FN
<br />SPECI PICAT1ONS
<br />1. ALL IMPROVEMENTS TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE
<br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORK5 STANDARD SPECIFICATIONS AND THE LATEST EDITION OF THE STATE OF
<br />CALIFORNIA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, AND THE REQUIREMENTS OF THE OAKNIDDD LAKE
<br />WATER DISTRICT.
<br />2. BENCHMARK: C17Y OF MANTECA BENCHMARK NO. 71, 2" BRAS5 CAP LOCATED APPROXIMATELY 25 FEET NORTH OF THE
<br />NORTHEAST CORNER OF SECTION 11, TOWNSHIP 2 SOUTH, RANGE 6 EAST, MOUNT DIABLO MERIDIAN, AT THE INTERSECTION OF
<br />WcKINLEY AVENUE AND BRONZAN ROAD.
<br />ELEVATION = 16.703, U. 5.6.5. DATUM.
<br />3. SOILS REPORT: THE 6EOTECHNICAL SERVICES REPORT FOR THE PROPOSED OAKWOOD LAKE DEVELOPMENT, WOODWARD AVENUE,
<br />MANTECA, CALIFORNIA, AS PREPARED BY KLEINFE_DER, INC., WITH PROJECT NO. 48043.601, DATED OCTOBER 27, 2004, 15
<br />HEREBY MADE A PART OF THESE PLANS.
<br />4. THESE PLANS HAVE BEEN CHECKED BY THE COUNTY OF SAN JOAQUIN AND/OR ITS AUTHORIZED REPRESENTATIVE, BUT SUCH
<br />CHECKING AND/OR APPROVAL DOES NOT RELIEVE THE DEVELOPER FROM HIS RESPON57BILITY TO CORRECT ERRORS, OMISSIONS
<br />OR MAKE CHAN67E5 REQUIRED BY CONDITIONS DISCOVERED IN THE FIELD DURIN6 THE COURSE OF CONSTRUCTION.
<br />5. THE CONTRACTOR SHALL KEEP HIMSELF FULLY INFORMED OF ALL EXI5TIN6 AND FUTURE STATE AND FEDERAL LAWS AND ALL
<br />COUNTY, MUNICIPAL AND SPECIAL DISTRICT ORDINANCES AND RE6ULATIONS NHICH IN ANY MANNER AFFECT THOSE 646A OR
<br />EMPLOYED IN THE WORK, OR THE MATERIALS USED IN THE WORK, OR WHICH IN ANY WAY AFFECT THE CONDUCT OF THE WORK,
<br />AND OF ALL SUCH ORDERS AND DECREES OF BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE SAME.
<br />THE CONTRACTOR SHALL AT ALL TIMES OBSERVE AND COMPLY WITH, AND SHALL CAUSE ALL HIS A6ENT5 AND EMPLOYEES TO
<br />OBSERVE AND COMPLY WITH ALL SUCH EXISTING AND FUTURE LAWS, ORDINANCES, RE60LATIONS, ORDERS AND DECREES OF
<br />BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE WORK; AND SHALL PROTECT AND INDEMNIFY SAN
<br />JOAQUIN COUNTY AND THE OWNER, AND ALL OFFICERS AND EMPLOYEES THEREOF CONNECTED WITH THE WORK, INCLUDIN6 THE
<br />ENGINEER, AGAINST ANY CLAIM OR LIABILITY ARISING FROM OR BASED ON THE VIOLATION OF ANY SUCH LAW, ORDINANCE,
<br />REGULATION, ORDER, OR DECREE, WHETHER BY HIMSELF OR HIS EMPLOYEES. IF ANY DISCREPANCY OR INCONSISTENCY IS
<br />DISCOVERED IN THE PLANS, SPECIFICATIONS, OR CONTRACT FOR THE MOW IN RELATION TO ANY SUCH LAW, ORDINANCE,
<br />REGULATION, ORDER, OR DECREE THE CONTRACTOR SHALL FORTHWITH REPORT THE SAM= TO THE E46INEER IN WRITIN6.
<br />6. THE ENGINEER A55UMES NO RESPONSIBILITY FOR ANY WORK BY THE CONTRACTOR OR OWNER BASED ON PLANS
<br />WHICH HAVE NOT BEEN 516NE19 AND SEALED BY THE EN6INEER AND APPROVED BY THE DISTRICT, CITY OR COUNTY
<br />HAVING JURISDICTION. ALL INFORMATION SHOWN ON PRELIMINARY DRAWIN65 IS SUBJECT TO CORRECTION AND CHAN6E,
<br />AND THE CONTRACTOR OR OWNER SHALL PERFORM ANY AND ALL WORK AT THEIR OWN RISK.
<br />7. ALL DISTANCES AND MEASUREMENTS ARE 61VEN AND WILL BE MADE IN A HORIZONTAL PLANE. 6RADE WILL BE GIVEN FROM THE
<br />TOP OF NAILS OR STAKES, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL PRESERVE ALL POINTS AND STAKES SET FOR
<br />LINES AND 6RADE5 OR MEASUREMENTS OF THE WORK, IN THEIR PROPER LOCATION UNTIL AUTHORIZED TO REMOVE THEM BY THE
<br />ENGINEER. ALL EXPENSES INCURRED IN RE' IN6 STAKES THAT HAVE BEEN REMOVED WITHOUT PROPER AUTHIOR17Y SHAH BE
<br />PAID FOR BY THE 6ENERAL CONTRACTOR.
<br />8. THESE PLANS HAVE BEEN PREPARED WITH THE INTENT THAT ASSOCIATED EN6INEERIN6 6ROUP, INC. WILL PERFORM THE
<br />CONSTRUCTION STAKING FOR THE COMPLETE PROJECT. THE CONTRACTOR SHALL PROVIDE ASSOCIATED EN&INEERIN6 6ROUP, INC.
<br />WITH F0R7Y-EI6HT HOURS ADVANCE NOTICE OF STAKING NEEDS. ANY STAKIN6 REQUESTED BY THE CONTRACTOR OR THEIR
<br />SUBCONTRACTORS THAT 15 ABOVE AND BEYOND THE AGREED UPON STAKIN6 REQUEST SHALL BE SUBJECT TO AN EXTRA BACK
<br />CHAR6E TO THE CONTRACTOR / CLIENT. IF ANOTHER FIRM OR A6ENCY 15 EMPLOYED TO USE THESE PLANS FOR THE PURPOSE
<br />OF CONSTRUCTION STAKIN6, NOTICE 15 HEREBY 61VEN THAT ASSOCIATED EN6INEERIN6 6ROUP, INC. WILL NOT ASSUME ANY
<br />RESPONSIBILITY FOR ERRORS OR OMISSIONS, IF ANY, WHICH MIGHT OCCUR AND NMICH COULD HAVE BEEN AVOIDED,
<br />CORRECTED OR MITIGATED IF ASSOCIATED EN6INEERIN6 6ROOP, INC. HAD PERFORMED THE 5TAKIN6 WORK.
<br />9. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN 6ENERAL TERNS, BUT NOT IN COMPLETE DETAIL,
<br />IT 15 UNDERSTOOD THAT ONLY THE BEST 6ENERAL PRACTICE 15 TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF
<br />THE FINEST QUALITY ARE TO BE USED.
<br />10. THE CONTRACTOR SHALL COMPLY WITH THE RE5QUIREFENT5 OF THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD
<br />(SNEGB), ORDER NO. 92-06-DWQ, NPDE5 6ENERAL PERMIT NO. CA50 0002. THE CONTRACTOR SHALL IMPLEMENT AND MONITOR
<br />THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH THE SWRCB REGULATIONS.
<br />Il. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS PERTAINING TO HIS
<br />OPERATIONS. HE SHALL PROVIDE ALL L16HTS, 516N5, BARRICADES, FLA6 MEN OR OTHER DEVICES NECESSARY FOR PUBLIC
<br />SAFETY. THE CONTRACTOR'S ATTENTION IS CALLED TO THE REQUIREMENTS OF TITLE 6 OF THE CALIFORNIA ADMINISTRATIVE
<br />CODE, SUBCHAPTER 4, ARTICLE 6, "EXCAVATIONS, TRENCHES, EARTHNIDRK."
<br />12. THE CONTRACTOR A6REE5 THAT HE SHALL A55UNE SOLE AND COMPLETE RESPONSIBILITY FOR JOB 5ITE CONDITIONS DURING
<br />THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDIN6 SAFETY OF ALL PE9?5ON5 AND PROPERTY; THAT THIS
<br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKIN6 HOURS; AND THAT THE CONTRACTOR
<br />SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER, THE ENGINEER AND SAN JOAQUIN COUNTY HARMLESS FROM ANY AND ALL
<br />LIABILITY, REAL OR ALLESED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON TH15 PROJECT, EXCEPTING FOR LIABILITY
<br />ARI5IN6 FROM THE SOLE NE6L76ENCE OF THE OWNER OR ENGINEER.
<br />13. APPROPRIATE DUST CONTROL SHALL BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST NUISANCE AS REQUIRED BY
<br />THE COUNTY OF SAN JOAQUIN, AT THE CONTRACTOR'S EXPEVSE. THE CONTRACTOR SHALL IMPLEMENT A DUST CONTROL PR05RAM
<br />AS PART OF THE MEASURES REWIRED BY THE E.I.R. (CHAPTER 4.6) FOR AIR QUALITY CONTROL AND THE REQUIREMENTS OF
<br />PM 10 AND THE BEST AVAILABLE CONTROL MEASURES (BACH) APPROVED BY THE BOARD. THE FR06RAH SHALL INSURE THAT, AT
<br />THE PUBLIC WORK5 DIRECTOR'S DISCRETION, A WATER VEHICLE FOR DUST CONTROL OPERATIONS IS KEPT READILY AVAILABLE
<br />AT ALL TIMES DURIN6 CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE PUBLIC WORKS DIIRECTOR AND BUILDIN6
<br />OFFICIAL WITH THE NAME AND TELEPHONE HUMBER OF THE PERSON DIRECTLY RESPONSIBLE FOR DUST CONTROL AND OPERATION
<br />OF THE WATER VEHICLE.
<br />14. THE EX15TIN6 UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS OR FIELD LOCATIONS WHEN POSSIBLE. THE CONTRACTOR
<br />SHALL LOCATE AND PRESERVE ALL EXISTIN6 FACILITIES INCLUDING 6A5, NATTER, IRRI6ATION, POKER, TELEPHONE, -se
<br />OR OTHERS WHICH MAY BE PRESENT IN THE AREA OF CONSTRUCTION. THE RESPECTIVE UTILITY COMPANIES SHALL BE
<br />NOTIFIED PRIOR TO B65INNIN6 WORK.
<br />15. THE EXI5TIN6 UTILITIES SHALL NOT BE INTERRUPTED UNTIL THE UTILITY COMPANY HAS PROVIDED ALTERNATIVE SERVICE
<br />FACILITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS WORK WITH THE APPROPRIATE A6ENCIES AND UTILITY
<br />COMPANIES.
<br />16. ALL CONSTRUCTION 5TAKIN6 FOR 6RADIN6 SHALL BE DONE BY A REGISTERED CIVIL EN6INEER OR LICENSED LAND SURVEYOR.
<br />17. ALL 7REJGHES SHALL BE BACKFILLED IN ACCORDANCE WITH SAN JOAQUIN COUNTY STANDARD DETAILS. COMPACTION SHALL BE
<br />ACHIEVED BY MECHANICAL MEANS. NO FLOODIN6, PONOIN6, OR JETTIN6 SHALL BE PERMITTED UNLE55 APPROVED BY THE
<br />DIRECTOR OF PUBLIC WORKS IN WRITING.
<br />18. TESTIN6: ALL INDEPENDENT LABORATORY INSPECTIONS CALLED FOR BY THE DIRECTOR OF PUBLIC WORKS WILL BE PAID
<br />FOR BY THE DEVELOPER OR CONTRACTOR.
<br />19. IF, DURING CONSTRUCTION, ARGHAEOLO61CAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE VICINITY SHALL BE HALTED,
<br />AND AN ARCHAEOL05IST CONSULTED, AND THE COUNTY PUBLIC WORKS DEPARTMENT NOTIFIED. IF, IN THE OPINION OF THE
<br />ARCHAEOLO615T, THE REMAINS ARE 5I6NIFICANT, MEASURES AS MAY BE REQUIRED BY THE DIRECTOR OF PUBLIC M1ORKS,
<br />SHALL BE TAKEN TO PROTECT THEM.
<br />20. DISPOSAL OF HATER INTO THE SANITARY SEVER SYSTEM IS STRICTLY PROHIBITED.
<br />21. THE CONTRACTOR SHALL MAINTAIN ALL STREETS, SIDEWALKS, AND ALL OTHER PUBLIC R16HT5-0F-WAY IN A CLEAN, SAFE AND
<br />USABLE CONDITION 7HROU6HOUT THE COURSE OF CONSTRUCTION. ALL SPILL5 OF SOIL, ROCK, CONSTRUCTION DEBRIS, ETC.,
<br />SHALL BE REMOVED IMMEDIATELY FROM PUBLICLY OWNED PROPERTY. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE
<br />MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. THE CONTRACTOR SHALL PROVIDE FOR SAFE, UNOBSTRUCTED ACCESS
<br />TO PRIVATE PROPERTY ADJACENT TO WORK THR9U6HOUT THE PERIOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE
<br />PUBLIC WORKS DEPARTMENT THE NAME AND TELEPHONE NUMBER OF PER50N AVAILABLE 24 HOURS A DAY IF PROBLEMS OR
<br />CONDITION IS NOT MET.
<br />22. ALL TRASH, CONSTRUCTION DEBRIS AND MATERIALS SHALL BE CONTAINED WITHIN THE CONSTRUCTION AREA UNTIL OFF-51TE
<br />DISPOSAL CAN BE ARRAN6ED.
<br />23. THE CONTRACTOR SHALL KEEP ADJOININ6 PUBLIC STREETS AND PARKIN6 AREAS FREE AND CLEAN OF PROJECT DIRT, MUD AND
<br />MATERIALS DURIN6 THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIVE MEASURES AS
<br />DIRECTED BY THE PUBLIC WORK5 INSPECTOR AT NO EXPENSE TO THE COUNTY.
<br />24. THE APPLICANT SHALL ALERT CONSTRUCTION PERSONNEL OF THE POSSIBILITY OF BURIED CULTURAL RESOURCES, HUMAN
<br />REMAINS AND OTHER SUCH CULTURAL RESOURCES AND SHALL IMMEDIATELY COMPLY WITH ALL REQUIREMENTS CONTAINED IN THE
<br />EIR, INCLUDIN6 THE STOPPA6E OF ALL WORK, NOTIFICATION OF THE NATIVE AMERICAN HERITAGE 6OHMI55ION AND THE SAN
<br />JOAQUIN COUNTY CORONER, AS APPLICABLE.
<br />6RADIN6 NOTES
<br />26. ALL 6RADIN6 SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS EN6INEER OR UNDER THEIR DIRECTION. THE SOILS
<br />ENGINEER SHALL INSPECT AND TEST THE PLACEMENT OF FILLS. THE SOILS EN61NEER SHALL SUBMIT A SOILS REPORT AND
<br />REQUIREMENTS AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF 6RAOIN6 OPERATIONS THE
<br />SOILS EN6INEER SHALL STATE IN A REPORT TO THE COUNTY OF SAN JOAQUIN THAT INSPECTIONS AND TESTS WERE MADE BY HIM
<br />OR UNDER HIS SUPERVISION AND THAT IN H15 OPINION ALL FILLS ARE COMPACTED TO THE REQUIRED RELATIVE DENSITY AND ARE
<br />ACCEPTABLE FOR THEIR INTENDED USE.
<br />27. THE CONTRACTOR SHALL LIMIT TRAFFIC SPEEDS ON ANY UNPAVED SURFACES TO 15 MILES PER HOUR TO LOWER THE AMOUNT OF
<br />DUST CREATED.
<br />28. THE CONTRACTOR SHALL SUSPEND EXCAVATION AND 6RADIN6 ACTIVITIES WHEN THE WINDS EXCEED 20 MILES PER HOUR.
<br />29. DEVELOPER/CONTRACTOW 5 WORK SHALL BE IN ACCORDANCE WITH THE 5.1VAP6D 60IDELINE5, INCLUDIN6 SJVAPGD REGULATION VIII
<br />AND IMPLEMENT CONTROL MEASURES BASED ON 5JVAPGD'5 COMPLIANCE ASSISTANT BULLETIN FOR SHORT TEa"1 IMPACTS. S.MAPCD
<br />SHALL BE CONTACTED TO DISCUSS MITI6ATION MEASURES AND IMPLEMENT MEASURES FROM TABLE 6-4 OF THE 6UIDE FOR
<br />ASSE551N6 AND MITI6ATIN6 AIR QUALITY IMPACTS.
<br />30. ALL 6RADIN6 SHALL COMPLY WITH THE CALIFORNIA BUILDIN6 CODE, CHAPTER 18, APPENDIX C CHAPTER 13.
<br />31. NO SLOPE SHALL BE STEED THAN 2 HORIZONTAL TO I VERTICAL.
<br />32. ACCESS TO THE PROJECT SITE FROM COUNTY OR CITY ROAD5 15 RESTRICTED EXCEPT AT TEMPORARY CONSTRUCTION
<br />ENTRANCES.
<br />EROSION CONTROL NOTES
<br />33. ALL WORK TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN STANDARDS AND THE STATE OF
<br />CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CONSTRUCTION SITE BEST MANA6EMENT PRACTICES (BMPs) MANUAL. THE
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURIN6 THAT ALL SUBCONTRACTORS, AND SUPPLIERS ARE AWARE OF, AND IMPLEMENT
<br />ALL STORM WATER QUALITY MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTIONS BMPS WILL RESULT IN TIME
<br />ISSUANCE OF CORRECTION NOTICES, CITATIONS AND/OR A PROJECT STOP ORDER.
<br />34. THIS EROSION CONTROL PLAN WAS PREPARED AS AN EXHIBIT TO THE STORM WATER POLLUTION PREVENTION PLAN (S.W.P.P.P.)
<br />FOR THE OAKWOOD LAKE SUBDIVISION, AS REQUIRED BY THE STATE WATER RESOURCES CONTROL BOARD. THE FACILITIES SHOWN ON
<br />THIS PLAN ARE DESI6NED TO CONTROL SEDIMENT DURING THE RAINY SEASON AFTER ROUGH 6RADIN6 HAS BEEN COMPLETED.
<br />EM95ION CONTROL MEASURES ARE TO BE OPERABLE PRIOR TO OCTOBER 15TH THROU6H APRIL 15TH OF ANY YEAR THAT 6RADIN6
<br />OPERATIONS HAVE LEFT AREAS UNPROTECTED FROM EROSION. NO 6RADIN6 WILL OCCUR BETNEEN OCTOBER 15TH AND APRIL 15TH,
<br />UNLE55 AUTHORIZED BY THE DIRECTOR OF PUBLIC WORKS. DES16N OF THESE FACILITIES MUST BE APPROVED OR UPDATED EACH
<br />YEAR PRIOR TO SEPTEMBER 30, AND SHALL BE SI6NED BY THE COUNTY EN6INEER. DAILY MAINTENANCE OF THE5E FACILITIES
<br />SHALL BE MONITORED AND INSPECTED BY THE PROJECT COORDINATOR.
<br />35. DURIN6 THE RAINY SEASON ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIALS AND DEBRIS. THE SITE SHALL BE
<br />MAINTAINED SO AS TO MINIMIZE 5EDIMENT LADEN RUNOFF TO ANY STORM DRAINA6E SYSTEM.
<br />36. CONSTRUCTION ENTRANCES CON515TIN6 OF A66i;'E6ATE ON 6EOTEXTILE FABRIC, AS PER THE DETAIL, SHALL BE PROVIDED AT EACH
<br />VEHICLE AGGE55 POINT TO EXI5TIN6 PAVED ROADS.
<br />37. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. THIS PLAN MAY NOT COVER
<br />ALL THE SITUATIONS THAT ARISE DURING CON5TRUCTI0N DUE TO UNANTICIPATED FIEF CONDITIONS. REVISIONS MAY BE MADE TO
<br />THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE DIRECTOR OF PUBLIC WORK5.
<br />36. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE ER05ION CONTROL MEA5URE5 TO THE
<br />SATISFACTION OF THE DIRECTOR OF PUBLIC WORK5.
<br />34. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION WILL BE MINIMIZED.
<br />STATE AND LOCAL LAMS GONGERNIN6 POLLUTION SHALL BE COMPLIED WITH.
<br />40. PRIOR TO THE COHHENC�ENT OF ANY CLEARING, 6RAOING OR EXCAVATION, THE CONTRACTOR/DEVELOPER SHALL PROVIDE EVIDENCE
<br />THAT A NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. A COPY OF
<br />THE SWPPP SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES.
<br />SILT FENCES
<br />41. IF POSSIBLE, SILT FENCE FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID THE USE OF JOINTS. MEN JOINTS ARE
<br />NECESSARY, FILTER FABRIC SHALL BE SPLICED AT A SUPPORT POST, WITH A MINIMUM OF 6" OVERLAP AND BOTH ENDS SECURELY
<br />FASTENED TO THE POST.
<br />42. SILT FENCE5 SHALL BE REMOVED MIEN THEY HAVE S
<br />PERMANENTLY STABILIZED. ERVED THEIR USEFUL PURPOSE, BUT NOT B THE UPSLOPE AREA HAS 8694
<br />43. FILTER FABRIC SHALL BE NO. 2125 AS MANUFACTURED BY AMOCO CONSTRUCTION FABRICS, OR APPROVED EQUAL.
<br />SEEDING
<br />44. SEED AND MULCH SHALL BE APPLIED BY SEPTEMBER 15TH TO ALL DISTURBED SLOPES S7 THAN 2S AND HI60 THAN 3 FEET,
<br />AND TO ALL CUT AND FILL SLOPES WITHIN OR ADJACENT TO PUBLIC RI6HT-OF-WAY5, OR AS DIRECTED BY THE DIRECTOR OF
<br />PUBLIC WORKS.
<br />45. SEED AND FERTILIZER WILL BE APPLIED HYDRAULICALLY OR BY HAND AT THE RATES SPECIFIED BELOW. ON SLOPES STRAW SHALL
<br />BE APPLIED BY BLONER OR BY HAND AND ANCHORED IN PLACE BY PUNCHIN6.
<br />ITEM POUNDS PER ACRE
<br />ZORRO ANNUAL FESCUE 10 LBS.
<br />ROSE CLOVER B LBS.
<br />Fr(MONULCH FIBER 1500 LBS.
<br />I6-20-0 FERTILIZER 307 LBS.
<br />(AMMONIUM PHOSPHATE)
<br />TACKIFIER 80 LBS.
<br />46. IF PLANT 6ROWTH IS INADEQUATE FOR EROSION CONTROL, OVERSIEE"J USIN6 HALF THE RATE OF THE OR161NAL APPLICATION. IF
<br />THE 61WWTH 15 OVER 60g DAMA6ED, REPLANT U51N6 THE ORI6INAL SPECIFICATIONS. THIS SHOULD BE DONE 14 TO 21 DAYS
<br />AFTER THE INITIAL PLANTIN6.
<br />47. ALTERNATIVE EROSIONS CONTROL TECHNIQUES MUST BE USED IN THE EVENT ADEQUATE VE6ETATION IS NOT ESTABLISHED PRIOR TO
<br />THE FIRST ANTICIPATED 516NIFICANT RAIN EVENT OF THE SEASON.
<br />NOTICE OF INTENT
<br />48. THE STATE WATER RESOURCES CON77WL. BOARD HAS RECEIVED AND PROCESSED THE NOTICE OF INTENT TO COMPLY WITH THE TERNS
<br />OF THE 6ENERAL PERMIT TO DISCHARGE STORM WATER A55061ATEP CONSTRUCTION ACTIVITY. THE WDID IDENTIFICATION NUMBER
<br />15 5539C330B37, FOR ANY COMMUNICATIONS RE6ARDIN6 THIS PERMIT.
<br />RECORD JRAWIT.10
<br />Corrections By
<br />No Changes By
<br />Date ?/)2 2ao8
<br />Any Person Using This Drawing Silou d Vµnty
<br />All information By inspecting The Site Of Vrork
<br />}
<br />00
<br />z
<br />0
<br />E
<br />Cr
<br />u
<br />w
<br />0
<br />w
<br />Q
<br />0
<br />z
<br />0
<br />Ln
<br />R
<br />Tq
<br />kv
<br />RYAN CARREL, R.C.E. 61619
<br />DAVE SKIDMORE, L.S. 7126
<br />No.61619
<br />Exp. 6-30-07
<br />DRAWN BY: M. E
<br />DATE: OCT. 4, 2"
<br />SCALE: NONE
<br />DWG: 296PONLCVR2
<br />CHECKED: K. H.
<br />JOB u 296L-06
<br />SHEET .2
<br />OF 05
<br />00
<br />n
<br />00
<br />.�
<br />WZ
<br />_
<br />�
<br />M
<br />'LIM
<br />.-.
<br />NM
<br />> �
<br />V
<br />a
<br />o
<br />0
<br />z
<br />C
<br />>-2�
<br />8 p
<br />U
<br />...
<br />W
<br />.21
<br />D
<br />z=
<br />C)
<br />O
<br />W
<br />U m
<br />H Q M
<br />Z
<br />�v Ln
<br />V 1
<br />'�'
<br />V
<br />i•
<br />� p �^
<br />v-
<br />V1
<br />Z
<br />z
<br />W
<br />_
<br />a
<br />kv
<br />RYAN CARREL, R.C.E. 61619
<br />DAVE SKIDMORE, L.S. 7126
<br />No.61619
<br />Exp. 6-30-07
<br />DRAWN BY: M. E
<br />DATE: OCT. 4, 2"
<br />SCALE: NONE
<br />DWG: 296PONLCVR2
<br />CHECKED: K. H.
<br />JOB u 296L-06
<br />SHEET .2
<br />OF 05
<br />
|