Laserfiche WebLink
PORTLAND CEMENT USED IN THE PRODUCTION OF CONCRETE PRODUCTS SET FORTH IN THIS SECTION SHALL CONED <br />TO THE PROVISIONS IN SECTION 90, "PORTLAND CEMENT CONCRETE," OF THE STANDARD SPECIFICATIONS. <br />CEMENT MORTAR SHALL CONFORM TO THE PROVISIONS IN SECTION 65-1.06, "JOINTS," OF THE STANDARD <br />SPECIFICATIONS. <br />PRIOR TO CAULKING VITRIFIED CLAY PIPE WITH CEMENT MORTAR, NOT MORE THAN ONE-THIRD THE ANNULAR SPACE <br />SHALL FIRST BE CAULKED WITH JUTE PRE -DIPPED IN CEMENT SLURRY. <br />HOT -POURED COMPOUNDS AND PRIMERS CONSISTING OF BITUMINOUS OR COAL TAR PRODUCTS, AND USED FOR <br />CAULKING BELL AND SPIGOT TYPE VITRIFIED CLAY PIPE, SHALL BE OF THE TYPE RECOMMENDED BY THE PIPE <br />MANUFACTURER FOR THE PURPOSE INTENDED. <br />THE PRIMER SHALL BE APPLIED TO THE SPIGOT AND INSIDE OF THE BELL AT LEAST TWENTY-FOUR (24) HOURS BEFORE <br />THE JOINTS ARE POURED. THE SURFACES SHALL BE DRY BEFORE APPLYING THE PRIMER. <br />THE JOINTS OF VITRIFIED CLAY PIPE SHALL BE CAULKED WITH DRY JUTE PRIOR TO POURING THE HOT COMPOUNDS. THE <br />COMPOUND SHALL BE HEATED TO THE TEMPERATURE RECOMMENDED BY THE MANUFACTURER. <br />FLEXIBLE COMPRESSION JOINTS IN VITRIFIED CLAY PIPE AND RESILIENT JOINT MATERIALS TO BE USED THEREIN SHALL <br />CONFORM TO THE REQUIREMENTS OF ASTM DESIGNATION: C 425. <br />RUBBER GASKETED JOINTS SHALL CONFORM TO THE PROVISIONS IN SECTION 65-1.06, "JOINTS," OF THE STANDARD <br />SPECIFICATIONS. <br />MISCELLANEOUS IRON AND STEEL ITEMS SHALL CONFORM TO THE PROVISIONS IN SECTION 75, "MISCELLANEOUS METAL," <br />OF THE STANDARD SPECIFICATIONS. <br />REINFORCEMENT SHALL CONFORM TO THE PROVISIONS IN SECTION 52, "REINFORCEMENT; OF THE STANDARD <br />SPECIFICATIONS. <br />CONCRETE SHALL CONFORM TO THE PROVISIONS IN SECTION 51, "CONCRETE STRUCTURES," AND SECTION 90, <br />"PORTLAND CEMENT CONCRETE," OF THE STANDARD SPECIFICATIONS. CONCRETE FOR SEWER STRUCTURES SHALL BE <br />CLASS A UNLESS OTHERWISE SHOWN ON THE PLANS. <br />INSTALLATION <br />EXCAVATION AND BACKFILL SHALL CONFORM TO THE PROVISIONS IN SECTION 19 ALTERNATE C, "EARTHWORK (STRUCTURE <br />EXCAVATION AND BACKFILL); OF THESE SPECIAL PROVISIONS. <br />THE PIPE SHALL BE LAID IN A TRENCH EXCAVATED TO THE LINES AND GRADES DESIGNATED BY THE ENGINEER. THE <br />BOTTOM OF THE TRENCH SHALL BE GRADED AND PREPARED TO PROVIDE A FIRM AND UNIFORM BEARING THROUGHOUT <br />THE ENTIRE LENGTH OF THE PIPE BARREL. <br />SUITABLE EXCAVATION SHALL BE MADE TO RECEIVE THE BELL OF THE PIPE AND THE JOINT SHALL NOT BEAR UPON THE <br />BOTTOM OF THE TRENCH. ALL ADJUSTMENT TO UNE AND GRADE SHALL BE MADE BY SCRAPING AWAY OR FILLING IN <br />WITH SAND, GRAVEL, OR GRANULAR MATERIAL UNDER THE BODY OF THE PIPE, AND NOT BY WEDGING OR BLOCKING. <br />TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED FEET (300') IN ADVANCE OF PIPE LAYING <br />OPERATIONS OR TWO HUNDRED FEET (200') TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE DIRECTOR. <br />THE EXCAVATION SHALL BE SUPPORTED SO THAT IT WILL BE SAFE AND THAT THE GROUND ALONGSIDE THE EXCAVATION <br />WILL NOT SLIDE OR SETTLE, AND ALL EXISTING IMPROVEMENTS, EITHER ON PUBLIC OR PRIVATE PROPERTY, WILL BE <br />FULLY PROTECTED FROM DAMAGE. <br />ALL SUPPORTS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED, UNLESS OTHERWISE DIRECTED BY THE <br />ENGINEER, AND SHALL BE WITHDRAWN IN A MANNER THAT WILL PREVENT THE CAVING OF THE SIDES OF THE <br />EXCAVATION. ALL OPENINGS CAUSED BY THE REMOVAL OF SUPPORTS SHALL BE FILLED WITH SUITABLE MATERIAL <br />PROPERLY COMPACTED. <br />BACKFILL OF PIPE TRENCHES MAY BE PLACED WHILE THE JOINT MORTAR IS STILL PLASTIC. SHOULD THE JOINT MORTAR <br />BECOME SET BEFORE THE BACKFILL IS PLACED, BACKFILLING THE PIPE TRENCHES SHALL NOT BE COMMENCED WITHIN <br />SIXTEEN (16) HOURS OF JOINTING THE PIPE SECTIONS. <br />PIPE SHALL BE PROTECTED DURING HANDLING AGAINST IMPACT SHOCKS AND FREE FALL. <br />WHEN THE NEW FACILITIES INTERFERE WITH THE EXISTING FLOW OF SEWAGE, THE CONTRACTOR SHALL PROVIDE <br />SATISFACTORY BYPASS FACILITIES AT HIS EXPENSE. <br />THE PIPE SHALL BE LAID WITHOUT BREAK UPGRADE FROM STRUCTURE TO STRUCTURE, WITH BELL END UPGRADE FOR <br />BELL AND SPIGOT PIPE, UNLESS OTHERWISE PERMITTED BY THE DIRECTOR. <br />SEWER PIPE SHALL BE CONNECTED TO EXISTING FACILITIES AS SHOWN ON THE PLANS AND AS DIRECTED BY THE <br />ENGINEER. <br />WHENEVER THE WORK CEASES FOR ANY REASON, THE END OF THE PIPE SHALL BE SECURELY CLOSED WITH A TIGHT <br />FITTING PLUG OR COVER. <br />WHENEVER EXISTING PIPES ARE TO BE CUT OR ABANDONED, THE OPEN ENDS OF SAID PIPES SHALL BE SECURELY <br />CLOSED BY A TIGHT FITTING PLUG OR WALL OF CONCRETE NOT LESS THAN 0.5 FOOT THICK. <br />ALL JOINTS SHALL BE CAREFULLY CLEANED ON THE INSIDE. <br />STOPPERS FOR PIPES AND BRANCHES LEFT UNCONNECTED SHALL BE MADE OF THE SAME MATERIAL AS THE PIPE, OR <br />OF RESILIENT JOINT MATERIAL CONFORMING TO THE REQUIREMENTS OF ASTM DESIGNATION: C 425. AFTER PLACING THE <br />STOPPER, IT SHALL BE COVERED WITH A LAYER OF SEALANT. THE SEALANT SHALL BE SUFFICIENTLY FLUID TO ENSURE <br />FREE FLOW AROUND THE STOPPER. <br />WHERE SHOWN ON THE PLANS OR DIRECTED BY THE ENGINEER, SEWER PIPE SHALL BE ENCASED IN CONCRETE, <br />REINFORCED WITH CONCRETE, OR BACKFILLED WITH CONCRETE, IN ACCORDANCE WITH THE DETAILS SHOWN ON THE <br />PLANS. <br />CONCRETE FOR PIPE ENCASEMENT, PIPE REINFORCEMENT, AND BACKFILL SHALL CONFORM TO THE PROVISIONS IN <br />SECTION 90-10, "MINOR CONCRETE," OF THE STANDARD SPECIFICATIONS, EXCEPT THAT THE MINOR CONCRETE SHALL <br />CONTAIN NOT LESS THAN FOUR HUNDRED -SEVENTY (470) POUNDS OF CEMENT PER CUBIC YARD. <br />ALL CONCRETE SHALL BE CURED FOR A PERIOD OF NOT LESS THAN TEN (10) DAYS AFTER BEING PLACED AND SHALL <br />BE PROTECTED FROM DAMAGE. <br />NEW MANHOLES, DROP INLET CONNECTIONS, LAMPHOLES, SERVICE LATERALS, SERVICE CLEANOUTS, TERMINAL CLEANOUT <br />STRUCTURES, AND PIPE CHIMNEYS FOR SEWERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS SHOWN ON <br />THE PLANS, AS SPECIFIED IN THESE SPECIAL PROVISIONS AND AS DIRECTED BY THE ENGINEER. <br />PRECAST CONCRETE PIPE MANHOLES SHALL CONFORM TO THE PROVISIONS IN SECTION 70, "MISCELLANEOUS FACILITIES; <br />OF THE STANDARD SPECIFICATIONS, EXCEPT FOR MEASUREMENT AND PAYMENT. <br />WHEN THE MANHOLE IS LOCATED IN THE PAVEMENT AREA, IT SHALL NOT BE CONSTRUCTED TO FINAL GRADE UNTIL THE <br />PAVEMENT HAS BEEN COMPLETED. <br />THE INSIDE BOTTOMS OF EXISTING MANHOLES, WHERE NEW CONNECTIONS ARE MADE, AND OF NEW MANHOLES SHALL BE <br />SHAPED TO PROVIDE CHANNELS CONFORMING TO THE SIZE AND SHAPE OF THE LOWER PORTION OF THE INLETS AND <br />OUTLETS OF THE MANHOLES. THE CHANNELS SHALL VARY UNIFORMLY IN SIZE AND SHAPE FROM INLET TO OUTLET. <br />NO PIPE SHALL PROJECT MORE THAN 0.17 FOOT INTO A MANHOLE AND IN NO CASE SHALL THE BELL OF A PIPE BE <br />BUILT INTO THE WALL OF A MANHOLE OR STRUCTURE. <br />MANHOLE COATING <br />ALL NEW MANHOLES, AS DEFINED BELOW, DOWNSTREAM FROM HYDROGEN SULFIDE PRODUCING STRUCTURES, TO THE <br />POINT OF CONNECTION INTO THE EXISTING: SYSTEM, SHALL RECEIVE A PROTECTIVE COATING. IN ADDITION, ANY EXISTING <br />MANHOLES DOWNSTREAM FROM NEW HYDROGEN SULFIDE PRODUCING SEWER SYSTEMS THAT THE ENGINEER DETERMINES <br />MAY BE AFFECTED BY NEW SEWER SYSTEMS SHALL BE COATED. AT A MINIMUM, ALL SANITARY SEWER MANHOLES <br />DOWNSTREAM FROM ALL PUMP STATIONS, DROP MANHOLES, AND MANHOLE PUMPING STATIONS SHALL BE COATED. ALL <br />MANHOLES USED FOR MANHOLE PUMPING STATIONS SHALL BE COATED. ALL MANHOLES CONSTRUCTED ON SEWER LINES <br />TWENTY-FOUR INCHES (24") AND LARGER, AND ANY OTHER STRUCTURE WHERE THE ENGINEER DETERMINES THAT <br />HYDROGEN SULFIDE GAS MAY BE A PROBLEM, SHALL BE COATED. <br />.nQ%n4\i r/ <br />BENCH MARK: <br />PER U.S.G.S. B.M. 19-8 1907-45. <br />LOCATION: NORTHWEST CORNER OF MASONIC <br />BUILDING IN THE TOWN OF WOODBRIDGE. <br />ELEVATION: 45.85 IS MOST CURRENT PER <br />F.E.M.A. <br />DATE SIGNED: 'k -2 10111 <br />THE COATING MATERIAL SHALL HAVE A MINIMUM POT LIFE OF THIRTY-FIVE (35) MINUTES AT 70' F AND A DRYING TIME <br />(ASTM D -L640) OF FOUR (4) HOURS. THE FLASH POINT OF THE INDIVIDUAL COMPONENTS AND THE FLUID MIXTURE <br />SHALL BE A MINIMUM OF 220' F (COC). THE COATING MATERIAL SHALL HAVE A LOW TEMPERATURE TOTAL CURE <br />CAPABILITY OF 40' F, MINIMUM. <br />THE CURED COATING MATERIAL SHALL HAVE SUFFICIENT ABRASION RESISTANCE TO EXHIBIT A WEIGHT LOSS OF LESS <br />THAN NINETY-TWO (92) MG WHEN MEASURED IN ACCORDANCE WITH ASTM D-4060. ADHESION (ASTM D -454L) SHALL BE <br />400.0 PSI, MINIMUM, WITH A DIRECT IMPACT RESISTANCE (ASTM D-2794) OF EIGHTEEN INCH -POUNDS (18' -LBS). THE <br />CURED COATING SHALL BE CAPABLE OF REPAIR AT ANY TIME DURING ITS LIFE. <br />THE COATING SHALL BE RESISTANT TO ATTACK FROM THE FOLLOWING: OXIDIZING AGENTS SUCH AS BLEACHES, SULFURIC, <br />ACETIC, HYDROCHLORIC, PHOSPHORIC, NITRIC, CHROMIC, OLEIC, AND STEARIC ACIDS; SODIUM AND CALCIUM HYDROXIDIES, <br />AMMONIUM, SODIUM, CALCIUM, MAGNESIUM, AND FERRIC CHLORIDES; FERRIC SULFATE, PETROLEUM OILS AND GREASES, <br />VEGETABLE AND ANIMAL OILS, FATS, GREASES, SOAPS, AND DETERGENTS. THE COATING SHALL BE IMPERMEABLE TO <br />SEWAGE GASES AND LIQUIDS AND SHALL NOT BE CONDUCIVE TO BACTERIAL OR FUNGAL GROWTH. <br />SURFACES TO BE COATED SHALL BE CLEANED OF ALL DIRT, DUST, CORROSION, LOOSE CONCRETE, GREASE, OILS AND <br />FOREIGN MATTER. SURFACE SHALL BE ABRASIVE TREATED TO ACHIEVE A FINISH CONFORMING TO ASTM D-4259. <br />SURFACES SHALL BE DRY PRIOR TO RECEIVING COATINGS. <br />PRECAST CONCRETE PIPE SECTIONS SHALL BE CORED FOR THE INSTALLATION OF PIPE AND OTHER PENETRATIONS PRIOR <br />TO BEING COATED. COATING SHALL EXTEND TO THE OUTSIDE EDGE OF ALL HOLES AND JOINTS. <br />THE EPDXY MATERIAL SHALL BE APPLIED BY HIGH PRESSURE AIRLESS SPRAY EQUIPMENT. THE COATING SHALL BE <br />APPLIED USING CROSS SPRAY METHODS TO ELIMINATE PINHOUNG AND SHADOWING. THE EPDXY PRIMER SHALL BE <br />APPLIED TO ACHIEVE AN INITIAL THICKNESS OF THREE (3) TO SIX (6) MIL THE EPDXY COATING MATERIAL SHALL BE <br />APPLIED IN A SINGLE COAT MULTIPLE PASS APPLICATION TO ACHIEVE A DRY FILM THICKNESS OF SIXTY (60) MIL, <br />MINIMUM. <br />ALL COATING OPERATIONS SHALL BE PERFORMED IN THE PRESENCE OF THE ENGINEER. ALL COATING WORK DONE IN <br />THE ABSENCE OF THE ENGINEER IS SUBJECT TO REJECTION UNLESS SPECIFICALLY APPROVED, IN WRITING, BY THE <br />ENGINEER PRIOR TO THE WORK BEING PERFORMED. THE ENGINEER SHALL HAVE ACCESS TO THE CONSTRUCTION SITE <br />AND THOSE AREAS INVOLVED WITH THE PERFORMANCE OF THE COATING WORK. ALL APPLICABLE SAFETY EQUIPMENT AND <br />SUITABLE RESPIRATORS SHALL BE USED DURING COATING OPERATIONS AS RECOMMENDED BY THE MANUFACTURER AND <br />THE MATERIAL SAFETY DATA SHEETS. <br />THE COATING SHALL BE FREE OF ALL BLISTERS, PINHOLES, HOLIDAYS AND DISCONTINUITIES. THE FINISHED COATING <br />SHALL BE TESTED FOR PINHOLES AND DISCONTINUITIES USING A HIGH-VOLTAGE SPARK TESTER. ALL TESTING SHALL BE <br />PERFORMED BY THE CONTRACTOR IN THE PRESENCE OF THE ENGINEER. THE TESTING SHALL BE PERFORMED AT A <br />MINIMUM VOLTAGE OF 125 VOLTS PER MIL OF DRY FILM THICKNESS. THE CONTRACTOR SHALL VERIFY THE PROPER <br />OPERATION OF THE TESTING EQUIPMENT AS PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS PRIOR TO SPARK TESTING. <br />SPARK TESTER SHALL BE TINKER-RASOR AP -W, OR APPROVED EQUAL. <br />ALL AREAS REQUIRED TO BE REPAIRED AS DETERMINED BY TESTING AND INSPECTION, SHALL BE FIRST SPOT SCARIFIED <br />AND THEN SPOT RECOATED AS PER MANUFACTURER'S RECOMMENDATIONS. <br />TESTING AND INSPECTION <br />PRIOR TO PERFORMING TESTS, THE PIPE INSTALLATION SHALL BE THOROUGHLY CLEANED. CLEANING SHALL BE <br />PERFORMED BY THE CONTRACTOR BY MEANS OF AN INFLATABLE RUBBER BALL THE BALL SHALL BE OF A SIZE THAT <br />WILL INFLATE TO FIT SNUGLY INTO THE PIPE TO BE TESTED. THE BALL SHALL BE CONTROLLED WITH A TAG LINE. THE <br />BALL SHALL BE PLACED IN THE LAST LAMPHOLE OR MAINTENANCE HOLE ON THE PIPE TO BE CLEANED, AND WATER <br />SHALL BE INTRODUCED BEHIND IT. THE BALL SHALL PASS THROUGH THE PIPE WITH ONLY THE PRESSURE OF THE WATER <br />IMPELLING IT. ALL DEBRIS FLUSHED OUT AHEAD OF THE BALL SHALL BE REMOVED AT THE FIRST MAINTENANCE HOLE <br />WHERE ITS PRESENCE IS NOTED. IN THE EVENT CEMENT OR WEDGED DEBRIS OR A DAMAGED PIPE SHALL STOP THE <br />BALL, THE CONTRACTOR SWILL REMOVE THE OBSTRUCTION. <br />FOLLOWING THE PLACEMENT AND COMPACTION OF BACKFILL AND PRIOR TO PLACEMENT OF PERMANENT PAVEMENT, THE <br />CONTRACTORS SHALL PERFORM A DEFLECTION TEST ON THE PIPE. IF THE PIPE SHOULD FAIL THE DEFLECTION TEST, THE <br />CONTRACTOR SHALL UNCOVER THE PIPE AND MAKE ADJUSTMENTS IN THE BEDDING AND/OR BACKFILL CONDITIONS THAT <br />WILL BE NECESSARY TO ACHIEVE A PASSING TEST. THE TRENCH SHALL BE BACKFILLED AND STREET SUBGRADE SHALL <br />BE RECOMPACTED AND THE PIPE RETESTED. ANY CORRECTIVE MEASURES FOUND NECESSARY TO MEET THE DEFLECTION <br />REQUIREMENTS, INCLUDING RECOMPACTION AND REGRADING OF THE STREET SUBGRADE, SHALL BE INCLUDED IN THE UNIT <br />PRICE BID FOR THE SANITARY SEWER PIPE. <br />THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT NEEDED TO COMPLETE THIS TEST. THE COST FOR THE DEFLECTION <br />TEST SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE SANITARY SEWER PIPE. DEFLECTION TEST SHALL BE <br />CONDUCTED AFTER THE PLACEMENT AND DENSIFICATION OF BACKFILL <br />THE CONTRACTOR SWILL FURNISH PROPERLY SIZED MANDRELS FOR SIZE AND TYPE OF PIPE INSTALLED. CERTIFICATION <br />OF PROPER SIZE SHALL BE REQUIRED AND MANDREL IDENTIFIED IN A MANNER TO IDENTIFY WITH CERTIFICATION. <br />FOR ABS PIPE --ALL MAINLINE PIPE SHALL BE CLEANED AND THEN MANDRELLED TO MEASURE FOR OBSTRUCTIONS <br />(DEFLECTION, JOINT OFFSETS, LATERAL INTRUSIONS, ETC.). A RIGID MANDREL WITH A CIRCULAR CROSS-SECTION HAVING <br />A DIAMETER AT LEAST NINETY-SIX PERCENT (96%) OF THE SPECIFIED AVERAGE INSIDE DIAMETER SHALL BE PULLED <br />THROUGH THE PIPE. THE METHOD OF MEASURING THE DEFLECTION SHALL BE APPROVED BY THE ENGINEER. ANY PIPE <br />THROUGH WHICH THE MANDREL WILL NOT PASS SHALL BE SAID TO HAVE FAILED AND WILL BE REPAIRED BY THE <br />CONTRACTOR AT HIS EXPENSE. <br />FOR HDPE PIPE --MAXIMUM LONG-TERM DEFLECTION FOR HDPE PIPE SHALL BE NO MORE THAN FIVE PERCENT (5%). <br />LONG-TERM DEFLECTION SHALL BE CALCULATED AS THE SHORT-TERM DEFLECTION MULTIPLIED BY A DEFLECTION LAG <br />FACTOR BASED UPON THE AVERAGE INSIDE DIAMETER OF THE PIPE. IN NO CASE SHALL A DEFLECTION LAG FACTOR OF <br />LESS THAN 1.5 BE ACCEPTED. SHORT-TERM DEFLECTION SHALL BE MEASURED WITH A MANDREL NO SOONER THAN <br />THIRTY (30) DAYS FOLLOWING INSTALLATION. MANDREL DEFLECTION TESTS MAY BE REQUIRED DURING INSTALLATION TO <br />HAVE AN ODD NUMBER OF LEGS TOTALING NO LESS THAN NINE (9). PIPE SECTIONS NOT MEETING THE DEFLECTION <br />REQUIREMENTS SHALL BE EXCAVATED, REINSTALLED, AND SUBJECT TO AN ADDITIONAL THIRTY (30) DAY DEFLECTION TEST. <br />FOR PVC PIPE --THE FOLLOWING TABLE LISTS MINIMUM PIPE I.D. DEFLECTIONS: I.E., O.D. OF MANDREL: <br />TABLE OF ALLOWABLE DEFLECTIONS FOR PVC PIPE <br />PIPE SIZE & BASE MIN <br />TYPE 1. D. ALLOWABLE I.D. <br />4" PVC 3.966 3.66 <br />6" PVC 5.742 5.36 <br />8" PVC 7.665 7.18 <br />10" PVC 9.565 8.98 <br />12" PVC 11.361 10.69 <br />15" PVC 15.898 13.08 <br />AT HIS OPTION, THE ENGINEER MAY REQUIRE A SAMPLE OF TEN PERCENT (10%) OF THE LATERALS RANDOMLY SELECTED <br />BY THE INSPECTORS SHALL ALSO BE TESTED FOR DEFLECTION. IF DIFFICULTY IS ENCOUNTERED IN PASSING THE <br />MANDREL TEST, THE INSPECTOR MAY DIRECT THAT A LARGER SAMPLE OF LATERALS BE TESTED UP TO INCLUDING ONE - <br />HUNDRED PERCENT (100%) OF ALL LATERALS. <br />AT THE CONTRACTOR'S EXPENSE, ALL LOCATIONS WITH DEFLECTION GREATER THAN ALLOWABLE SHALL BE EXCAVATED, <br />REPAIRED OR REPLACED, BACKFILLED AND RETESTED. <br />ANY CORRECTIVE WORK PROPOSED SHALL BE APPROVED BY THE ENGINEER. NO VIBRATING RE -ROUNDED DEVICES <br />SHALL BE ALLOWED TO CORRECT PIPE DEFLECTIONS. <br />IN ADDITION TO THE DEFLECTION REQUIREMENTS, THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS AND <br />LABOR NECESSARY TO PROVIDE VIDEO INSPECTION OF ALL MAIN LINE SEWER PIPES. THE VIDEO LOG SHALL BE <br />RECORDED USING VHS FORMAT AND SHALL INCLUDE AN ON-SCREEN COUNTER INDICATING THE POSITION OF THE <br />CAMERA, IN FEET, WITH RESPECT TO THE LENGTH OR STATIONING OF THE SEWER MAIN BEING TELEVISED. THE COUNTY <br />SHALL BE PROVIDED WITH TWO (2) COPIES OF THE COMPLETED VIDEO LOG. <br />THE VIDEO SHALL BE PERFORMED FOLLOWING THE PLACEMENT AND DENSIFICATION OF BACKFILL, BUT PRIOR TO THE <br />PLACEMENT OF PAVING. ANY DEFECTIVE PIPE OR CONDITIONS DISCOVERED BY TELEVISING SHALL BE CORRECTED BY <br />THE CONTRACTOR AT HIS EXPENSE. ANY CORRECTIVE WORK PROPOSED SHALL FIRST BE APPROVED BY THE ENGINEER. <br />THAN 3/8 INCH OR 1 PERCENT OF THE INSIDE DIAMETER, WHICHEVER IS GREATER; PROTRUDING, DEFORMED OR FOLDED <br />GASKETS; STANDING WATER AT A DEPTH GREATER THAN 0.01 FOOT PER INCH OF DIAMETER (BASED ON A LOSS OF PIPE <br />AREA OF 6.8 PERCENT). <br />THE COUNTY MAY ALSO TELEVISE THE SEWER MAINS PRIOR TO THE EXPIRATION OF THE ONE (1) YEAR WARRANTY <br />PERIOD. IF A DEFECTIVE CONDITION IS UNACCOUNTABLY FOUND, IT SHALL BE PRESUMED TO BE CAUSED BY DEFECTIVE <br />WORKMANSHIP OR MATERIALS. THE CONTRACTOR SHALL BE NOTIFIED AND SHALL CORRECT THE WORK IN A MANNER <br />APPROVED BY THE ENGINEER. <br />FULL COMPENSATION FOR FURNISHING ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND INCIDENTALS FOR PROVIDING <br />VIDEO INSPECTION OF THE SEWER PIPES SHALL BE CONSIDERED AS BEING INCLUDED IN THE CONTRACT UNIT COSTS BID <br />FOR THE VARIOUS SIZES OF SEWER PIPE INSTALLED AND NO ADDITIONAL COMPENSATION SHALL BE MADE THEREFOR. <br />WHEN DESIGNATED ON THE PLANS, SEWERS SHALL BE TESTED BY THE CONTRACTOR FOR WATERTIGHTNESS. EACH <br />SECTION OF SEWER SHALL BE TESTED BETWEEN SUCCESSIVE MAINTENANCE HOLES BY CLOSING THE LOWER END OF THE <br />SEWER TO BE TESTED AND INLET SEWER OF THE UPPER MAINTENANCE HOLE WITH STOPPERS. THE PIPE AND <br />MAINTENANCE HOLE SHALL BE FILLED WITH WATER TO A POINT FOUR FEET (4') (1.22M) ABOVE THE INVERT OF THE <br />SEWER AT THE CENTER OF THE UPPER MAINTENANCE HOLE; OR IF GROUND WATER IS PRESENT, FOUR FEET (4') <br />(1.22M) ABOVE THE AVERAGE ADJACENT GROUND WATER LEVEL. <br />THE ALLOWABLE LEAKAGE WILL BE COMPUTED BY THE FORMULAE: <br />E = 0.0001 LD4R_FOR MORTARED JOINTS. <br />E = 0.00002 LDS FOR ALL OTHER JOINTS. <br />WHERE: <br />L IS LENGTH OF SEWER AND HOUSE CONNECTIONS TESTED, IN FEET. <br />E IS THE ALLOWABLE LEAKAGE IN GALLONS PER MINUTE OF SEWER TESTED. <br />D IS THE INTERNAL DIAMETER OF THE PIPE, IN INCHES. <br />H IS THE DIFFERENCE IN ELEVATION, IN FEET, BETWEEN THE WATER SURFACE IN THE UPPER MAINTENANCE HOLE AND <br />THE INVERT OF THE PIPE AT THE LOWER MAINTENANCE HOLE; OR IF GROUNDWATER IS PRESENT ABOVE THE INVERT OF <br />THE PIPE IN THE LOWER MAINTENANCE HOLE, THE DIFFERENCE IN ELEVATION BETWEEN THE WATER SURFACE IN THE <br />UPPER MAINTENANCE HOLE AND THE GROUNDWATER AT THE LOWER MAINTENANCE HOLE. <br />HOWEVER, THE MAXIMUM SHALL NOT EXCEED TWO HUNDRED (200) GALLONS PER INCH OF INTERNAL DIAMETER PER MILE <br />PER DAY. <br />THE CONTRACTOR SHALL, AT HIS EXPENSE, FURNISH ALL WATER, MATERIALS AND LABOR FOR MAKING THE REQUIRED <br />TEST. ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE ENGINEER. <br />WHERE THE LEAKAGE OF THE SEWER EXCEEDS THE ABOVE AMOUNT, IT SHALL BE CORRECTED IMMEDIATELY AND THE <br />AMOUNT OF LEAKAGE REDUCED TO A QUANTITY WITHIN THE SPECIFIED AMOUNT. IN ANY CASE, THE CONTRACTOR SHALL <br />STOP ANY INDIVIDUAL LEAKS WHICH MAY BE OBSERVED. <br />AIR PRESSURE TEST <br />THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT AND LABOR FOR MAKING AN AIR TEST. AIR TEST <br />EQUIPMENT SHALL BE APPROVED BY THE DIRECTOR PRIOR TO THE BEGINNING OF THE TEST. <br />EACH SECTION OF SEWER SHALL BE TESTED BETWEEN SUCCESSIVE MAINTENANCE HOLES BY PLUGGING AND BRACING ALL <br />OPENINGS IN THE MAIN SEWER LINE AND THE UPPER ENDS OF ALL SEWER CONNECTIONS. PRIOR TO ANY AIR <br />PRESSURE TESTING, ALL PIPE PLUGS SHALL BE CHECKED WITH A SOAP SOLUTION TO DETECT ANY AIR LEAKAGE. IF <br />ANY LEAKS ARE FOUND, THE AIR PRESSURE SHALL BE RELEASED, THE LEAKS ELIMINATED AND THE TEST PROCEDURE <br />STARTED OVER AGAIN. <br />THE FINAL LEAKAGE TEST OF THE SEWER MAIN LINE AND BRANCHING SEWER CONNECTIONS SHALL BE CONDUCTED IN <br />THE PRESENCE OF THE DIRECTOR OR HIS REPRESENTATIVE IN THE FOLLOWING MANNER: <br />1. CLEAN PIPE TO BE TESTED BY PROPELLING SNUG FITTING INFLATED RUBBER BALL THROUGH THE PIPE WITH <br />WATER. <br />2. PLUG ALL PIPE OUTLETS WITH SUITABLE TEST PLUGS. BRACE EACH PLUG SECURELY. <br />3. IF THE PIPE TO BE TESTED IS SUBMERGED IN GROUND WATER, INSERT A PIPE PROBE BY BORING, OR JETTING, <br />INTO THE BACKFILL MATERIAL ADJACENT TO THE CENTER OF THE PIPE AND DETERMINE THE PRESSURE IN THE PROBE <br />WHEN AIR PASSES SLOWLY THROUGH IT. THIS IS THE BACK PRESSURE DUE TO GROUND WATER SUBMERGENCE OVER <br />THE END OF THE PROBE. ALL GAUGE PRESSURES IN THE TEST SHOULD BE INCREASED BY THIS AMOUNT. <br />4. ADD AIR SLOWLY TO THE PORTION OF THE PIPE INSTALLATION UNDER TEST UNTIL THE INTERNAL AIR PRESSURE IS <br />RAISED TO 4.0 PSIG. <br />5. AFTER AN INTERNAL PRESSURE OF 4.0 PSIG IS OBTAINED, ALLOW AT LEAST TWO (2) MINUTES FOR AIR <br />TEMPERATURE TO STABILIZE, ADDING ONLY THE AMOUNT OF AIR REQUIRED TO MAINTAIN PRESSURE. <br />6. WHEN PRESSURE DECREASES TO 3.5 PSIG, START STOP WATCH. <br />6A. THE FOLLOWING APPLIES TO ALL PIPES OTHER THAN PVC AND ABS (SEE 68): <br />DETERMINE THE TIME IN SECONDS THAT IS REQUIRED FOR THE INTERNAL AIR PRESSURE TO REACH 2.5 PSIG. MINIMUM <br />PERMISSIBLE PRESSURE HOLDING TIMES ARE INDICATED BY THE FOLLOWING FORMULA AND TABLE IN SECONDS: <br />T = K(D) <br />G <br />WHERE T = <br />MINIMUM REQUIRED TIME <br />IN <br />4 <br />Time <br />for <br />Lngr <br />SECONDS <br />K = <br />CONSTANT 0.022 <br />21" <br />D = <br />NOMINAL PIPE DIAMETER <br />IN <br />33• <br />INCHES <br />39' <br />G = <br />ALLOWAB LE AIR LOSS <br />RATE <br />8" <br />PER UNIT AREA, 0.003 <br />CU. <br />15" <br />FT./MIN./SQ. FT. <br />OF <br />10 <br />INTERNAL/SURFACE AREA <br />2e <br />MINIMUM HOLDING TIME IN SECONDS REQUIRED FOR PRESSURE TO DROP <br />FROM 3 1/2 TO 2 1/2 PSIG <br />PIPE DIAMETER <br />PIPE DIAMETER <br />NO.I DESCRIPTION <br />NOTES: (1) TO BE USED WHEN TESTING ONE DIAMETER ONLY. <br />(2) THE ABOVE AIR PRESSURE TEST PROCEDURE IS BASED ON ASTM C828. ANY SPECIAL SITUATIONS OR CONDITIONS <br />SHALL CONFORM TO THIS ASTM STANDARD. <br />6A FOR PVC AND ABS LINES, THE FOLLOWING TABLE LISTS THE MINIMUM TIMES ALLOWED FOR A PRESSURE DROP <br />FROM 3.5 PSI TO 3.0 PSI IN EXCESS OF THE GROUND WATER PRESSURE AT THE TOP OF THE PIPE. <br />1 <br />Pipe <br />Dia <br />(in) <br />2 <br />Min <br />Time <br />(min <br />3 <br />Lgth <br />for <br />Kin <br />4 <br />Time <br />for <br />Lngr <br />Specification time for Length <br />(L) shown (min:aec) <br />18" 1 <br />21" <br />24• <br />27" <br />30" <br />33• <br />36" <br />39' <br />Time <br />4" <br />S. <br />8" <br />la" 1 <br />12" 1 <br />15" <br />25 <br />4 <br />10 <br />16 <br />2e <br />40 <br />62 <br />89 <br />121 <br />158 <br />200 <br />246 <br />299 <br />356 <br />418 <br />509 <br />1:S3 <br />20 <br />35 <br />55 <br />79 <br />124 <br />176 <br />243 <br />317 <br />401 <br />495 <br />599 <br />713 <br />837 <br />15 <br />13 <br />30 <br />53 <br />83 <br />119 <br />186 <br />267 <br />364 <br />475 <br />601 <br />743 <br />698 <br />1020 <br />1105 <br />100 <br />16 <br />40 <br />70 <br />110 <br />156 <br />246 <br />256 <br />485 <br />634 <br />765 <br />651 <br />935 <br />4:57 <br />5:56 <br />125 <br />22 <br />50 <br />66 <br />138 <br />196 <br />309 <br />446 <br />595 <br />660 <br />7:00 <br />0433 <br />9:50 <br />11:24 <br />12:50 <br />150 <br />26 <br />59 <br />106 <br />165 <br />238 <br />371 <br />510 <br />13:21 <br />15:35 <br />17:40 <br />20:02 <br />175 <br />31 <br />69 <br />123 <br />193 <br />271 <br />425 <br />200 <br />35 <br />79 <br />141 <br />220 <br />317 <br />225 <br />40 <br />89 <br />158 <br />248 <br />340 <br />250 <br />44 <br />99 <br />176 <br />275 <br />275 <br />46 <br />109 <br />194 <br />283 <br />300 <br />53 <br />119 <br />211 <br />350 <br />62 <br />139 <br />227 <br />406 <br />70 <br />Ise <br />45079 <br />170 <br />500 <br />Be <br />5sa <br />97 <br />600 <br />106 <br />650 <br />113 <br />1 170 <br />1 227 <br />1 283 <br />1 340 <br />1 425 <br />1 510 <br />1 595 <br />sea <br />765 <br />851 <br />935 <br />1020 <br />1105 <br />NO.I DESCRIPTION <br />NOTES: (1) TO BE USED WHEN TESTING ONE DIAMETER ONLY. <br />(2) THE ABOVE AIR PRESSURE TEST PROCEDURE IS BASED ON ASTM C828. ANY SPECIAL SITUATIONS OR CONDITIONS <br />SHALL CONFORM TO THIS ASTM STANDARD. <br />6A FOR PVC AND ABS LINES, THE FOLLOWING TABLE LISTS THE MINIMUM TIMES ALLOWED FOR A PRESSURE DROP <br />FROM 3.5 PSI TO 3.0 PSI IN EXCESS OF THE GROUND WATER PRESSURE AT THE TOP OF THE PIPE. <br />1 <br />Pipe <br />Dia <br />(in) <br />2 <br />Min <br />Time <br />(min <br />3 <br />Lgth <br />for <br />Kin <br />4 <br />Time <br />for <br />Lngr <br />Specification time for Length <br />(L) shown (min:aec) <br />sec) <br />Time <br />Lgth <br />100 ft <br />150 ft <br />200 ft <br />250 ft <br />300 ft <br />350 ft <br />400 ft <br />4SO ft <br />(ft) <br />(sac) <br />4 <br />1:S3 <br />597 <br />.19OL <br />1:53 <br />1:53 <br />1:53 <br />1:53 <br />1:53 <br />1:53 <br />1:53 <br />1:53 <br />6 <br />2:50 <br />399 <br />.427L <br />2:50 <br />2 -.SD <br />2:50 <br />2.50 <br />2:502150 <br />2:51 <br />3:12 <br />8 <br />3:47 <br />290 <br />.760L <br />3:47 <br />3:47 <br />3:47 <br />3:47 <br />3: 45 <br />4:26 <br />5:04 <br />5:42 <br />10 <br />4:43 <br />239 <br />1.187L <br />4:43 <br />4:43 <br />4:43 <br />4:57 <br />5:56 <br />6:S5 <br />7,54 <br />6:54 <br />12 <br />5:40 <br />199 <br />1.709L <br />5:40 <br />5:40 <br />5:42 <br />7:00 <br />0433 <br />9:50 <br />11:24 <br />12:50 <br />15 <br />I 7:Os <br />I 159 <br />2.671L <br />7:05 <br />7:05 <br />1 7:05 <br />11:08 <br />13:21 <br />15:35 <br />17:40 <br />20:02 <br />SAFETY NOTE: <br />THE AIR TEST MAY BE DANGEROUS IF, BECAUSE OF IGNORANCE OR CARELESSNESS, A LINE IS IMPROPERLY PREPARED. <br />IT IS EXTREMELY IMPORTANT THAT THE VARIOUS PLUGS BE INSTALLED AND BRACED IN SUCH A WAY AS TO PREVENT <br />BLOW OUTS. INASMUCH AS A FORCE OF TWO HUNDRED -FIFTY (250) LBS. IS EXERTED ON AN EIGHT INCH (8") PLUG <br />BY AN INTERNAL PIPE PRESSURE OF 5.0 PSI, IT SHOULD BE REALIZED THAT SUDDEN EXPULSION OF A POORLY <br />INSTALLED PLUG OR OF A PLUG THAT IS PARTIALLY DEFLATED BEFORE THE PIPE PRESSURE IS RELEASED CAN BE <br />DANGEROUS. <br />AS A SAFETY PRECAUTION, PRESSURIZING EQUIPMENT SHOULD INCLUDE A REGULATOR SET AT PERHAPS 10.0 PSI TO <br />AVOID OVER -PRESSURIZING AND DAMAGING AN OTHERWISE ACCEPTABLE LINE. NO ONE SHALL BE ALLOWED IN THE <br />MAINTENANCE HOLES DURING TESTING. <br />IF THE TIME LAPSE IS LESS THAN THAT SHOWN IN THE TABLE, THE CONTRACTOR SHALL MAKE THE NECESSARY <br />CORRECTIONS TO REDUCE THE LEAKAGE TO ACCEPTABLE LIMITS. <br />SECTION 73 <br />ALTERNATE A <br />CONCRETE CURBS AND SIDEWALKS --CONCRETE CURBS AND SIDEWALKS SHALL CONFORM TO THE REQUIREMENTS IN <br />SECTION 73, "CONCRETE CURBS AND SIDEWALKS," OF THE STANDARD SPECIFICATIONS, THE STANDARD DRAWINGS AND <br />THESE SPECIAL PROVISIONS. <br />"HANDICAP RAMP" SHALL BE CONSIDERED THE SAME AS "CURB RAMP" IN THE STANDARD SPECIFICATIONS AND THESE <br />SPECIAL PROVISIONS. <br />IN LIEU OF THE REQUIREMENTS OF SECTION 73-1.05, "CURB CONSTRUCTION; OF THE STANDARD SPECIFICATIONS; <br />WEAKENED PLANE JOINTS SHALL BE CONSTRUCTED AT INTERVALS SHOWN ON THE STANDARD DRAWINGS. <br />WHERE CURB AND GUTTER ONLY IS CONSTRUCTED, DRIVEWAYS SHALL BE PLACED MONOLITHICALLY WITH THE CURB AND <br />GUTTER OR SHALL CONFORM TO ONE OF THE FOLLOWING ALTERNATIVES: <br />(A) DOWELS (FIVE-EIGHTHS INCH [5/8"] DIAMETER BY TWENTY-FOUR INCHES [24"] LONG) SPACED AT FOUR FOOT <br />(4') INTERVALS. <br />(B) KEYWAY CONSTRUCTED AS SHOWN ON STANDARD DRAWINGS OR TWO INCHES (2") IN HEIGHT AND ONE INCH (1") <br />IN DEPTH MINIMUM. <br />A UNIFORM COLOR SHALL BE MAINTAINED BY THE ADDITION OF ONE POUND OF LAMP BLACK PER CUBIC YARD OF <br />CONCRETE FOR CURB, GUTTER AND SIDEWALK CONSTRUCTION. <br />WALKWAY AND DRIVEWAY APPROACHES PROVIDING ACCESS TO PRIVATE PROPERTY THAT ARE CONSTRUCTED BEHIND NEW <br />SIDEWALK SHALL BE COLORED AND TEXTURED AS REQUIRED TO MATCH THE EXISTING FACILITY. <br />ALL CONCRETE GUTTERS SHALL BE WATER TESTED FOR DRAINAGE BEFORE ACCEPTANCE. THE MAXIMUM DEVIATION FROM <br />A TRUE GRADE SHALL NOT RESULT IN PONDING WATER FOR A DEPTH EXCEEDING 0.02 FOOT. <br />GROUND AREA TO BE USED FOR LANDSCAPING PURPOSES, WHICH HAS BEEN EXCAVATED OR IS BELOW FINISHED GRADE <br />SHALL BE BACKFILLED WITH SELECTED MATERIAL OR IMPORTED TOPSOIL FREE OF STONES CONFORMING TO THE <br />PROVISIONS OF SECTION 20-2.01, "TOPSOIL; OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS, <br />UNLESS OTHERWISE SHOWN ON THE PLANS. <br />SECTION 76 <br />DOMESTIC WATER FACILITIES --THIS WORK CONSISTS OF FURNISHING AND INSTALLING PRESSURE WATER PIPE, CONTROL <br />VALVES, THRUST BLOCKS, FIRE HYDRANT TEES, FIRE HYDRANTS AND SERVICE LINES, ALL AS SHOWN ON THE PLANS OR <br />AS DIRECTED BY THE ENGINEER, AND AS SPECIFIED IN THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. <br />>,lATIBIAteT--IN ACCORDANCE WITH SECTION 6-1.07, "CERTIFICATES OF COMPLIANCE," OF THE STANDARD SPECIFICATIONS, <br />A CERTIFICATE OF COMPLIANCE SHALL BE FURNISHED WITH ALL MATERIALS LISTED HEREIN. ALL PIPES AND FITTINGS <br />(EXCEPT VALVES) SHALL HAVE A MINIMUM WORKING PRESSURE OF ONE HUNDRED -FIFTY (150) POUNDS PER SQUARE <br />INCH (PSI) AND CONFORM TO THESE SPECIAL PROVISIONS. <br />ALTERNATIVE PIPE ALTERNATIVE WATER PIPE SHALL CONFORM TO THE REQUIREMENTS OF SECTION 62, "ALTERNATIVE <br />CULVERTS," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. ALTERNATIVE WATER PIPE WILL BE <br />DESIGNATED BY TYPE ON THE PLANS AND IN THE ENGINEER'S ESTIMATE. THE EQUIVALENT KINDS OF PIPE WILL BE <br />SHOWN ON THE PIANS FOR EACH TYPE. THE KIND OF PIPE TO BE INSTALLED SHALL BE AT THE OPTION OF THE <br />CONTRACTOR. <br />THE KINDS OF PIPE FOR ALTERNATIVE WATER PIPE SHALL CONFORM TO THE FOLLOWING PROVISIONS: <br />1. CAST IRON AND DUCTILE IRON PIPE FOR WATER SHALL BE FURNISHED IN THE SIZES, CLASSES, GRADES OR <br />NOMINAL THICKNESSES, AND JOINT TYPES DESIGNATED ON THE PLANS OR IN THE SPECIAL PROVISIONS. <br />CAST IRON PIPE SHALL COMPLY WITH ANSI A2L.6 (AWWA C106) FOR PIPE CAST IN METAL MOLDS OR ANSI A21.8 (AWWA <br />C108) FOR PIPE CAST IN SAND LINED MOLDS. <br />DUCTILE IRON PIPE SHALL COMPLY WITH ANSI A21.51 (AWWA C151). <br />CAST AND DUCTILE IRON PIPE JOINTS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS FOR THE TYPES SPECIFIED <br />ON THE PLANS OR IN THE SPECIAL PROVISIONS: <br />TYPE OF JOINT SPECIFICATION <br />RUBBER GASKET PUSH -ON ANSI A21.11 (AWWA <br />JOINT C 1 1 1 ) <br />MECHANICAL JOINT ANSI A21.11 (AWWA <br />PREPARED IN THE <br />FLANGED JOINT <br />FLANGED JOINT <br />(THREADED FLANGES) <br />C 1 1 1 ) <br />ANSI B16.1, B16.2 AND <br />A21 .10 (AWWA C 1 1 0) <br />ANSI B2.1 <br />WMWOOD ESTATES <br />GENERAL NOTES AND SPECIFICATIONS <br />OFFICE OF: • Civil Engineering <br />• Land Surveying <br />• Structural Engineering <br />• Planning <br />4045 Coronado Avenue • Stockton, CA 95204 <br />209 443-20210 Fax: 209 942-0214 <br />ENIGINEERIN6,INC. <br />DRAWN BY: <br />DJA <br />SCALE: <br />AS SHOWN <br />DATE: 0e722706 SHEET OF <br />C-4 <br />R.C.E. NO.: 62498 JOB NO. <br />04251 <br />EXP DATE: <br />09/2007 1"' <br />T <br />G- <br />