My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-4170
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-4096-4176
>
SU-4170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 12:02:02 PM
Creation date
10/15/2024 12:02:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR <br />Location Quantity <br />86 Locations throughout project 1,243 S.Y. <br />PLANING ASPHALT CONCRETE <br />PAVEMENT <br />Location Quantity <br />Mainline <br />8 Locations Throughout Total 3,225 S.Y. <br />Refer To Plans <br />Wildwood Road Intersection: <br />61 S.Y. <br />Total 3,286 S.Y. <br />ADJUST MONUMENT <br />FRAME AND COVER <br />Location <br />Quantity <br />Sta. <br />1095+87 <br />1 Each <br />Sta. <br />1122+35 <br />1 Each <br />Sta. <br />1148+86 <br />1 Each <br />Sta. <br />1175+36 <br />1 Each <br />Sta. <br />1201+83 <br />1 Each <br />Total 5 Each <br />IMPORTED BORROW <br />Br. <br />29C-159, <br />Tons <br />NW <br />Quadrant <br />Br. <br />29C-159, <br />Sta. 1094+78 <br />SE <br />Quadrant <br />Br. <br />29C-158, <br />Sta. 1030+65 <br />NW <br />Quadrant <br />Br. <br />29C-158, <br />Sta.1064+60 <br />SE <br />Quadrant <br />Br. <br />29C-076, <br />Sta.1 189+22 <br />NW <br />Quadrant <br />Br. <br />29C-076, <br />Wildwood Road <br />SE <br />Quadrant <br />18 C.Y. <br />12 C.Y. <br />18 C.Y. <br />18 C.Y. <br />18 C.Y. <br />19 C.Y. <br />Total 102 C.Y. <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 1094+79 to Sta. 1226+33 2,923 To <br />DRIVEWAYS <br />Location <br />7 Locations <br />17 Locations <br />PENETRATION TREATMENT <br />243 S.Y. <br />560 S.Y. <br />Location Quantity <br />Intersections <br />Wildwood Road 119 S.Y. <br />ASPHALT CONCRETE (TYPE A) <br />I Location Quantity I <br />Mainline <br />829 <br />Tons <br />Driveways <br />Sta. <br />1129+60 <br />24 Locations <br />Sta. 1094+78 <br />to <br />Sta, 1130+06 <br />2,091 <br />Tons <br />Sta. 1030+65 <br />to <br />Sta. 1 164+34 <br />1,996 <br />Tons <br />Sta.1064+60 <br />to <br />Sta.1 188+64 <br />1,425 <br />Tons <br />Sta.1 189+22 <br />to <br />Sta.1226+25 <br />2,194 <br />Tons <br />Wildwood Road <br />Quad. <br />Intersection <br />15 <br />Tons <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />�allai/mt 0.-/0,7X ea&eKM .PPI!/O, (jn�a9l� yf �e <br />FILE NAME DRAWER SHEET N0. I A REVISIONS DATE <br />K:\PR0IECTS\2008\STIP\JZ — JACK TONE — (22860)\PL NS\Jack Tone All—Large Plans <br />5U H170 <br />Total 7,711 Tons <br />COUNTY OF SAN JOAQUIN <br />NO SCALE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Pavement Repair <br />86 Locations <br />829 <br />Tons <br />Driveways <br />Sta. <br />1129+60 <br />24 Locations <br />105 <br />Tons <br />A.C. Misc. <br />Areas <br />S.Y. <br />Sta. <br />4 Locations <br />3 <br />Tons <br />A.C. Dike (T'ype F) <br />S.Y. <br />Total 24 <br />13 Locations <br />19 <br />Tons <br />Total 956 Tons <br />ASPHALT CONCRETE (MISC. AREAS) <br />Location Quantity <br />Sta. <br />1129+52 <br />6 <br />S.Y. <br />Sta. <br />1129+60 <br />6 <br />S.Y. <br />Sta. <br />1031 +44 <br />6 <br />S.Y. <br />Sta. <br />1165+18 <br />6 <br />S.Y. <br />6,411 <br />S.Y. <br />Total 24 <br />S.Y. <br />PLACE ASPHALT CONCRETE <br />DIKE TYPE C <br />Location Quantity <br />17 Locations throughout project 2,862 L.F. <br />Refer to Plans Sheets 3 & 4 <br />PLACE ASPHALT CONCRETE <br />DIKE TYPE F <br />Location Quantity <br />6 Locations throughout project 533 L.F. <br />Refer to Plans Sheets 3 & 4 <br />SUMMARY OF QUANTITIES <br />'ON 133HS I 0M"O <br />PAVEMENT REINFORCING FABRIC <br />Location Quantity <br />Sta.1094+78 <br />to <br />Sta.1130+06 <br />9,408 <br />S.Y. <br />Sta.1030+65 <br />to <br />Sta.1164+34 <br />(Temple Creek) <br />8,984 <br />S.Y. <br />Sta.1064+60 <br />to <br />Sta.1188+64 <br />SE <br />6,411 <br />S.Y. <br />Sta.1189+22 <br />to <br />Sta.1226+25 <br />(No. Lone Tree Creek) <br />9,875 <br />S.Y. <br />Width=24' Throughout <br />Total <br />34,678 <br />S.Y. <br />METAL BEAM GUARD RAILING <br />Location <br />SE Quad. <br />TERMINAL SYSTEM (TYPE SRT) <br />Location Quantity <br />IuyIC Lyl,— <br />NW Quad. <br />idge 29C— <br />NW Quad. <br />SE Quad. <br />idge 29C— <br />NW Quad. <br />SE Quad. <br />No. Lone T <br />1 Eachl <br />1 Each <br />1 Each <br />1 Each <br />1 Each <br />Total 5 Each <br />JACK TONE ROAD RESURFACING <br />(French Camp Road to Wildwood Road) <br />SHEET TOTAL <br />N0. SHEETS <br />7 <br />TERMINAL <br />SYSTEM (TYPE ET) <br />Location <br />Quantity <br />Bridge <br />29C-159 <br />(Temple Creek) <br />NW <br />Quad. <br />1 <br />Each <br />SE <br />Quad. <br />1 <br />Each <br />Bridge <br />29C-158 <br />(No. Lone Tree Creek) <br />NW <br />Quad. <br />1 <br />Each <br />SE <br />Quad. <br />1 <br />Each <br />Bridge <br />29C-076 <br />(Lone Tree Creek) <br />NW <br />Quad. <br />1 <br />Each <br />SE <br />Quad. <br />1 <br />Each <br />Total <br />Each <br />TERMINAL SYSTEM (TYPE SRT) <br />Location Quantity <br />IuyIC Lyl,— <br />NW Quad. <br />idge 29C— <br />NW Quad. <br />SE Quad. <br />idge 29C— <br />NW Quad. <br />SE Quad. <br />No. Lone T <br />1 Eachl <br />1 Each <br />1 Each <br />1 Each <br />1 Each <br />Total 5 Each <br />JACK TONE ROAD RESURFACING <br />(French Camp Road to Wildwood Road) <br />SHEET TOTAL <br />N0. SHEETS <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.