Laserfiche WebLink
WN <br />SPEC I PI GAT I ONO <br />1. ALL IMPROVEMENTS TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC MORKS STANDARD SPECIFICATIONS AND THE LATEST EDITION OF THE STATE OF <br />CALIFORNIA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, AND THE REQUIREMENTS OF THE OAKMOOD LAKE <br />WATER DISTRICT. <br />2. BENCHMARK: CITY OF MANTECA BENCHMARK NO. 71, 2" BRASS CAP LOCATED APPROXIMATELY 25 FEET NORTH OF THE <br />NORTHEAST COQ OF SECTION 11, TO►WSHIP 2 SOUTH, RAN6E 6 EAST, MOUNT DIABLO MERIDIAN, AT THE INTER5ECTION OF <br />MOKINLEY AVENUE AND BRONZAN ROAD. <br />ELEVATION = 16.703, U.5.6.5. DATUM. <br />3. SOILS REPORT: THE 6EOTECHNICAL SERVICES REPORT FOR THE PROPOSED OAKWOOD LAKE DEVELOPMENT, MiOOPWARD AVENUE, <br />MANTECA, CALIFORNIA, AS PREPARED BY KLEINFELDER, INC., WITH PROJECT NO. 48043.601, DATED OCTOBER 27, 2004, 15 <br />HEREBY MADE A PART OF THESE PLANS. <br />4. THESE PLANS HAVE BEEN CHECKED BY THE COUNTY OF SAN JOAQUIN AND/OR ITS AUTHORIZED REPRESENTATIVE, BUT SUCH <br />CHEC.KIN6 AND/OR APPROVAL DOES NOT RELIEVE THE DEVELOPER FROM HIS RESPONSIBILITY TO CORRECT ERRORS, OMISSIONS <br />OR MAKE CHAN6E5 REQUIRED BY CONDITIONS DISCOVEIaE' D IN THE FIELD DURIN6 THE COURSE OF CONSTRUCTION. <br />5. THE CONTRACTOR SHALL KEEP HIMSELF FULLY INFORMED OF ALL EXISTING AND FUTURE STATE AND FEDERAL LAN5 AND ALL <br />COUNTY, MUNICIPAL AND SPECIAL DISTRICT ORDINANCES AND REGULATIONS WEIGHT IN ANY MANS AFFECT TH05E EN6A6ED OR <br />EMPLOYED IN THE WORK, OR THE MATERIALS USED IN THE WORK, OR WHICH IN ANY WAY AFFECT THE CONDUCT OF THE WORK, <br />AND OF ALL SUCH ORDE 5 AND DECREES OF BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE SAME. <br />THE CONTRACTOR SHALL AT ALL TIMES OBSERVE AND COMPLY WITH, AND SHALL CAUSE ALL HIS A6ENTS AND EMPLOYEES TO <br />OBSERVE AND COMPLY WITH ALL SUCH EXISTIN6 AND FUTURE LANE, ORDINANCES, REGULATIONS, ORDERS AND DECKS OF <br />BODIES OR TRIBUNALS HAVING ANY JURISDICTION OR AUTHORITY OVER THE MORK; AND SHALL PROTECT AND INDEMNIFY SAN <br />JOAQUIN COUNTY AND THE OWNER, AND ALL OFFICERS AND EMPLOYEES THEREOF CONNECTED WITH THE MORK, INCLUDING THE <br />ENGINEER, A6AINST ANY CLAIM OR LIABILITY ARISING FROM OR BASED ON THE VIOLATION OF ANY SUCH LAN, ORDINANCE, <br />RE6ULATION, ORDER, OR DEGREE, MiETHER BY HIMSELF OR HIS EMPLOYEES. IF ANY DISCREPANCY OR INCONSISTENCY 15 <br />DISCOVERED IN THE PLANS, SPECIFICATIONS, OR CONTRACT FOR THE WORK IN REiATION TO ANY SUCH LAW, ORDINANCE, <br />REGULATION, ORDER, OR DEGREE THE CONTRACTOR SHALL FORTHMITH REPORT THE SAME TO THE ENGINEER IN MRITIN6. <br />6. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY MOW PERFORMED BY THE CONTRACTOR OR OWNER BASED ON PLANS <br />MHICH HAVE NOT BEEN 5I6NED AND SEALED BY THE ENGINEER AND APPROVED BY THE DISTRICT, CITY OR COUNTY <br />HAVING JURISDICTION. ALL INFORMATION SHOWN ON PREiIMINARY DRAMIN65 IS SUBJECT TO CORRECTION AND CHANGE, <br />AND THE CONTRACTOR OR OMNER SHALL PEW -ORM ANY AND ALL WORK AT THEIR OMN RISK. <br />7. ALL DISTANCES AND MEASUREM1ENT5 ARE 61VEN AND WILL BE MADE IN A HORIZONTAL PLANE. 6RADE WILL BE 61VEN FROM THE <br />TOP OF NAILS OR STAKES, UNLESS NOTED OTHERPgISE. THE CONTRACTOR SHALL PRESERVE ALL POINTS AND STAKES SET FOR <br />LINES AND 6RADE5 OR MEASUREMENTS OF THE MOW, IN THEIR PROPER LOCATION UNTIL AUTHORIZED TO REMOVE THEM BY THE <br />ENGINEER. ALL EXPENSES INCURRED IN REF1-ACIN6 STAKES THAT HAVE BEEN REMOVED WITHOUT PROPER AUTHORITY SHALL BE <br />PAID FOR BY THE 6ENEERAL CONTRACTOR. <br />B. THESE PLANS HAVE BEEN PREPARED WITH THE INTENT THAT ASSOCIATED EN61NE1=RIN6 6ROUP, INC. WILL PERFORMS THE <br />CONSTRICTION STAKIN6 FOR THE COMPLETE PROJECT. THE CONTRACTOR SHALL PROVIDE ASSCCIATED EN&INEERIN5 6ROUP, INC. <br />WITH F0R7Y-EI6HT HOURS ADVANCE NOTICE OF 5TAKIN6 NEE=DS. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR <br />SUBCONTRACTORS THAT 15 ABOVE AND BEYOND THE A6RE£D UPON STAKIN6 REQUEST SHALL BE SUBJECT TO AN EXTRA BACK <br />CHARGE TO THE CONTRACTOR / CLIENT. IF ANOTHER FIRM OR A6E3*GY IS EMPLOYED TO USE THESE PLANS FOR THE PUW05E <br />OF CONSTRUCTION STAKIN6, NOTICE 15 HElQ55Y 6IVEN THAT ASSOCIATED ENWNEERIN6 6ROUP, INC. WILL NOT ASSUME ANY <br />RESPONSIBILITY FOR ERRORS OR OMI5510N5, IF ANY, NHICH M16HT OCCUR AND WHICH COULD HAVE BEEN AVOIDED, <br />CORRECTED OR MITIGATED IF ASSOCIATED EN51NEERIN6 6ROUP, INC. HAD PERFORMED THE STAKIN6 WORK. <br />4. MHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE MOW IN 6ENERAL TERMS, BUT NOT IN COMPLETE DETAIL, <br />IT 15 UNDERSTOOD THAT ONLY THE BEST 6ETERAL PRACTICE 15 TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF <br />THE FINEST QUALITY ARE TO BE USED. <br />10. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br />(501G8), ORDER NO. c12 -06 -PHO, NIPDESS 6ENERAL PERMIT NO. CA5000002. THE CONTRACTOR SHALL IMPLEMENT AND MONITOR <br />THE STORM WATER POLLUTION PREVENTION PLAN (504PPP) IN ACCORDANCE WITH THE 5NRGB REWL.ATION5. <br />11. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL SAFETY RE6ULATION5 PERTAINING TO HI5 <br />OPERATIONS. HE SHALL PROVIDE ALL L16H77S, SI6NS, BARRICADES, FLA6 MEN OR OTHER DEVICES NECESSARY FOR PUBLIC <br />SAFETY. THE CONTRACTOR'S ATTENTION 15 CALLED TO THE REQUIREMENTS OF TITLE 6 OF THE CALIFORNIA ADMINISTRATIVE <br />CODE, 5UBCHAPTER 4, ARTICLE 6, "EXCAVATIONS, TRENCHES, EARTHWORK." <br />12. THE CONTRACTOR A6REE5 THAT HE SHALL A55UME SOLE AND COMPLETE RESPONLSiIBILITY FOR JOB 51TE CONDITIONS DURING <br />THE COURSE OF CONSTRUCTION OF THI5 PROJECT, INCLUDING SAFETY OF ALL PER5ON5 AND PROPERTY; THAT THIS <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKIN6 HOURS; AND THAT THE CONTRACTOR <br />SHALL DEFEND, INDEMNIFY AND HOLD THE OMNER, THE ENGINEER AND SAN JOAQUIN COUNTY HARMLESS FROM ANY AND ALL <br />LIABILITY, REAL OR ALLE6ED, IN CONNECTION WITH THE PERFORMANCE OF HOW ON THIS PROJECT, EXCEPTING FOR LIABILITY <br />ARI5IN6 FROM THE SOLE NE6L16ENCE OF THE OWNER OR ENGINEER. <br />13. APPROPRIATE DUST CONTROL SHALL BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST N[)I5ANCE AS REQUIRED BY <br />THE COUNTY OF SAN JOAQUIN, AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL IMPLEMENT A DUST CONTROL PR06FAM <br />AS PART OF THE MEASURES REQUIRED BY THE E.I.R. (CHAPTER 4.6) FOR AIR QUALITY CONTROL AND THE REQUIREMENTS OF <br />PM 10 AND THE BEST AVAILABLE CONTROL MEASURES (BACM) APPROVED BY THE BOARD. THE PR06RAM SHALL INSURE THAT, AT <br />THE PUBLIC WORKS DIRECTOR'S DISCRETION, A WATER VEHICLE FOR DUST CONTROL OPERATIONS 15 KEPT READILY AVAILABLE <br />AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE PUBLIC MORKS DIRECTOR AND BUILDING <br />OFFICIAL WITH THE NAME AND TELEPHONE NUMBER OF THE PERSON DIRECTLY RESPONSIBLE FOR DUST CONTROL AND OPERATION <br />OF THE WATER VEHICLE. <br />14. THE EXISTIN6 UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS OR FIELD LOCATIONS WHEN POSSIBLE. THE CONTRACTOR <br />SHALL LOCATE AND PRESERVE ALL EXI5TIN6 FACILITIES INCLUDING 6A5, WATER, IRRI6ATION, POPER, TELEPHONE, Slgm 2 <br />OR OTHERS WHICH MAY BE PRESENT IN THE AREA OF CONSTRUCTION. THE RESPECTIVE UTILITY COMPANIES SHALL BE <br />NOTIFIED PRIOR TO BE6INNIN6 MONO. <br />15. THE EXI5TIN6 UTILITIES SHALL NOT BE INTERRUPTED UNTIL THE UTILITY COMPANY HAS PROVIDED ALTERNATIVE SERVICE <br />FACILITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE HIS MOW WITH THE APPROPRIATE A6ENCIES AND UTILITY <br />COMPANIES. <br />16. ALL CONSTRUCTION STAKIN6 FOR 6RADIN6 5HALL BE DONE BY A RE61S7EREP CIVIL ENGINEER OR LICENSED LAND SURVEYOR. <br />17. ALL TRENCHES SHALL BE BACKFILLED IN ACCORDANCE WITH SAN JOAQUIN COUNTY STANDARD DETAILS. COMPACTION SHALL BE <br />ACHIEVED BY MECHANICAL MEANS. NO FLOODIN6, PONDING, OR JETTIN6 SHALL BE PERMITTED UNLESS APPROVED BY THE <br />DIRECTOR OF PUBLIC WORKS IN MRITIN6. <br />18. TE5TIN6: ALL INDEPENDENT LABORATORY INSPECTIONS CALLED FOR BY THE DIRECTOR OF PUBLIC MORK5 WILL BE PAID <br />FOR BY THE DEVELOPER OR CONTRACTOR. <br />19. IF, DURING CONSTRUCTION, ARGHAEOLA5ICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE VICINITY SHALL BE HALTED, <br />AND AN ARGHAEOL05I5T CONSULTED, AND THE COUNTY PUBLIC MOWS DEPARTMENT NOTIFIED. IF, IN THE OPINION OF THE <br />ARCHAEOLOGIST, THE REMAINS ARE SI6NIFICANT, MEASURES AS MAY BE REQUIRED BY THE DIRECTOR OF PUBLIC MORKS, <br />SHALL BE TAKEN TO PROTECT THEM. <br />20. DISPOSAL OF WATER INTO THE SANITARY SEER SYSTEM 15 STRICTLY PROHIBITED. <br />21. THE CONTRACTOR SHALL MAINTAIN ALL STREETS, SIDEVALKS, AND ALL OTHER PUBLIC RI6HTS-OF-WAY IN A CLEAN, SAFE AND <br />USABLE CONDITION THROU6FWT THE COURSE OF CONSTRUCTION. ALL SPILLS OF SOIL, ROCK, CONSTRUCTION DEBRIS, ETC., <br />SHAT BE REMOVED IMMEDIATELY FROM PUBLICLY OA ED PROPERTY. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE <br />MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. THE CONTRACTOR SHALL PROVIDE FOR SAFE, UNOBSTRUCTED ACCESS <br />TO PRIVATE PROPERTY ADJACENT TO MORK THROU6HOUT THE PERIOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE <br />PUBLIC WORKS DEPARTMENT THE NAME AND TELEPHONE NUMBER OF PERSON AVAILABLE 24 HOURS A DAY IF PROBLEMS OR <br />CONDITION 15 NOT MET. <br />22. ALL TRASH, CONSTRUCTION DEBRIS AND MATERIALS SHALL BE CONTAINED WITHIN THE CONSTRUCTION AREA UNTIL OFF-SITE <br />DISPOSAL CAN BE ARRAN6ED. <br />23. THE CONTRACTOR SHALL KEEP ADJOININ6 PUBLIC STREETS AND PARKING AREAS FREE AND CLEAN OF PROJECT DIRT, MUD AND <br />MATERIALS DURING THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL SE RESPONSIBLE FOR CORRECTIVE MEASURES AS <br />DIRECTED BY TIME PUBLIC WORKS INSPECTOR AT NO EXPENSE TO THE COUNTY. <br />24. THE APPLICANT SHALL ALERT CONSTRUCTION PERSONNEL OF THE POSSIBILITY OF BURIED CULTURAL RESOURCES, HUMAN <br />REMAINS AND OTHER SUCH CULTURAL RESOURCES AND SHALL IMMEDIATELY COMPLY WITH ALL REQUIREMENTS CONTAINED IN THE <br />EIR, INCLUDING THE STOPPA6E OF ALL NOW, NOTIFICATION OF THE NATIVE AMERICAN HERITA6E COMMISSION AND THE SAN <br />JOAQUIN COUNTY CORONER, AS APPLICABLE. <br />6RADIN6 NOTES <br />25. ALL 6RADIN6 SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS EN6INEER OR UNDER THEIR DIRECTION. THE SOILS <br />EN61NEER SHALL INSPECT AND TEST THE PLACEMENT OF FILLS. THE SOILS EN6INE£R SHALL SUBMIT A SOILS REPORT AND <br />RBQU1REENTS AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF 6RADING OPERATIONS THE <br />SOILS ENGINEER SHALL STATE IN A REPORT TO THE COUNTY OF SAN JOAQUIN THAT INSPECTIONS AND TESTS WERE MADE BY HIM <br />OR UNDER HIS SUPERVISION AND THAT IN H15 OPINION ALL FILLS ARE COMPACTED TO THE REQUIRED RELATIVE DENSITY AND ARE <br />ACCEPTABLE FOR THEIR INTENDED USE. <br />26. THE CONTRACTOR SHALL LIMIT TRAFFIC SPEEDS ON ANY UNPAVED 5URFArE5 TO 15 MILES PER HOUR TO LOWER THE AMOUNT OF <br />DUST CREATED. <br />27. THE CONTRACTOR SHALL SUSPEND EXCAVATION AND 6RADIN6 ACTIVITIES WHEN THE WINDS EXCEED 20 MILES PER HOUR. <br />28. DEVELOPER/CONTRACTOR'S WORK SHALL BE IN ACCORDANCE WITH THE SJVAPCD 6UIDELINES, INCLUDING SJVAPCD REGULATION VIII <br />AND IMPLEMENT CONTROL MEASURES BASED ON SJVAPGD'S COMPLIANCE ASSISTANT BULLETIN FOR SHORT T6Q11 IMPACTS. SJVAPCD <br />5HALL BE CONTACTED TO DISCUSS MITIGATION MEASURES AND IMPLEMENT MEASURES FROMTABLE 6-4 OF THE GUIDE FOR <br />ASSE55IN6 AND MITI6ATIN6 AIR QUALITY IMPACTS. <br />24. ALL 6RADIN6 SHALL COMPLY WITH THE CALIFORNIA BUILDIN6 CODE, CHAPTER 10, APPENDIX C CHAPTER 13. <br />30. NO SLOPE SHALL BE STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL. <br />31. ACCESS TO THE PROJECT SITE FROM COUNTY OR CITY ROADS 15 RESTRICTED EXCEPT AT TEMPORARY CONSTRUCTION <br />ENTRANCES. <br />EROSION CONTROL NOTES <br />32. ALL NOW TO BE DONE SHALL BE DONE IN ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN STANDARDS AND THE STATE: OF <br />CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CONSTRUCTION SITE BEST MANA6E14ENT PRACTICES (BMPS) MANUAL. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURIN6 THAT ALL SUBCONTRACTORS, AND SUPPLIBR5 ARE AHARE OF, AND IMPLEMIENT <br />ALL STORM MATER QUALITY MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTIONS SMPS WILL RESULT IN THE <br />ISSUANCE OF CORRECTION NOTICES, CITATIONS AND/OR A PROJECT STOP ORDER. <br />33. THIS EROSION CONTROL PLAN WAS PR2iPARED AS AN EXHIBIT TO THE STORM WATER POLLUTION PREVENTION PLAN (5.W.P.P.P.) <br />FOR THE OAKWQOD LAKE SUBDIVISION, AS REQUIRED BY THE STATE HATER RESOURCES CONTROL BOARD. THE FACILITIES SHOMVN ON <br />THIS PLAN ARE DESI6NED TO CONTROL SEDIMENT DURING THE RAINY SEASON AFTER ROU6H 6RADIN6 HAS BEEN COMPLETED. <br />ERR-61ON CONTROL. MEASURES ARE TO BE OPERABLE PRIOR TO OCTOBER 15TH THROU6H APRIL 15TH OF ANY YEAR THAT 6RADIN6 <br />OPERATIONS HAVE LET AREAS UNPROTECTED FROM EROSION. NO 6RADIN6 WILL OCCUR BETNEEN OCTOBER 15TH AND APRIL 15TH, <br />UNLESS AUTHORIZED BY THE DIRECTOR OF PUBLIC WORK5. DE5I6N OF THESE FACILITIES MUST BE APPROVED OR UPDATED EACH <br />YEAR PRIOR TO SEPTEMBER 30, AND SHALL BE 516N/ED BY THE COUNTY ENGINEER. DAILY MAINTENANCE OF THESE FACILITIES <br />SHALL BE MONITORED AND INSPECTED BY THE PROJECT COORDINATOR. <br />34. DURIN6 THE RAINY SEASON ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIALS AND DEBRIS. THE SITE SHALL BE <br />MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAINA6E SYSTEM. <br />35. CONSTRUCTION ENTRANCE5 COh51STIN5 OF A66RESATE ON 6E0TEXTILE FABRIC, AS PER TTE DETAIL, SHALL BE PROVIDED AT EACH <br />VEHICLE ACCESS POINT TO EXISTIN6 PAVED ROADS. <br />36. ALL E1R05ION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. THI5 PLAN MAY NOT COVER <br />ALL THE SITUATIONS THAT ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. REVISIONS MAY BE MADE TO <br />THE PLAN IN THE FIELD SUBJECT TO THE APPROVAL OF THE DIRECTOR OF PUBLIC MORK5. <br />37. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES TO THE <br />SATISFACTION OF THE DIRECTOR OF PUBLIC MORK5. <br />38. CONSTRUCTION OPERATION5 SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION WILL BE MINIMIZED. <br />STATE AND LOCAL LAWS CONCERNIN6 POLLUTION SHALL BE COMPLIED WITH. <br />34. PRIOR TO THE COf*0CB1E?NT OF ANY CLEARIN6, 6RADIN6 OR EXCAVATION, THE CONTRACTOR/DEVELOPER SHALL PROVIDE EVIDENCE <br />THAT A NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. A COPY OF <br />THE SWPPP SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIME5. <br />SILT FENCES <br />40. IF POSSIBLE, SILT FENCE FABRIC SHALL BE CUT FROM A CONTINUOUS ROLL TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE <br />NECESSARY, FILTER FABRIC SHALL BE SPLICED AT A SUPPORT POST, WITH A MINIMUM OF 6" OVERLAP AND BOTH ENDS SECURELY <br />FASTENED TO THE POST. <br />41. SILT FENCES SHALL BE REMOVED NHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFOTE THE UPSLOPE AREA HAS BEEN <br />PERMANENTLY STABILIZED. <br />42. FILTER FABRIC SHALL BE NO. 2125 AS MANUFACTURED BY AMO.1O.0 CONSTRUCTION FABRICS, OR APPROVED EQUAL. <br />C� TANG <br />43. SEED AND MULCH SHALL BE APPLIED BY SEPTEMBER 15TH TO ALL DISTURBED SLOPES STEEPER THAN 2S AND H164NEr.' THIAN 3 FEET, <br />AND TO ALL CUT AND FILL SLOPES WITHIN OR ADJACENT TO PUBLIC RIGHT -OF -MAYS, OR AS DIRECTED BY THE DIRECTOR OF <br />PUBLIC MORK5. <br />44. SEED AND FERTILIZER WILL BE APPLIED HYDRAULICALLY OR BY HAND AT THE RATES SPECIFIED BELOW. ON SLOPES STRAW SHALL <br />BE APPLIED BY BLOMER OR BY HAND AND ANCHORED IN PLACE BY PUNCHING. <br />ITEM POUNDS PER ACRE <br />ZORRO ANNUAL FESCUE 10 LBS. <br />ROSE CLOVER 8 LBS. <br />HYDROMULCH FIBER 1500 LBS. <br />16-20-0 FERTILIZER 300 LBS. <br />(AMMONIUM PHOSPHATE) <br />TACKIFIER 80 LBS. <br />45. IF PLANT 6RONTH IS INADEQUATE FOR EiR05ION CONTROL, OVERSEED USING HALF THE RATE OF THE ORIGINAL APPLICATION. IF <br />THE 6ROWTH IS OVER 60% DAM46ED, REPLANT USIN6 THE ORIGINAL SPECIFICATIONS. THIS SHOULD BE DONE 14 TO 21 DAYS <br />AFTER THE INITIAL PLANTIN6. <br />46. ALTERNATIVE MONS CONTROL TELHRNIQUES MUST BE USED IN THE EVENT ADEQUATE VEGETATION IS NOT ESTABLISHED PRIOR TO <br />THE FIRST ANTICIPATED 5I6NIFICANT RAIN EVENT OF THE SEASON. <br />NOTICE OF INTENT <br />47. THE STATE WATER RE50LOWESS CONTROL BOARD HAS RECEIVED AND PROCESSED THE NOTICE OF INTENT TO COMPLY WITH THE TERMS <br />OF THE 6EINEZAL PERMIT TO DISCHA E STORM WATER ASSOCIATED CONSTRUCTION ACTIVITY. THE WDID IDENTIFICATION NUMBER <br />15 5534C330837, FOR ANY COMMUNICATIONS RE6ARDIN6 THI5 PERMIT. <br />RECORD DRAWING <br />Corrections By <br />No Changes By <br />Date 3/n/2,ns <br />Any Person Using This Drawing Should Verity <br />All information By inspecting The Site Of Work <br />F <br />z <br />O <br />a <br />iY <br />U <br />w <br />W <br />H <br />0 <br />z <br />O <br />Fn <br />C <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp. 6-3607 <br />DRAWN BY: M. E <br />DATE: OCT. 9, 2" <br />SCALE: NONE <br />DWG: 246P0NPCVR4 <br />CHECKED: K. M• <br />JOB # 246L-06 <br />SHEET .2 <br />OF 05 <br />V <br />C <br />1" <br />.. <br />WZ <br />_ui <br />C <br />Lr,) <br />�. <br />C <br />,Do <br />LuM Ln <br />> Ln <br />o <br />D N <br /><Z <br />..r <br />C <br />�1 <br />O O <br />UO� <br />W0=�� <br />LL <br />O <br />W. <br />U m <br />U-1 0 h <br />IL i <br />V <br />% <br />N L <br />"r0q <br />V) <br />z <br />Z <br />7 <br />W <br />v) <br />a <br />RYAN CARREL, R.C.E. 61619 <br />DAVE SKIDMORE, L.S. 7126 <br />No.61619 <br />Exp. 6-3607 <br />DRAWN BY: M. E <br />DATE: OCT. 9, 2" <br />SCALE: NONE <br />DWG: 246P0NPCVR4 <br />CHECKED: K. M• <br />JOB # 246L-06 <br />SHEET .2 <br />OF 05 <br />