BACK OF SIDEWALK
<br />MANHOLE GRATE-
<br />SIDEWALK-,,
<br />RATE
<br />SIDEWALK 1 JOINT
<br />18" CONE
<br />0
<br />d
<br />Q
<br />6" SEWER PIPE S.=004 -
<br />CONCRETE HOSE
<br />HAND FORM BOTTOM
<br />OF MANHOLE TO
<br />MAINTAIN CON77NLIOUS FLOW
<br />24"
<br />4'-10"
<br />ELEC. PANEL
<br />4" CONDUIT FROM
<br />ELECTRICAL SERVICE
<br />(BY PG&E)
<br />1 �2" CONDUIT TO JUNCTION
<br />BOX (SEE BELOW)
<br />�I
<br />PLANT VIEW
<br />36"x36" PRECAST VALVE.
<br />BOX WITH 1/4" ALUMINUM
<br />OAMOND PLATE COVER
<br />JOINT
<br />TOP RAIL SUPPORT
<br />(BOLTS TO COVER
<br />FRAME)
<br />JOINT
<br />6" OVERFLOW aPE
<br />CE 6" DEEP
<br />DRAW ROCK
<br />1 1/2" PIPE GUIDE RAILS
<br />MUST BE PLUMB
<br />SUBMERSIBLE NON -CLOG PUM
<br />4" DISCHARGE ELBOW
<br />4" UFT OUT ASSEMBL
<br />du
<br />Q
<br />PROFILE VIEW
<br />O
<br />LIFTING
<br />CHAIN
<br />RAIL
<br />BOTTOM OF BASIN MUST
<br />HAVE SMOOTH TROWLED
<br />SURFACE FOR MOUNTING
<br />SUPPORT C4S77AAG
<br />a
<br />0
<br />FLOAT MOUNTING
<br />BRACKET
<br />STATE RIGHT OF WAY/
<br />BACK OF CURB
<br />LINE
<br />OF GUTTER
<br />1/4" ALUM. DAMOND PLATE COVER
<br />1/4 "x3"x3" ANaE FRAME W/
<br />R£MOMt6Y£ KEY NNIN C H AND
<br />SLAM LOCK WITH AA44MOE HANDL£
<br />2" CONDUIT TO CONTROL PANEL
<br />PRECAST 72" MANHOLE
<br />SECTIONS (TYP.)
<br />ELEV. 21.00
<br />HIGH WATER ALARM
<br />PUMP 12 ON
<br />6" INLET PIPE
<br />MERCURY FLOAT SWITCH
<br />PER PUMP MAN REO. (TYP)
<br />ELEV. 16.00
<br />PUMPS OFF
<br />EUM 14.00
<br />SUMP FLOOR
<br />CONCRETE BASE
<br />&
<br />/ E h4UST FAN (7Y'P.) FLUORESCENT LIGHTING
<br />r --i r -__l /
<br />BASE PLAN
<br />rµ
<br />ENCLOSURE CONSTRUCTION NOTES
<br />RIGHT SIDE VIEW
<br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY
<br />WELDED AND REINFORCED WHERE REWRED.
<br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT.
<br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL
<br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE.
<br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED.
<br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS.
<br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR.
<br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS
<br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY.
<br />CONTROL SYSTEM
<br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS
<br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT,
<br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1,
<br />GROUP C AND D.
<br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N,
<br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR
<br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC
<br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY.
<br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND
<br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE
<br />PROTECTED BY FUSE OR CIRCUIT BREAKER.
<br />fHE FOLLOWING FEATURES SHALL BE PROWDED:
<br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS,
<br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE
<br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP.
<br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING.
<br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD
<br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS
<br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS
<br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF
<br />7HERE ARE HIGH INFLOW COADMONS
<br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE
<br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY
<br />77ED TOGETHERR,
<br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL.
<br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE
<br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE
<br />774£ CONTROL IS4
<br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S
<br />INTENDED 70 OPERATE
<br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE
<br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS
<br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED.
<br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE
<br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER
<br />A POWER FAILURE.
<br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT.
<br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT.
<br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER.
<br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS
<br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G.
<br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP.
<br />GENERAL NOTES:
<br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY
<br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£
<br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS.
<br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS
<br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY.
<br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS
<br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS
<br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E
<br />HORSEPOWER IS 3 HP EACH.
<br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS
<br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE,
<br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO
<br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE
<br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED
<br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK.
<br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS
<br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR
<br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS.
<br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS.
<br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST.
<br />® ECCENTRIC VALVE, 1/4 TURN OPERATION.
<br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW.
<br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY.
<br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS
<br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL.
<br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A
<br />VFD PHASE CONVERTER.
<br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED.
<br />CONTROL PANEL REQUIREMENTS.•
<br />PROVISIONS FOR U71UTY METERING
<br />- SUB BREAKERS (20/1 12OV)
<br />- MAIN DISCONNECT CIRCUIT RVAKER
<br />CONDUIT AREA
<br />CONDUIT AREA
<br />- AAI£ DELAY RELAYS AS REQUIRED)
<br />LEWD
<br />LOAD
<br />INTERLOCK
<br />QU/RED)
<br />- VOLTMETER
<br />- H I 7OR SNITCHES
<br />2F
<br />-
<br />INSTRUMIENTA710N
<br />ct CONTROLS
<br />- CONSTANT SPEED DRIVES, 3 HP
<br />MEIENNG &
<br />SWITCH GEAR
<br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1
<br />- EXHAUST FAN PACKAGES W17ND IOSTATS
<br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV)
<br />301430"+
<br />-
<br />- GFC/ arEPT
<br />- KV4 TRANSFORMER 48OV-120/240V 1 PHASE
<br />BASE PLAN
<br />rµ
<br />ENCLOSURE CONSTRUCTION NOTES
<br />RIGHT SIDE VIEW
<br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY
<br />WELDED AND REINFORCED WHERE REWRED.
<br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT.
<br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL
<br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE.
<br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED.
<br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS.
<br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR.
<br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS
<br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY.
<br />CONTROL SYSTEM
<br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS
<br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT,
<br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1,
<br />GROUP C AND D.
<br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N,
<br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR
<br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC
<br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY.
<br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND
<br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE
<br />PROTECTED BY FUSE OR CIRCUIT BREAKER.
<br />fHE FOLLOWING FEATURES SHALL BE PROWDED:
<br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS,
<br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE
<br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP.
<br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING.
<br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD
<br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS
<br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS
<br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF
<br />7HERE ARE HIGH INFLOW COADMONS
<br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE
<br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY
<br />77ED TOGETHERR,
<br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL.
<br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE
<br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE
<br />774£ CONTROL IS4
<br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S
<br />INTENDED 70 OPERATE
<br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE
<br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS
<br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED.
<br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE
<br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER
<br />A POWER FAILURE.
<br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT.
<br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT.
<br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER.
<br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS
<br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G.
<br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP.
<br />GENERAL NOTES:
<br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY
<br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£
<br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS.
<br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS
<br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY.
<br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS
<br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS
<br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E
<br />HORSEPOWER IS 3 HP EACH.
<br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS
<br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE,
<br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO
<br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE
<br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED
<br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK.
<br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS
<br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR
<br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS.
<br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS.
<br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST.
<br />® ECCENTRIC VALVE, 1/4 TURN OPERATION.
<br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW.
<br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY.
<br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS
<br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL.
<br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A
<br />VFD PHASE CONVERTER.
<br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED.
<br />CONTROL PANEL REQUIREMENTS.•
<br />PROVISIONS FOR U71UTY METERING
<br />- SUB BREAKERS (20/1 12OV)
<br />- MAIN DISCONNECT CIRCUIT RVAKER
<br />CONDUIT AREA
<br />CONDUIT AREA
<br />- AAI£ DELAY RELAYS AS REQUIRED)
<br />LEWD
<br />LOAD
<br />INTERLOCK
<br />QU/RED)
<br />- VOLTMETER
<br />- H I 7OR SNITCHES
<br />- AMMETERS
<br />- PUSN-B 07ON
<br />- CONSTANT SPEED DRIVES, 3 HP
<br />- FORMERS
<br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1
<br />- EXHAUST FAN PACKAGES W17ND IOSTATS
<br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV)
<br />301430"+
<br />-
<br />- GFC/ arEPT
<br />BASE PLAN
<br />rµ
<br />ENCLOSURE CONSTRUCTION NOTES
<br />RIGHT SIDE VIEW
<br />1. 0(TER/0R 12 GA. H.D. GALV STEEL AND INTERIOR 14 CA. COLD ROLLED STEEL ELECTRICALLY
<br />WELDED AND REINFORCED WHERE REWRED.
<br />2. CONSTRUCT10V WILL BE AAE94 3R OR 12, RAIN-77GHT AND DUST-AOHT.
<br />3. ALL NUTS BOLTS, SCREWS, AND H/IGES WYL BE STAWLESS STEEL
<br />4. NUTS, BOLTS, AND SCREWS WILL NOT BE V/SRE FROM OUTSIDE OF ENCLOSURE.
<br />5. PHENOLIC NAMEPLATES MILL BE PROVIDED AS REQUIRED.
<br />6. CONTROL MRNYG WILL BE MARKED AT BOTH OW BY PERMANENT WRE MARKERS.
<br />7. A PLASIA COVERED WIRING DAGAW IWU BE ATTACHED TO THE INSIDE OF THE FRONT DOOR.
<br />8. ENCLOSLME WILL BE FACTORY MIRED AND CONFORM TO REQUPED NaM STANDARDS
<br />9. COLOR 70 BE APPROVED BY SAN JQAQUIN COUNTY.
<br />CONTROL SYSTEM
<br />THE COANROL CENTER SHALL BE DES00 AND MANUFACTURED FOR SUBMERSIBLE PUMP AFF1447ONS
<br />774E CONTROL CENTER SHALL BE DE9GA/ED FOR A 3 PHASE 60 HERTZ, 230 VOLT,
<br />4 MIRE POWER SUPPLY. PUMPS SHALL BE RATED AND LABELED EXPLOSA%V PROOF FOR CLASS 1, DN/S/ON 1,
<br />GROUP C AND D.
<br />FOR EACH PUMP MOTOR PROVIDE A UL LISTED TYPE 508 F SELF-PR07EC77NG CIR(X1IT BREAKER COMB00710N,
<br />IN70PATED STARTER. THIS /NIEGR47ED STARTER SHALL CONSIST OF A M/AGAIEW CIRCUIT BREAKER WITH DOOR
<br />INIERLOCKING HANDLE A SELF-PRO7ECTED MAGNETIC CONTACTOR, AND A CLASS 10 TYPE ADJUSTABLE BI-METALUC
<br />AMBIENT COMPENSATED THERMAL OVERLOAD RELAY.
<br />A CONTROL POWER TRANSFORMER SHALL PRONE 120 VOL75 FOR THE EXTERNAL LEVEL SENSING CIRCUITS AND
<br />OTHER PILOT CYRCUITRY. THE PRAARY AND THE SECONDARY 70 THE CONTROL POWER TRANSFORMER SHALL BE
<br />PROTECTED BY FUSE OR CIRCUIT BREAKER.
<br />fHE FOLLOWING FEATURES SHALL BE PROWDED:
<br />THE COMPONENTS USED IN THE PANEL INCLUDING BREAKERS, STARTERS AND PILOT DEVCZS,
<br />SHALL BE THE PRODUCT OF ONE MANUFACTURER WITH A NATIONAL D/SIRIBURAN N£7Ml7RK, AND THE
<br />PANEL SHALL BE ASSEMBLED IN A UL 508 LICENSED SHOP.
<br />ALL CONTROL RELAYS COMPONENTS SHALL BE MOUNTED ON DIN ROLLS FOR EASE OF SERVICING.
<br />]ERM/NALS SHWLLL BE PROVIDED FOR ALL INCOMING AND OUTGOING CIRCUITS, EXCEPT FOR MOTOR LOAD
<br />GABLES WHICH MAY BE CONNECTED DIRECTLY TO THE OVERLOAD RELAY AERABIM4LS
<br />AN ELECTRONIC ALTERNATOR (FOR DUPLEX STATIONS) PROVIDING AUTOMAIM AL7ERN4WN OF THE PUMPS
<br />UNDER NORMAL CPER47MVG CONDITIONS AND ALLOWING B07H PUMPS 70 OPERATE SAIHLTANEOUSLY IF
<br />7HERE ARE HIGH INFLOW COADMONS
<br />ALL WIRES IN THE CONTROL PANEL SHALL BE COLOR CODED BY VOLTAGE. POWER SUPPLY WIRES SHALL BE
<br />ISOLATED FROM THE CONTROL WARES CONTROL WIRING IS TO BE RUN IN WRf CHANNELS AND NOT SIMPLY
<br />77ED TOGETHERR,
<br />AN ELECTRIC W/RI/G SCH£ALATIC DIAGRAM SHALL BE SUPPLIED WNH EVERY CONTROL PANEL.
<br />A NAMEPLATE SHALL BE PERM4NENTLY AFi7XED TO THE INSIDE OF THE CONTROL ENCLOSURE. THE
<br />NAMEPLATE SHALL. HAVE A SEPAL NUMBER STAMPED ON IT FOR FU77JRE7RIC TY THE MAERATE
<br />774£ CONTROL IS4
<br />SHALL ALSO COMFY THE M07OR HORSEPOWER AND AMPERAGE OF THE PUMP(S
<br />INTENDED 70 OPERATE
<br />THE CONTROL PANEL SHALL BE BUILT IN ACCORDANCE WTTH THE STANDARDS E57ABUSHED BY THE
<br />NA7nW ELECIRMAL CODE, M4ROAAL ELECTRICAL MANUFAC71ARERS ASSOC WN AND UNDERWRITERS
<br />LABORATORY. A UL. 508 LABEL SHALL BE PRO11DED.
<br />A SEPARATE MOTOR THERMAL PR07ECWN CIRCUIT SHUT BE PROVIDED FOR EACH PUMP MOTOR. THE
<br />CIRCUIT SHALL BE ANNUALLY RE -SET AFTER A STA70R THERMAL OVERLOAD BUT AU70MTMALLY RESET AFTER
<br />A POWER FAILURE.
<br />IF REQUESTED, THE CONTROL AND PUMP SHALL BE TESTED TOGETHER BEFORE SHIPMENT.
<br />A HAND -OFF -AUTO SELEC70R SWITCH SHALL BE TESIED TOGETHER BEFORE SHIPMENT.
<br />GR TYPE DUPLEX OUTLET, FUSED OR CIRCUIT BREAKER.
<br />THE DEADFRONT DOOR SHALL PROVIDE COMPLETE PR07ECTION FROM 774E INTERIOR ELECTRA( AL CIRCUITS
<br />BUT SHALL BE HINGED ALONG ITS ENITRE LENGTH TO ALLOW EASY ACCESS FOR SERVMM/G.
<br />HOUR METER (ELAPSED 71M£) FOR EACH PUMP.
<br />GENERAL NOTES:
<br />1. THE CONTRACTOR SHALL FURNISH ALL MLATERALS TOOLS, EQUIPMENT LABOR AND DO ALL WORK NECESSARY
<br />TO CONSTRUCT THE SEWER LIFT STAWN. COMPLETE AND READY FOR OPER471011, AS SHOWN ON TIES£
<br />PLANS AND DETAILS, AND IN CONFORMANCE 70 THE SPECIFICATIONS.
<br />MATERIALS, EQUIPMENT, AND WORK 70 BE DOME SHALL COMPLY WITH THE APPLMABLE RULES REGUL.AT70NS
<br />AND ORDINANCES OF THE SAN JOAQUIN COUNTY.
<br />2 7HE PUMP STATION SHALL BE EQUIPPED W17H FLYGT MODEL CP -3085 X 092 PUMPS
<br />MOTORS AND APPURTENANCES; OR APPROVED EQUAL. PROVIDE FLUSH VALVES FOR ALL PUMPS
<br />THE PUMP MOTOR SHALL OPERATE AT 120 GPM AT 11.5 FEET OF DYNAMIC HEAD. APPROXIA7E
<br />HORSEPOWER IS 3 HP EACH.
<br />3. THE DETAILS SHOWN ON MESE PLANS ARE NOT INTENDED TO /DE7VT/FY OR EXCLl1DE ANY MANUFACTURER OF THIS
<br />TYPE OF INS)ALLATION. 7NEREfORE THE CONMACIOR SHALL SUBMIT SHOP DRAMOAGS OF ALL MOUNTING HARDWARE,
<br />GUIDE-RNLS, DISCHARGE DISCONNECT BASE PERFORMANCE CURVES AND ELE'CTRKAL WIRING SCHEM AW DIAGRAM/ TO
<br />THE ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL FURNISH THE OAGAM WITH SOX COMPLETE SETS OF THE
<br />AFOREMENTIONED DRAWINGS ON HIS INITIAL SUBMITTAL AND REQUIRED RESUBW71ALS ANY EQUPMENT PURCHASED
<br />BY THE CONTRACTOR, PRIOR TO APPROVAL BY THE ENGINEER, SHALL BE AT THE CONTRACTOR'S RISK.
<br />4. NUMM£R/LAL IDEN77RED EQUIPMENT ITEMS
<br />Q1 HEAVY DULY ALUMINUM COVER, SPRING OR TORSION BAR ASSISTED; DESIGN FOR
<br />H-20 LOADING; RECESSED W17H PAD -LOCKABLE HASPS.
<br />Q W47ER77GHT, POWER CABLE AND CONTROL CABLE CONNECTORS.
<br />(1) CHECK VALVE, LEVER AND WEIGHT ASSIST.
<br />® ECCENTRIC VALVE, 1/4 TURN OPERATION.
<br />5. ALL SHOP DRAWINGS MUST BE APPROVED BY SAN "QUIN COUNTY. SUBMIT SUFFKIENT COPIES FOR REVIEW.
<br />6. THE AFI STATION SHALL BE INSPECTED AND TESTED TO THE S47)SFACAON OF 7HE SAN JCAQUIN COUNTY.
<br />7. VERIFY INLET ELEVARON Wf7H THE ATTACHED PLAN AND PROFILE DRAWINGS
<br />8. ALL INTERNAL BRACKETS AND HARDWARE SHALL BE STAINLESS STEEL.
<br />9. POWER SUPPLY TO THE UFT STAITON SHALT BE 3 PHASE 230 VOLT OR SINGLE PHASE 230 VOLT WITH A
<br />VFD PHASE CONVERTER.
<br />10. LIECTRICAL ONLY PERMIT FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION REQUIRED.
<br />CONTROL PANEL REQUIREMENTS.•
<br />PROVISIONS FOR U71UTY METERING
<br />- SUB BREAKERS (20/1 12OV)
<br />- MAIN DISCONNECT CIRCUIT RVAKER
<br />- PUMP CONTROLS
<br />- GENERARHR DISCONNECT CIRCUIT BREAKER
<br />- AAI£ DELAY RELAYS AS REQUIRED)
<br />- GENERATOR RECEPTACLE 100 AMP
<br />- CONTROL RELAYS (ASREQUOMD)
<br />INTERLOCK
<br />QU/RED)
<br />- VOLTMETER
<br />- H I 7OR SNITCHES
<br />- AMMETERS
<br />- PUSN-B 07ON
<br />- CONSTANT SPEED DRIVES, 3 HP
<br />- FORMERS
<br />- BYPASS/ISOLAT10N CONTRACTORS W/HMCP'S AND 0/L RELAYS, SIZE 1
<br />- EXHAUST FAN PACKAGES W17ND IOSTATS
<br />- TRANSFORMER DISCONNECT CIRCUIT BREAKER (48OV)
<br />- STRIP HEATERS W/ THERMOSTATS
<br />- INIERA41L PANEL WIRE, AWARE TAGS, AND ALL CONTROLS AS REQUIRED.
<br />- GFC/ arEPT
<br />- KV4 TRANSFORMER 48OV-120/240V 1 PHASE
<br />■ 4
<br />i px1
<br />/ p
<br />O
<br />r
<br />J
<br />W
<br />it
<br />W
<br />CA
<br />z
<br />L
<br />RUMM
<br />15
<br />�J SHEETS
<br />0
<br />C
<br />E
<br />J
<br />h
<br />n
<br />O
<br />O
<br />N
<br />ro
<br />R
<br />N
<br />O
<br />r
<br />J
<br />W
<br />it
<br />W
<br />CA
<br />z
<br />L
<br />RUMM
<br />15
<br />�J SHEETS
<br />
|