Laserfiche WebLink
RELOCATED E. V.A. <br />PAVEMENT ( NOT A <br />PART OF THIS WORK) <br />SLOPE VARIES <br />3' SHOULDER 3' MIN. <br />5=.02 <br />µo �7?� <br />POND SIDE 6RADINti pe <br />6 _5 <br />AT 2:1 AS PER THE <br />PLAN. �,n <br />0 <br />S� <br />A <br />6RADE ROADSIDE SHOULDER AND C9ti <br />SHALE AS SHOWN TO DIRECT RUNOFF <br />TO DRAINA6E POINTS AS PER PLAN <br />ROADSIDE SHOULDER AND SHALE <br />SECT I ON <br />NO SCALE <br />\ab <br />�� ��b <br />9to <br />Rpp <br />XAO <br />NI, a'� a <br />V1_Ip �lP�` �/ \a��„` //FSy�t�{ik�( <br />j <br />SS�N'r, <br />et1 Mp e- oR'+ <br />�bt ''bJD <br />fva M� 10. <br />/ <br />o <br />� a <br />A„ <br />Ap � � � INSTALL 54 L . F. � 12 <br />0 �� <br />GLASS IV R. G. P. AT 5 005 — <br />�• v� a5 / i ��� �.1NN 0 0 <br />INSTALL FLARED END SECTIONS �® <br />AT EACH END. <br />% <br />/ b <br />e LIMITS OF REMOVAL 0 0 f <br />OF EX. E. V. A. 4 p� /�.•� VA • vti �� � yo'` 12' INV. =14.23 � • <br />�6RADE A ROADSIDE SHOULDER o a3'b `N1- <br />AND SHALE AS PER DETAIL B <br />a -ABOVE, AS REQ'D. TO DIRECT <br />RONOFF TO THE NEW 12” R.G.P. � / �� � v`�• N m <br />CULVERT <br />_ � � /, Qi ; � •s Ory. •\\ ,- o � �� / ^o• <br />151 <br />.Vb� V A�. � 1 � l i GQ O � •VA- <br />0 <br />2' PV6 <br />CONSTRUCT A DRAINA6E SHALE <br />/ FROM THE 12” R.C.P. TO THE <br />//' \ p' j°/ •�' THE LAKE, AS SHOWN. RIPRAP <br />- ' 3 v / / / THE DRAINA6E <br />ASHALE AS REQUIRED <br />TO PREVENT EROSION. <br />( PLACE A 4„ THICK LAYER— <br />Of= <br />AYEROF 3/4” CRUSHED ROCK ON- 1 3 I <br />THE POND ACCESS ROAD, TYP.,/ i <br />v ALL AROUND, I NGC�LUDI N6 THE ACCESS RAMP. ��" <br />\ 0 <br />SLOPE THE TOP OF THE POND2, a a-- LAKE <br />O. 1' TOIVARD5 THE LINED BA51N�-' ��- <br />i TO PROVIDE FOR DRAINA6E.;"3 _ I <br />2.5:1 <br />TOP OF BERM SHALL BE 12.0/ �5 b <br />t b FEET WIDE, TYP. <br />\ti- l r l l• B /2.0' 67.3' <br />m 24 <br />1 <br />I <br />22 <br />PROPOSED L I NE7 i <br />SEWER STORA6E POND. <br />6RADE A ROADSIDE SHOULDER vb. \ \ <br />AND SHALE AS PER DETA I L B <br />ABOVE, AS REQ' D. TO DIRECT <br />RONOFF TO THE NEH 12" R.G.P. <br />CULVERT. <br />PROPOSED EMER6ENCY ACCESS LANE, \ `L r \ / \ <br />WATER LINE AND SEWER FORGE MAINS g� V � o LJGY '��>>� '�ij✓Y: <br />\ 1 h <br />AS PER THE EMERGENCY ACCESS AND VEHI GLE <br />b \ \.\ \,\ ! \ a \ I b 12 <br />UTILITIES RELOCATIONS ADDENDUM <br />FOR THE OAKNOOD LAKE SUBDIVISION <br />OFF-SITE HATER AND EMER6ENCY 10 <br />ACCESS PLANS. (NOTA PART OF Ij jai <br />THIS WORK) \ b ��� 0o I <br />b• \,n5° <br />vb � C \ B' 12.0' � 72. 1' <br />SNGHMARK� 4 <br />� vb �PH\ �ry \ <br />CITY OF MANTECA BENCHMARK NO. 71, 2" <br />BRA55 GAP LOCATED 25 FEET t NORTH �`� \ 2: I \ V ��_ 1 a 2 <br />OF THE NORTHEAST CORNER OF SECTION <br />1 1, TOWNSHIP 2 SOUTH, RANGE 6 EAST, <br />MOUNT DIABLO MERIDIAN, AT THE vb " v ,` n �� 0 p a /"% V �. O <br />INTERSECTION OF McK I NLEY AVENUE AND V va� � y �V • U / a <br />13RONZAN ROAD. , <br />ELEVATION = 16.703, U. S.6.5. DATUM ba �A �: �. o0. -2 <br />I n <br />� VJ. •\ 0. 10 <br />\I \ \A ° � � <br />A \ ® . <br />\L \0011 <br />i Tr <br />f <br />GALL U5A TOLL FREE �I e <br />a y I vb _ ,\ '�'b' <br />800-227-2600 _ _ <br />BEFORE PLANTING TREES, TRENCHI N6, EXI5TI N6 NELL I G \ \p� k 3 ( /' h a u X FROM CONSTRUCT A DRAINA6E SHALE <br />DI66I NG FENCE POST HOLES, BLASTING, TO BE REMOVED OR RELOCATED I \ \ \ \� 'X , TH� THE ROADSIDE SHALE TO <br />s THE LAKE, AS SHOWN. RIPRAP <br />GRADING, EXCAVATING, DRILLING, PIPE AS REWIRED.-` <br />PUSHI N6, ETC. , GALL UNDERGROUND THE DRAINA6E SHALE AS REQUIRED ti � � y_ n '; i�� TO PREVENT EROSION. ; <br />SERVICE ALERT FOR UNDER6ROUND EXISTING STORM DRAIN CULVERT 9 <br />US HILLCLEARANPROVIDE INFORMATION ABOUT E. TO BE REMOVED. OF w� OF EX OF REMOVAL SHALL LOCATE <br />THE EXI5TIN6 <br />OR LOCATE AND MARK UNDERGROUND <br />0 CONSTRUCTION TER LINE PRIOR <br />AND DETERMINE <br />\� <br />FACILITIES FOR YOU. \ I t HITH THE O.L.W.D. PERSONNEL IF <br />MODIFICATIONS ARE REQUIRED. <br />EXISTING � 1 <br />MOBILE HOME PARK 1 / <br />APPROXIMATE EARTHWORK QUANTITIES <br />TOTAL GUT .....................12,522 CU. YDS. <br />TOTAL COMPACTED FILL ..........48,649 CU. YDS. <br />(25% COMPACTION INCLUDED) <br />IMPORT DIRT REQUIRED ........... 36,177 CU. YDS. <br />GRADING NOTE <br />THE CONTRACTOR SHALL VERIFY EARTHWORK QUANTITIES <br />PRIOR TO SUBMITTIN6 BIDS. ANY DISCREPANCY SHALL BE <br />BROU6HT TO THE ATTENTION OF THE EN6INEER PRIOR TO <br />5UBMITTIN6 BIDS. <br />PLACE A 4" THICK LAYER <br />OF 3/4" CRUSHED ROCK ON <br />THE POND ACCESS ROAD, TYP. <br />POND L I NER (BY OTHERS) — <br />DE -516N HIGH HATER LEVEL = 20.0 <br />POND VOLUME <br />26.66 ACRE-FEET <br />EXI STI N6 GROUND <br />TYPICAL <br />PONO SECT I ON <br />SCALE: HORIZONTAL: 1"=40' <br />VERTICAL: I"=4' <br />tiry <br />a <br />0 <br />a <br />u <br />Ln <br />W <br />0 <br />0 <br />z <br />O <br />K <br />K"V c °° <br />Z M <br />W Coc <br />C Lu <br />Z a o <br />O N <br />C rz <br />�.2Op� <br />�, <br />V W) _nC) <br />O WT <br />rn�oM <br />V <br />�/j <br />i• n�ip� <br />V1fo <br />Z <br />W v) a <br />Q <br />O <br />1'TOWARD5 THE LINED BASH <br />THE TOP OF THE P <br />O. I <br />TO PROVIDE FOR DRAINA6E. V Z V <br />24 <br />ti <br />22 p- A <br />:THE CONTRACTOR SHALL USE <br />SELECTED IMPORT SOILS TO m A 1 <br />CONSTRUCT THE POND BERM. 20 0 <br />IMPORTED SOILS SHALL HAVE <br />A MINIMUM PLASTICITY INDEX <br />OF 5 WITH 20% PA551N6 THE 18 F- <br />200 SIEVE. THE CONTRACTOR Z l!1 <br />SHALL COORDINATE THE BERM <br />WORK W I T1 1 THE SITE 16W_ V <br />i f3 6EOTECHNIGAL ENGINEER AS V "` w <br />REQUIRED. <br />\ _ 14 O J <br />\ 12 U1(�Z <br />10 Q <br />6 'Q N <br />PLACE LAKE EV6E SLOPE <br />PROTECTION AS REQ'D. <br />� <br />2 <br />0 <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />for -2 <br />�pFESS/ <br />No.61619 <br />_6 Exp.630-07 <br />CIVIL avQ <br />CF CAl1 <br />j <br />R E C 0 D® R /�,l�V i I- %J G' <br />Corre�aior,s By <br />No Changes Bv- <br />Date 3/12/?�,E3 <br />Any Person Using This Drawing Should Verity <br />All information By inspecting The Site Of Work <br />Z <br />DRAWN BY: M. E <br />DATE: XT. 4, 2" <br />SCALE: 1 —40 <br />DWG: 246L-BASE2 <br />CHECKED: K. M. <br />joe n 2,46L-06 <br />SHEET 5 <br />OF 45 <br />