Laserfiche WebLink
SPEC I Fl CAT I ONS <br />1. ALL IMPROVEMENTS TO BE DONE SHALL BE DUNE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS AND THE LATEST EDITION OF THE STATE OF <br />CALIFORNIA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, AND THE REQUIREMENTS OF THE OAKWOOD LAKE <br />WATER DISTRICT. <br />2. BENCHMARK: CITY OF MAN7ECA BENCHMARK NO. 71, 2" BRASS GAP LOCATED APPROXIMATELY 25 FEET NORTH OF THE <br />NORTHEAST CORNER OF SECTION 11, TOWNSHIP 2 SOUTH, RAN6E 6 EAST, MOUNT DIABLO MERIDIAN, AT THE INTERSECTION OF <br />MoKINLEY AVENUE AND BRONZAN ROAD. <br />ELEVATION = 16.703, U. 5.6.5. DATUM. <br />3. SOILS REPORT: THE 6EOTF3f4HNIGAL SERVICES REPORT FOR THE PROPOSED OAK400D LAKE DEVELOPMENT, WGICDWARD AVENUE, <br />MANTECA, CALIFORNIA, A5 PREPARED BY KLEINF$DER, INC., WITH PROJECT NO. 4BOg3.601, DATED OCTOBER 27, 2004, IS <br />HEREBY MADE A PART OF THESE PLANS. <br />4. THESE PLANS HAVE BEEN CHECKED BY THE COUNTY OF SAN JOAQUIN AND/OR IT5 AUTHORIZED REPRESENTATIVE, BUT SUCH <br />CHECKIN6 AND/OR APPROVAL DOES NOT RELIEVE THE DEVELOPER FROM HIS RESPONSIBILITY TO CORRECT ERRORS, OMISSIONS <br />OR MAKE CHANGES REQUIRED BY CONDITIONS DISCOVERED IN THE FIELD DURIN6 THE COURSE OF CONSTRUCTION. <br />5. THE CONTRACTOR SHALL KEEP HIMSELF FULLY INFORMED OF ALL EXISTIN6 AND FUTURE STATE AND FEDERAL LAWS AND ALL <br />COUNTY, MUNICIPAL AND SPECIAL DISTRICT ORDINAW25 AND REGULATIONS WHICH IN ANY MANNER AFFECT THOSE E46A OR <br />EMPLOYED IN THE NOW, OR THE MATERIAL5 USED IN THE NOW, OR WHICH IN ANY WAY AFFECT THE CONDUCT OF THE WORK, <br />AND OF ALL SUCH ORDERS AND DECREES OF BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE SAME. <br />THE CONTRACTOR SHALL AT ALL TIMES OBSERVE AND COMPLY WITH, AND SHALL CAUSE ALL HIS A6ENT5 AND EMPLOYES TO <br />OBSERVE AND COMPLY WITH ALL SUCH EXISTING AND FUTURE LAWS, ORDINANCES, REGULATIONS, ORDERS AND DECREE5 OF <br />BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE WORK; AND SHALL PROTECT AND INDEMNIFY SAN <br />JOAQUIN COUNTY AND THE OM4ED, AND ALL OFFICERS AND EMPLOYEES THEREOF CONNECTED WITH THE WORK, INCLUDING THE <br />ENGINEER, A6AINST ANY CLAIM OR LIABILITY ARI5IN6 FROM OR BASED ON THE VIOLATION OF ANY SUCH LAW, ORDINANCE, <br />REGULATION, ORDER, OR DEGREE, WHETHER BY HIMSELF OR HIS EMPLOYEES. IF ANY DISCREPANCY OR IW"4515TEN16Y IS <br />DISCOVERED IN THE PLANS, SPECIFICATIONS, OR CONTRACT FOR THE WORK IN RELATION TO ANY SUCH LAW, ORDINANCE, <br />RE6UL.ATION, ORDER, OR DEGREE THE CONTRACTOR SHALL FORTHWITH REPORT THE SAME TO THE E 6,INEER IN PRITIN6. <br />6. THE E16INE=R ASSUMES NO RESPONSIBILITY FOR ANY NOW PERFORMED BY THE CONTRACTOR OR OWNER BASED ON PLANS <br />WHICH HAVE NOT BEEN SI6NED AND SEALED BY THE ENGINEER AND APPROVED BY THE DISTRICT, CITY OR COUNTY <br />HAVING JURISDICTION. ALL INFORMATION SHOWN ON PRELIMINARY DRAWIN65 15 SUBJECT TO CORRECTION AND CHANGE, <br />AND THE CONTRACTOR OR OWNER SHALL PERFORM ANY AND ALL WORK AT THEIR OWN RISK. <br />7. ALL DISTANGE5 AND MEASUREMENfTS ARE 61VEd AND WILL BE MADE IN A HORIZONTAL PLANE. 6RAVE WILL BE 61VEM FROM THE <br />TOP OF NAILS OR STAKES, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL PRESERVE ALL POINTS AND STAKES SET FOR <br />LINE5 AND 6RAVE5 OR WEASURE34WTS OF THE WORK, IN THEIR PROPER LOCATION UNTIL AUTHORIZED TO REMOVE THEM BY THE <br />E46I NEER. ALL EXPENSES INCURRED IN REPLAGI N6 STAKES THAT HAVE BEEN REMOVED WITHOUT PROPER AUTHORITY SHALL BE <br />PAID FOR BY THE 6ENERAL CONTRACTOR. <br />&. THESE PLANS HAVE BEEN PREPARED WITH THE INTENT THAT ASSOCIATED E46INEERIN6 6ROUP, INC. WILL PERFORM THE <br />CONSTRUCTION STAKING FOR THE COMPLETE PRO -ECT. THE CONTRACTOR SHALL PROVIDE ASSOCIATED EJ6INEERINC, &ROUP, INC. <br />WITH FORTY-EI6HT HOURS ADVANCE NOTICE OF STAKIN6 NEEVS. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR <br />SUBCONTRACTORS THAT 15 ABOVE AND BEYOND THE A6REDD UPON STAKIN6 REQUEST SHALL BE SUBJECT TO AN EXTRA BACK <br />CHARGE TO THE CONTRACTOR / CLIENT. IF ANOTHER FIRM OR A6EJGY IS EMPLOYED TO USE THESE PLANS FOR THE PURPOSE <br />OF CONSTRUCTION STAKING, NOTICE IS HEREBY 61VE4 THAT ASSOCIATED BJ6IN✓ ERIN5 6ROUP, INC. WILL NOT ASSUME ANY <br />RESPONSIBILITY FOR ERRORS OR OMISSIONS, IF ANY, WHICH M16HT OCCUR AND WHICH COULD HAVE BEEN AVOIDED, <br />CORRECTED OR MITIGATED IF ASSOCIATED EJ6INEERIN6 6ROUP, INC. HAD PERFORMED THE 5TAKIN6 WORK. <br />q. M4ERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN 664E.- TERMS, BUT NOT IN COMPLETE DETAIL, <br />IT IS UNDERSTOOD THAT ONLY THE BEST 6ENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF <br />THE FINEST QUALITY ARE TO BE USED. <br />10. THE CONTRACTOR SHALL COMPLY WITH THE RE>UIRHMENITS OF THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br />(SWRCB), ORDER NO. q2 -06 -DMO, NEVES 6ENERAL PERMIT NO. CASO00002. THE CONTRACTOR SHALL IMPLEMENT AND MONITOR <br />THE STORM WATER POLLUTION PREVENTION PLAN (SMF`PP) IN ACCORDANCE WITH THE SAROB REWL.ATIONS. <br />11. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS PERTAININ6 TO HIS <br />OPERATIONS. HE SHALL PROVIDE ALL L16HT5, 516N5, BARRICADES, FLAG MEN OR OTHER DEVICES NtEGE55ARY FOR PUBLIC <br />SAFETY. THE CONTRACTOR'S ATTENTION 15 GALLED TO THE REQUIREMENTS OF TITLE B OF THE CALIFORNIA ADMINISTRATIVE <br />CODE, SUBCHAPTER 4, ARTICLE 6, "EXCAVATIONS, TRENCHES, EARTHWORK." <br />12. THE CONTRACTOR A64REE5 THAT HE SHALL ASSUME SOLE AND COMPLETE RE5PON57BILITY FOR JOB SITE CONDITIONS DURING <br />THE COURSE OF CONSTRUCTION OF THIS PROJECT, INGLUDIN6 SAFETY OF ALL PERSONS AND PROPERTY; THAT 77-4I5 <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR <br />SHALL DEFEND, INDEMNIFY AND HOLD THE OMNER, THE E16INEER AND SAN JOAQUIN COUNTY HARMLE55 FROM ANY AND ALL <br />LIABILITY, REAL OR ALLE6ED, IN CONNECTION WITH THE PEZFORMAMC.E OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY <br />ARISING FROM THE SOLE NE6L16ENGE OF THE OWNER OR EN6INEER. <br />13. APPROPRIATE DUST CONTROL SHALL BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST N1UI5ANCE AS REQUIRED BY <br />THE COUNTY OF SAN JOAQUIN, AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL IMPLEMENT A DUST CONTROL PROGRAM <br />AS PART OF THE MEASURES RE5QUIRED BY THE E.I.R. (CHAPTER 4.6) FOR AIR QUALITY CONTROL AND THE REtirIRE ENTS OF <br />PM 10 AND THE BEST AVAILABLE CONTROL MEASURES (BACM) APPROVED BY THE BOARD. THE PROSRAM SHALL INSURE THAT, AT <br />THE PUBLIC WORKS DIRECTOR'S DISCRETION, A WATER VEHICLE FOR DUST CONTROL OPERATIONS 15 KEPT READILY AVAILABLE <br />AT ALL TIMES DURIN6 CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE PUBLIC WORK5 DIRECTOR AND BUILDING <br />OFFICIAL WITH THE NAME AND TELEPHONE NUMBER OF THE PERSON DIRECTLY RESPONSIBLE FOR DUST CONTROL AND OPERATION <br />OF THE WATER VEHICLE. <br />14. THE EXISTING UTILITIES ARE PLOTTED FROM AVAILABLE REC.ORDr OR FIELD LOCATIONS WHEN POSSIBLE. THE CONTRACTOR <br />SHALL LOCATE AND PRESERVE ALL EXISTIN6 FACILITIES INCLUDINAS 6A5, WATER, IRRI6ATION, POWER, TELEPHONE, 50� <br />OR OTHERS WHICH MAY BE PRESENT IN THE AREA OF CONSTRUCTION. THE RESPECTIVE UTILITY COMPANIES SHALL BE <br />NOTIFIED PRIOR TO BEGINNING WORK. <br />15. THE EXISTIN6 UTILITIES SHALL NOT BE INTERRUPTED UNTIL THE UTILITY COMPANY HAS PROVIDED ALTERNATIVE SERVICE <br />FACILITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS HOW WITH THE APPROPRIATE A6ENGIES AND UTILITY <br />COMPANIES. <br />16. ALL CONSTRUCTION 5TAKIN6 FOR 6RADIN6 SHALL 13E DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. <br />17. ALL TRENCHES SHALL BE BACKFILLED IN AGCORDANGE WITH SAN JOAQUIN COUNTY STANDARD DETAILS. COMPACTION SHALL BE <br />ACHIEVED BY MECHANICAL MEANS. NO FLOODINk6, PONDING, OR JETTING SHALL BE PERMITTED UNLESS APPROVED BY THE <br />DIRECTOR OF PUBLIC WORKS IN WRITIN6. <br />145. TESTING: ALL INDEPENDENT LABORATORY INSPECTIONS GALLED FOR BY THE DIRECTOR OF PUBLIC WORKS WILL BE PAID <br />FOR BY THE DEVELOPER OR CONTRACTOR. <br />Iq. IF, DURING CONSTRUCTION, ARGHAEOL061CAL REMAINS ARE 6J000NTE EV, CONSTRUCTION IN THE VICINITY SHALL BE HALTED, <br />AND AN ARG4-AEO_06I5T CONSULTED, AND THE COUNTY PUBLIC WORKS DEPARTMENT NOTIFIED. IF, IN THE OPINION OF THE <br />A11RGHAEOL0615T, THE REMAINS ARE 5I6NIFICANT, MEASU1RE5 AS MAY BE REQUIRED BY THE DIRECTOR OF PUBLIC WORKS, <br />SHALL BE TAKEN TO PROTECT THEM. <br />20. DISPOSAL OF WATER INTO THE SANITARY SENER SYSTEM IS STRICTLY PROHIBITED. <br />21. THE CONTRACTOR SHALL MAINTAIN ALL STILTS, SID614ll_K5, AND ALL OTHER PUBLIC R16HT5-OF-WAY IN A CLEAN, SAFE AND <br />USABLE CONDITION THIRCJU&MT THE COURSE OF CONSTRICTION. ALL SPILLS OF SOIL, ROCK, CONSTRUCTION DEBRIS, ETC., <br />SHALL BE REMOVED IMMEDIATELY FROM PUBLICLY OMS PROPERTY. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE <br />MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. THE CONTRACTOR SHALL PROVIDE FOR SAFE, UNOBSTRUCTED ACCESS <br />TO PRIVATE PROPERTY ADJACENT TO WORK THR17U6HOUT THE PERIOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE <br />PUBLIC WOR1K5 DEPARTMENT THE NAME AND TEL.ED'HONE NUMBER OF PEiR50N AVAILABLE 24 HOURS A DAY IF PROBLEfS OR <br />CONDITION 15 NOT MET. <br />22. ALL TRASH, CONSTRUCTION DEBRIS AND MUATERIAL5 SHALL BE CONTAINED WITHIN THE CONSTRUCTION AREA UNTIL OFF-SITE <br />DISPOSAL CAN BE ARRAN6ED. <br />23. THE CONTRACTOR SHALL KEEP ADJOININ6 PUBLIC STREETS AND PARKING AREAS FREE AND GLEAN OF PROJECT DIRT, MUD AND <br />MATERIALS DURING THE CONSTRUCTION PERF. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIVE MEASURES AS <br />DIRECTED BY THE PUBLIC WORKS INSPECTOR AT NO EXPENSE TO THE COUNTY. <br />24. THE APPLICANT SHALL ALERT CONSTRUCTION PER50NNEL OF THE POSSIBILITY OF BURIED CULTURAL RESOURCES, HUMAN <br />REMAINS AND OTHER SUCH CULTURAL RESOURCES AND SHALL IMMEDIATELY COMPLY WITH ALL REQUIREMENTS CONTAINED IN THE <br />EIR, IN6LUDIN6 THE S7OPPA6E OF ALL NOW, NOTIFICATION OF THE NATIVE AMERICAN HERITA6E COMMISSION AND THE SAN <br />JOAQUIN COUNTY CORONER, AS APPLICABLE. <br />6RADIN6 NOTES <br />26. ALL 6RADIN67 SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER THEIR DIRECTION. THE SOILS <br />ENGINEER SHALL INSPECT AND TEST THE PLACEMENT OF FILLS. THE SOILS ENGINEER SHALL SUBMIT A SOILS REPORT AND <br />REQUIREMENTS AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF 6RADIN6 OPERATIONS THE <br />SOILS EN6INEER SHALL STATE IN A REPORT TO THE COUNTY OF SAN JOAQUIN THAT INSPECTIONS AND TESTS WERE MADE BY HIM <br />OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION ALL FILLS ARE COMPACTED TO THE REWIRED RELATIVE DEN5ITY AND ARE <br />ACCEPTABLE FOR THEIR INTENDED USE. <br />27. THE CONTRACTOR SHALL LIMIT TRAFFIC SPEEDS ON ANY UNPAVED SURFACES TO 15 MILES PER HOUR TO LOWER THE AMOUNT OF <br />DUST CREATED. <br />26. THE CONTRACTOR SHALL SUSPEND EXCAVATION AND 6RADIN6 ACTIVITIES WHEN THE WINDS EXCEED 20 MILES PER HOUR. <br />2q. DEVELOPER/CONTRACTOR'S WORK SHALL BE IN ACI.ORDANGE WITH THE 5JVAPGD 60IDELINE5, INCLUDING SJVAPGD REGULATION VIII <br />AND IMPLEMENT CONTROL MEASURES BASED ON 5JVAPGD'S COMPLIANCE A5515TANT BULLETIN FOR SHORT TERM IMPACTS. SJVAPGD <br />SHALL BE CONTACTED TO DISCUSS HIT16ATION MEASURES AND IMPLEMENT MEASURES FROM TABLE 6-4 OF THE GUIDE FOR <br />ASSESSIN6 AND MITI6ATIN6 AIR QUALITY IMPACTS. <br />30. ALL 6RADIN6 SHALL COMPLY WITH THE CALIFORNIA BUILDIN6 CODE, CHAPTER 18, APPENDIX G CHAPTER 13. <br />31. NO SLOPE SHALL BE 5TE19PER THAN 2 HORIZONTAL TO 1 VERTICAL. <br />32. ACCESS TO THE PROJECT SITE FROM COUNTY OR CITY ROADS 15 RESTRICTED EXCEPT AT TEMPORARY CONSTRUCTION <br />ENTRANCES. <br />EROSION CONTROL NOTES <br />33. ALL WORK TO BE DONE SMALL BE DONE IN ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN STANDARDS AND THE STATE OF <br />CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CONSTRUCTION SITE BEST MANA6EMENT PRACTICES (HNPs) MANUAL. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ESURIN6 THAT ALL SUBCONTRACTORS, AND SUPPLIERS ARE AWARE OF, AND IHR -B ENT <br />AL STORM WATER QUALITY MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTIONS BMPS WILL RESULT IN THE <br />ISSUANCE OF CORRECTION NOTICES, CITATIONS AND/OR A PROJECT STOP ORDER. <br />34. THIS EROSION CONTROL PLAN WAS PREPARED AS AN EXHIBIT TO THE STORM WATER POLLUTION PREVENTION PLAN (S.W.P.P.P.) <br />FOR THE OAKWGiOD LAKE SUBDIVISION, AS REQUIRED BY THE STATE WATER RESOURCES CONTROL BOARD. THE FACILITIES 940M4 ON <br />THIS PLAN ARE DE516NED TO CONTROL SEDIMENT DURIN6 THE RAINY SEASON AFTER ROU6H 6RADIN6 HAS BEEN COMPLETED. <br />EROSION CONTROL MEASURES ARE TO BE OPERABLE PRIOR TO OCTOBER 15TH THROUGH APRIL 15TH OF ANY YEAR THAT 6RADIN6 <br />OPERATIONS HAVE LE=T AREAS UNPROTECTED FROM EROSION. NO 6RADIN6 WILL OCCUR BETWEEN OCTOBER 15TH AND APRIL 15TH, <br />UNLESS AUTHORIZED BY THE DIRECTOR OF PUBLIC WORKS. DES16N OF THESE FACILITIES MIDST BE APPROVED OR UPDATED EACH <br />YEAR PRIOR TO SEPTEMBER 30, AND SHALL BE 5164ED BY THE COUNTY EN61NE3R. DAILY MAINTENANCE OF THESE FACILITIES <br />SHALL BE MONITORED AND INSPECTED BY THE PROJECT COORDINATOR. <br />35. DURING THE RAINY SEASON ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIALS AND DEBRIS. THE SITE SHALL BE <br />MAINTAINED 50 AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAINA6E SYSTEM. <br />36. CONSTRUCTION ENTRANCES GON515TIN6 OF A66RE6ATE ON 6EOTEXTIL.E FABRIC, AS PER THE DETAIL, SHALL BE PROVIDED AT EACH <br />VEHICLE AGGE55 POINT TO EXI5TIN6 PAVED ROADS. <br />37. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. THIS PLAN MAY NOT COVER <br />ALL THE SITUATIONS THAT ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. REVISIONS MAY BE MADE TO <br />THE PLAN IN THE FIELD SUBJECT TO 774E APPROVAL OF THE DIRECTOR OF PUBLIC WORKS. <br />36. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE ER05ION CONTROL MEASURES TO THE <br />SATISFACTION OF THE DIRECTOR OF PUBLIC WORK5. <br />3q. CO45TR XTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EO510N AND WATER POLLUTION WILL BE MINIMIZE). <br />STATE AND LOCAL LAWS CONIGERJIN6 POLLUTION SHALL BE COMPLIED WITH. <br />40. PRIOR TO THE C�4T OF ANY CLEARING, 6RADIN6 OR EXCAVATION, THE CONTRACTOR/DEVELOPER SHALL PROVIDE EVIDENCE <br />THAT A NOTICE OF INTENT (NOI) HA5 BEEN SUBMITTED TO THE CALIFORNIA STATE WATER RE!50� CONTROL BOARD. A COPY OF <br />THE SWPP SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. <br />SILT FENCES <br />41. IF POSSIBLE, SILT FENCE FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID THE USE OF JOINTS. MEN JOINTS ARE <br />NECESSARY, FILTER FABRIC SHALL BE SPLICED AT A SUPPORT POST, WITH A MINIMUM OF 6. OVERLAP AND BOTH ENDS SECURELY <br />FASTENED TO THE POST. <br />42. SILT FENCES, SHALL BE REMOVED M4Ed 77 -EY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BE ORE THE UPSLOPE AREA 445 BEEN <br />PERMANENTLY STABILIZED. <br />43. FILTER FABRIC SHALL BE NO. 2125 AS MANUFACTURED BY AMOCO CONSTRUCTION FABRICS, OR APPROVED EQUAL. <br />SEEDIN6 <br />44. SEED AND MULCH SHALL BE APPLIED BY SEPTEMBER 15TH TO ALL DISTURBED SLOPES STS THAN 2Z AND HIGHER THAN 3 FELT, <br />AND TO ALL CUT AND FILL SLOPES WITHIN OR ADJACENT TO PUBLIC R16HT-OF-WAY5, OR AS DIRECTED BY THE DIRECTOR OF <br />PUBLIC WORK5. <br />45. AND FERTILIZER WILL 13E APPLIED HYDRAULICALLY OR BY HAND AT THE RATES SPECIFIED BELOW. ON SLOPES 5TRAW SHALL <br />BE APPLIED SY BLOWER OR BY HAND AND ANCHORED IN PLACE BY PUNCHING. <br />ITEM POUNDS PER ACRE <br />ZORRO ANNUAL FESCUE 10 LBS. <br />ROSE CLOVER 6 LBS. <br />HYDROMULCH FIBER 1500 LBS. <br />16-20-0 FERTILIZER 300 LBS. <br />(AMMONIUM PHOSPHATE) <br />TACKIFIER 60 LBS. <br />46. IF PLANT 6ROWTH I5 INADEQUATE FOR EROSION CONTROL, OVEIRSEDD USING HALF 714E RATE OF THE ORI6INAL APPLICATION. IF <br />THE 6ROWTH 15 OVER 60% DAMA6ED, REPLANT U5IN6 THE ORI61NAL SPECIFICATIONS. THIS SHOULD BE DONE 14 TO 21 DAYS <br />AFTER THE INITIAL PLANTING. <br />47. ALTERNATIVE E1W5ION5 CONTROL TECHNIQUES MUST BE USED IN THE EVENT ADEQUATE VEGETATION 1S NOT ESTABLISHED PRIOR TO <br />THE FIR5T ANTICIPA7RD 516NIFICANT RAIN EVENT OF THE SEASON. <br />WASH OUT AREA <br />46. TEMPORARY CONCRETE WASH OUT AREAS SHALL BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINA6E <br />FACILITIES OR WATERCOURSES. 7E•A'0RARY CONCRETE WASHOUT AREAS SHALL BE CONSTRUCTED WITH A PIT OR BERMEJ AREA AND <br />BE MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND GONGRETE WASTE 6ENERATED BY WASHOUT <br />OPERATIONS. WASH OUT AREAS SHALL BE CONSTRUCTED WITH A 10 FOOT MINIMUM WIDTH. <br />4q. ONCE CONCRETE WASTE5 ARE WASHED INTO THE DESI6NATED AREA AND ALLONFD TO HARDEN, THE CONCRETE SHALL BE BROKEN UP, <br />REMOVED, AND DISPOSED OF PER BMP MM -5, 'SOLID WA57-E MANA6EIEJT', AND IN CONFORMANCE WITH THE PROVISIONS IN THE <br />STATE STANDARD SPECIFICATIONS, SECTION 15-3.02, "REMOVAL METHODS". DISPOSE OF HARDENED CONCRETE ON A RE6ULAR <br />BASIS. <br />50. TEMPORARY WASH OUT AREAS SHALL 13E LINED WITH POLYETHYLENE PLASTIC LININ6 MATERIAL THAT IS A MINIMUM OF 60 MIL <br />THICKNESS, FREE FROM HOLES, TEARS OR OTHER DEFECTS THAT WOULD COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. <br />51. M -EN TEMPORARY WASH OUT FACILITIES ARE NO LONGED REQUIRED FOR THE NOW, THE HARDENED CONCRETE SHALL BE REMOVED <br />AND VISP05ED OF AS NOTED ABOVE. MATERIALS USED TO CONSTRUCT TEMPORARY WASH OUT FACILITIES SHALL BECOME THE <br />PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AND BE DISPOSED OF IN ACCORDANCE WITH STATE <br />STANDARD SPECIFICATIONS, SECTION <br />NOTICE OF INTENT <br />52. THE STATE WATER 1;aE50URX6 CONTROL BOARD HAS RECEIVED AND PRXZ 56ID THE NOTICE OF INTENT TO COMPLY WITH THE TERMS <br />OF THE 6ENERAL PERMIT TO DI5CHAR5E STORM TARTER ASSOCIATED CONSTRUCTION ACTIVITY. THE WDID IDENTIFICATION NUMBER <br />I5 553gC330B37, FOR ANY COMMUNICATIONS RE6ARDIN6 TH15 PERMIT. <br />RECORD DRAWING <br />Corrc ctions By <br />No ;;r:anoes Bs <br />Date <br />Any Person UsOj This Drav;;ng Suri !d V' r ' <br />All information By inspectin j The Situ 01t Work <br />Y <br />OD <br />z <br />0 <br />a <br />u <br />Ln <br />w <br />w <br />a <br />0 <br />z <br />0 <br />En <br />R <br />r <br />*vk <br />z Q <br />O z <br />`H Qy <br />V/ IL <br />OL <br />} v <br />ry- <br />H <br />N� <br />y <br />tuv� <br />Z <br />Q <br />lu <br />T- Q Z <br />O <br />Z O O <br />Z <br />O <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp.6-30-07 <br />DRAWN BY: KEVIN <br />DATE: AUG• 16, 2004 <br />SCALE: NONE <br />DWG: 2g6P0ND6VR <br />CHECKED: R. D. C. <br />]oB a 2g6L-06 <br />SHEET .2 <br />OF 05 <br />v <br />� <br />00 <br />W <br />Z <br />C <br />C <br />�v <br />.a <br />w rn Ln <br />>o <br />V <br />. <br />D�N <br />Q <br />Z <br />` <br />01 <br />rz <br />0 <br />p <br />U <br />W <br />.0 <br />OL�; <br />16 <br />0W.Hu <br />p1 <br />., <br />W n'1 <br />0 <br />Z <br />/� <br />V1 <br />�7 <br />pLul- <br />Ln <br />yo <br />Z <br />C <br />W <br />7 <br />a <br />*vk <br />z Q <br />O z <br />`H Qy <br />V/ IL <br />OL <br />} v <br />ry- <br />H <br />N� <br />y <br />tuv� <br />Z <br />Q <br />lu <br />T- Q Z <br />O <br />Z O O <br />Z <br />O <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp.6-30-07 <br />DRAWN BY: KEVIN <br />DATE: AUG• 16, 2004 <br />SCALE: NONE <br />DWG: 2g6P0ND6VR <br />CHECKED: R. D. C. <br />]oB a 2g6L-06 <br />SHEET .2 <br />OF 05 <br />