Laserfiche WebLink
� I'I <br />Op} p 0p .9p h �1 �p0 <br />p0 p0 p0 vA p0 <br />PROJECT <br />EXIST IO" GONG PIPE <br />LIMITS <br />0 0} <br />ry0 �."qy hh hOp _ <br />1 �P" EX15T DRIVEWAY <br />p I m l hO O <br />I VIII EXIST HOUSE >Fts --- <br />I I I I I <br />N h <br />y} 9� nVp V p}♦ e <br />p91 M c}�I 11 1191YI , OL—t <br />I y�l h0 <br />6�0 <br />I �p5 Chi— p} <br />1 % <br />Ah p N p91 1 O^ Op <br />I II h <br />N n; Iii <br />1L I II u <br />II <br />� p h II I I pOOhb %Oh�� <br />phi R 0 hol p9. n EX. TEL. p' <br />II <br />III h 11 <br />I IH <br />I I <br />IQ } <br />k9tV <br />Oho <br />pp. <br />15+98.0'5 S.G. <br />1M <br />Pb %yo <br />EXIST WELL �o <br />POSED P.U.E. E <br />PRIVATE ROAD <br />p9' <br />i <br />0 <br />1T%/ <br />_L LLL/��11/LIEXIST�PAVED /DR /ZZ -/A ZZ/-/ %���� Z <br />051-180-17 <br />ti hp }p h 09 <br />h sQ' <br />17+86,x¢ £G 24' AG PAVING <br />EP ��s ��% HARMONYh,,o % GROVE LANE h ti. <br />18 19 20 21 IS,? 22 h� 23 4 _ %ryo <br />®a0 <br />ii h°Wi'10 <br />1 11 p9 <br />DRAINAGE POND <br />t _ 1041 CU. YD. <br />15+15A2 EG BOTTOM ELEV. 48.1 <br />LIMITS CT <br />CONTROL PRACTICE <br />I <br />�" <br />\2 <br />II �/ = I <br />WN571RUCTION TRAFFIC, ENTERING THE PAVED ROAD MUST OR055 THE CONSTRUCTION ENTRANCE. <br />INSTALL <br />FIBER ROLLO <br />I <br />UNTIL NECESSARY <br />EX. P.P <br />STANDARD 11-4 <br />6, <br />Nh ry <br />00 <br />Q----- yO^----�--- <br />PUBLIC ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE 51TE SHALL BE <br />MAINTAINED 50 THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM <br />Provide temporary stabilization of <br />p5 p <br />MN <br />Ohh 000 %p9 <br />�' .p Mq p <br />10+00.00 HARMONY 6ROVE LAHE <br />BE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER 15T OF EACH 50SEGONT YEAR UNTIL THE <br />PROPOSED IMPR MENTS ARE COMPLETED. <br />5. <br />; <br />PROJECT <br />10+25.00 TRETHEWAY ROAD <br />Stabilized Construction Site <br />4. <br />i <br />al <br />4 p,% <br />LIMITS <br />Sweep sediment from paved <br />5. CONTRACTOR TO USE A WATER TRUCK DURING &RADIN6 TO MINIMIZE WIND EROSION AND REDUCE DUST <br />6. <br />IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR <br />051-180-51 <br />"�� p" II����,99 �} ��• 11+2i.63BG <br />I I I <br />EROSION CONTROL NOTES: <br />I. ALL EROSION AND SEDIMENT CONTROL MEA5URE5 SHALL BE CONSTRUCTED AND <br />MAINTAINED IN ACCORDANCE WITH SAN JOAGUIN COUNTY IMPROVEMENT <br />STANDARDS, CURRENT EDITION. <br />2. ER05ION CONTROL BEST MANAGEMENT PRACTICES (BMPe) SHALL BE INSTALLED <br />AND MAINTAINED DURING THE WET 5EA50N (OCTOBER I THROUGH APRIL 50). <br />SEDIMENT CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED ALL YEAR. <br />5. ALL DRAINA6E INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS <br />AND WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT <br />CONTROL AND INLET FILTER BA65, YEAR ROUND. INLET FILTER BA&S <br />SHALL BE REMOVED FROM THE DRAINAGE INLETS UPON ACCEPTANCE OF <br />THE PUBLIC IMPROVEMENTS BY THE COUNTY. <br />4. ALL STABILIZED CONSTRUCTION ACCESS LOCATION5 SHALL BE CONSTRUCTED PER <br />DETAIL WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS. THE <br />STABILIZED ACCE55 SHALL BE MAINTAINED ON A YEAR ROUND BA515 UNTIL <br />COMPLETION OF CONSTRUCTION <br />5. ALL AREAS DISTURBED DURING 00145TRUCTION, BY GRADIN&, TRENCHING, OR OTHER <br />ACTIVITIE5, SHALL BE PROTECTED FROM ER05ION DURING THE AET SEASON (OCTOBER I <br />THROUGH APRIL 50). HYDR05EED, IF UTILIZED, MUST BE PLACED BY SEPTEMBER 15. <br />HYDROSEED PLACED DURING THE WET SEASON SHALL USE A SECONDARY ER05ION <br />PROTECTION METHOD SUCH AS EROSION CONTROL BLANKETS OR STRAW MULCH <br />6. SENSITIVE AREAS AND AREAS WHERE EXISTING VE6ETATION 15 BEIN6 <br />PRESERVED SHALL BE PROTECTED WITH CONSTRUCTION FENCING. SEDIMENT <br />CONTROL BMP5 SHALL BE INSTALLED WHERE ACTIVE CONSTRUCTION AREAS <br />DRAIN INTO SENSITIVE OR PRESERVED VEGETATION AREAS <br />7. SEDIMENT CONTROL BMPe SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE <br />DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPS SHALL BE MAINTAINED <br />YEAR ROUND UNTIL THE CONSTRUCTION 15 COMPLETE OR THE DRAINAGE PATTERN HAS <br />BEEN GHANSED AND NO LONGER LEAVES THE SITE. <br />8. THE FOLLOWING AREAS ARE TO RECEIVE HYDROSEEDING OR OTHER EROSION <br />CONTROL: <br />LOT FRONT YARD BEHIND SIDEWALK - THE FIRST 18 FEET OR TOP OF SLOPE <br />(WHICHEVER 15 GREATER) <br />SIDEYARDS BEHIND THE SIDEWALK - THE FIRST 7S FEET OR TOP OF SLOPE <br />(WHICHEVER IS GREATER) <br />SLOPES - ALL SLOPES GREATER THAN 10:1 <br />9. EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT SHALL BE IN <br />SUBSTANTIAL COMPLIANCE AT ALL TIMES WITH THE STORM WATER POLLUTION <br />PREVENTION PLAN (5WPPP) PREPARED FOR THE PROJECT IN ACCORDANCE <br />WITH THE STATE OF CALIFORNIA GENERAL CON5TR ICTION PERMIT. TH15 <br />PERMIT REOUIRE5 THAT THE 5104PPP BE KEPT UP-TO-DATE TO REFLECT THE <br />CHAN61N& SITE CONDITIONS AND THE SWPPP 15 TO BE AVAILABLE ON SITE AT <br />ALL TIMES FOR REVIEW BY STATE AND LOCAL INSPECTORS. <br />REVISIONS <br />NO. DESCRIPTION <br />ENGR.1 COUNTY APPROVAL <br />INIT. BY DATE <br />— — — INSTALL STRAW ROLL OR FILTER ROLL 0 <br />INSTALL CONSTRUCTION O <br />ENTRANCE PROTECTION <br />STORM WATER POLLUTION PREVENTION PLAN <br />WITH THE EXCEPTION OF PROPERLY DE5ILTED RATER FROM SITE DEWATERING, THE <br />CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AND/OR LIQUIDS TO THE STORM <br />DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE: <br />A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK GLEAN -OUT AREA. CITY <br />INSPECTOR APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY <br />IMPLEMENTED AT AND AROUND THE GLEAN -OUT AREA. <br />B. TACK GOAT AND PRIME GOAT A51PHALTS SHALL BE CAREFULLY SPRAYED AND ANY <br />EXCE55 MATERIAL SPILLED SHALL BE GLEANED UP IMMEDIATELY BY PROPER <br />METHODS. <br />G. ALL ECUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO <br />AVOID SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND GLEANED UP IMMEDIATELY <br />IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES <br />SHALL BE EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT. <br />D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIOUID5 DURING <br />SAWCUTTIN& ACTIVITIES. <br />BENCHMARK ELEVATION: 5EE SHEET I <br />JOB NO. : 041167P12 <br />DATE : 05/21/07 1:42 <br />SCALE HORIZ.: 1'-50' <br />SCALE VERT.: <br />DRAWN KD <br />DESIGN EFS <br />CHECK EFS <br />k <br />SEAL: <br />(Q C-15372 ' \ m <br />I EXP. 3-31-09 I ;a <br />s'\c' <br />\OF C 1 A�\ <br />1 <br />D�AINA&E POND - <br />�" 652 CU. YD. <br />1070M <br />ELEV. 44.2 <br />LL <br />—� — — <br />_ T — <br />I <br />I <br />I <br />�I <br />61 <br />EP po9� 4" OAK <br />� " � 6" OAK <br />�� <br />3 <br />0 EXIST HELL <br />�} I <br />6pM1 <br />h2 <br />INSTALL FIBER ROLLO <br />MAINTAIN UNTIL NECESSARY <br />;OUNTY STANDARD 11-4 I <br />hh <br />,0 <br />h 9 <br />h0' O <br />5 <br />p y'Yp I <br />h I <br />METAL <br />SHOP BLD& <br />h1 I <br />.Ih 9 ph >O <br />0^ '��^, `^� g p y � h Oho¢ <br />— �— — — — — — — — — — —oe — — — — — — —`L_ — r — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br />051-180-32 <br />p90 <br />ISENERAL: <br />CONTROL PRACTICE <br />Sequence construction to reduce <br />amount and duration of soil <br />I. A 00145TRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF <br />THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br />WN571RUCTION TRAFFIC, ENTERING THE PAVED ROAD MUST OR055 THE CONSTRUCTION ENTRANCE. <br />INSTALL <br />FIBER ROLLO <br />MAINTAIN <br />UNTIL NECESSARY <br />COUNTY <br />STANDARD 11-4 <br />EP po9� 4" OAK <br />� " � 6" OAK <br />�� <br />3 <br />0 EXIST HELL <br />�} I <br />6pM1 <br />h2 <br />INSTALL FIBER ROLLO <br />MAINTAIN UNTIL NECESSARY <br />;OUNTY STANDARD 11-4 I <br />hh <br />,0 <br />h 9 <br />h0' O <br />5 <br />p y'Yp I <br />h I <br />METAL <br />SHOP BLD& <br />h1 I <br />.Ih 9 ph >O <br />0^ '��^, `^� g p y � h Oho¢ <br />— �— — — — — — — — — — —oe — — — — — — —`L_ — r — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br />051-180-32 <br />p90 <br />ISENERAL: <br />CONTROL PRACTICE <br />Sequence construction to reduce <br />amount and duration of soil <br />I. A 00145TRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF <br />THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br />WN571RUCTION TRAFFIC, ENTERING THE PAVED ROAD MUST OR055 THE CONSTRUCTION ENTRANCE. <br />exposure to wind, rain, and <br />2. <br />GHANI TO THIS ER05ION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE <br />runoff <br />As Needed <br />until paving is <br />ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE ENGINEER. DURING THE RAINY SEASON, <br />Preserve existing vegetation <br />PUBLIC ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE 51TE SHALL BE <br />MAINTAINED 50 THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM <br />Provide temporary stabilization of <br />AND PUBLIC, ROADWAY. THI5 PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL <br />exposed areas <br />Use water truck or other means <br />to stabilize soil from wind <br />BE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER 15T OF EACH 50SEGONT YEAR UNTIL THE <br />PROPOSED IMPR MENTS ARE COMPLETED. <br />5. <br />CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN <br />erosion and reduce dust <br />ADDITION, BEFORE DURING AND AFTER EACH STORM EVENT. <br />Stabilized Construction Site <br />4. <br />ALL EROSION CONTROL BMPa SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS <br />Entrance <br />Sweep sediment from paved <br />5. CONTRACTOR TO USE A WATER TRUCK DURING &RADIN6 TO MINIMIZE WIND EROSION AND REDUCE DUST <br />6. <br />IN CASE DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ENGAGE AN EROSION CONTROL CONTRACTOR <br />areas manually <br />Sweep sediment from paved <br />areas using a vacuum type <br />sweeper <br />Verify after <br />TO PROPERLY DISPOSE OF THE WATER. DETENTION PONDS MAY BE REQUIRED FOR DEWATERING AND THEY <br />WILL BE DESIGNED IF THE NEED ARISES. ALTERNATIVE EFFECTIVE METHODS SHALL BE IMPLEMENTED IF THE <br />PROPOSED METHOD FAILS TO THE SATISFACTION OF THE COUNTY INSPECTOR. ALL WATER PUMPED FROM <br />TRENCHES OR SEDIMENT TRAP MUST PASS THROUGH A GRAVEL BAG FOR FILTRATION BEFORE IT IS <br />to wet season <br />storm <br />DISCHARGED ON PROPERTY. <br />Use straw/fiber rolls as a sediment <br />barriers to keep soil onsite <br />BMP NOTES: <br />I. ALL ON-SITE MATERIALS RILL BE STORED IN LOCK BOX. <br />Clean and stabilize site prior to wet <br />season. Hydroseed and/or instst all straw <br />2. <br />USE WATERING TRUCK FOR DUST CONTROL. <br />and tackifier. <br />Thoroughly sweep sediment from <br />S. ALL PLANTER AREAS TO RECEIVE STRAW AND TAGKIFIER AFTER PAVING ACTIVITIES ARE COMPLETE. <br />4. <br />ALL DEBRIS AND SOLID WASTE TO BE STOCKPILED IN A 40 YARD DUM11I <br />paved areas <br />S. <br />ALL SPOIL PILES TO BE COVERED COMPLETELY WITH PLASTIC SHEETING AND SPOIL AREAS TO BE <br />SURROUNDED WITH STRANFILTER ROLLS. <br />When dewatering, use sediment traps, or <br />basins. Do not discharge dewatering <br />6. <br />NO VEHICLES OR MACHINERY TO BE STORED, FUELED OR WASHED ON PROJECT SITE. ALL VEHICLE AND <br />material to the storm drain system <br />7. <br />8. <br />MACHINERY MAINTENANCE TO BE PERFORMED OFF-SITE. <br />DURING ROUGH GRADIN& CONTRACTOR TO INSTALL HEARTH DIKE AND 5TRANVFILTER ROLLS AT <br />PERIMETER OF THE PROPERTY TO MAINTAIN RUN-OFF ON 51TE <br />IN CASE COLLOIDAL SUSPENSION NEEDS TO BE REMOVED PRIOR TO 0I50HAR6E, THE CONTRACTOR <br />When cleaning streets in construction <br />areas, the removal of material <br />sweeping or other mechanical ormanual <br />methods must be maximized and the <br />WILL M516N AND CONSTRUCT TEMPORARY HOLDING BASINS. THE DESIGN OF THE BA51N WILL BE <br />ADVRE55M IF THE NEED ARISES. THE COLLOIDAL CLAYS TREATMENT SHALL BE APPROVED BY SAN <br />JOAQUIN COUNTY PRIOR TO IMPLEMENTATION. <br />tracking of mud avoided <br />All materials shall be stored in lock box <br />Cover stockpiled areas with tarp and <br />delimit the area with straw/filter rolls <br />EARNEST F. SMITH - CIVIL ENGINEER <br />221 W. OAK STREET, SUITE B-2 PHONE (209) 334-6523 <br />LODI, CALIFORNIA 95240 FAX (209) 334-2611 <br />DATE: -X- I2 -- p� <br />R.C.E. NO.: 15372 <br />E. F. SMITH, DESIGN ENGINEER EXP. DATE: 3-31-09 <br />m <br />LU <br />LU: <br />U) <br />LU <br />0 <br />MPLEMENTATION DATE MAINTENANCE SCHEDULE <br />During entire period of N/A <br />Construction <br />N/A I N/A <br />Before any rainy eventl As Needed <br />During entire <br />As Needed <br />period of <br />Construction <br />Prior to start <br />As Needed <br />until paving is <br />Construction <br />complete <br />During entire period <br />Daily <br />of Construction <br />During entire <br />Daily <br />period of <br />Construction <br />Prior to start of <br />Verify every <br />other week and/or <br />Construction <br />after major <br />rain storm <br />As needed prior <br />Verify after <br />major rain <br />to wet season <br />storm <br />During entire period Daily <br />of Construction <br />During construction As Needed during <br />wet season <br />During construction I Weekly <br />During construction Weekly <br />During construction Weekly <br />HARMONY GROVE LANE <br />IMPROVEMENTS <br />EROSION CONTROL PLAN <br />SAN JOAQUIN COUNTY STATE OF CALIFORNIA <br />SHEET <br />12 <br />OF 15 <br />FILE NO. D41167P12 <br />