Laserfiche WebLink
f <br />FILE: 0309E06.DWG — E 6 1 EDIT: 4/12/2007 6:08 AM BY LISINSKI I PLOP: 4/12/2007 6:15 AM BY JOHN LISINSKI <br />R 1 OVERALL SITE PLAN - ELECTRICAL <br />T <br />H <br />0 20' 40' <br />SCALE: 1"=20'—O" <br />WEST YO S T <br />10' 1260 Lake Boulevard <br />Suite 240 <br />A S S O C I A T E S Davis, California 95616 <br />( 530) 756-5905 <br />REVISIONS By— <br />QAC Consulting Engineers FAX ( 530) 756-5991 <br />I <br />Contact <br />David J. Archangelo <br />Project <br />2006-0309 <br />INTERFACE <br />E N G I N E E R I N G <br />895o CAL CENTER DR, SUITE 250, SACRAMEN70, CA 95826 <br />W <br />A. <br />O <br />0 <br />M <br />O <br />COATED, FOR TRANSITION FROM PVC CONDUIT TO RIGID STEEL/PVC <br />MI <br />co 1 <br />0 <br />COATED CONDUIT SEE DETAIL, DRAWING E 1 . <br />N <br />0 <br />0 <br />a <br />EXISTING CONTROL BUILDING, FOR MODIFICATIONS SEE PARTIAL <br />N <br />FLOOR PLAN — POWER & SIGNAL, DRAWING E 7. <br />V , <br />FILE: 0309E06.DWG — E 6 1 EDIT: 4/12/2007 6:08 AM BY LISINSKI I PLOP: 4/12/2007 6:15 AM BY JOHN LISINSKI <br />R 1 OVERALL SITE PLAN - ELECTRICAL <br />T <br />H <br />0 20' 40' <br />SCALE: 1"=20'—O" <br />WEST YO S T <br />10' 1260 Lake Boulevard <br />Suite 240 <br />A S S O C I A T E S Davis, California 95616 <br />( 530) 756-5905 <br />REVISIONS By— <br />QAC Consulting Engineers FAX ( 530) 756-5991 <br />I <br />Contact <br />David J. Archangelo <br />Project <br />2006-0309 <br />INTERFACE <br />E N G I N E E R I N G <br />895o CAL CENTER DR, SUITE 250, SACRAMEN70, CA 95826 <br />5 <br />4 <br />3 <br />`a <br />BAR IS ONE INCH LSI ON ORIGINAL DRAWING <br />[IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY <br />County of San Joaquin WM MAMER <br />010-0-07-18 <br />Flag City Pump Station & Force Main DRO" KUM <br />E6 1 <br />SHEET NUM MM <br />OVERALL SITE PLAN 30 of 44 <br />ELECTRICAL Favow <br />GENERAL SHEET NOTES <br />A. <br />ALL NEW EXTERIOR EXPOSED CONDUITS TO BE RIGID STEEL/PVC <br />COATED, FOR TRANSITION FROM PVC CONDUIT TO RIGID STEEL/PVC <br />1� <br />COATED CONDUIT SEE DETAIL, DRAWING E 1 . <br />SHEET KEYNOTES <br />Ot <br />EXISTING CONTROL BUILDING, FOR MODIFICATIONS SEE PARTIAL <br />FLOOR PLAN — POWER & SIGNAL, DRAWING E 7. <br />EXISTING UTILITY SERVICE MAIN SWITCHBOARD 'MS'. <br />3 <br />EXISTING UTILITY SERVICE TRANSFORMER. <br />4 j <br />EXISTING STANDBY GENERATOR.. <br />9 <br />V <br />EXISTING STANDBY GENERATOR FUEL TANK. <br />06 <br />EXISTING RAW SEWAGE PUMP STATION, FOR MODIFICATIONS SEE <br />ENLARGED AREA PLAN DRAWING E 8. <br />Q <br />NEW RAW SEWAGE PUMP STATION EFFLUENT FLOW METER AND <br />VAULT, FOR LAYOUT SEE ENLARGED AREA PLAN DRAWING E 9. <br />Q <br />NEW RAW SEWAGE PUMP STATION EFFLUENT CONTROL VALVES AND <br />VAULT, FOR LAYOUT SEE ENLARGED AREA PLAN DRAWING E 9. <br />O <br />EXISTING AERATION BASIN, CLARIFIER, SURGE BASIN AND AEROBIC <br />8 <br />DIGESTER. <br />10 <br />UNDERGROUND CONDUIT, FOR INSTALLATION SEE TYPICAL TRENCH <br />DETAIL, DRAWING E 11. <br />11 <br />UNDERGROUND CONCRETE PULLBOX (POWER), FOR INSTALLATON SEE <br />DETAIL, DRAWING E 11. <br />12 <br />UNDERGROUND CONCRETE PULLBOX (CONTROL), FOR INSTALLATON <br />SEE DETAIL, DRAWING E 11. <br />13 <br />UNDERGROUND CONCRETE PULLBOX (SIGNAL), FOR INSTALLATON <br />7 <br />SEE DETAIL, DRAWING E 11. <br />14 <br />EXISTING EMERGENCY STORAGE POND. <br />15 <br />EXISTING POLYMER STORAGE FACILITY. <br />16 <br />EXISTING FILTER APPURTENANCES AND POLYMER STORAGE FACILITY. <br />17 <br />EXISTING CONTINUOUS FLOW FILTER. <br />118 <br />EXISTING CHLORINATION AND DECHLORINATION STORAGE FACILIY. <br />109 <br />EXISTING CHLORINATION AND DECHLORINATION FEED PUMPS FACILIY. <br />B <br />VC <br />EXISTING CHLORINE CONTACT BASIN. <br />`21 <br />EXISTING INSTRUMENT SHED. <br />22� <br />COORDINATE INSTALLATION OF NEW UNDERGROUND CONDUITS WITH <br />EXISTING CONDUITS. <br />5 <br />4 <br />3 <br />`a <br />BAR IS ONE INCH LSI ON ORIGINAL DRAWING <br />[IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY <br />County of San Joaquin WM MAMER <br />010-0-07-18 <br />Flag City Pump Station & Force Main DRO" KUM <br />E6 1 <br />SHEET NUM MM <br />OVERALL SITE PLAN 30 of 44 <br />ELECTRICAL Favow <br />