Laserfiche WebLink
FN <br />SPECI PICAT1ONS <br />1. ALL IMPROVEMENTS TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORK5 STANDARD SPECIFICATIONS AND THE LATEST EDITION OF THE STATE OF <br />CALIFORNIA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, AND THE REQUIREMENTS OF THE OAKNIDDD LAKE <br />WATER DISTRICT. <br />2. BENCHMARK: C17Y OF MANTECA BENCHMARK NO. 71, 2" BRAS5 CAP LOCATED APPROXIMATELY 25 FEET NORTH OF THE <br />NORTHEAST CORNER OF SECTION 11, TOWNSHIP 2 SOUTH, RANGE 6 EAST, MOUNT DIABLO MERIDIAN, AT THE INTERSECTION OF <br />WcKINLEY AVENUE AND BRONZAN ROAD. <br />ELEVATION = 16.703, U. 5.6.5. DATUM. <br />3. SOILS REPORT: THE 6EOTECHNICAL SERVICES REPORT FOR THE PROPOSED OAKWOOD LAKE DEVELOPMENT, WOODWARD AVENUE, <br />MANTECA, CALIFORNIA, AS PREPARED BY KLEINFE_DER, INC., WITH PROJECT NO. 48043.601, DATED OCTOBER 27, 2004, 15 <br />HEREBY MADE A PART OF THESE PLANS. <br />4. THESE PLANS HAVE BEEN CHECKED BY THE COUNTY OF SAN JOAQUIN AND/OR ITS AUTHORIZED REPRESENTATIVE, BUT SUCH <br />CHECKING AND/OR APPROVAL DOES NOT RELIEVE THE DEVELOPER FROM HIS RESPON57BILITY TO CORRECT ERRORS, OMISSIONS <br />OR MAKE CHAN67E5 REQUIRED BY CONDITIONS DISCOVERED IN THE FIELD DURIN6 THE COURSE OF CONSTRUCTION. <br />5. THE CONTRACTOR SHALL KEEP HIMSELF FULLY INFORMED OF ALL EXI5TIN6 AND FUTURE STATE AND FEDERAL LAWS AND ALL <br />COUNTY, MUNICIPAL AND SPECIAL DISTRICT ORDINANCES AND RE6ULATIONS NHICH IN ANY MANNER AFFECT THOSE 646A OR <br />EMPLOYED IN THE WORK, OR THE MATERIALS USED IN THE WORK, OR WHICH IN ANY WAY AFFECT THE CONDUCT OF THE WORK, <br />AND OF ALL SUCH ORDERS AND DECREES OF BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE SAME. <br />THE CONTRACTOR SHALL AT ALL TIMES OBSERVE AND COMPLY WITH, AND SHALL CAUSE ALL HIS A6ENT5 AND EMPLOYEES TO <br />OBSERVE AND COMPLY WITH ALL SUCH EXISTING AND FUTURE LAWS, ORDINANCES, RE60LATIONS, ORDERS AND DECREES OF <br />BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE WORK; AND SHALL PROTECT AND INDEMNIFY SAN <br />JOAQUIN COUNTY AND THE OWNER, AND ALL OFFICERS AND EMPLOYEES THEREOF CONNECTED WITH THE WORK, INCLUDIN6 THE <br />ENGINEER, AGAINST ANY CLAIM OR LIABILITY ARISING FROM OR BASED ON THE VIOLATION OF ANY SUCH LAW, ORDINANCE, <br />REGULATION, ORDER, OR DECREE, WHETHER BY HIMSELF OR HIS EMPLOYEES. IF ANY DISCREPANCY OR INCONSISTENCY IS <br />DISCOVERED IN THE PLANS, SPECIFICATIONS, OR CONTRACT FOR THE MOW IN RELATION TO ANY SUCH LAW, ORDINANCE, <br />REGULATION, ORDER, OR DECREE THE CONTRACTOR SHALL FORTHWITH REPORT THE SAM= TO THE E46INEER IN WRITIN6. <br />6. THE ENGINEER A55UMES NO RESPONSIBILITY FOR ANY WORK BY THE CONTRACTOR OR OWNER BASED ON PLANS <br />WHICH HAVE NOT BEEN 516NE19 AND SEALED BY THE EN6INEER AND APPROVED BY THE DISTRICT, CITY OR COUNTY <br />HAVING JURISDICTION. ALL INFORMATION SHOWN ON PRELIMINARY DRAWIN65 IS SUBJECT TO CORRECTION AND CHAN6E, <br />AND THE CONTRACTOR OR OWNER SHALL PERFORM ANY AND ALL WORK AT THEIR OWN RISK. <br />7. ALL DISTANCES AND MEASUREMENTS ARE 61VEN AND WILL BE MADE IN A HORIZONTAL PLANE. 6RADE WILL BE GIVEN FROM THE <br />TOP OF NAILS OR STAKES, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL PRESERVE ALL POINTS AND STAKES SET FOR <br />LINES AND 6RADE5 OR MEASUREMENTS OF THE WORK, IN THEIR PROPER LOCATION UNTIL AUTHORIZED TO REMOVE THEM BY THE <br />ENGINEER. ALL EXPENSES INCURRED IN RE' IN6 STAKES THAT HAVE BEEN REMOVED WITHOUT PROPER AUTHIOR17Y SHAH BE <br />PAID FOR BY THE 6ENERAL CONTRACTOR. <br />8. THESE PLANS HAVE BEEN PREPARED WITH THE INTENT THAT ASSOCIATED EN6INEERIN6 6ROUP, INC. WILL PERFORM THE <br />CONSTRUCTION STAKING FOR THE COMPLETE PROJECT. THE CONTRACTOR SHALL PROVIDE ASSOCIATED EN&INEERIN6 6ROUP, INC. <br />WITH F0R7Y-EI6HT HOURS ADVANCE NOTICE OF STAKING NEEDS. ANY STAKIN6 REQUESTED BY THE CONTRACTOR OR THEIR <br />SUBCONTRACTORS THAT 15 ABOVE AND BEYOND THE AGREED UPON STAKIN6 REQUEST SHALL BE SUBJECT TO AN EXTRA BACK <br />CHAR6E TO THE CONTRACTOR / CLIENT. IF ANOTHER FIRM OR A6ENCY 15 EMPLOYED TO USE THESE PLANS FOR THE PURPOSE <br />OF CONSTRUCTION STAKIN6, NOTICE 15 HEREBY 61VEN THAT ASSOCIATED EN6INEERIN6 6ROUP, INC. WILL NOT ASSUME ANY <br />RESPONSIBILITY FOR ERRORS OR OMISSIONS, IF ANY, WHICH MIGHT OCCUR AND NMICH COULD HAVE BEEN AVOIDED, <br />CORRECTED OR MITIGATED IF ASSOCIATED EN6INEERIN6 6ROOP, INC. HAD PERFORMED THE 5TAKIN6 WORK. <br />9. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN 6ENERAL TERNS, BUT NOT IN COMPLETE DETAIL, <br />IT 15 UNDERSTOOD THAT ONLY THE BEST 6ENERAL PRACTICE 15 TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF <br />THE FINEST QUALITY ARE TO BE USED. <br />10. THE CONTRACTOR SHALL COMPLY WITH THE RE5QUIREFENT5 OF THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br />(SNEGB), ORDER NO. 92-06-DWQ, NPDE5 6ENERAL PERMIT NO. CA50 0002. THE CONTRACTOR SHALL IMPLEMENT AND MONITOR <br />THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH THE SWRCB REGULATIONS. <br />Il. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS PERTAINING TO HIS <br />OPERATIONS. HE SHALL PROVIDE ALL L16HTS, 516N5, BARRICADES, FLA6 MEN OR OTHER DEVICES NECESSARY FOR PUBLIC <br />SAFETY. THE CONTRACTOR'S ATTENTION IS CALLED TO THE REQUIREMENTS OF TITLE 6 OF THE CALIFORNIA ADMINISTRATIVE <br />CODE, SUBCHAPTER 4, ARTICLE 6, "EXCAVATIONS, TRENCHES, EARTHNIDRK." <br />12. THE CONTRACTOR A6REE5 THAT HE SHALL A55UNE SOLE AND COMPLETE RESPONSIBILITY FOR JOB 5ITE CONDITIONS DURING <br />THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDIN6 SAFETY OF ALL PE9?5ON5 AND PROPERTY; THAT THIS <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKIN6 HOURS; AND THAT THE CONTRACTOR <br />SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, THE ENGINEER AND SAN JOAQUIN COUNTY HARMLESS FROM ANY AND ALL <br />LIABILITY, REAL OR ALLESED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON TH15 PROJECT, EXCEPTING FOR LIABILITY <br />ARI5IN6 FROM THE SOLE NE6L76ENCE OF THE OWNER OR ENGINEER. <br />13. APPROPRIATE DUST CONTROL SHALL BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST NUISANCE AS REQUIRED BY <br />THE COUNTY OF SAN JOAQUIN, AT THE CONTRACTOR'S EXPEVSE. THE CONTRACTOR SHALL IMPLEMENT A DUST CONTROL PR05RAM <br />AS PART OF THE MEASURES REWIRED BY THE E.I.R. (CHAPTER 4.6) FOR AIR QUALITY CONTROL AND THE REQUIREMENTS OF <br />PM 10 AND THE BEST AVAILABLE CONTROL MEASURES (BACH) APPROVED BY THE BOARD. THE FR06RAH SHALL INSURE THAT, AT <br />THE PUBLIC WORK5 DIRECTOR'S DISCRETION, A WATER VEHICLE FOR DUST CONTROL OPERATIONS IS KEPT READILY AVAILABLE <br />AT ALL TIMES DURIN6 CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE PUBLIC WORKS DIIRECTOR AND BUILDIN6 <br />OFFICIAL WITH THE NAME AND TELEPHONE HUMBER OF THE PERSON DIRECTLY RESPONSIBLE FOR DUST CONTROL AND OPERATION <br />OF THE WATER VEHICLE. <br />14. THE EX15TIN6 UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS OR FIELD LOCATIONS WHEN POSSIBLE. THE CONTRACTOR <br />SHALL LOCATE AND PRESERVE ALL EXISTIN6 FACILITIES INCLUDING 6A5, NATTER, IRRI6ATION, POKER, TELEPHONE, -se <br />OR OTHERS WHICH MAY BE PRESENT IN THE AREA OF CONSTRUCTION. THE RESPECTIVE UTILITY COMPANIES SHALL BE <br />NOTIFIED PRIOR TO B65INNIN6 WORK. <br />15. THE EXI5TIN6 UTILITIES SHALL NOT BE INTERRUPTED UNTIL THE UTILITY COMPANY HAS PROVIDED ALTERNATIVE SERVICE <br />FACILITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE APPROPRIATE A6ENCIES AND UTILITY <br />COMPANIES. <br />16. ALL CONSTRUCTION 5TAKIN6 FOR 6RADIN6 SHALL BE DONE BY A REGISTERED CIVIL EN6INEER OR LICENSED LAND SURVEYOR. <br />17. ALL 7REJGHES SHALL BE BACKFILLED IN ACCORDANCE WITH SAN JOAQUIN COUNTY STANDARD DETAILS. COMPACTION SHALL BE <br />ACHIEVED BY MECHANICAL MEANS. NO FLOODIN6, PONOIN6, OR JETTIN6 SHALL BE PERMITTED UNLE55 APPROVED BY THE <br />DIRECTOR OF PUBLIC WORKS IN WRITING. <br />18. TESTIN6: ALL INDEPENDENT LABORATORY INSPECTIONS CALLED FOR BY THE DIRECTOR OF PUBLIC WORKS WILL BE PAID <br />FOR BY THE DEVELOPER OR CONTRACTOR. <br />19. IF, DURING CONSTRUCTION, ARGHAEOLO61CAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE VICINITY SHALL BE HALTED, <br />AND AN ARCHAEOL05IST CONSULTED, AND THE COUNTY PUBLIC WORKS DEPARTMENT NOTIFIED. IF, IN THE OPINION OF THE <br />ARCHAEOLO615T, THE REMAINS ARE 5I6NIFICANT, MEASURES AS MAY BE REQUIRED BY THE DIRECTOR OF PUBLIC M1ORKS, <br />SHALL BE TAKEN TO PROTECT THEM. <br />20. DISPOSAL OF HATER INTO THE SANITARY SEVER SYSTEM IS STRICTLY PROHIBITED. <br />21. THE CONTRACTOR SHALL MAINTAIN ALL STREETS, SIDEWALKS, AND ALL OTHER PUBLIC R16HT5-0F-WAY IN A CLEAN, SAFE AND <br />USABLE CONDITION 7HROU6HOUT THE COURSE OF CONSTRUCTION. ALL SPILL5 OF SOIL, ROCK, CONSTRUCTION DEBRIS, ETC., <br />SHALL BE REMOVED IMMEDIATELY FROM PUBLICLY OWNED PROPERTY. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE <br />MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. THE CONTRACTOR SHALL PROVIDE FOR SAFE, UNOBSTRUCTED ACCESS <br />TO PRIVATE PROPERTY ADJACENT TO WORK THR9U6HOUT THE PERIOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE <br />PUBLIC WORKS DEPARTMENT THE NAME AND TELEPHONE NUMBER OF PER50N AVAILABLE 24 HOURS A DAY IF PROBLEMS OR <br />CONDITION IS NOT MET. <br />22. ALL TRASH, CONSTRUCTION DEBRIS AND MATERIALS SHALL BE CONTAINED WITHIN THE CONSTRUCTION AREA UNTIL OFF-51TE <br />DISPOSAL CAN BE ARRAN6ED. <br />23. THE CONTRACTOR SHALL KEEP ADJOININ6 PUBLIC STREETS AND PARKIN6 AREAS FREE AND CLEAN OF PROJECT DIRT, MUD AND <br />MATERIALS DURIN6 THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIVE MEASURES AS <br />DIRECTED BY THE PUBLIC WORK5 INSPECTOR AT NO EXPENSE TO THE COUNTY. <br />24. THE APPLICANT SHALL ALERT CONSTRUCTION PERSONNEL OF THE POSSIBILITY OF BURIED CULTURAL RESOURCES, HUMAN <br />REMAINS AND OTHER SUCH CULTURAL RESOURCES AND SHALL IMMEDIATELY COMPLY WITH ALL REQUIREMENTS CONTAINED IN THE <br />EIR, INCLUDIN6 THE STOPPA6E OF ALL WORK, NOTIFICATION OF THE NATIVE AMERICAN HERITAGE 6OHMI55ION AND THE SAN <br />JOAQUIN COUNTY CORONER, AS APPLICABLE. <br />6RADIN6 NOTES <br />26. ALL 6RADIN6 SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS EN6INEER OR UNDER THEIR DIRECTION. THE SOILS <br />ENGINEER SHALL INSPECT AND TEST THE PLACEMENT OF FILLS. THE SOILS EN61NEER SHALL SUBMIT A SOILS REPORT AND <br />REQUIREMENTS AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF 6RAOIN6 OPERATIONS THE <br />SOILS EN6INEER SHALL STATE IN A REPORT TO THE COUNTY OF SAN JOAQUIN THAT INSPECTIONS AND TESTS WERE MADE BY HIM <br />OR UNDER HIS SUPERVISION AND THAT IN H15 OPINION ALL FILLS ARE COMPACTED TO THE REQUIRED RELATIVE DENSITY AND ARE <br />ACCEPTABLE FOR THEIR INTENDED USE. <br />27. THE CONTRACTOR SHALL LIMIT TRAFFIC SPEEDS ON ANY UNPAVED SURFACES TO 15 MILES PER HOUR TO LOWER THE AMOUNT OF <br />DUST CREATED. <br />28. THE CONTRACTOR SHALL SUSPEND EXCAVATION AND 6RADIN6 ACTIVITIES WHEN THE WINDS EXCEED 20 MILES PER HOUR. <br />29. DEVELOPER/CONTRACTOW 5 WORK SHALL BE IN ACCORDANCE WITH THE 5.1VAP6D 60IDELINE5, INCLUDIN6 SJVAPGD REGULATION VIII <br />AND IMPLEMENT CONTROL MEASURES BASED ON 5JVAPGD'5 COMPLIANCE ASSISTANT BULLETIN FOR SHORT TEa"1 IMPACTS. S.MAPCD <br />SHALL BE CONTACTED TO DISCUSS MITI6ATION MEASURES AND IMPLEMENT MEASURES FROM TABLE 6-4 OF THE 6UIDE FOR <br />ASSE551N6 AND MITI6ATIN6 AIR QUALITY IMPACTS. <br />30. ALL 6RADIN6 SHALL COMPLY WITH THE CALIFORNIA BUILDIN6 CODE, CHAPTER 18, APPENDIX C CHAPTER 13. <br />31. NO SLOPE SHALL BE STEED THAN 2 HORIZONTAL TO I VERTICAL. <br />32. ACCESS TO THE PROJECT SITE FROM COUNTY OR CITY ROAD5 15 RESTRICTED EXCEPT AT TEMPORARY CONSTRUCTION <br />ENTRANCES. <br />EROSION CONTROL NOTES <br />33. ALL WORK TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN STANDARDS AND THE STATE OF <br />CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CONSTRUCTION SITE BEST MANA6EMENT PRACTICES (BMPs) MANUAL. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURIN6 THAT ALL SUBCONTRACTORS, AND SUPPLIERS ARE AWARE OF, AND IMPLEMENT <br />ALL STORM WATER QUALITY MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTIONS BMPS WILL RESULT IN TIME <br />ISSUANCE OF CORRECTION NOTICES, CITATIONS AND/OR A PROJECT STOP ORDER. <br />34. THIS EROSION CONTROL PLAN WAS PREPARED AS AN EXHIBIT TO THE STORM WATER POLLUTION PREVENTION PLAN (S.W.P.P.P.) <br />FOR THE OAKWOOD LAKE SUBDIVISION, AS REQUIRED BY THE STATE WATER RESOURCES CONTROL BOARD. THE FACILITIES SHOWN ON <br />THIS PLAN ARE DESI6NED TO CONTROL SEDIMENT DURING THE RAINY SEASON AFTER ROUGH 6RADIN6 HAS BEEN COMPLETED. <br />EM95ION CONTROL MEASURES ARE TO BE OPERABLE PRIOR TO OCTOBER 15TH THROU6H APRIL 15TH OF ANY YEAR THAT 6RADIN6 <br />OPERATIONS HAVE LEFT AREAS UNPROTECTED FROM EROSION. NO 6RADIN6 WILL OCCUR BETNEEN OCTOBER 15TH AND APRIL 15TH, <br />UNLE55 AUTHORIZED BY THE DIRECTOR OF PUBLIC WORKS. DES16N OF THESE FACILITIES MUST BE APPROVED OR UPDATED EACH <br />YEAR PRIOR TO SEPTEMBER 30, AND SHALL BE SI6NED BY THE COUNTY EN6INEER. DAILY MAINTENANCE OF THE5E FACILITIES <br />SHALL BE MONITORED AND INSPECTED BY THE PROJECT COORDINATOR. <br />35. DURIN6 THE RAINY SEASON ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIALS AND DEBRIS. THE SITE SHALL BE <br />MAINTAINED SO AS TO MINIMIZE 5EDIMENT LADEN RUNOFF TO ANY STORM DRAINA6E SYSTEM. <br />36. CONSTRUCTION ENTRANCES CON515TIN6 OF A66i;'E6ATE ON 6EOTEXTILE FABRIC, AS PER THE DETAIL, SHALL BE PROVIDED AT EACH <br />VEHICLE AGGE55 POINT TO EXI5TIN6 PAVED ROADS. <br />37. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. THIS PLAN MAY NOT COVER <br />ALL THE SITUATIONS THAT ARISE DURING CON5TRUCTI0N DUE TO UNANTICIPATED FIEF CONDITIONS. REVISIONS MAY BE MADE TO <br />THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE DIRECTOR OF PUBLIC WORK5. <br />36. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE ER05ION CONTROL MEA5URE5 TO THE <br />SATISFACTION OF THE DIRECTOR OF PUBLIC WORK5. <br />34. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION WILL BE MINIMIZED. <br />STATE AND LOCAL LAMS GONGERNIN6 POLLUTION SHALL BE COMPLIED WITH. <br />40. PRIOR TO THE COHHENC�ENT OF ANY CLEARING, 6RAOING OR EXCAVATION, THE CONTRACTOR/DEVELOPER SHALL PROVIDE EVIDENCE <br />THAT A NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. A COPY OF <br />THE SWPPP SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. <br />SILT FENCES <br />41. IF POSSIBLE, SILT FENCE FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID THE USE OF JOINTS. MEN JOINTS ARE <br />NECESSARY, FILTER FABRIC SHALL BE SPLICED AT A SUPPORT POST, WITH A MINIMUM OF 6" OVERLAP AND BOTH ENDS SECURELY <br />FASTENED TO THE POST. <br />42. SILT FENCE5 SHALL BE REMOVED MIEN THEY HAVE S <br />PERMANENTLY STABILIZED. ERVED THEIR USEFUL PURPOSE, BUT NOT B THE UPSLOPE AREA HAS 8694 <br />43. FILTER FABRIC SHALL BE NO. 2125 AS MANUFACTURED BY AMOCO CONSTRUCTION FABRICS, OR APPROVED EQUAL. <br />SEEDING <br />44. SEED AND MULCH SHALL BE APPLIED BY SEPTEMBER 15TH TO ALL DISTURBED SLOPES S7 THAN 2S AND HI60 THAN 3 FEET, <br />AND TO ALL CUT AND FILL SLOPES WITHIN OR ADJACENT TO PUBLIC RI6HT-OF-WAY5, OR AS DIRECTED BY THE DIRECTOR OF <br />PUBLIC WORKS. <br />45. SEED AND FERTILIZER WILL BE APPLIED HYDRAULICALLY OR BY HAND AT THE RATES SPECIFIED BELOW. ON SLOPES STRAW SHALL <br />BE APPLIED BY BLONER OR BY HAND AND ANCHORED IN PLACE BY PUNCHIN6. <br />ITEM POUNDS PER ACRE <br />ZORRO ANNUAL FESCUE 10 LBS. <br />ROSE CLOVER B LBS. <br />Fr(MONULCH FIBER 1500 LBS. <br />I6-20-0 FERTILIZER 307 LBS. <br />(AMMONIUM PHOSPHATE) <br />TACKIFIER 80 LBS. <br />46. IF PLANT 6ROWTH IS INADEQUATE FOR EROSION CONTROL, OVERSIEE"J USIN6 HALF THE RATE OF THE OR161NAL APPLICATION. IF <br />THE 61WWTH 15 OVER 60g DAMA6ED, REPLANT U51N6 THE ORI6INAL SPECIFICATIONS. THIS SHOULD BE DONE 14 TO 21 DAYS <br />AFTER THE INITIAL PLANTIN6. <br />47. ALTERNATIVE EROSIONS CONTROL TECHNIQUES MUST BE USED IN THE EVENT ADEQUATE VE6ETATION IS NOT ESTABLISHED PRIOR TO <br />THE FIRST ANTICIPATED 516NIFICANT RAIN EVENT OF THE SEASON. <br />NOTICE OF INTENT <br />48. THE STATE WATER RESOURCES CON77WL. BOARD HAS RECEIVED AND PROCESSED THE NOTICE OF INTENT TO COMPLY WITH THE TERNS <br />OF THE 6ENERAL PERMIT TO DISCHARGE STORM WATER A55061ATEP CONSTRUCTION ACTIVITY. THE WDID IDENTIFICATION NUMBER <br />15 5539C330B37, FOR ANY COMMUNICATIONS RE6ARDIN6 THIS PERMIT. <br />RECORD JRAWIT.10 <br />Corrections By <br />No Changes By <br />Date ?/)2 2ao8 <br />Any Person Using This Drawing Silou d Vµnty <br />All information By inspecting The Site Of Vrork <br />} <br />00 <br />z <br />0 <br />E <br />Cr <br />u <br />w <br />0 <br />w <br />Q <br />0 <br />z <br />0 <br />Ln <br />R <br />Tq <br />kv <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp. 6-30-07 <br />DRAWN BY: M. E <br />DATE: OCT. 4, 2" <br />SCALE: NONE <br />DWG: 296PONLCVR2 <br />CHECKED: K. H. <br />JOB u 296L-06 <br />SHEET .2 <br />OF 05 <br />00 <br />n <br />00 <br />.� <br />WZ <br />_ <br />� <br />M <br />'LIM <br />.-. <br />NM <br />> � <br />V <br />a <br />o <br />0 <br />z <br />C <br />>-2� <br />8 p <br />U <br />... <br />W <br />.21 <br />D <br />z= <br />C) <br />O <br />W <br />U m <br />H Q M <br />Z <br />�v Ln <br />V 1 <br />'�' <br />V <br />i• <br />� p �^ <br />v- <br />V1 <br />Z <br />z <br />W <br />_ <br />a <br />kv <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp. 6-30-07 <br />DRAWN BY: M. E <br />DATE: OCT. 4, 2" <br />SCALE: NONE <br />DWG: 296PONLCVR2 <br />CHECKED: K. H. <br />JOB u 296L-06 <br />SHEET .2 <br />OF 05 <br />