�(J <br />I' X i <br />WOOD POST OR <br />STEEL POST - <br />6' MIN. <br />FLAW I <br />A <br />A <br />PLAN <br />SECTION A -A <br />FIBER ROLL <br />NOTES: <br />1. FILTER ROLLS SHALL BE CONSTRUCTED LONG ENOUGH TO EXTEND ACROSS THE EXPECTED FLOW PATH, <br />2. SUPPORT POSTS SHALL BE A MINIMUM 24' LONG 1' X 1' WOOD POSTS DRIVEN A MINIMUM OF 6 <br />INCHES INTO THE GROUND. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART. <br />3. FILTER ROLL SHALL BE IMBEDDED A MINIMUM OF 3 INCHES INTO EXISTING GROUND <br />4. CONTRACTOR SHALL MAKE INSPECTIONS WEEKLY DURING THE WET SEASON, MONTHLY DURING THE DRY <br />SEASON AND IMMEDIATELY AFTER EACH RAINFALL TO DETERMINE IF REPAIRS AND SEDIMENT REMOVAL IS <br />REQUIRED. SEDIMENT SHALL BE REMOVED BEFORE R HAS REACHED ONE HALF THE HEIGHT OF THE <br />FILTER ROLL <br />O FIBER/STRAW ROLL DETAIL <br />GRAVEL BAC <br />OVERLAP ONTO <br />SPILLWAY <br />tlGIFS: <br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC. <br />2. CONSTRUCT ON GENTLY SLOPING STREET WHERE WATER CAN POND AND ALLOW <br />SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF BAGS TO SERVE AS <br />SPILLWAY. SPILLWAY HEIGHT SHALL BE LOWER THAN CURB HEIGHT AND SUFFICIENT IN <br />SIZE TO PASS FLOWS FROM SEVERE STORM EVENT. <br />4. PLACE TWO LAYERS OF GRAVEL BAGS. OVERLAP BAGS AND PACK THEM TIGHTLY <br />TOGETHER TO MINIMIZE THE SPACE BETWEEN BAGS. FILL BAG WITH 3/4" DRAIN ROCK. <br />5. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 <br />OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN <br />AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD. <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE <br />DEUNEATION DEVICES TO ALERT MOTORISTS, BICYCLJSTS AND PEDESTRIANS. THE USE OF <br />SUCH DEVICES SHALL BE SUBJECT TO THE ENGINEER'S APPROVAL. <br />(D CURB INLET DETAIL <br />CONSTRUCTION SITE BITE OF FNIB I <br />EXISTING <br />50 FT (15 METERS) MINIMUM <br />L <br />6' to 12' DEPTH OF WASHED <br />GRADED 3'-4' FRACTURED STONE <br />IIEIII-III-111.111. <br />GEOTEXTILE MATERIAL <br />A <br />6 INCHES <br />(150 MM) MW. <br />SECTION A -A <br />FesDIRECTION <br />) OF TRAVEL. � <br />PLAN VIEW <br />NOTES <br />I. STABILIZED CONSTRUCTION SITE ACCESS SWILL BE <br />CONSTRUCTED OF 3` TO 4' WASHED, WELL -GRADED <br />FRACTURED STONE AGGREGATE. MATERIAL SHALL BE <br />PLACED TO A MINIMUM THICKNESS OF 6 INCHES, <br />SLOPED AWAY FROM THE ROADWAY. <br />2. LENGTH OF ENTRANCE SHALL BE A MINIMUM OF 50 <br />FEET (15 METERS). WIDTH SHALL BE A MIN. OF 15 <br />FT (4.5 METERS) OR GREATER IF NECESSARY TO <br />COVER ALL VEHICULAR INGRESS AND EGRESS. <br />PROVIDE AMPLE TURNING RADII. <br />3. THE ENTRANCE SHALL BE KEPT IN GOOD CONDITION <br />BY OCCASIONAL TOP DRESSING WITH MATERIAL AS <br />SPECIFIED IN NOTE 1. <br />4. ACCESSES SHALL BE INSPECTED WEEKLY DURING <br />PERIODS OF HEAVY USAGE, MONTHLY DURING <br />NORMAL USAGE, AND AFTER EACH RAINFALL, WITH <br />MAINTENANCE PROVIDED AS NECESSARY. PERIODIC <br />TOP DRESSING SHALL BE DONE AS NEEDED. <br />A <br />Q CONSTRUCTION ENTRANCE <br />EXIST. A.0 <br />PLACEMENT AT VERTICAL CURBS <br />FACE OF7, INLET FILTER <br />/- GRATE <br />EXISTING / <br />OPEN BA" <br />HOOD A I <br />e <br />v <br />v <br />e <br />a v <br />FLIER <br />MATERIAL EXISTING DROP <br />INLET GRATE <br />SECTION A - A <br />PLACEMENT AT ROLLED CURBS <br />FACE OF CURB7 /- INLETTE FILTER <br />GRA <br />8 <br />PLAN VIEW <br />FILTER GRATE FILTER <br />CURB <br />B <br />v7^' <br />a v <br />b o. <br />v <br />EXISTINGDROP WIRE OR <br />INLET GRATE TE WRAP <br />SECTION B - B <br />NOTES <br />1.THE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 2 ACRES <br />(0.8 HECTARES). <br />2. THE FILTER PAD SHALL BE 1 INCH (25 MM) THICK CLEANABLE POLYESTER FOR <br />AND ACRYLIC LATEX RESIN OR APPROVED EQUAL, FILTER PAD SMALL OVERLAP DROP <br />INLET ON ALL SIDES BY A MIN. OF 1' (25 MM). <br />3. THE FILTER GRATE SHALL BE MADE OF EXPANDED METAL OR REBAR AMD BE OF <br />SUFFICIENT STRENGTH TO PREVENT BENDING WHEN ORNEN OVER. CRATE MATERIAL <br />SHALL NOT EXCEED 0.5 INCH (13 MLI) TICK. THE GRATE SHALL HAVE A MINIMUM <br />6OX OPEN AREA GRATES USED AT VERTICAL CURBS SHALL HAVE A VERTICAL <br />EXTENSION TO COVER THE CURB OPENING. THE FILTER GRATE SHALL BE THE SAVE <br />SIZE AS THE INLET GRATE, <br />4. THE FILTER PAD AND GRATE SMALL BE SECURELY ATTACHED TO THE DROP INLET <br />BY WIRE OR TE -WRAPS. <br />5.INLET FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. <br />REPAIRS AND SEDIMENT AND DEBRIS REMOVAL SHALL BE MADE AS NECESSARY. <br />6. WLL7 FILTERS SHALL BE 01C0H57RUCTId!' STORM DRAIN FILTERS BY POLLUTION <br />SOL VI ION. <br />CURB INLET DETAIL <br />50X50MM(2'X21STAKE OR <br />J -BAR DRIVEN 1 INCH <br />25 MM) BELOW TOP OF SALE - - STRW OR HAY BALE <br />lM( <br />) MIN. TARP COMPACTED SOIL <br />NYLON OR <br />WIRE BINDINGS I I STALE TARP 10 GROLBD <br />EXISTING GROUND -� 1 <br />111-1 YM) <br />4 INCH (100 MM) MIN. 18 INCHES (450 MM) MIN. <br />SET BALE IN TRENCH <br />SECTION A -A <br />STRAW BALE ALIGNMENT <br />" O&T <br />2 STAKES ANGLE FIRST STAKE TOWARDS <br />PER BALE T PREVIOUSLY LAID BALE <br />I I 1:;x, 1-1 <br />PLACE BALES TIGHTLY 4 INCH (100 MM) <br />TOGETHER WITH NO GAPS TRENCH <br />FRONT VIEW <br />1 PLACE BALES IN 4 INCH (100 MM) DEEP TRENCH ALONG THE CONTOUR <br />IN THE SHAPE OF AN ARC WITH THE ENDS W4 LL OF THE ARC'S COTTER BALES <br />SHALL BE PLACED SO THAT BINDINGS ARE HORIZONTAL. <br />2. BATS SHALL BE AK4ff D BY TW 2' X Y (50 X 50 IW) STAKES OR i4 J -BAR W&DO <br />THROUGH THE BALE AND INTO THE GROUND A YWWHI DEPTH OF 16 BICTES (450 MM). <br />STAKES OR J -BARS SHALL ITE DRIVEN FLUSH WITH THE TOP OF THE BALE. <br />THE FIRST STAKE OR J -BAR W EACH BALE SHALL BE DRIVEN AT AN MILE <br />TOWARDS THE PRPAOUSLY LAID BICE TO FORCE THE BILES TORY TOGETHER. <br />3. AFTER SAES ARE STAKED IN PLACE, EXCAVATED SOIL SHALL BE BACKFILLED <br />AGAINST THE SIDE TO A MINIMUM HEIGHT OF 4 INCHES (100 MM). <br />4. CONTRACTOR MAY SUBSTITUE HAY BALE WITH AN EARTHEN DIKE <br />AFTER RECEIVING APPROVAL FORM A CERTIFIED PROFESSIONAL <br />IN EROSION AND SEDIMENT CONTROLCONTROL <br />5. CONTRACTOR SHALL (SPECT BASS WEEKLY AND AFTER EACH WASHOUT. REPAIRS <br />SHALL BE MADE AS NECESSARY AID MUM M OF (150 1gBM��A L BE REMOVm WHEN IT HAS <br />,AIXUMULATED TO A DEPTH 6 MM 09 DEDECDM1k DBNES SHAH BE REPLACED WHEN <br />CONCRETE WASHOUT <br />GRAVEL <br />S <br />SPILLWAY <br />-�- -� 12• ..... <br />- <br />ING Hi_ MIN. MIN. <br />CATCH <br />BASIN <br />SECTION A -A <br />1. GRAVEL BAGS SHALL DE WOVEN GEOTEXTILE FABRIC. <br />2. CONSTRUCT ON GENTLY SUING STREET WHERE WATER CAN POND AND ALLOW <br />SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF BAGS TO SERVE AS SPILLWAY. <br />SPILLWAY HEIGHT SHALL BE SUFFICIENT IN SIZE TO PASS FLOWS FROM SEVER STORM EVENT. <br />4. PLACE TWO LAYERS OF GRAVEL BAGS. OVER LAP BAGS AND PACK THEM TIGHTLY <br />TOGETHER TO MINIMIZE THE SPACE BETWEEN BAG& FILL BAG WITH 3/4' DRAIN ROCK. <br />5. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 <br />OF THE FILTER DEPTH HAS BEEN FILLED, REMOVED SEDIMENT SHALL BE DEPOSITED IN <br />AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD, <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE <br />DELINEATION DEVICES TO ALERT MOTORISTS. BICYCLISTS AND PEDESTRIANS. THE USE OF <br />SUCH DEVICES SHALL BE SUBJECT TO THE ENGINEERS APPROVAL. <br />OINLET DETAIL <br />WE OR <br />TE WRAP <br />(TYPKu) <br />PLACEMENT AT <br />ROLLED CURBS <br />FACE OF CURB <br />INLET FILTER <br />I 7 <br />FILTER <br />N <br />U) o <br />U <br />w <br />00 o <br />OU <br />MATERIAL <br />L <br />m� <br />H <br />°o°O°OOOo <br />000000 <br />TO OY£RIAP <br />DROP INLET <br />c <br />°Doo°O°O°o° <br />3 m <br />BY I'(2W <br />VERTICAL <br />0 <br />00000000000 <br />o°o°00oo°0 <br />Z <br />O <br />1NNMIUN <br />EXiDISgN <br />CO <br />o°o°o <br />W <br />Z <br />xn <br />O <br />OF CRUATE <br />Q <br />U <br />to <br />MARE <br />TO EXTEND <br />A <br />PAST EACH <br />I -- <br />(TYPICAL) <br />SIDE CURB <br />M] <br />OPENING <br />PLAN VIEW <br />BUSTING OPEN <br />TE <br />61C1 HOW i <br />EX TDISION <br />MARE OR TIE WWW <br />� FILTER GRATE <br />e <br />v <br />v <br />e <br />a v <br />FLIER <br />MATERIAL EXISTING DROP <br />INLET GRATE <br />SECTION A - A <br />PLACEMENT AT ROLLED CURBS <br />FACE OF CURB7 /- INLETTE FILTER <br />GRA <br />8 <br />PLAN VIEW <br />FILTER GRATE FILTER <br />CURB <br />B <br />v7^' <br />a v <br />b o. <br />v <br />EXISTINGDROP WIRE OR <br />INLET GRATE TE WRAP <br />SECTION B - B <br />NOTES <br />1.THE MAXIMUM DRAINAGE AREA PER FILTER SHALL BE NO MORE THAN 2 ACRES <br />(0.8 HECTARES). <br />2. THE FILTER PAD SHALL BE 1 INCH (25 MM) THICK CLEANABLE POLYESTER FOR <br />AND ACRYLIC LATEX RESIN OR APPROVED EQUAL, FILTER PAD SMALL OVERLAP DROP <br />INLET ON ALL SIDES BY A MIN. OF 1' (25 MM). <br />3. THE FILTER GRATE SHALL BE MADE OF EXPANDED METAL OR REBAR AMD BE OF <br />SUFFICIENT STRENGTH TO PREVENT BENDING WHEN ORNEN OVER. CRATE MATERIAL <br />SHALL NOT EXCEED 0.5 INCH (13 MLI) TICK. THE GRATE SHALL HAVE A MINIMUM <br />6OX OPEN AREA GRATES USED AT VERTICAL CURBS SHALL HAVE A VERTICAL <br />EXTENSION TO COVER THE CURB OPENING. THE FILTER GRATE SHALL BE THE SAVE <br />SIZE AS THE INLET GRATE, <br />4. THE FILTER PAD AND GRATE SMALL BE SECURELY ATTACHED TO THE DROP INLET <br />BY WIRE OR TE -WRAPS. <br />5.INLET FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. <br />REPAIRS AND SEDIMENT AND DEBRIS REMOVAL SHALL BE MADE AS NECESSARY. <br />6. WLL7 FILTERS SHALL BE 01C0H57RUCTId!' STORM DRAIN FILTERS BY POLLUTION <br />SOL VI ION. <br />CURB INLET DETAIL <br />50X50MM(2'X21STAKE OR <br />J -BAR DRIVEN 1 INCH <br />25 MM) BELOW TOP OF SALE - - STRW OR HAY BALE <br />lM( <br />) MIN. TARP COMPACTED SOIL <br />NYLON OR <br />WIRE BINDINGS I I STALE TARP 10 GROLBD <br />EXISTING GROUND -� 1 <br />111-1 YM) <br />4 INCH (100 MM) MIN. 18 INCHES (450 MM) MIN. <br />SET BALE IN TRENCH <br />SECTION A -A <br />STRAW BALE ALIGNMENT <br />" O&T <br />2 STAKES ANGLE FIRST STAKE TOWARDS <br />PER BALE T PREVIOUSLY LAID BALE <br />I I 1:;x, 1-1 <br />PLACE BALES TIGHTLY 4 INCH (100 MM) <br />TOGETHER WITH NO GAPS TRENCH <br />FRONT VIEW <br />1 PLACE BALES IN 4 INCH (100 MM) DEEP TRENCH ALONG THE CONTOUR <br />IN THE SHAPE OF AN ARC WITH THE ENDS W4 LL OF THE ARC'S COTTER BALES <br />SHALL BE PLACED SO THAT BINDINGS ARE HORIZONTAL. <br />2. BATS SHALL BE AK4ff D BY TW 2' X Y (50 X 50 IW) STAKES OR i4 J -BAR W&DO <br />THROUGH THE BALE AND INTO THE GROUND A YWWHI DEPTH OF 16 BICTES (450 MM). <br />STAKES OR J -BARS SHALL ITE DRIVEN FLUSH WITH THE TOP OF THE BALE. <br />THE FIRST STAKE OR J -BAR W EACH BALE SHALL BE DRIVEN AT AN MILE <br />TOWARDS THE PRPAOUSLY LAID BICE TO FORCE THE BILES TORY TOGETHER. <br />3. AFTER SAES ARE STAKED IN PLACE, EXCAVATED SOIL SHALL BE BACKFILLED <br />AGAINST THE SIDE TO A MINIMUM HEIGHT OF 4 INCHES (100 MM). <br />4. CONTRACTOR MAY SUBSTITUE HAY BALE WITH AN EARTHEN DIKE <br />AFTER RECEIVING APPROVAL FORM A CERTIFIED PROFESSIONAL <br />IN EROSION AND SEDIMENT CONTROLCONTROL <br />5. CONTRACTOR SHALL (SPECT BASS WEEKLY AND AFTER EACH WASHOUT. REPAIRS <br />SHALL BE MADE AS NECESSARY AID MUM M OF (150 1gBM��A L BE REMOVm WHEN IT HAS <br />,AIXUMULATED TO A DEPTH 6 MM 09 DEDECDM1k DBNES SHAH BE REPLACED WHEN <br />CONCRETE WASHOUT <br />GRAVEL <br />S <br />SPILLWAY <br />-�- -� 12• ..... <br />- <br />ING Hi_ MIN. MIN. <br />CATCH <br />BASIN <br />SECTION A -A <br />1. GRAVEL BAGS SHALL DE WOVEN GEOTEXTILE FABRIC. <br />2. CONSTRUCT ON GENTLY SUING STREET WHERE WATER CAN POND AND ALLOW <br />SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF BAGS TO SERVE AS SPILLWAY. <br />SPILLWAY HEIGHT SHALL BE SUFFICIENT IN SIZE TO PASS FLOWS FROM SEVER STORM EVENT. <br />4. PLACE TWO LAYERS OF GRAVEL BAGS. OVER LAP BAGS AND PACK THEM TIGHTLY <br />TOGETHER TO MINIMIZE THE SPACE BETWEEN BAG& FILL BAG WITH 3/4' DRAIN ROCK. <br />5. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 <br />OF THE FILTER DEPTH HAS BEEN FILLED, REMOVED SEDIMENT SHALL BE DEPOSITED IN <br />AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROAD, <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO THE PUBLIC WILL REQUIRE <br />DELINEATION DEVICES TO ALERT MOTORISTS. BICYCLISTS AND PEDESTRIANS. THE USE OF <br />SUCH DEVICES SHALL BE SUBJECT TO THE ENGINEERS APPROVAL. <br />OINLET DETAIL <br />WE OR <br />TE WRAP <br />(TYPKu) <br />PLACEMENT AT <br />ROLLED CURBS <br />FACE OF CURB <br />INLET FILTER <br />I 7 <br />� GRATE <br />A I I A <br />PLAN VIEW <br />FILTER GRATE FILTER MATERIAL <br />va <br />v <br />EX' <br />1SCT.R�ATTEE �WRRAAP <br />SECTION A -A <br />MM <br />1. THE MAXIMUM DRAINAGE AREA PER FALTER SWILL ITE NO MORE THAN 2 ACRES <br />(0.8 HECTARES). <br />2. THE FILTER PAD WIAIL BE 1 INCH (25 MM) THICK CLEANABLE POLYESTER FIBER <br />AND ACRYLIC LATEX RESIN OR APPROVED EQUAL FILTER PAD SHALL OVERLAP DROP <br />INLET ON ALL SIDES BY A MIN. OF 1' (25 MM). <br />3. THE FILTER GRATE SHALL BE MADE OF EXPANDED META OR REEAR AND BE OF <br />SUFFICIENT STRENGTH TO PREVENT BENDING WHEN DRIVEN OVER. GRATE MATERIAL <br />SHALL NOT EIC® 0.5 INCH (13 MM) THICK. THE GRATE SHALL HAVE A MIIN" <br />WX OPEN AREA CRATES USED AT VERTICAL CURBS SHALL HAVE A VERTICAL <br />EXTENSION TO COVER THE CURB OPMAIC, THE FILTER GRATE SHALL BE THE SAME <br />SIZE AS THE INLET GRATE. <br />4. THE FILTER PAD AND GRATE SHALL BE SECURELY ATTACHED TO THE DROP INLET <br />BY WIRE OR TIE -WRAPS. <br />5. INLET FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. <br />REPAIRS AND SEDIMENT AND DEBRIS REMOVAL SHALL BE MADE AS NECESSARY. <br />6'"M FILTERS FILTERS SHAL BE RONISTRUCTION' STORM DRAIN FILTERS BY POLLUTION <br />SOLUTION. <br />Q INLET DETAIL <br />N0, 62009 <br />EXP. 9/30/2007 <br />Z <br />z <br />UJ <br />N <br />U) o <br />U <br />w <br />u <br />OU <br />L <br />m� <br />H <br />LU <br />DU <br />c <br />Q <br />3 m <br />0 <br />0 <br />{L} <br />Z <br />O <br />~ <br />W�O <br />CO <br />Z <br />W <br />Z <br />xn <br />O <br />(Dm� <br />Q <br />U <br />to <br />2 N <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />06/27/06 <br />Scale <br />NTS <br />Original Drawing Scale <br />0 �.. 1 <br />LL1_LLLLIJIJ <br />Sheet Number <br />9 of 10 <br />Project File No. <br />OS -112 <br />z <br />N0 <br />0.0. <br />L0 <br />H <br />DU <br />0 <br />0 <br />Q <br />w <br />0 <br />Z <br />I -- <br />M] <br />W <br />W <br />LTJ <br />O <br />W <br />v) <br />NW <br />Z <br />0 <br />D <br />Z <br />Q <br />UO <br />Z <br />J <br />cV <br />0 <br />U <br />OU <br />N <br />WM <br />W <br />Design <br />AMC <br />Check <br />AMC <br />Date <br />06/27/06 <br />Scale <br />NTS <br />Original Drawing Scale <br />0 �.. 1 <br />LL1_LLLLIJIJ <br />Sheet Number <br />9 of 10 <br />Project File No. <br />OS -112 <br />