Laserfiche WebLink
R/Wt <br />CONSTRUCTION <br />R/Wt CENTERLINE R/Wt <br />25.00' 25.00' <br />TRENCH PATCH <br />PER S.J. CO. STD I SLURRY SEAL <br />R-29. 0.55' AC I <br />3.5' <br />rZ 24' f w <br />2' MIN W `� <br />0 <br />3 <br />W <br />0 + o <br />TYP TRENCH PER <br />ST -201 <br />PROPOSED 18" O <br />STORM DRAIN <br />(SEE PLAN FOR <br />LIMITS) <br />BETWEEN WALKER LANE AND EAST END <br />STA 1+17t TO 10+04t <br />NO SCALE <br />30.00' <br />EARTHWORK - <br />(INCL IN HDPE <br />PIPE QTY) <br />----------- <br />0.25' SHOULDER <br />BACKING <br />3 <br />� <br />I <br />CONSTRUCTION <br />CENTERLINE <br />R/Wt <br />30.00' <br />F - SLURRY SEAL <br />AIN W <br />0 <br />TYP TRENCH PER O <br />ST -201 ,_1 <br />PROPOSED 18" <br />STORM DRAIN <br />(SEE PLAN FOR <br />LIMITS) <br />MARSH STREET - TYPICAL SECTION <br />BETWEEN WALKER LANE AND CARDINAL AVENUE <br />STA 20+18t TO 25+57t <br />NO SCALE <br />CONSTRUCTION <br />CENTERLINE <br />R/Wt R/Wt <br />30.00' <br />15't <br />EARTHWORK VAIES SLURRY SEAL <br />(INCL IN HDPE VAR. <br />PIPE QTY) <br />18't <br />o I w <br />0.25' SHOULDER BACKING <br />2' MIN U) <br />TYP TRENCH PER 0 <br />ST -201 3 <br />h <br />Q <br />0 U)I <br />PROPOSED 18"---- <br />STORM DRAIN <br />(SEE PLAN FOR <br />LIMITS) <br />BETWEEN WALKER LANE AND CARDINAL AVENUE <br />STA 25+57t TO 31+13t <br />NO SCALE <br />UCTION <br />R/Wt CONS CENTERLINER/Wt <br />30.00' I 30.00' <br />SLURRY SEAL <br />TRENCH PATCH <br />PER S.J. CO. STD. <br />R-29. 0.55' AC VARIES <br />0 24't La <br />�� ---- - - - -------T- <br />2' MIN N <br />W <br />0 <br />3 <br />�O h <br />0 <br />TYP TRENCH PER <br />ST -201 <br />PROPOSED 24" O <br />STORM DRAIN <br />(SEE PLAN FOR <br />LIMITS) <br />MARSH STREET - TYPICAL SECTION <br />BETWEEN CARDINAL AVENUE AND BIRD AVENUE <br />STA 40+26f TO 49+11t <br />NO SCALE <br />R/Wt <br />CONSTRUCTION <br />R/Wt <br />30.00' 10.00' <br />BETWEEN BIRD AVENUE AND THE DIVERTING CANAL <br />STA 49+11t TO 60+57t <br />NO SCALE <br />R/Wt <br />30.00' - <br />TRENCH PATCH <br />PER S.J. CO. ST. <br />R-29. 0.55' AC <br />al <br />CONSTRUCTION <br />CENTERLINE <br />2' MIN <br />I` <br />SLURRY SEAL <br />N0. I <br />BY DATE REVISIONS: <br />1930 HOWARD ROAD, BUTE 125 <br />TRENCH PATCH <br />PER S.J. CO. ST. <br />h <br />DRAWING NAME: IP-02.DWG <br />QL <br />QL <br />DATE SUBMITTED: 11-29-07 <br />R-29. 0.55' AC <br />+ <br />10.5' <br />a <br />2204 <br />JCJ PROJ. MGR: <br />REP <br />24't <br />CAUTION: <br />w <br />these plans will not <br />the plans must be <br />be responsible for, or liable for, unauthorized changes to <br />in writing and must be approved by the preparer of these <br />or uses of these <br />plans. <br />2' <br />MIN <br />N <br />W <br />0 <br />3 <br />�o <br />ti <br />W <br />0 <br />+ <br />TYP TRENCH PER <br />ST -201 <br />PROPOSED 24" <br />0 <br />STORM DRAIN <br />(SEE PLAN FOR <br />LIMITS) <br />BETWEEN BIRD AVENUE AND THE DIVERTING CANAL <br />STA 49+11t TO 60+57t <br />NO SCALE <br />R/Wt <br />30.00' - <br />TRENCH PATCH <br />PER S.J. CO. ST. <br />R-29. 0.55' AC <br />al <br />CONSTRUCTION <br />CENTERLINE <br />2' MIN <br />I` <br />TIME: 3:20:09 PM <br />LAYOUT: Layoutl <br />N:\MTBO14800\CADD\IP <br />N0. I <br />BY DATE REVISIONS: <br />1930 HOWARD ROAD, BUTE 125 <br />MADERA, CA 93537 <br />h <br />DRAWING NAME: IP-02.DWG <br />QL <br />QL <br />DATE SUBMITTED: 11-29-07 <br />O <br />+ <br />TYP TRENCH PER 1n <br />ST -201 <br />PROPOSED STORM DRAIN <br />(SIZE VARIES, SEE PLAN O <br />FOR LIMITS) <br />DATE: 11/29/07 <br />SERVER: <br />PATH: <br />TIME: 3:20:09 PM <br />LAYOUT: Layoutl <br />N:\MTBO14800\CADD\IP <br />N0. I <br />BY DATE REVISIONS: <br />1930 HOWARD ROAD, BUTE 125 <br />MADERA, CA 93537 <br />559.551.5220 TEL 55 AK4"o FAX <br />DRAWING NAME: IP-02.DWG <br />PREPARED FOR: SAN JOAQUIN COUNTY <br />DATE SUBMITTED: 11-29-07 <br />PAGE SETUP: <br />DESIGNER: <br />2204 <br />JCJ PROJ. MGR: <br />REP <br />Note: All utilities & obstructions shown are approximate. It is the contractors responsibility <br />to verify the location & depth with the appropriate agencies. The contractor shall notify the <br />engineer imediotely regarding any discrepancies or ambiguities which may exist. <br />CAUTION: <br />The engineer preparing <br />plans. All changes to <br />these plans will not <br />the plans must be <br />be responsible for, or liable for, unauthorized changes to <br />in writing and must be approved by the preparer of these <br />or uses of these <br />plans. <br />30.00' <br />SLURRY SEAL <br />--_-1 <br />Q) \� _ <br />N <br />0 <br />BETWEEN CARDINAL AVENUE AND BIRD AVENUE <br />STA 70+23t TO 81+21t <br />NO SCALE <br />OQROFESSTOA, <br />�Pk-D E, p� <br />W �o xsF �m <br />NO. 5355 <br />* Ex _ inn <br />UIVI �Q <br />OF CAO O�j <br />1_800-227-2600 <br />1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN OR CITY OF STOCKTON STANDARD PLANS AND SPECIFICATIONS, <br />AND ALL AMENDMENTS THERETO TO DATE. ALL WORK SHALL BE UNDER THE INSPECTION OF THE COUNTY, SANITARY SEWER WORK BY THE CITY OF STOCKTON DEPARTMENT <br />OF PUBLIC WORKS. <br />2. IT IS INTENDED THAT THESE PLANS AND THE COUNTY STANDARD SPECIFICATIONS REQUIRE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK <br />CONTEMPLATED BE PROVIDED AND THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. <br />3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS. THE <br />ENGINEER'S INTERPRETATION OR CORRECTION THEREOF SHALL BE CONCLUSIVE. <br />4. DRAWING NUMBERS SHOWN ON THE PLANS REFER TO COUNTY OF SAN JOAQUIN STANDARD PLANS, SHOWN THUS: S.J. CO. ST. <br />5. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST <br />GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED. <br />6. CONSTRUCTION STAKING FOR ALL WORK SHALL BE DONE BY THE CONTRACTOR. <br />7. THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH MARKS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL <br />EXPENSES FOR REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE. <br />8. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION FROM THE COUNTY. <br />9. ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO INSTALLATION OF ANY CURB, GUTTER, SIDEWALK, AND STREET PAVING. <br />10. ALL STATIONS REFER TO DISTANCES ALONG CONSTRUCTION CENTERLINE, PERPENDICULAR TO OR RADIAL FROM THE CENTERLINE STATIONS, UNLESS OTHERWISE NOTED. <br />11. ALL UTILITIES AND OBSTRUCTIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION AND DEPTH WITH THE APPROPRIATE <br />AGENCIES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST. <br />12. THE CONTRACTOR SHALL EXPOSE AND CHECK INVERTS ON EXISTING UTILITIES AND CLEARANCE OF KNOWN CROSSINGS OF UTILITIES BEFORE CONSTRUCTING NEW PIPELINES, <br />IN ACCORDANCE WITH SPECIAL PROVISIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST. <br />13. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF ANY DIFFERENCES IN LOCATION OF EXISTING UTILITIES FROM THAT SHOWN, OR ANY OTHER <br />CONFLICTS WITH THE DESIGN BEFORE CONTINUING WITH WORK IN THAT AREA. <br />14. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS <br />CONTRACT. <br />15. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE <br />PROJECT. <br />16. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE IN THE FIELD THEIR MAIN AND SERVICE <br />LINES. <br />17. THE CONTRACTOR SHALL NOTIFY THE MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING <br />THE TOLL- FREE NUMBER 1-800-227-2600. <br />18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. THE COST OF REPLACING EXISTING IMPROVEMENTS SHALL BE DONE <br />AT CONTRACTOR'S EXPENSE. <br />19. A CITY OF STOCKTON REPRESENTATIVE SHALL BE PRESENT DURING ALL CONSTRUCTION WORK RELATED TO SANITARY SEWERS. <br />20. THE CONTRACTOR'S ATTENTION IS DIRECTED TO: SECTION 1540 (o) (1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION <br />1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973 AS AMENDED <br />WHICH STATES: <br />"PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E., SEWER, WATER, FUEL, ELECTRIC LINES, ETC., <br />WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF <br />SUCH AN INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING; AND, WHEN IT IS UNCOVERED, ADEQUATE PROTECTION <br />SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED <br />WORK AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATION". <br />pi1[01 lf,t1- . . <br />1. THE CONTRACTOR SHALL EXPOSE EXISTING STORM DRAINS, WHERE CONNECTION IS TO BE MADE, TO VERIFY EXISTING FLOW LINES AND LOCATIONS. CONTRACTOR SHALL <br />IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES FROM THE PLANS. <br />2. CONTRACTOR TO BE RESPONSIBLE FOR ALL TESTING OF STORM DRAIN FACILITIES. ALL TESTING SHALL BE AT CONTRACTOR'S EXPENSE AND SHALL BE INCLUDED IN THE <br />PRICE BID FOR STORM DRAIN INSTALLATION. <br />R/Wt <br />3. STORM DRAIN STUBS SHALL BE PLUGGED WITH A REMOVABLE PLUG RECOMMENDED BY PIPE MANUFACTURER. <br />4. STORM DRAIN INLETS SHALL BE 18" OR 24" DIA. PER S.J. CO. ST. CW -D14, UNLESS OTHERWISE NOTED. <br />5. STORM DRAIN MANHOLES PER S.J. CO. STD. CW -S7 AND D-18. <br />6. WHEN TRENCH AND EXCAVATION IS IN EXISTING PAVED STREETS AND/OR DRIVEWAYS, REPLACE PAVEMENT 6" ON EACH SIDE OF TRENCH. REFER TO S.J. CO. STD. <br />DRAWING NO. R-29. MAXIMUM PAYMENT WIDTH FOR AC WILL BE O.D. +20" +12" (6" ON EACH SIDE OF TRENCH). <br />7. IF THE WATER MAIN PARALLELING THE STORM DRAIN MAIN DOES NOT MEET THE CASE 2 ZONE B REQUIREMENTS, THE STORM DRAIN MAIN SHOULD BE CONSTRUCTED OF <br />HIGH -DENSITY -POLYETHYLENE (HDPE) PIPE WITH FUSION WELDED JOINTS (PER AWWA C906-99). <br />1. THE CONTRACTOR SHALL SEAL EXISTING PAVEMENT THE LIMITS OF THE PROJECT WITH LATEX MODIFIED SLURRY SEAL (TYPE II), REFER TO TYPICAL SECTIONS FOR ROAD <br />WIDTHS AND STATIONING. <br />SAN JOAQUIN COUNTY <br />GARDEN ACRES - WALKER LANE AREA STORM <br />B E Y 0 N D E N G <br />I N E E R I N G <br />DRAINAGE IMPROVEMENTS - <br />PHASE 2A & 2B <br />1930 HOWARD ROAD, BUTE 125 <br />MADERA, CA 93537 <br />559.551.5220 TEL 55 AK4"o FAX <br />WWWAMTE.COM <br />PREPARED FOR: SAN JOAQUIN COUNTY <br />DATE SUBMITTED: 11-29-07 <br />2 <br />15 SHE[ <br />SCALE <br />VERTICAL: 1 "= N/A <br />HORIZONTAL: 1'= N/A <br />MTBO14800 <br />