Laserfiche WebLink
DESIGN CONDITIONS <br />A. This CNG fueling station has been designed with the following <br />pressure and temperature parameters: <br />Operating Pressure: 3600 prig <br />Design Pressure: 4500 psig <br />Design Temperature: 20 to 110 degrees F <br />Pneumatic Test Pressure: 4950 psig (for CNG piping) <br />Materials: All Piping and tubing shall be seamless <br />PIPE SPECIFICATIONS <br />A. Natural Gas (G) Abovegrade <br />1. Carbon Steel (CS): ASTM 106 Grade B Schedule 40 black. <br />a, Fittings; ASTM A234/A234M . <br />b. Joints: ASME B31.9. <br />c. Jacket: None <br />d. Plug Valves: Refer to PG&E standards. <br />i. 2 inches and smaller. MSS SP 78, 200psi WOG, threaded ends, <br />semi -steel construction, and full pipe area. <br />ii. 2-1/2" and larger: MSS SP 78, 200psi WOG, Flanged ends, <br />semi -steel construction, full pipe area. Furnish with worth gear <br />operator. <br />e. Check valves: Tom Wheatley figure 55 or KF valve series 35 per <br />PG&E STD K-15, <br />B. Natural Gas (G) buried <br />NOT USED <br />C. Compressed Natural Gas (CNG) <br />1. Carbon Steel - Heavy Walled (CS2) Schedule 160 ASTM At 06 grade B. <br />a. Fittings: 6000psi forged steel socket weld - ASME SA 105 (if <br />buried), ASME SA 350LF2 (if above ground) <br />2. Tubing (SST) - Seamless, fully annealed tube for general service <br />conforming to the requirements of ASTM A 213 for Grades TP 304 or <br />TP 316 material having a minimum ultimate tensile strength of 75,000 <br />psi. Tutting shall be cold finished and free of scratches. All tubing is <br />sized according to the maximum expected flow rate and must be <br />installed per the drawings. No tubing with other than the minimum wall <br />thickness required is to be used without approval of the owner. The <br />internal and external surfaces of the tubing shall be provided with <br />adequate protection from corrosion and abrasion during normal <br />handling and storage. The manufacturer of vendor shall be prepared to <br />certify that all tubing conforms to the requirements of this specification <br />and shall provide formal Mill Certificates for each lot. <br />Above ground tubing shall be of rigid straight lengths. All bends above <br />grade must be made with tubing benders and should be 90 degrees <br />whenever possible. All lengths of tubing shall be anchored per code to <br />prevent excessive vibration. All tubing shall run true to the vertical and <br />horizontal axis of the equipment and shall be anchored to prevent injury. <br />All underground tubing shall be continuous with no intermediate joints <br />fittings or unions that are inaccessible and shall be installed inside a <br />buried plastic pipe or PVC conduit sleeve. Underground tubing shall be <br />continuous with no intermediate joints, valves or fittings that are buried <br />or inaccessible. <br />Minimum Tube Wall Thickness (Inches): <br />See Schedule <br />Tube Fittings: <br />1/4" TO 1/2" Swagelok or equal 316 stainless steel, double ferrule <br />type fittings. 5000 psi minimum working pressure. <br />3/4" Not Used <br />Ball Valves: <br />1/4 to 1/2 Hoke series 71, 316 ss w/TFE seats & seals <br />Needle Valves: <br />1/4 to 1/2 Hoke, 316 ss w/TFE seals <br />Sleeve (for buried tubing): Not Used <br />Bleed Valves: Hoke series 6600, 316 ss bleed valve with integral tube <br />ends. 6000 psi maximum working pressure. <br />Bads Pressure Regulators: <br />Aqua Environmental <br />TESTING AND INSPECTION <br />A. When assembly of a welded gas piping or tubing assembly is <br />complete, a pneumatic pressure test shall be performed in accordance <br />with ASME/ANSI 1331.3. All pressure sensitive devices (regulators, <br />relief valves, etc.) Shall be removed or isolated from the system prior to <br />testing. The leak test pressure shall be as follows: <br />EiN Pressure <br />CNG Piping and Tubing (CNG) 4800 psig <br />Natural Gas Piping (G) 75 psig <br />Vent piping (V) N/A <br />1. A source of high-pressure gas (nitrogen) shall be connected to one <br />end of the system. <br />2. The pressure shall be gradually increased, in 500 psig increments <br />and held for 15 minutes (at which time all connections shall be soap <br />tested to check for leaks), until maximum pressure is reached. <br />Document testing. <br />3. After all connections are proved to be leak free, record final pressure <br />and allow to set for one hour. After one hour, compare test pressure to <br />recorded pressure. If pressures are the same, bleed off the gas in a <br />controlled and safe manner. If the test pressure is lower than the <br />recorded pressure, or if a leak is found while soap testing, find and <br />repair the leak and repeat the test procedure. <br />4. Upon completion of the pneumatic pressure test, all pressure <br />sensitive devices shall be reinstalled in the system and soap tested for <br />leaks at operating pressure. <br />S. Contractor shall use an approved soap and water solution to test all <br />pipe fittings and connections during testing and at start-up. <br />PURGING AND PRESSURIZING <br />A. All purging and pressurizing shall be done by Contractor and <br />observed by the Owner or designated representative. <br />B. Prior to pressurizing the system with natural gas, the ESD system <br />must be operational. Natural gas shall not be introduced into the <br />system without prior authorization from the Owner. All air shall be <br />purged from the entire system to the satisfaction of the Owner and in <br />accordance with the manufacturers instructions prior to pressurizing the <br />system. <br />C. Prior to Natural gas being introduced into any piping system, all <br />fabrication, testing, and work requiring flame or sparking devices shall <br />be complete. After natural gas has been introduced, the Owner shall <br />do welding or other work, which could ignite natural gas vapors, only <br />upon authorization. <br />D. Once the system is pressurized (to full operating pressure) all <br />valves, welds, joints and fittings shall be leak tested and signed off by <br />the Owner. <br />ARNIN <br />u <br />" MACHINE <br />STARTS <br />AUTOMATICALLY <br />SIGN TYPE 1141' <br />SCALE: 3"=1'-0" <br />SIGN SCHEDULE <br />TYPE <br />DESCRIPTION <br />QTY. <br />SIZE <br />MATERIAL <br />BACKGROUND <br />TEXT <br />LOCATION <br />(NOTE 7) <br />OWARNING <br />- FLAMMABLE GAS <br />6 <br />10"1 <br />0.04 ALUMINUM <br />ORANGE/WHITE <br />BLACK <br />COMPRESSOR AND FUELING AREA (SEE P-2 FOR LOCATION) <br />OIN <br />CASE OF FIRE <br />6 <br />10714" <br />.04 ALUMINUM <br />WHITE <br />BLACK <br />COMPRESSOR AND FUELING AREA (SEE P-2 FOR LOCATION) <br />OEMERGENCY <br />FUEL SHUT-OFF <br />6 <br />7"X10" <br />0.04 ALUMINUM <br />WHITE <br />RED <br />ABOVE ESD (E) SWITCH (REFER TO P-2) <br />® <br />MACHINE STARTS AUTOMATICALLY <br />1 <br />7710" <br />0.04 ALUMINUM <br />ORANGE <br />BLACK <br />COMPRESSOR AREA <br />OHAZARD <br />DIAMOND (NPFA 704) <br />4 <br />10"1 <br />0.125 FRP <br />HAZ DIAMOND <br />BLACK <br />LOCATE NEAR ENTRANCE(S) FASTEN WITH SCREWS OR TIES <br />SIGNAGE NOTES: <br />1. ALL SIGNS SHALL BE IN ACCORDANCE WITH OSHA SPECIFICATIONS 1910.145 AND ANSI SPECIFICATIONS Z535. <br />2. ITABLE FOR OUTDOOR USE. <br />3. SIGNS SHALL BE MADE OF 0.40 INCH THICK ALUMINUM WITH BAKED WHITE ENAMEL BACKGROUND U.N.O.. LETTERS SHALL BE 3M WEATHERIZED VINYL - SIZE, COLOR AND FONT <br />AS NOTED. <br />4. VENDORS LISTED ARE ONLY FOR ESTABLISHING STANDARDS OF QUALITY AND PERFORMANCE. OTHER MANUFACTURES MAY BE SUBSTITUTED IF APPROVED. <br />5. CONTRACTOR SHALL PROVIDE AND INSTALL SIGNAGE AS SHOWN ON DRAWINGS. IN ADDITION, CONTRACTOR SHALL TAG ALL EQUIPMENT AND VALVES AND SHALL LABEL <br />ALL LINES IN ACCORDANCE WITH ANSI A13.1-1987. <br />6. SIGNS SHALL BE PROVIDED AND INSTALLED WITH NECESSARY BRACKETS, SUPPORTS AND HARDWARE. BRACKETS, SUPPORTS AND HARDWARE SHALL BE GALVANIZED. <br />ALL HARDWARE SHALL BE VANDAL AND TAMPER RESISTANT. <br />7. WHERE SIGNAGE IS TO BE ATTACHED TO EXTERIOR SURFACE OF EQUIPMENT, SUCH AS COMPRESSOR ENCLOSURE OR DISPENSER FRONT PANEL, SIGN MATERIAL SHALL BE <br />SELF ADHESIVE VINYL. <br />8. SIGNS SHALL BE LOCATED FOR EASY VISIBILITY FROM ALL SIDES. <br />SIGN TYPE 11111 It <br />SCALE: 3"=1'-0" <br />SIGN TYPE 1121' <br />SCALE: 3"=1'-0" <br />SIGN TYPE 1131' <br />SCALE:3"=1'-0" <br />SIGN TYPE 1151' <br />SCALE: 3"=1'-0" <br />COUNTY OF SAN JOAQUIN <br />Submitted 2008 <br />THOMAS RYAN FLINN <br />DIRECTOR OF PUBLIC WORKS <br />L3, MINOR REVISION TM 04/08 <br />0 PRELIMINARY FOR CLIENT REVIEW TM <br />REV. .DESCRIPTION BY DATE <br />SAN JOAQUIN COUNTY e PUBLIC WORKS <br />STOCKTON, CA <br />T.IITCHELLENGINEERSOAKLAND CALIFORNIA <br />AS NOTED IFOR <br />DRWN TM <br />THE USE OF THESE DRAWINGS AND CHECKED TM <br />SPECIFICATIONS SHALL BE RESTRICTED TO <br />THE ORIGINAL USE FOR WHICH THEY WERE APPROVED <br />PREPARED. REUSE, REPRODUCTION, OR <br />PUBLICATION, IN WHOLE OR IN PART, IS <br />HPOHIBITED WITHOUT THE WRITTEN CONSENT JOB <br />OF T. MITCHELL ENGINEERS. 0521 <br />CNG SYSTEM UPGRADE <br />DOWNTOWN GARAGE <br />SIGNAGE AND NOTES <br />P3 <br />an t,: ing :' ra D:Twie 'Sh' �'' <br />Verity <br />All rtt'o.mat�gn R. `,,Tpr_•c•. rhe S <br />rPs W.rk <br />COUNTY OF SAN JOAQUIN <br />Submitted 2008 <br />THOMAS RYAN FLINN <br />DIRECTOR OF PUBLIC WORKS <br />L3, MINOR REVISION TM 04/08 <br />0 PRELIMINARY FOR CLIENT REVIEW TM <br />REV. .DESCRIPTION BY DATE <br />SAN JOAQUIN COUNTY e PUBLIC WORKS <br />STOCKTON, CA <br />T.IITCHELLENGINEERSOAKLAND CALIFORNIA <br />AS NOTED IFOR <br />DRWN TM <br />THE USE OF THESE DRAWINGS AND CHECKED TM <br />SPECIFICATIONS SHALL BE RESTRICTED TO <br />THE ORIGINAL USE FOR WHICH THEY WERE APPROVED <br />PREPARED. REUSE, REPRODUCTION, OR <br />PUBLICATION, IN WHOLE OR IN PART, IS <br />HPOHIBITED WITHOUT THE WRITTEN CONSENT JOB <br />OF T. MITCHELL ENGINEERS. 0521 <br />CNG SYSTEM UPGRADE <br />DOWNTOWN GARAGE <br />SIGNAGE AND NOTES <br />P3 <br />