GUTTER SHALL BE WATER TESTED BEFORE
<br />ACCEPTANCE. THE MAXIMUM DEVIATION FROM A TRUE GRADE SHALL NOT RESULT IN PONDING WATER FOR DEPTH
<br />EXCEEDING 0.04 FOOT.
<br />SURFACING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT, AT THE END OF EACH DAY'S WORK, THE
<br />DISTANCE BETWEEN THE ENDS OF ADJACENT SURFACED LANES SHALL NOT BE GREATER THAN CAN BE COMPLETED IN
<br />THE FOLLOWING DAY OF NORMAL SURFACING OPERATIONS.
<br />PORTABLE DELINEATORS IN CONFORMANCE WITH SECTION 12-3.04, "PORTABLE DELINEATORS," OF THE STANDARD
<br />SPECIFICATIONS SHALL BE FURNISHED AND PLACED AT A MAXIMUM SPACING OF 300 FEET ON TANGENTS AND 100 FEET
<br />ON CURVES ALONG ANY EDGE OF NEW SURFACING WHICH HAS A DROP OFF OF MORE THAN 0.10 FOOT. DEUNEATORS
<br />SHALL BE STAGGERED WHEN REQUIRED ON BOTH SIDES OF TRAFFIC.EXISTING PAVEMENT MARKERS SHALL BE REMOVED
<br />AND DISPOSED OF, UNLESS OTHERWISE SHOWN ON THE PLANS.
<br />DURING THE REMOVAL OF CERAMIC TYPE PAVEMENT MARKERS, SCREENS, OR OTHER PROTECTIVE DEVICES SHALL BE
<br />FURNISHED TO CONTAIN ANY FRAGMENTS AS PROVIDED FOR IN SECTION 7-1.09, "PUBUC SAFETY," OF THE STANDARD
<br />SPECIFICATIONS.
<br />SECTION 39 ALTERNATE E UQUID ASPHALT (PRIME COAT).--UQUID ASPHALT (PRIME COAT) SHALL CONFORM TO THE
<br />REQUIREMENTS IN SECTIONS 39, "ASPHALT CONCRETE," AND 93, "LIQUID ASPHALT," OF THE STANDARD SPECIFICATIONS
<br />AND THESE SPECIAL PROVISIONS. UQUID ASPHALT SHALL BE GRADE SC -70 OR SD -250 AND SHALL BE APPLIED AT THE
<br />APPROXIMATE TOTAL RATE OF 0.25 GALLON PER SQUARE YARD IN ONE APPLICATION, THE GRADE AND EXACT RATE OF
<br />APPLICATION WILL BE DETERMINED BY THE ENGINEER AND THE DIRECTOR. LIQUID ASPHALT SHALL NOT BE APPLIED WHEN
<br />THE ATMOSPHERIC TEMPERATURE IS BELOW 50' F. AT LOCATIONS WHERE PUBLIC TRAFFIC IS BEING ROUTED OVER THE
<br />ROADBED TO BE TREATED, THE PRIME COAT SHALL NOT BE APPLIED TO MORE THAN ONE-HALF THE WIDTH OF THE
<br />TRAVELED WAY AT A TIME, AND THE REMAINING WIDTH SHALL BE KEPT FREE OF OBSTRUCTIONS AND OPEN FOR USE BY
<br />PUBLIC TRAFFIC UNTIL THE TREATMENT FIRST APPLIED IS READY FOR USE BY PUBLIC TRAFFIC. LIQUID ASPHALT SHALL
<br />NOT BE APPLIED UNTIL A MINIMUM OF 24 HOURS AFTER THE COUNTY HAS ACCEPTED THE AGGREGATE BASE FOR
<br />SURFACE TOLERANCES AND COMPACTION REQUIREMENTS.
<br />NO. 62009
<br />EXP. 9/30/2007
<br />Design
<br />DMA
<br />Check
<br />AMC
<br />Date
<br />06/02/06
<br />Scale
<br />AS SHOWN
<br />Original Drawing Scale
<br />ID �„ 1„
<br />LJ_LJ_LJ_LJ�
<br />Sheet Number
<br />2 Of 10
<br />Project File No.
<br />04-124
<br />N
<br />W
<br />U
<br />L0
<br />0
<br />z
<br />0
<br />O
<br />dE
<br />W
<br />In
<br />N
<br />Na
<br />m
<br />Q
<br />0
<br />U
<br />W
<br />Q
<br />U
<br />Y
<br />d
<br />\J
<br />/
<br />0
<br />IU
<br />Q
<br />Z
<br />3
<br />}
<br />0
<br />H
<br />N
<br />I—
<br />W
<br />O
<br />z
<br />0
<br />z
<br />(�
<br />—n
<br />UW�N
<br />m
<br />Q
<br />Design
<br />DMA
<br />Check
<br />AMC
<br />Date
<br />06/02/06
<br />Scale
<br />AS SHOWN
<br />Original Drawing Scale
<br />ID �„ 1„
<br />LJ_LJ_LJ_LJ�
<br />Sheet Number
<br />2 Of 10
<br />Project File No.
<br />04-124
<br />N
<br />W
<br />L0
<br />0
<br />0
<br />O
<br />In
<br />0
<br />Q
<br />Y
<br />d
<br />\J
<br />/
<br />0
<br />z
<br />U
<br />=0
<br />H
<br />N
<br />0
<br />>
<br />0
<br />J
<br />m
<br />Q
<br />CL
<br />i=
<br />0
<br />Z
<br />Q
<br />rW^
<br />v
<br />W
<br />Design
<br />DMA
<br />Check
<br />AMC
<br />Date
<br />06/02/06
<br />Scale
<br />AS SHOWN
<br />Original Drawing Scale
<br />ID �„ 1„
<br />LJ_LJ_LJ_LJ�
<br />Sheet Number
<br />2 Of 10
<br />Project File No.
<br />04-124
<br />
|