Laserfiche WebLink
CA D E F G H <br />COUNTY APPROVAL <br />REVISION DESCRIPTION <br />APPROVED BY DATE <br />1. I, Ce'f.J 1 <br />, <br />CHLORINE INJECTOR LINE RECORD DRAWING <br />^ti SEE DETAIL 7SHEET M2 <br />FOR CONNECTIONION II These record drawings have been prepared <br />� <br />based on information provided by others. t <br />II The Engineer has not verified the accuracy <br />of such information and shall not be resp— <br />TRANSFORMER ;� onsible for any errors or omissions which <br />may be incorporated herein as a result. <br />..i <br />,' II MOUNT PIPING TO REAR WALL <br />1( 1 B , OF CHLORINE BUILDING <br />M3 10" RESTRAINED FLANGED •I <br />COUPLING ADAPTER SIMILAR TO TYP II <br />4 e " PRESSURE RELIEF <br />VALVE <br />I I o_ <br />C ADDITION HEMICAL METERING <br />CONTROL <br />PUMP MOUNTED ON <br />MCC a <br />M3 I� 1/2 PW TANK <br />:I SCH80 PVC <br />I; 12"Wx 12"Hx 6"D NEMA 3R BACK <br />j �• al ENCLOSURE w/ HINGED FRONT PRESSURE <br />RELOCATED II DOOR (LOCKABLE). MOUNTED VALVE <br />GENERATOR SET .' ON UNISTRUT WELDED TO PIPE <br />10 RW •' 3/8" CL TYP 1 LL PVC 4 <br />ION—EXCHANGE NITRATE <br />(I 1/4" COPPER TUBE, BALL VALVE TYP <br />TREATMENT SYSTEM (NIC) LOOPED 6" ABOVE FLEXIBLE SUCTION <br />HORIZ AXIS 50 GALLON CHLORINE <br />, TUBE <br />MAKE—UP TANK TUBE ADAPTOR PUMP MOUNTING ECESS <br />/� 1/2" SST NEEDLE VALVE <br />+ /r G _.___ _ li NIPPLE WANDST CLOSE BUSHING HOSE BIB <br />SCH 80 REDUCER <br />BAG FILTERS <br />N <br />PIPE SUPPORTS TYP <br />M3 * M410 M405 <br />C I PLAN TYP 0 TYP TYP <br />M3 N 1/4"=1,-0„ <br />10" FW <br />6" EL. <br />—� TYP OF 2 <br />6" R <br />10" EL.0.5% SLOPE �- <br />TYP OF 3 10" PW <br />PIPE SUPPORT <br />AND FOOTING <br />�A IPJ <br />DOWELED INTO <br />DRAIN BARREL <br />L 11.60 <br />SIMILAR TO TYP TYP <br />SECTION A <br />1/4"=1'-0" M3 <br />M401 <br />BASE SIMILAR TO TYP <br />M� C <br />II <br />I, <br />:I <br />I' <br />, <br />RI <br />I' <br />(I <br />II <br />I, A <br />' M3 <br />I' <br />II <br />, <br />II <br />NOTES: <br />1. PIPE SUPPORTS SHOWN APPROXIMATE. ALL <br />SUPPORTS SHALL BE LOCATED AND @400 <br />INSTALLED AS SPECIFIED AND ACCORDING TO <br />2. ION—EXCHANGE NITRATE TREATMENT SYSTEM <br />WILL BE SUPPLIED AND INSTALLED BY SEIMENS <br />WATER UNDER SEPARATE CONTRACT. <br />CONTRACTOR SHALL COORDINATE WITH SIEMENS <br />WATER FOR CONNECTION OF ALL SITE PIPING <br />3. BAG FILTERS WILL BE SUPPLIED BY OWNER <br />AND INSTALLED BY CONTRACTOR ACCORDING <br />TO MANUFACTURERS INSTRUCT'nA,c <br />z <br />VER <br />LOJ <br />1" PW <br />2" PVC CONDUIT <br />CHEMICAL CONTAINMENT <br />TUB, 55—GAL. <br />CHLORINATION BUILDING <br />1/2"=V -0 - <br />6" FW <br />10'x6 <br />RED. EL. <br />TYP OF 3 <br />y <br />BAG FILTER <br />TYP OF 2 <br />PRESSURE <br />GAGE <br />10" FW <br />TYP <br />6" GV <br />TYP OF 3 <br />V <br />Ezp.12-31-01 'r—X2 <br />No. C 59437 <br />DESIGN RESPONSIBILITY DOES NOT INCLUDE <br />BAG FILTER OR ION EXCHANGE SYSTEM <br />EL 11.60 <br />/ 6" LR EL. <br />TYP OF 2 "" lRECORD ORAM V I G <br />y✓ , <br />SECTION ------- <br />1/4"=1'-0" M3 ra ' ar l � ;rii o D, ;.,Vv °;y SYtotlli,i Verify <br />�•.�nf�m,usi:)n <br />By hist)(-Ct ng The Site Of Work <br />SCALE BAR IS ONE INCH DATE <br />AT FULL SCALE JULY 2007 DESIGNED NTC ECO; LOGIC FLYING J INC. FLYING J -LOOT DRAWING NUMBER SHEET NUMBER <br />AS NOTED O IF NOT ONE 1 DRAWN BD 333 WEST CENTER STREET CSA 31 WELL NUMBER 3 NITRATE MECHANICAL PIPING PLAN <br />ON THIS SHEET SCALE ACCORDINGLY FILE CHECKED MAG Engineering NORTH SALT LAKE, UT 84054 AND SECTIONS M3 <br />FLYJ07-007 Rocklin, California TREATMENT SYSTEM SITE IMPROVEMENTS 11 OF 22 <br />13 <br />12 <br />