Laserfiche WebLink
BACK OF SIDEWALK <br />MANHOLE GRATE- <br />SIDEWALK-,, <br />RATE <br />SIDEWALK 1 JOINT <br />18" CONE <br />0 <br />d <br />Q <br />6" SEWER PIPE S.=004 - <br />CONCRETE HOSE <br />HAND FORM BOTTOM <br />OF MANHOLE TO <br />MAINTAIN CON77NLIOUS FLOW <br />24" <br />4'-10" <br />ELEC. PANEL <br />4" CONDUIT FROM <br />ELECTRICAL SERVICE <br />(BY PG&E) <br />1 �2" CONDUIT TO JUNCTION <br />BOX (SEE BELOW) <br />�I <br />PLANT VIEW <br />36"x36" PRECAST VALVE. <br />BOX WITH 1/4" ALUMINUM <br />OAMOND PLATE COVER <br />JOINT <br />TOP RAIL SUPPORT <br />(BOLTS TO COVER <br />FRAME) <br />JOINT <br />6" OVERFLOW aPE <br />CE 6" DEEP <br />DRAW ROCK <br />1 1/2" PIPE GUIDE RAILS <br />MUST BE PLUMB <br />SUBMERSIBLE NON -CLOG PUM <br />4" DISCHARGE ELBOW <br />4" UFT OUT ASSEMBL <br />du <br />Q <br />PROFILE VIEW <br />O <br />LIFTING <br />CHAIN <br />RAIL <br />BOTTOM OF BASIN MUST <br />HAVE SMOOTH TROWLED <br />SURFACE FOR MOUNTING <br />SUPPORT C4S77AAG <br />a <br />0 <br />FLOAT MOUNTING <br />BRACKET <br />STATE RIGHT OF WAY/ <br />BACK OF CURB <br />LINE <br />OF GUTTER <br />1/4" ALUM. DAMOND PLATE COVER <br />1/4 "x3"x3" ANaE FRAME W/ <br />R£MOMt6Y£ KEY NNIN C H AND <br />SLAM LOCK WITH AA44MOE HANDL£ <br />2" CONDUIT TO CONTROL PANEL <br />PRECAST 72" MANHOLE <br />SECTIONS (TYP.) <br />ELEV. 21.00 <br />HIGH WATER ALARM <br />PUMP 12 ON <br />6" INLET PIPE <br />MERCURY FLOAT SWITCH <br />PER PUMP MAN REO. (TYP) <br />ELEV. 16.00 <br />PUMPS OFF <br />EUM 14.00 <br />SUMP FLOOR <br />CONCRETE BASE <br />& <br />/ E h4UST FAN (7Y'P.) FLUORESCENT LIGHTING <br />r --i r -__l / <br />BASE PLAN <br />rµ <br />ENCLOSURE CONSTRUCTION NOTES <br />RIGHT SIDE VIEW <br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY <br />WELDED AND REINFORCED WHERE REWRED. <br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT. <br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL <br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE. <br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED. <br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS. <br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR. <br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS <br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY. <br />CONTROL SYSTEM <br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS <br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT, <br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1, <br />GROUP C AND D. <br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N, <br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR <br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC <br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY. <br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND <br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE <br />PROTECTED BY FUSE OR CIRCUIT BREAKER. <br />fHE FOLLOWING FEATURES SHALL BE PROWDED: <br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS, <br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE <br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP. <br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING. <br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD <br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS <br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS <br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF <br />7HERE ARE HIGH INFLOW COADMONS <br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE <br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY <br />77ED TOGETHERR, <br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL. <br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE <br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE <br />774£ CONTROL IS4 <br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S <br />INTENDED 70 OPERATE <br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE <br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS <br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED. <br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE <br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER <br />A POWER FAILURE. <br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT. <br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT. <br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER. <br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS <br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G. <br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP. <br />GENERAL NOTES: <br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY <br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£ <br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS. <br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS <br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY. <br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS <br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS <br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E <br />HORSEPOWER IS 3 HP EACH. <br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS <br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE, <br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO <br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE <br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED <br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK. <br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS <br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR <br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS. <br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS. <br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST. <br />® ECCENTRIC VALVE, 1/4 TURN OPERATION. <br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW. <br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY. <br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS <br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL. <br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A <br />VFD PHASE CONVERTER. <br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED. <br />CONTROL PANEL REQUIREMENTS.• <br />PROVISIONS FOR U71UTY METERING <br />- SUB BREAKERS (20/1 12OV) <br />- MAIN DISCONNECT CIRCUIT RVAKER <br />CONDUIT AREA <br />CONDUIT AREA <br />- AAI£ DELAY RELAYS AS REQUIRED) <br />LEWD <br />LOAD <br />INTERLOCK <br />QU/RED) <br />- VOLTMETER <br />- H I 7OR SNITCHES <br />2F <br />- <br />INSTRUMIENTA710N <br />ct CONTROLS <br />- CONSTANT SPEED DRIVES, 3 HP <br />MEIENNG & <br />SWITCH GEAR <br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1 <br />- EXHAUST FAN PACKAGES W17ND IOSTATS <br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV) <br />301430"+ <br />- <br />- GFC/ arEPT <br />- KV4 TRANSFORMER 48OV-120/240V 1 PHASE <br />BASE PLAN <br />rµ <br />ENCLOSURE CONSTRUCTION NOTES <br />RIGHT SIDE VIEW <br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY <br />WELDED AND REINFORCED WHERE REWRED. <br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT. <br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL <br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE. <br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED. <br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS. <br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR. <br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS <br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY. <br />CONTROL SYSTEM <br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS <br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT, <br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1, <br />GROUP C AND D. <br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N, <br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR <br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC <br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY. <br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND <br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE <br />PROTECTED BY FUSE OR CIRCUIT BREAKER. <br />fHE FOLLOWING FEATURES SHALL BE PROWDED: <br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS, <br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE <br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP. <br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING. <br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD <br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS <br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS <br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF <br />7HERE ARE HIGH INFLOW COADMONS <br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE <br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY <br />77ED TOGETHERR, <br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL. <br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE <br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE <br />774£ CONTROL IS4 <br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S <br />INTENDED 70 OPERATE <br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE <br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS <br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED. <br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE <br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER <br />A POWER FAILURE. <br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT. <br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT. <br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER. <br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS <br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G. <br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP. <br />GENERAL NOTES: <br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY <br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£ <br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS. <br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS <br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY. <br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS <br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS <br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E <br />HORSEPOWER IS 3 HP EACH. <br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS <br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE, <br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO <br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE <br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED <br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK. <br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS <br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR <br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS. <br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS. <br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST. <br />® ECCENTRIC VALVE, 1/4 TURN OPERATION. <br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW. <br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY. <br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS <br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL. <br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A <br />VFD PHASE CONVERTER. <br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED. <br />CONTROL PANEL REQUIREMENTS.• <br />PROVISIONS FOR U71UTY METERING <br />- SUB BREAKERS (20/1 12OV) <br />- MAIN DISCONNECT CIRCUIT RVAKER <br />CONDUIT AREA <br />CONDUIT AREA <br />- AAI£ DELAY RELAYS AS REQUIRED) <br />LEWD <br />LOAD <br />INTERLOCK <br />QU/RED) <br />- VOLTMETER <br />- H I 7OR SNITCHES <br />- AMMETERS <br />- PUSN-B 07ON <br />- CONSTANT SPEED DRIVES, 3 HP <br />- FORMERS <br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1 <br />- EXHAUST FAN PACKAGES W17ND IOSTATS <br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV) <br />301430"+ <br />- <br />- GFC/ arEPT <br />BASE PLAN <br />rµ <br />ENCLOSURE CONSTRUCTION NOTES <br />RIGHT SIDE VIEW <br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY <br />WELDED AND REINFORCED WHERE REWRED. <br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT. <br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL <br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE. <br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED. <br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS. <br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR. <br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS <br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY. <br />CONTROL SYSTEM <br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS <br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT, <br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1, <br />GROUP C AND D. <br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N, <br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR <br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC <br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY. <br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND <br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE <br />PROTECTED BY FUSE OR CIRCUIT BREAKER. <br />fHE FOLLOWING FEATURES SHALL BE PROWDED: <br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS, <br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE <br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP. <br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING. <br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD <br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS <br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS <br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF <br />7HERE ARE HIGH INFLOW COADMONS <br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE <br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY <br />77ED TOGETHERR, <br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL. <br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE <br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE <br />774£ CONTROL IS4 <br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S <br />INTENDED 70 OPERATE <br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE <br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS <br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED. <br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE <br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER <br />A POWER FAILURE. <br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT. <br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT. <br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER. <br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS <br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G. <br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP. <br />GENERAL NOTES: <br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY <br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£ <br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS. <br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS <br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY. <br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS <br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS <br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E <br />HORSEPOWER IS 3 HP EACH. <br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS <br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE, <br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO <br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE <br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED <br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK. <br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS <br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR <br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS. <br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS. <br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST. <br />® ECCENTRIC VALVE, 1/4 TURN OPERATION. <br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW. <br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY. <br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS <br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL. <br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A <br />VFD PHASE CONVERTER. <br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED. <br />CONTROL PANEL REQUIREMENTS.• <br />PROVISIONS FOR U71UTY METERING <br />- SUB BREAKERS (20/1 12OV) <br />- MAIN DISCONNECT CIRCUIT RVAKER <br />- PUMP CONTROLS <br />- GENERARHR DISCONNECT CIRCUIT BREAKER <br />- AAI£ DELAY RELAYS AS REQUIRED) <br />- GENERATOR RECEPTACLE 100 AMP <br />- CONTROL RELAYS (ASREQUOMD) <br />INTERLOCK <br />QU/RED) <br />- VOLTMETER <br />- H I 7OR SNITCHES <br />- AMMETERS <br />- PUSN-B 07ON <br />- CONSTANT SPEED DRIVES, 3 HP <br />- FORMERS <br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1 <br />- EXHAUST FAN PACKAGES W17ND IOSTATS <br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV) <br />- STRIP HEATERS W/ THERMOSTATS <br />- INIERA41L PANEL WIRE, AWARE TAGS, AND ALL CONTROLS AS REQUIRED. <br />- GFC/ arEPT <br />- KV4 TRANSFORMER 48OV-120/240V 1 PHASE <br />■ 4 <br />i px1 <br />/ p <br />O <br />r <br />J <br />W <br />it <br />W <br />CA <br />z <br />L <br />RUMM <br />15 <br />�J SHEETS <br />0 <br />C <br />E <br />J <br />h <br />n <br />O <br />O <br />N <br />ro <br />R <br />N <br />O <br />r <br />J <br />W <br />it <br />W <br />CA <br />z <br />L <br />RUMM <br />15 <br />�J SHEETS <br />