PORTLAND CEMENT USED IN THE PRODUCTION OF CONCRETE PRODUCTS SET FORTH IN THIS SECTION SHALL CONED
<br />TO THE PROVISIONS IN SECTION 90, "PORTLAND CEMENT CONCRETE," OF THE STANDARD SPECIFICATIONS.
<br />CEMENT MORTAR SHALL CONFORM TO THE PROVISIONS IN SECTION 65-1.06, "JOINTS," OF THE STANDARD
<br />SPECIFICATIONS.
<br />PRIOR TO CAULKING VITRIFIED CLAY PIPE WITH CEMENT MORTAR, NOT MORE THAN ONE-THIRD THE ANNULAR SPACE
<br />SHALL FIRST BE CAULKED WITH JUTE PRE -DIPPED IN CEMENT SLURRY.
<br />HOT -POURED COMPOUNDS AND PRIMERS CONSISTING OF BITUMINOUS OR COAL TAR PRODUCTS, AND USED FOR
<br />CAULKING BELL AND SPIGOT TYPE VITRIFIED CLAY PIPE, SHALL BE OF THE TYPE RECOMMENDED BY THE PIPE
<br />MANUFACTURER FOR THE PURPOSE INTENDED.
<br />THE PRIMER SHALL BE APPLIED TO THE SPIGOT AND INSIDE OF THE BELL AT LEAST TWENTY-FOUR (24) HOURS BEFORE
<br />THE JOINTS ARE POURED. THE SURFACES SHALL BE DRY BEFORE APPLYING THE PRIMER.
<br />THE JOINTS OF VITRIFIED CLAY PIPE SHALL BE CAULKED WITH DRY JUTE PRIOR TO POURING THE HOT COMPOUNDS. THE
<br />COMPOUND SHALL BE HEATED TO THE TEMPERATURE RECOMMENDED BY THE MANUFACTURER.
<br />FLEXIBLE COMPRESSION JOINTS IN VITRIFIED CLAY PIPE AND RESILIENT JOINT MATERIALS TO BE USED THEREIN SHALL
<br />CONFORM TO THE REQUIREMENTS OF ASTM DESIGNATION: C 425.
<br />RUBBER GASKETED JOINTS SHALL CONFORM TO THE PROVISIONS IN SECTION 65-1.06, "JOINTS," OF THE STANDARD
<br />SPECIFICATIONS.
<br />MISCELLANEOUS IRON AND STEEL ITEMS SHALL CONFORM TO THE PROVISIONS IN SECTION 75, "MISCELLANEOUS METAL,"
<br />OF THE STANDARD SPECIFICATIONS.
<br />REINFORCEMENT SHALL CONFORM TO THE PROVISIONS IN SECTION 52, "REINFORCEMENT; OF THE STANDARD
<br />SPECIFICATIONS.
<br />CONCRETE SHALL CONFORM TO THE PROVISIONS IN SECTION 51, "CONCRETE STRUCTURES," AND SECTION 90,
<br />"PORTLAND CEMENT CONCRETE," OF THE STANDARD SPECIFICATIONS. CONCRETE FOR SEWER STRUCTURES SHALL BE
<br />CLASS A UNLESS OTHERWISE SHOWN ON THE PLANS.
<br />INSTALLATION
<br />EXCAVATION AND BACKFILL SHALL CONFORM TO THE PROVISIONS IN SECTION 19 ALTERNATE C, "EARTHWORK (STRUCTURE
<br />EXCAVATION AND BACKFILL); OF THESE SPECIAL PROVISIONS.
<br />THE PIPE SHALL BE LAID IN A TRENCH EXCAVATED TO THE LINES AND GRADES DESIGNATED BY THE ENGINEER. THE
<br />BOTTOM OF THE TRENCH SHALL BE GRADED AND PREPARED TO PROVIDE A FIRM AND UNIFORM BEARING THROUGHOUT
<br />THE ENTIRE LENGTH OF THE PIPE BARREL.
<br />SUITABLE EXCAVATION SHALL BE MADE TO RECEIVE THE BELL OF THE PIPE AND THE JOINT SHALL NOT BEAR UPON THE
<br />BOTTOM OF THE TRENCH. ALL ADJUSTMENT TO UNE AND GRADE SHALL BE MADE BY SCRAPING AWAY OR FILLING IN
<br />WITH SAND, GRAVEL, OR GRANULAR MATERIAL UNDER THE BODY OF THE PIPE, AND NOT BY WEDGING OR BLOCKING.
<br />TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED FEET (300') IN ADVANCE OF PIPE LAYING
<br />OPERATIONS OR TWO HUNDRED FEET (200') TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE DIRECTOR.
<br />THE EXCAVATION SHALL BE SUPPORTED SO THAT IT WILL BE SAFE AND THAT THE GROUND ALONGSIDE THE EXCAVATION
<br />WILL NOT SLIDE OR SETTLE, AND ALL EXISTING IMPROVEMENTS, EITHER ON PUBLIC OR PRIVATE PROPERTY, WILL BE
<br />FULLY PROTECTED FROM DAMAGE.
<br />ALL SUPPORTS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED, UNLESS OTHERWISE DIRECTED BY THE
<br />ENGINEER, AND SHALL BE WITHDRAWN IN A MANNER THAT WILL PREVENT THE CAVING OF THE SIDES OF THE
<br />EXCAVATION. ALL OPENINGS CAUSED BY THE REMOVAL OF SUPPORTS SHALL BE FILLED WITH SUITABLE MATERIAL
<br />PROPERLY COMPACTED.
<br />BACKFILL OF PIPE TRENCHES MAY BE PLACED WHILE THE JOINT MORTAR IS STILL PLASTIC. SHOULD THE JOINT MORTAR
<br />BECOME SET BEFORE THE BACKFILL IS PLACED, BACKFILLING THE PIPE TRENCHES SHALL NOT BE COMMENCED WITHIN
<br />SIXTEEN (16) HOURS OF JOINTING THE PIPE SECTIONS.
<br />PIPE SHALL BE PROTECTED DURING HANDLING AGAINST IMPACT SHOCKS AND FREE FALL.
<br />WHEN THE NEW FACILITIES INTERFERE WITH THE EXISTING FLOW OF SEWAGE, THE CONTRACTOR SHALL PROVIDE
<br />SATISFACTORY BYPASS FACILITIES AT HIS EXPENSE.
<br />THE PIPE SHALL BE LAID WITHOUT BREAK UPGRADE FROM STRUCTURE TO STRUCTURE, WITH BELL END UPGRADE FOR
<br />BELL AND SPIGOT PIPE, UNLESS OTHERWISE PERMITTED BY THE DIRECTOR.
<br />SEWER PIPE SHALL BE CONNECTED TO EXISTING FACILITIES AS SHOWN ON THE PLANS AND AS DIRECTED BY THE
<br />ENGINEER.
<br />WHENEVER THE WORK CEASES FOR ANY REASON, THE END OF THE PIPE SHALL BE SECURELY CLOSED WITH A TIGHT
<br />FITTING PLUG OR COVER.
<br />WHENEVER EXISTING PIPES ARE TO BE CUT OR ABANDONED, THE OPEN ENDS OF SAID PIPES SHALL BE SECURELY
<br />CLOSED BY A TIGHT FITTING PLUG OR WALL OF CONCRETE NOT LESS THAN 0.5 FOOT THICK.
<br />ALL JOINTS SHALL BE CAREFULLY CLEANED ON THE INSIDE.
<br />STOPPERS FOR PIPES AND BRANCHES LEFT UNCONNECTED SHALL BE MADE OF THE SAME MATERIAL AS THE PIPE, OR
<br />OF RESILIENT JOINT MATERIAL CONFORMING TO THE REQUIREMENTS OF ASTM DESIGNATION: C 425. AFTER PLACING THE
<br />STOPPER, IT SHALL BE COVERED WITH A LAYER OF SEALANT. THE SEALANT SHALL BE SUFFICIENTLY FLUID TO ENSURE
<br />FREE FLOW AROUND THE STOPPER.
<br />WHERE SHOWN ON THE PLANS OR DIRECTED BY THE ENGINEER, SEWER PIPE SHALL BE ENCASED IN CONCRETE,
<br />REINFORCED WITH CONCRETE, OR BACKFILLED WITH CONCRETE, IN ACCORDANCE WITH THE DETAILS SHOWN ON THE
<br />PLANS.
<br />CONCRETE FOR PIPE ENCASEMENT, PIPE REINFORCEMENT, AND BACKFILL SHALL CONFORM TO THE PROVISIONS IN
<br />SECTION 90-10, "MINOR CONCRETE," OF THE STANDARD SPECIFICATIONS, EXCEPT THAT THE MINOR CONCRETE SHALL
<br />CONTAIN NOT LESS THAN FOUR HUNDRED -SEVENTY (470) POUNDS OF CEMENT PER CUBIC YARD.
<br />ALL CONCRETE SHALL BE CURED FOR A PERIOD OF NOT LESS THAN TEN (10) DAYS AFTER BEING PLACED AND SHALL
<br />BE PROTECTED FROM DAMAGE.
<br />NEW MANHOLES, DROP INLET CONNECTIONS, LAMPHOLES, SERVICE LATERALS, SERVICE CLEANOUTS, TERMINAL CLEANOUT
<br />STRUCTURES, AND PIPE CHIMNEYS FOR SEWERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS SHOWN ON
<br />THE PLANS, AS SPECIFIED IN THESE SPECIAL PROVISIONS AND AS DIRECTED BY THE ENGINEER.
<br />PRECAST CONCRETE PIPE MANHOLES SHALL CONFORM TO THE PROVISIONS IN SECTION 70, "MISCELLANEOUS FACILITIES;
<br />OF THE STANDARD SPECIFICATIONS, EXCEPT FOR MEASUREMENT AND PAYMENT.
<br />WHEN THE MANHOLE IS LOCATED IN THE PAVEMENT AREA, IT SHALL NOT BE CONSTRUCTED TO FINAL GRADE UNTIL THE
<br />PAVEMENT HAS BEEN COMPLETED.
<br />THE INSIDE BOTTOMS OF EXISTING MANHOLES, WHERE NEW CONNECTIONS ARE MADE, AND OF NEW MANHOLES SHALL BE
<br />SHAPED TO PROVIDE CHANNELS CONFORMING TO THE SIZE AND SHAPE OF THE LOWER PORTION OF THE INLETS AND
<br />OUTLETS OF THE MANHOLES. THE CHANNELS SHALL VARY UNIFORMLY IN SIZE AND SHAPE FROM INLET TO OUTLET.
<br />NO PIPE SHALL PROJECT MORE THAN 0.17 FOOT INTO A MANHOLE AND IN NO CASE SHALL THE BELL OF A PIPE BE
<br />BUILT INTO THE WALL OF A MANHOLE OR STRUCTURE.
<br />MANHOLE COATING
<br />ALL NEW MANHOLES, AS DEFINED BELOW, DOWNSTREAM FROM HYDROGEN SULFIDE PRODUCING STRUCTURES, TO THE
<br />POINT OF CONNECTION INTO THE EXISTING: SYSTEM, SHALL RECEIVE A PROTECTIVE COATING. IN ADDITION, ANY EXISTING
<br />MANHOLES DOWNSTREAM FROM NEW HYDROGEN SULFIDE PRODUCING SEWER SYSTEMS THAT THE ENGINEER DETERMINES
<br />MAY BE AFFECTED BY NEW SEWER SYSTEMS SHALL BE COATED. AT A MINIMUM, ALL SANITARY SEWER MANHOLES
<br />DOWNSTREAM FROM ALL PUMP STATIONS, DROP MANHOLES, AND MANHOLE PUMPING STATIONS SHALL BE COATED. ALL
<br />MANHOLES USED FOR MANHOLE PUMPING STATIONS SHALL BE COATED. ALL MANHOLES CONSTRUCTED ON SEWER LINES
<br />TWENTY-FOUR INCHES (24") AND LARGER, AND ANY OTHER STRUCTURE WHERE THE ENGINEER DETERMINES THAT
<br />HYDROGEN SULFIDE GAS MAY BE A PROBLEM, SHALL BE COATED.
<br />.nQ%n4\i r/
<br />BENCH MARK:
<br />PER U.S.G.S. B.M. 19-8 1907-45.
<br />LOCATION: NORTHWEST CORNER OF MASONIC
<br />BUILDING IN THE TOWN OF WOODBRIDGE.
<br />ELEVATION: 45.85 IS MOST CURRENT PER
<br />F.E.M.A.
<br />DATE SIGNED: 'k -2 10111
<br />THE COATING MATERIAL SHALL HAVE A MINIMUM POT LIFE OF THIRTY-FIVE (35) MINUTES AT 70' F AND A DRYING TIME
<br />(ASTM D -L640) OF FOUR (4) HOURS. THE FLASH POINT OF THE INDIVIDUAL COMPONENTS AND THE FLUID MIXTURE
<br />SHALL BE A MINIMUM OF 220' F (COC). THE COATING MATERIAL SHALL HAVE A LOW TEMPERATURE TOTAL CURE
<br />CAPABILITY OF 40' F, MINIMUM.
<br />THE CURED COATING MATERIAL SHALL HAVE SUFFICIENT ABRASION RESISTANCE TO EXHIBIT A WEIGHT LOSS OF LESS
<br />THAN NINETY-TWO (92) MG WHEN MEASURED IN ACCORDANCE WITH ASTM D-4060. ADHESION (ASTM D -454L) SHALL BE
<br />400.0 PSI, MINIMUM, WITH A DIRECT IMPACT RESISTANCE (ASTM D-2794) OF EIGHTEEN INCH -POUNDS (18' -LBS). THE
<br />CURED COATING SHALL BE CAPABLE OF REPAIR AT ANY TIME DURING ITS LIFE.
<br />THE COATING SHALL BE RESISTANT TO ATTACK FROM THE FOLLOWING: OXIDIZING AGENTS SUCH AS BLEACHES, SULFURIC,
<br />ACETIC, HYDROCHLORIC, PHOSPHORIC, NITRIC, CHROMIC, OLEIC, AND STEARIC ACIDS; SODIUM AND CALCIUM HYDROXIDIES,
<br />AMMONIUM, SODIUM, CALCIUM, MAGNESIUM, AND FERRIC CHLORIDES; FERRIC SULFATE, PETROLEUM OILS AND GREASES,
<br />VEGETABLE AND ANIMAL OILS, FATS, GREASES, SOAPS, AND DETERGENTS. THE COATING SHALL BE IMPERMEABLE TO
<br />SEWAGE GASES AND LIQUIDS AND SHALL NOT BE CONDUCIVE TO BACTERIAL OR FUNGAL GROWTH.
<br />SURFACES TO BE COATED SHALL BE CLEANED OF ALL DIRT, DUST, CORROSION, LOOSE CONCRETE, GREASE, OILS AND
<br />FOREIGN MATTER. SURFACE SHALL BE ABRASIVE TREATED TO ACHIEVE A FINISH CONFORMING TO ASTM D-4259.
<br />SURFACES SHALL BE DRY PRIOR TO RECEIVING COATINGS.
<br />PRECAST CONCRETE PIPE SECTIONS SHALL BE CORED FOR THE INSTALLATION OF PIPE AND OTHER PENETRATIONS PRIOR
<br />TO BEING COATED. COATING SHALL EXTEND TO THE OUTSIDE EDGE OF ALL HOLES AND JOINTS.
<br />THE EPDXY MATERIAL SHALL BE APPLIED BY HIGH PRESSURE AIRLESS SPRAY EQUIPMENT. THE COATING SHALL BE
<br />APPLIED USING CROSS SPRAY METHODS TO ELIMINATE PINHOUNG AND SHADOWING. THE EPDXY PRIMER SHALL BE
<br />APPLIED TO ACHIEVE AN INITIAL THICKNESS OF THREE (3) TO SIX (6) MIL THE EPDXY COATING MATERIAL SHALL BE
<br />APPLIED IN A SINGLE COAT MULTIPLE PASS APPLICATION TO ACHIEVE A DRY FILM THICKNESS OF SIXTY (60) MIL,
<br />MINIMUM.
<br />ALL COATING OPERATIONS SHALL BE PERFORMED IN THE PRESENCE OF THE ENGINEER. ALL COATING WORK DONE IN
<br />THE ABSENCE OF THE ENGINEER IS SUBJECT TO REJECTION UNLESS SPECIFICALLY APPROVED, IN WRITING, BY THE
<br />ENGINEER PRIOR TO THE WORK BEING PERFORMED. THE ENGINEER SHALL HAVE ACCESS TO THE CONSTRUCTION SITE
<br />AND THOSE AREAS INVOLVED WITH THE PERFORMANCE OF THE COATING WORK. ALL APPLICABLE SAFETY EQUIPMENT AND
<br />SUITABLE RESPIRATORS SHALL BE USED DURING COATING OPERATIONS AS RECOMMENDED BY THE MANUFACTURER AND
<br />THE MATERIAL SAFETY DATA SHEETS.
<br />THE COATING SHALL BE FREE OF ALL BLISTERS, PINHOLES, HOLIDAYS AND DISCONTINUITIES. THE FINISHED COATING
<br />SHALL BE TESTED FOR PINHOLES AND DISCONTINUITIES USING A HIGH-VOLTAGE SPARK TESTER. ALL TESTING SHALL BE
<br />PERFORMED BY THE CONTRACTOR IN THE PRESENCE OF THE ENGINEER. THE TESTING SHALL BE PERFORMED AT A
<br />MINIMUM VOLTAGE OF 125 VOLTS PER MIL OF DRY FILM THICKNESS. THE CONTRACTOR SHALL VERIFY THE PROPER
<br />OPERATION OF THE TESTING EQUIPMENT AS PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS PRIOR TO SPARK TESTING.
<br />SPARK TESTER SHALL BE TINKER-RASOR AP -W, OR APPROVED EQUAL.
<br />ALL AREAS REQUIRED TO BE REPAIRED AS DETERMINED BY TESTING AND INSPECTION, SHALL BE FIRST SPOT SCARIFIED
<br />AND THEN SPOT RECOATED AS PER MANUFACTURER'S RECOMMENDATIONS.
<br />TESTING AND INSPECTION
<br />PRIOR TO PERFORMING TESTS, THE PIPE INSTALLATION SHALL BE THOROUGHLY CLEANED. CLEANING SHALL BE
<br />PERFORMED BY THE CONTRACTOR BY MEANS OF AN INFLATABLE RUBBER BALL THE BALL SHALL BE OF A SIZE THAT
<br />WILL INFLATE TO FIT SNUGLY INTO THE PIPE TO BE TESTED. THE BALL SHALL BE CONTROLLED WITH A TAG LINE. THE
<br />BALL SHALL BE PLACED IN THE LAST LAMPHOLE OR MAINTENANCE HOLE ON THE PIPE TO BE CLEANED, AND WATER
<br />SHALL BE INTRODUCED BEHIND IT. THE BALL SHALL PASS THROUGH THE PIPE WITH ONLY THE PRESSURE OF THE WATER
<br />IMPELLING IT. ALL DEBRIS FLUSHED OUT AHEAD OF THE BALL SHALL BE REMOVED AT THE FIRST MAINTENANCE HOLE
<br />WHERE ITS PRESENCE IS NOTED. IN THE EVENT CEMENT OR WEDGED DEBRIS OR A DAMAGED PIPE SHALL STOP THE
<br />BALL, THE CONTRACTOR SWILL REMOVE THE OBSTRUCTION.
<br />FOLLOWING THE PLACEMENT AND COMPACTION OF BACKFILL AND PRIOR TO PLACEMENT OF PERMANENT PAVEMENT, THE
<br />CONTRACTORS SHALL PERFORM A DEFLECTION TEST ON THE PIPE. IF THE PIPE SHOULD FAIL THE DEFLECTION TEST, THE
<br />CONTRACTOR SHALL UNCOVER THE PIPE AND MAKE ADJUSTMENTS IN THE BEDDING AND/OR BACKFILL CONDITIONS THAT
<br />WILL BE NECESSARY TO ACHIEVE A PASSING TEST. THE TRENCH SHALL BE BACKFILLED AND STREET SUBGRADE SHALL
<br />BE RECOMPACTED AND THE PIPE RETESTED. ANY CORRECTIVE MEASURES FOUND NECESSARY TO MEET THE DEFLECTION
<br />REQUIREMENTS, INCLUDING RECOMPACTION AND REGRADING OF THE STREET SUBGRADE, SHALL BE INCLUDED IN THE UNIT
<br />PRICE BID FOR THE SANITARY SEWER PIPE.
<br />THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT NEEDED TO COMPLETE THIS TEST. THE COST FOR THE DEFLECTION
<br />TEST SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE SANITARY SEWER PIPE. DEFLECTION TEST SHALL BE
<br />CONDUCTED AFTER THE PLACEMENT AND DENSIFICATION OF BACKFILL
<br />THE CONTRACTOR SWILL FURNISH PROPERLY SIZED MANDRELS FOR SIZE AND TYPE OF PIPE INSTALLED. CERTIFICATION
<br />OF PROPER SIZE SHALL BE REQUIRED AND MANDREL IDENTIFIED IN A MANNER TO IDENTIFY WITH CERTIFICATION.
<br />FOR ABS PIPE --ALL MAINLINE PIPE SHALL BE CLEANED AND THEN MANDRELLED TO MEASURE FOR OBSTRUCTIONS
<br />(DEFLECTION, JOINT OFFSETS, LATERAL INTRUSIONS, ETC.). A RIGID MANDREL WITH A CIRCULAR CROSS-SECTION HAVING
<br />A DIAMETER AT LEAST NINETY-SIX PERCENT (96%) OF THE SPECIFIED AVERAGE INSIDE DIAMETER SHALL BE PULLED
<br />THROUGH THE PIPE. THE METHOD OF MEASURING THE DEFLECTION SHALL BE APPROVED BY THE ENGINEER. ANY PIPE
<br />THROUGH WHICH THE MANDREL WILL NOT PASS SHALL BE SAID TO HAVE FAILED AND WILL BE REPAIRED BY THE
<br />CONTRACTOR AT HIS EXPENSE.
<br />FOR HDPE PIPE --MAXIMUM LONG-TERM DEFLECTION FOR HDPE PIPE SHALL BE NO MORE THAN FIVE PERCENT (5%).
<br />LONG-TERM DEFLECTION SHALL BE CALCULATED AS THE SHORT-TERM DEFLECTION MULTIPLIED BY A DEFLECTION LAG
<br />FACTOR BASED UPON THE AVERAGE INSIDE DIAMETER OF THE PIPE. IN NO CASE SHALL A DEFLECTION LAG FACTOR OF
<br />LESS THAN 1.5 BE ACCEPTED. SHORT-TERM DEFLECTION SHALL BE MEASURED WITH A MANDREL NO SOONER THAN
<br />THIRTY (30) DAYS FOLLOWING INSTALLATION. MANDREL DEFLECTION TESTS MAY BE REQUIRED DURING INSTALLATION TO
<br />HAVE AN ODD NUMBER OF LEGS TOTALING NO LESS THAN NINE (9). PIPE SECTIONS NOT MEETING THE DEFLECTION
<br />REQUIREMENTS SHALL BE EXCAVATED, REINSTALLED, AND SUBJECT TO AN ADDITIONAL THIRTY (30) DAY DEFLECTION TEST.
<br />FOR PVC PIPE --THE FOLLOWING TABLE LISTS MINIMUM PIPE I.D. DEFLECTIONS: I.E., O.D. OF MANDREL:
<br />TABLE OF ALLOWABLE DEFLECTIONS FOR PVC PIPE
<br />PIPE SIZE & BASE MIN
<br />TYPE 1. D. ALLOWABLE I.D.
<br />4" PVC 3.966 3.66
<br />6" PVC 5.742 5.36
<br />8" PVC 7.665 7.18
<br />10" PVC 9.565 8.98
<br />12" PVC 11.361 10.69
<br />15" PVC 15.898 13.08
<br />AT HIS OPTION, THE ENGINEER MAY REQUIRE A SAMPLE OF TEN PERCENT (10%) OF THE LATERALS RANDOMLY SELECTED
<br />BY THE INSPECTORS SHALL ALSO BE TESTED FOR DEFLECTION. IF DIFFICULTY IS ENCOUNTERED IN PASSING THE
<br />MANDREL TEST, THE INSPECTOR MAY DIRECT THAT A LARGER SAMPLE OF LATERALS BE TESTED UP TO INCLUDING ONE -
<br />HUNDRED PERCENT (100%) OF ALL LATERALS.
<br />AT THE CONTRACTOR'S EXPENSE, ALL LOCATIONS WITH DEFLECTION GREATER THAN ALLOWABLE SHALL BE EXCAVATED,
<br />REPAIRED OR REPLACED, BACKFILLED AND RETESTED.
<br />ANY CORRECTIVE WORK PROPOSED SHALL BE APPROVED BY THE ENGINEER. NO VIBRATING RE -ROUNDED DEVICES
<br />SHALL BE ALLOWED TO CORRECT PIPE DEFLECTIONS.
<br />IN ADDITION TO THE DEFLECTION REQUIREMENTS, THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS AND
<br />LABOR NECESSARY TO PROVIDE VIDEO INSPECTION OF ALL MAIN LINE SEWER PIPES. THE VIDEO LOG SHALL BE
<br />RECORDED USING VHS FORMAT AND SHALL INCLUDE AN ON-SCREEN COUNTER INDICATING THE POSITION OF THE
<br />CAMERA, IN FEET, WITH RESPECT TO THE LENGTH OR STATIONING OF THE SEWER MAIN BEING TELEVISED. THE COUNTY
<br />SHALL BE PROVIDED WITH TWO (2) COPIES OF THE COMPLETED VIDEO LOG.
<br />THE VIDEO SHALL BE PERFORMED FOLLOWING THE PLACEMENT AND DENSIFICATION OF BACKFILL, BUT PRIOR TO THE
<br />PLACEMENT OF PAVING. ANY DEFECTIVE PIPE OR CONDITIONS DISCOVERED BY TELEVISING SHALL BE CORRECTED BY
<br />THE CONTRACTOR AT HIS EXPENSE. ANY CORRECTIVE WORK PROPOSED SHALL FIRST BE APPROVED BY THE ENGINEER.
<br />THAN 3/8 INCH OR 1 PERCENT OF THE INSIDE DIAMETER, WHICHEVER IS GREATER; PROTRUDING, DEFORMED OR FOLDED
<br />GASKETS; STANDING WATER AT A DEPTH GREATER THAN 0.01 FOOT PER INCH OF DIAMETER (BASED ON A LOSS OF PIPE
<br />AREA OF 6.8 PERCENT).
<br />THE COUNTY MAY ALSO TELEVISE THE SEWER MAINS PRIOR TO THE EXPIRATION OF THE ONE (1) YEAR WARRANTY
<br />PERIOD. IF A DEFECTIVE CONDITION IS UNACCOUNTABLY FOUND, IT SHALL BE PRESUMED TO BE CAUSED BY DEFECTIVE
<br />WORKMANSHIP OR MATERIALS. THE CONTRACTOR SHALL BE NOTIFIED AND SHALL CORRECT THE WORK IN A MANNER
<br />APPROVED BY THE ENGINEER.
<br />FULL COMPENSATION FOR FURNISHING ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND INCIDENTALS FOR PROVIDING
<br />VIDEO INSPECTION OF THE SEWER PIPES SHALL BE CONSIDERED AS BEING INCLUDED IN THE CONTRACT UNIT COSTS BID
<br />FOR THE VARIOUS SIZES OF SEWER PIPE INSTALLED AND NO ADDITIONAL COMPENSATION SHALL BE MADE THEREFOR.
<br />WHEN DESIGNATED ON THE PLANS, SEWERS SHALL BE TESTED BY THE CONTRACTOR FOR WATERTIGHTNESS. EACH
<br />SECTION OF SEWER SHALL BE TESTED BETWEEN SUCCESSIVE MAINTENANCE HOLES BY CLOSING THE LOWER END OF THE
<br />SEWER TO BE TESTED AND INLET SEWER OF THE UPPER MAINTENANCE HOLE WITH STOPPERS. THE PIPE AND
<br />MAINTENANCE HOLE SHALL BE FILLED WITH WATER TO A POINT FOUR FEET (4') (1.22M) ABOVE THE INVERT OF THE
<br />SEWER AT THE CENTER OF THE UPPER MAINTENANCE HOLE; OR IF GROUND WATER IS PRESENT, FOUR FEET (4')
<br />(1.22M) ABOVE THE AVERAGE ADJACENT GROUND WATER LEVEL.
<br />THE ALLOWABLE LEAKAGE WILL BE COMPUTED BY THE FORMULAE:
<br />E = 0.0001 LD4R_FOR MORTARED JOINTS.
<br />E = 0.00002 LDS FOR ALL OTHER JOINTS.
<br />WHERE:
<br />L IS LENGTH OF SEWER AND HOUSE CONNECTIONS TESTED, IN FEET.
<br />E IS THE ALLOWABLE LEAKAGE IN GALLONS PER MINUTE OF SEWER TESTED.
<br />D IS THE INTERNAL DIAMETER OF THE PIPE, IN INCHES.
<br />H IS THE DIFFERENCE IN ELEVATION, IN FEET, BETWEEN THE WATER SURFACE IN THE UPPER MAINTENANCE HOLE AND
<br />THE INVERT OF THE PIPE AT THE LOWER MAINTENANCE HOLE; OR IF GROUNDWATER IS PRESENT ABOVE THE INVERT OF
<br />THE PIPE IN THE LOWER MAINTENANCE HOLE, THE DIFFERENCE IN ELEVATION BETWEEN THE WATER SURFACE IN THE
<br />UPPER MAINTENANCE HOLE AND THE GROUNDWATER AT THE LOWER MAINTENANCE HOLE.
<br />HOWEVER, THE MAXIMUM SHALL NOT EXCEED TWO HUNDRED (200) GALLONS PER INCH OF INTERNAL DIAMETER PER MILE
<br />PER DAY.
<br />THE CONTRACTOR SHALL, AT HIS EXPENSE, FURNISH ALL WATER, MATERIALS AND LABOR FOR MAKING THE REQUIRED
<br />TEST. ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE ENGINEER.
<br />WHERE THE LEAKAGE OF THE SEWER EXCEEDS THE ABOVE AMOUNT, IT SHALL BE CORRECTED IMMEDIATELY AND THE
<br />AMOUNT OF LEAKAGE REDUCED TO A QUANTITY WITHIN THE SPECIFIED AMOUNT. IN ANY CASE, THE CONTRACTOR SHALL
<br />STOP ANY INDIVIDUAL LEAKS WHICH MAY BE OBSERVED.
<br />AIR PRESSURE TEST
<br />THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT AND LABOR FOR MAKING AN AIR TEST. AIR TEST
<br />EQUIPMENT SHALL BE APPROVED BY THE DIRECTOR PRIOR TO THE BEGINNING OF THE TEST.
<br />EACH SECTION OF SEWER SHALL BE TESTED BETWEEN SUCCESSIVE MAINTENANCE HOLES BY PLUGGING AND BRACING ALL
<br />OPENINGS IN THE MAIN SEWER LINE AND THE UPPER ENDS OF ALL SEWER CONNECTIONS. PRIOR TO ANY AIR
<br />PRESSURE TESTING, ALL PIPE PLUGS SHALL BE CHECKED WITH A SOAP SOLUTION TO DETECT ANY AIR LEAKAGE. IF
<br />ANY LEAKS ARE FOUND, THE AIR PRESSURE SHALL BE RELEASED, THE LEAKS ELIMINATED AND THE TEST PROCEDURE
<br />STARTED OVER AGAIN.
<br />THE FINAL LEAKAGE TEST OF THE SEWER MAIN LINE AND BRANCHING SEWER CONNECTIONS SHALL BE CONDUCTED IN
<br />THE PRESENCE OF THE DIRECTOR OR HIS REPRESENTATIVE IN THE FOLLOWING MANNER:
<br />1. CLEAN PIPE TO BE TESTED BY PROPELLING SNUG FITTING INFLATED RUBBER BALL THROUGH THE PIPE WITH
<br />WATER.
<br />2. PLUG ALL PIPE OUTLETS WITH SUITABLE TEST PLUGS. BRACE EACH PLUG SECURELY.
<br />3. IF THE PIPE TO BE TESTED IS SUBMERGED IN GROUND WATER, INSERT A PIPE PROBE BY BORING, OR JETTING,
<br />INTO THE BACKFILL MATERIAL ADJACENT TO THE CENTER OF THE PIPE AND DETERMINE THE PRESSURE IN THE PROBE
<br />WHEN AIR PASSES SLOWLY THROUGH IT. THIS IS THE BACK PRESSURE DUE TO GROUND WATER SUBMERGENCE OVER
<br />THE END OF THE PROBE. ALL GAUGE PRESSURES IN THE TEST SHOULD BE INCREASED BY THIS AMOUNT.
<br />4. ADD AIR SLOWLY TO THE PORTION OF THE PIPE INSTALLATION UNDER TEST UNTIL THE INTERNAL AIR PRESSURE IS
<br />RAISED TO 4.0 PSIG.
<br />5. AFTER AN INTERNAL PRESSURE OF 4.0 PSIG IS OBTAINED, ALLOW AT LEAST TWO (2) MINUTES FOR AIR
<br />TEMPERATURE TO STABILIZE, ADDING ONLY THE AMOUNT OF AIR REQUIRED TO MAINTAIN PRESSURE.
<br />6. WHEN PRESSURE DECREASES TO 3.5 PSIG, START STOP WATCH.
<br />6A. THE FOLLOWING APPLIES TO ALL PIPES OTHER THAN PVC AND ABS (SEE 68):
<br />DETERMINE THE TIME IN SECONDS THAT IS REQUIRED FOR THE INTERNAL AIR PRESSURE TO REACH 2.5 PSIG. MINIMUM
<br />PERMISSIBLE PRESSURE HOLDING TIMES ARE INDICATED BY THE FOLLOWING FORMULA AND TABLE IN SECONDS:
<br />T = K(D)
<br />G
<br />WHERE T =
<br />MINIMUM REQUIRED TIME
<br />IN
<br />4
<br />Time
<br />for
<br />Lngr
<br />SECONDS
<br />K =
<br />CONSTANT 0.022
<br />21"
<br />D =
<br />NOMINAL PIPE DIAMETER
<br />IN
<br />33•
<br />INCHES
<br />39'
<br />G =
<br />ALLOWAB LE AIR LOSS
<br />RATE
<br />8"
<br />PER UNIT AREA, 0.003
<br />CU.
<br />15"
<br />FT./MIN./SQ. FT.
<br />OF
<br />10
<br />INTERNAL/SURFACE AREA
<br />2e
<br />MINIMUM HOLDING TIME IN SECONDS REQUIRED FOR PRESSURE TO DROP
<br />FROM 3 1/2 TO 2 1/2 PSIG
<br />PIPE DIAMETER
<br />PIPE DIAMETER
<br />NO.I DESCRIPTION
<br />NOTES: (1) TO BE USED WHEN TESTING ONE DIAMETER ONLY.
<br />(2) THE ABOVE AIR PRESSURE TEST PROCEDURE IS BASED ON ASTM C828. ANY SPECIAL SITUATIONS OR CONDITIONS
<br />SHALL CONFORM TO THIS ASTM STANDARD.
<br />6A FOR PVC AND ABS LINES, THE FOLLOWING TABLE LISTS THE MINIMUM TIMES ALLOWED FOR A PRESSURE DROP
<br />FROM 3.5 PSI TO 3.0 PSI IN EXCESS OF THE GROUND WATER PRESSURE AT THE TOP OF THE PIPE.
<br />1
<br />Pipe
<br />Dia
<br />(in)
<br />2
<br />Min
<br />Time
<br />(min
<br />3
<br />Lgth
<br />for
<br />Kin
<br />4
<br />Time
<br />for
<br />Lngr
<br />Specification time for Length
<br />(L) shown (min:aec)
<br />18" 1
<br />21"
<br />24•
<br />27"
<br />30"
<br />33•
<br />36"
<br />39'
<br />Time
<br />4"
<br />S.
<br />8"
<br />la" 1
<br />12" 1
<br />15"
<br />25
<br />4
<br />10
<br />16
<br />2e
<br />40
<br />62
<br />89
<br />121
<br />158
<br />200
<br />246
<br />299
<br />356
<br />418
<br />509
<br />1:S3
<br />20
<br />35
<br />55
<br />79
<br />124
<br />176
<br />243
<br />317
<br />401
<br />495
<br />599
<br />713
<br />837
<br />15
<br />13
<br />30
<br />53
<br />83
<br />119
<br />186
<br />267
<br />364
<br />475
<br />601
<br />743
<br />698
<br />1020
<br />1105
<br />100
<br />16
<br />40
<br />70
<br />110
<br />156
<br />246
<br />256
<br />485
<br />634
<br />765
<br />651
<br />935
<br />4:57
<br />5:56
<br />125
<br />22
<br />50
<br />66
<br />138
<br />196
<br />309
<br />446
<br />595
<br />660
<br />7:00
<br />0433
<br />9:50
<br />11:24
<br />12:50
<br />150
<br />26
<br />59
<br />106
<br />165
<br />238
<br />371
<br />510
<br />13:21
<br />15:35
<br />17:40
<br />20:02
<br />175
<br />31
<br />69
<br />123
<br />193
<br />271
<br />425
<br />200
<br />35
<br />79
<br />141
<br />220
<br />317
<br />225
<br />40
<br />89
<br />158
<br />248
<br />340
<br />250
<br />44
<br />99
<br />176
<br />275
<br />275
<br />46
<br />109
<br />194
<br />283
<br />300
<br />53
<br />119
<br />211
<br />350
<br />62
<br />139
<br />227
<br />406
<br />70
<br />Ise
<br />45079
<br />170
<br />500
<br />Be
<br />5sa
<br />97
<br />600
<br />106
<br />650
<br />113
<br />1 170
<br />1 227
<br />1 283
<br />1 340
<br />1 425
<br />1 510
<br />1 595
<br />sea
<br />765
<br />851
<br />935
<br />1020
<br />1105
<br />NO.I DESCRIPTION
<br />NOTES: (1) TO BE USED WHEN TESTING ONE DIAMETER ONLY.
<br />(2) THE ABOVE AIR PRESSURE TEST PROCEDURE IS BASED ON ASTM C828. ANY SPECIAL SITUATIONS OR CONDITIONS
<br />SHALL CONFORM TO THIS ASTM STANDARD.
<br />6A FOR PVC AND ABS LINES, THE FOLLOWING TABLE LISTS THE MINIMUM TIMES ALLOWED FOR A PRESSURE DROP
<br />FROM 3.5 PSI TO 3.0 PSI IN EXCESS OF THE GROUND WATER PRESSURE AT THE TOP OF THE PIPE.
<br />1
<br />Pipe
<br />Dia
<br />(in)
<br />2
<br />Min
<br />Time
<br />(min
<br />3
<br />Lgth
<br />for
<br />Kin
<br />4
<br />Time
<br />for
<br />Lngr
<br />Specification time for Length
<br />(L) shown (min:aec)
<br />sec)
<br />Time
<br />Lgth
<br />100 ft
<br />150 ft
<br />200 ft
<br />250 ft
<br />300 ft
<br />350 ft
<br />400 ft
<br />4SO ft
<br />(ft)
<br />(sac)
<br />4
<br />1:S3
<br />597
<br />.19OL
<br />1:53
<br />1:53
<br />1:53
<br />1:53
<br />1:53
<br />1:53
<br />1:53
<br />1:53
<br />6
<br />2:50
<br />399
<br />.427L
<br />2:50
<br />2 -.SD
<br />2:50
<br />2.50
<br />2:502150
<br />2:51
<br />3:12
<br />8
<br />3:47
<br />290
<br />.760L
<br />3:47
<br />3:47
<br />3:47
<br />3:47
<br />3: 45
<br />4:26
<br />5:04
<br />5:42
<br />10
<br />4:43
<br />239
<br />1.187L
<br />4:43
<br />4:43
<br />4:43
<br />4:57
<br />5:56
<br />6:S5
<br />7,54
<br />6:54
<br />12
<br />5:40
<br />199
<br />1.709L
<br />5:40
<br />5:40
<br />5:42
<br />7:00
<br />0433
<br />9:50
<br />11:24
<br />12:50
<br />15
<br />I 7:Os
<br />I 159
<br />2.671L
<br />7:05
<br />7:05
<br />1 7:05
<br />11:08
<br />13:21
<br />15:35
<br />17:40
<br />20:02
<br />SAFETY NOTE:
<br />THE AIR TEST MAY BE DANGEROUS IF, BECAUSE OF IGNORANCE OR CARELESSNESS, A LINE IS IMPROPERLY PREPARED.
<br />IT IS EXTREMELY IMPORTANT THAT THE VARIOUS PLUGS BE INSTALLED AND BRACED IN SUCH A WAY AS TO PREVENT
<br />BLOW OUTS. INASMUCH AS A FORCE OF TWO HUNDRED -FIFTY (250) LBS. IS EXERTED ON AN EIGHT INCH (8") PLUG
<br />BY AN INTERNAL PIPE PRESSURE OF 5.0 PSI, IT SHOULD BE REALIZED THAT SUDDEN EXPULSION OF A POORLY
<br />INSTALLED PLUG OR OF A PLUG THAT IS PARTIALLY DEFLATED BEFORE THE PIPE PRESSURE IS RELEASED CAN BE
<br />DANGEROUS.
<br />AS A SAFETY PRECAUTION, PRESSURIZING EQUIPMENT SHOULD INCLUDE A REGULATOR SET AT PERHAPS 10.0 PSI TO
<br />AVOID OVER -PRESSURIZING AND DAMAGING AN OTHERWISE ACCEPTABLE LINE. NO ONE SHALL BE ALLOWED IN THE
<br />MAINTENANCE HOLES DURING TESTING.
<br />IF THE TIME LAPSE IS LESS THAN THAT SHOWN IN THE TABLE, THE CONTRACTOR SHALL MAKE THE NECESSARY
<br />CORRECTIONS TO REDUCE THE LEAKAGE TO ACCEPTABLE LIMITS.
<br />SECTION 73
<br />ALTERNATE A
<br />CONCRETE CURBS AND SIDEWALKS --CONCRETE CURBS AND SIDEWALKS SHALL CONFORM TO THE REQUIREMENTS IN
<br />SECTION 73, "CONCRETE CURBS AND SIDEWALKS," OF THE STANDARD SPECIFICATIONS, THE STANDARD DRAWINGS AND
<br />THESE SPECIAL PROVISIONS.
<br />"HANDICAP RAMP" SHALL BE CONSIDERED THE SAME AS "CURB RAMP" IN THE STANDARD SPECIFICATIONS AND THESE
<br />SPECIAL PROVISIONS.
<br />IN LIEU OF THE REQUIREMENTS OF SECTION 73-1.05, "CURB CONSTRUCTION; OF THE STANDARD SPECIFICATIONS;
<br />WEAKENED PLANE JOINTS SHALL BE CONSTRUCTED AT INTERVALS SHOWN ON THE STANDARD DRAWINGS.
<br />WHERE CURB AND GUTTER ONLY IS CONSTRUCTED, DRIVEWAYS SHALL BE PLACED MONOLITHICALLY WITH THE CURB AND
<br />GUTTER OR SHALL CONFORM TO ONE OF THE FOLLOWING ALTERNATIVES:
<br />(A) DOWELS (FIVE-EIGHTHS INCH [5/8"] DIAMETER BY TWENTY-FOUR INCHES [24"] LONG) SPACED AT FOUR FOOT
<br />(4') INTERVALS.
<br />(B) KEYWAY CONSTRUCTED AS SHOWN ON STANDARD DRAWINGS OR TWO INCHES (2") IN HEIGHT AND ONE INCH (1")
<br />IN DEPTH MINIMUM.
<br />A UNIFORM COLOR SHALL BE MAINTAINED BY THE ADDITION OF ONE POUND OF LAMP BLACK PER CUBIC YARD OF
<br />CONCRETE FOR CURB, GUTTER AND SIDEWALK CONSTRUCTION.
<br />WALKWAY AND DRIVEWAY APPROACHES PROVIDING ACCESS TO PRIVATE PROPERTY THAT ARE CONSTRUCTED BEHIND NEW
<br />SIDEWALK SHALL BE COLORED AND TEXTURED AS REQUIRED TO MATCH THE EXISTING FACILITY.
<br />ALL CONCRETE GUTTERS SHALL BE WATER TESTED FOR DRAINAGE BEFORE ACCEPTANCE. THE MAXIMUM DEVIATION FROM
<br />A TRUE GRADE SHALL NOT RESULT IN PONDING WATER FOR A DEPTH EXCEEDING 0.02 FOOT.
<br />GROUND AREA TO BE USED FOR LANDSCAPING PURPOSES, WHICH HAS BEEN EXCAVATED OR IS BELOW FINISHED GRADE
<br />SHALL BE BACKFILLED WITH SELECTED MATERIAL OR IMPORTED TOPSOIL FREE OF STONES CONFORMING TO THE
<br />PROVISIONS OF SECTION 20-2.01, "TOPSOIL; OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS,
<br />UNLESS OTHERWISE SHOWN ON THE PLANS.
<br />SECTION 76
<br />DOMESTIC WATER FACILITIES --THIS WORK CONSISTS OF FURNISHING AND INSTALLING PRESSURE WATER PIPE, CONTROL
<br />VALVES, THRUST BLOCKS, FIRE HYDRANT TEES, FIRE HYDRANTS AND SERVICE LINES, ALL AS SHOWN ON THE PLANS OR
<br />AS DIRECTED BY THE ENGINEER, AND AS SPECIFIED IN THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS.
<br />>,lATIBIAteT--IN ACCORDANCE WITH SECTION 6-1.07, "CERTIFICATES OF COMPLIANCE," OF THE STANDARD SPECIFICATIONS,
<br />A CERTIFICATE OF COMPLIANCE SHALL BE FURNISHED WITH ALL MATERIALS LISTED HEREIN. ALL PIPES AND FITTINGS
<br />(EXCEPT VALVES) SHALL HAVE A MINIMUM WORKING PRESSURE OF ONE HUNDRED -FIFTY (150) POUNDS PER SQUARE
<br />INCH (PSI) AND CONFORM TO THESE SPECIAL PROVISIONS.
<br />ALTERNATIVE PIPE ALTERNATIVE WATER PIPE SHALL CONFORM TO THE REQUIREMENTS OF SECTION 62, "ALTERNATIVE
<br />CULVERTS," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALTERNATIVE WATER PIPE WILL BE
<br />DESIGNATED BY TYPE ON THE PLANS AND IN THE ENGINEER'S ESTIMATE. THE EQUIVALENT KINDS OF PIPE WILL BE
<br />SHOWN ON THE PIANS FOR EACH TYPE. THE KIND OF PIPE TO BE INSTALLED SHALL BE AT THE OPTION OF THE
<br />CONTRACTOR.
<br />THE KINDS OF PIPE FOR ALTERNATIVE WATER PIPE SHALL CONFORM TO THE FOLLOWING PROVISIONS:
<br />1. CAST IRON AND DUCTILE IRON PIPE FOR WATER SHALL BE FURNISHED IN THE SIZES, CLASSES, GRADES OR
<br />NOMINAL THICKNESSES, AND JOINT TYPES DESIGNATED ON THE PLANS OR IN THE SPECIAL PROVISIONS.
<br />CAST IRON PIPE SHALL COMPLY WITH ANSI A2L.6 (AWWA C106) FOR PIPE CAST IN METAL MOLDS OR ANSI A21.8 (AWWA
<br />C108) FOR PIPE CAST IN SAND LINED MOLDS.
<br />DUCTILE IRON PIPE SHALL COMPLY WITH ANSI A21.51 (AWWA C151).
<br />CAST AND DUCTILE IRON PIPE JOINTS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS FOR THE TYPES SPECIFIED
<br />ON THE PLANS OR IN THE SPECIAL PROVISIONS:
<br />TYPE OF JOINT SPECIFICATION
<br />RUBBER GASKET PUSH -ON ANSI A21.11 (AWWA
<br />JOINT C 1 1 1 )
<br />MECHANICAL JOINT ANSI A21.11 (AWWA
<br />PREPARED IN THE
<br />FLANGED JOINT
<br />FLANGED JOINT
<br />(THREADED FLANGES)
<br />C 1 1 1 )
<br />ANSI B16.1, B16.2 AND
<br />A21 .10 (AWWA C 1 1 0)
<br />ANSI B2.1
<br />WMWOOD ESTATES
<br />GENERAL NOTES AND SPECIFICATIONS
<br />OFFICE OF: • Civil Engineering
<br />• Land Surveying
<br />• Structural Engineering
<br />• Planning
<br />4045 Coronado Avenue • Stockton, CA 95204
<br />209 443-20210 Fax: 209 942-0214
<br />ENIGINEERIN6,INC.
<br />DRAWN BY:
<br />DJA
<br />SCALE:
<br />AS SHOWN
<br />DATE: 0e722706 SHEET OF
<br />C-4
<br />R.C.E. NO.: 62498 JOB NO.
<br />04251
<br />EXP DATE:
<br />09/2007 1"'
<br />T
<br />G-
<br />
|