Laserfiche WebLink
rl <br />PANELBOARD SCHEDULE 'A " <br />BUS AMPS <br />LOAD <br />POLE <br />AMPS <br />BUS <br />A B <br />AMPS <br />POLE <br />I <br />LOAD <br />BUS AMPS <br />A <br />I B <br />I A <br />B <br />4 <br />❑ FUSED ■ CIRCUIT BREAKER (PLUG-IN) BRANCH DEVICE <br />FOR TO CHEM SHED <br />2 <br />30 <br />1 <br />3 <br />5 <br />7 <br />9 <br />11 <br />13 <br />15 <br />17 <br />19 <br />2122 <br />23 <br />2 <br />4 <br />6 <br />8 <br />10 <br />12 <br />14 <br />16 <br />18 <br />20 <br />24 <br />20 <br />1 <br />SITE LIGHTS <br />4.4 <br />ALL BREAKERS MUST BE RATED TO INTERRUPT A <br />SHORT CIRCUIT ISC OF --W-,000 AMPS SYMMETRICAL <br />¢ <br />t <br />- <br />- <br />20 <br />1 <br />SITE RECEPTACLES <br />SURFACE <br />4 <br />4.2 <br />20 <br />BLOCK HEATER <br />2 <br />20 <br />20 <br />1 <br />MCC INTERIOR LIGHTS <br />2.5 <br />20 <br />20 <br />4.2 <br />1_ Q <br />W Z o <br />- <br />- <br />20 <br />1 <br />AIR CONDITIONER <br />20 <br />7.4 <br />5 <br />MCC SPACE HEATERS <br />1 <br />20 <br />20 <br />1 <br />MCC RECEPTACLE <br />2.8 <br />1 1 SPARE <br />DATE: 03 08 07 <br />2 <br />CONTROL PANEL <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />OF 47 <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 <br />SPARE <br />- <br />TOTAL AMPS BUS A 22.9 BUS B 21.6 CONNECTED Kva 5.34 <br />RATED VOLTAGE.• E 120/240 ❑ <br />1 PHASE, <br />3 WIRE <br />BRANCH POLES ❑ 12 <br />N 20 ❑ 30 ❑ 42 <br />RATED AMPS: 0 100 ❑ 150 ❑ 200 ❑ <br />REMARKS <br />CAB/NET ❑ SURFACE N FLUSH <br />MOUNTED IN MCC <br />FULL NEUTRAL BUS <br />I E GROUND BUS <br />M HINGED DOOR <br />E KEYED DOOR LATCH <br />W/100 HPS 120V BALLAST & PSA POLE FOR <br />❑ FUSED ■ CIRCUIT BREAKER (PLUG-IN) BRANCH DEVICE <br />1 <br />FEED IS TO BE ❑ BOTTOM ❑ <br />TOP PER MCC MFR. <br />❑ MAIN LUGS ONLY <br />I MAIN _W_ AMPS 0 <br />BREAKER ❑ <br />FUSED SWITCH <br />I ❑ <br />TO BE GF/ BREAKERS <br />ALL BREAKERS MUST BE RATED TO INTERRUPT A <br />SHORT CIRCUIT ISC OF --W-,000 AMPS SYMMETRICAL <br />SURFACE <br />APPROVED MFRS WESTINGHOUSE, ITE, SQUARED, <br />GE ONLY <br />METALUX <br />VT2-24DDR- WL - <br />LIGHTING FIXTURE SCHEDULE <br />TYPE <br />MANUFACTURER <br />CATALOG NUMBER <br />LAMPS <br />VOLTS <br />MOUNTING <br />REMARKS <br />A <br />LITHON14 <br />KAD-l00S-R5S-120-SPD04 <br />100W HPS <br />120V <br />16' POLE <br />W/100 HPS 120V BALLAST & PSA POLE FOR <br />LIGHTING <br />1 <br />20 <br />1 -9 2 <br />3 -41- 4 <br />5 0 6 <br />7 —0 B <br />9 0 10 <br />Ill 0 12F-20 <br />100A <br />1 SPARE <br />PUMPING PLANT EXT. LIGHTING <br />B <br />LITHOL/ER <br />KWB220TSHPF <br />(2) 20 IS <br />120V <br />SURFACE <br />480V MCC VESTIBULE, & PLC PANEL INT. LIGHTING <br />C <br />METALUX <br />VT2-24DDR- WL - <br />(2) F4OT12WM <br />120V <br />SURFACE <br />CHEMICAL SHED INTERIOR LIGHTING, MOUNT FIXTURES <br />20 <br />20 <br />120 -LES <br />H <br />L <br />Z <br />WITH 1/4" SPACING FROM FINISH WALL. <br />0 <br />TDRK 2100 PHOTO CELL <br />a PUMP #1 PUMP 12 <br />NEMA SIZE NEMA SIZE <br />30A -3P 2 2 <br />FI/NR FVNR <br />H 0 A COMB. COMB. <br />STARTER STARTER <br />Q L S <br />CONTROL <br />LOAD <br />POLES <br />I AMPS <br />1201240V <br />AMPS <br />PUMP #3 <br />PANEL <br />A <br />B <br />A <br />10-3W <br />3.6 <br />NEMA SIZE <br />LIGHTING <br />1 <br />20 <br />1 -9 2 <br />3 -41- 4 <br />5 0 6 <br />7 —0 B <br />9 0 10 <br />Ill 0 12F-20 <br />100A <br />1 SPARE <br />2 <br />FUSED SWITCH <br />❑ _ <br />SPACE <br />RECEPTACLES <br />PANELBOARD <br />20 <br />FVNR <br />1 SPARE <br />97 <br />TOTAL AMPS AT 480V, 30 <br />- <br />';q " <br />SPARE <br />COMB. <br />20 <br />20 <br />1 SPARE <br />H <br />w _ <br />Z <br />STARTER <br />PUMP <br />480:120/240V NEMA SIZE <br />HOFFMAN 10 2 <br />CR29-0216-G036 I 10KVA FVNR <br />DRY TYPE COMB. <br />O XFMR STARTER <br />480u <br />20OA-3P <br />AUTOMATIC <br />TRANSFER <br />SWITCH <br />TRANSITION <br />SECTION <br />CHEMICAL SHED DPNL SCHEDULE <br />BUS AMPS <br />LOAD <br />POLES <br />I AMPS <br />I BUS <br />A B <br />AMPS <br />I POLES LOAD <br />BUS AMPS <br />A <br />B <br />A <br />B <br />3.6 <br />30 <br />LIGHTING <br />1 <br />20 <br />1 -9 2 <br />3 -41- 4 <br />5 0 6 <br />7 —0 B <br />9 0 10 <br />Ill 0 12F-20 <br />20 <br />1 SPARE <br />BREAKER ❑ <br />FUSED SWITCH <br />❑ _ <br />4 <br />RECEPTACLES <br />1 <br />20 <br />20 <br />1 SPARE <br />97 <br />TOTAL AMPS AT 480V, 30 <br />- <br />SPARE <br />1 <br />20 <br />20 <br />1 SPARE <br />H <br />w _ <br />Z <br />W <br />SPARE <br />1 <br />20 <br />20 <br />1 SAPRE <br />1_ Q <br />W Z o <br />� <br />- <br />Q <br />SPARE <br />1 <br />20 <br />20 <br />1 SPARE <br />- <br />SPARE <br />1 <br />1 20 <br />1 1 SPARE <br />DATE: 03 08 07 <br />SCALE: <br />TOTAL AMPS. BUS A-!1-6- BUS B 4 CONNECTED Kva • 9 <br />RATED VOLTAGE.• N 120/240 ❑ <br />I 1 PHASE, <br />3 WIRE <br />I BRANCH POLES 0 12 <br />❑ 20 30 ❑ 42 <br />RATED AMPS. • 0 100 ❑ 150 ❑ 200 ❑ <br />25 HP PUMP <br />CAB/NET ❑ SURFACE 0 FLUSH <br />MOUNTED IN MCC <br />FULL NEUTRAL BUS <br />10 GROUND BUS <br />N HINGED DOOR <br />M KEYED DOOR LATCH <br />30 <br />❑ FUSED M CIRCUIT BREAKER (PLUG-IN) BRANCH DEV/CE <br />10 <br />FEED /S TO BE ❑ BOTTOM ❑ <br />TDP PER MCC MFR. <br />❑ MAIN LUGS ONLY <br />MAIN -.iQ_ AMPS 0 <br />BREAKER ❑ <br />FUSED SWITCH <br />❑ _ <br />_ TO BE GFI BREAKERS <br />ALL BREAKERS MUST BE RATED TO INTERRUPT A <br />SHORT CIRCUIT ISC OF -1j2_,000 AMPS SYMME7R/CAL <br />TOTAL KVA <br />APPROVED MFRS WES7INGHOUSE, ITE, SQUARE D. <br />GE ONLY <br />97 <br />TOTAL AMPS AT 480V, 30 <br />BOOSTER PUMP STATION - 480V MOTOR CONTROL CENTER ELE ✓ATION VIEW <br />(SHOWN WITH EXTERIOR WEATHER WRAP DOORS REMOVED) <br />N. T.S. <br />120V AC CONTROL <br />FROM PANEL A' <br />PHOTO -CELL SHALL BE <br />TDRK MODEL 2100 OR <br />EQUAL. MOUNTED AT <br />480V MCC. <br />\_T9 SITE LIGHT/NG <br />PHOTO -CELL SWITCHING DIAGRAM <br />L2 120VAC FROM PANEL <br />A <br />17' 150W <br />N2 <br />I TO OTHER HEATERS I <br />IN EACH MCC <br />VERTICAL SECTION <br />480V MCC HEATER SCHEMA TI C <br />LOAD CALCULATIONS FOR <br />THORNTON WATER <br />STORAGE PROJECT <br />DESCRIPTION <br />LOAD KVA <br />PER UNIT <br />UN/TS <br />TOTAL <br />LOAD KVA <br />25 HP PUMP <br />25 <br />2 <br />50 <br />15 HP PUMP <br />15 <br />2 <br />30 <br />10KVA, 10, 480.120/240V <br />TRANSFORMER <br />10 <br />1 <br />10 <br />SUBTOTAL KVA <br />a <br />z <br />U <br />W <br />90 <br />PLUS 25X OF LARGEST <br />MOTOR = .25 x 25KVA = <br />H <br />V Q <br />7 <br />TOTAL KVA <br />® otf <br />a O <br />97 <br />TOTAL AMPS AT 480V, 30 <br />U <br />w Z <br />117 <br />NEED 200A SERVICE <br />QgOFESS/O <br />y` 1024 Z <br />B, s�wr. sone Irm <br />1�11/oul <br />I OF CALIF' <br />e e — ch cia <br />INC. <br />6060 Sunrise Vista, #3450 <br />Citrus Heights, ca 95610 <br />COPYRIGHTO2�ORTHSTAR ENGINEERING GROUP, INC <br />a <br />0 <br />a <br />n. <br />a <br />W <br />a <br />0 <br />N <br />z <br />0 <br />in <br />N <br />W Z <br />w O <br />a <br />z <br />U <br />W <br />H <br />V Q <br />W <br />z <br />® otf <br />a O <br />Q �. J <br />~ <br />U <br />w Z <br />0 W <br />z <br />Q <br />3: O <br />H <br />w _ <br />Z <br />W <br />H ::D <br />O <br />0 ' <br />Q <br />00 <br />1_ Q <br />W Z o <br />� <br />w z <br />Q <br />•0 <br />JOB I: <br />DATE: 03 08 07 <br />SCALE: <br />DRAWN: K.T. <br />DESIGN: M.B. <br />CHK D: M.B. <br />SHEET <br />NUMBER <br />E9 <br />OF 47 <br />