My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-4444
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-4290-4457
>
SU-4444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:30:17 PM
Creation date
10/15/2024 1:30:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G <br />C <br />MARKET STREET <br />PROP LINE <br />CNG SUPPLY AND VENT <br />TUBING <br />PIPE RACK <br />(SIM TO EXISTING) <br />II,L) <br />Pt4l,-r'�E��v �SoR) <br />Ss� (T°Ool"pR <br />3/gj I <br />„ J S Sf <br />5' <br />3/9 <br />s <br />opgin���� <br />y - ,I <br />1h FILL, I 6'-8„ <br />111r�E�V/ / <br />I � /IAS � <br />TWE FILL 14ANi� L 77//3/N9 I)L7AIL <br />TIMEFILL BRACKET <br />AND RETRACTOR <br />(SEE DETAIL) <br />5000PSI HOSE ASSEMBLY <br />1 /4"CNG, 1 /4'VENT <br />HOSE BREAK FTG(S) <br />3—WAY FILL VALVE ASSEMBLY <br />W/NGV TYPE 2 NOZZLE <br />TYPICAL FILL STATION A <br />SCALE: N.T.S. <br />(E) CONC FLOOR <br />7^ <br />SUPPLY <br />c <br />SUPPLY AND VENT <br />TUBING <br />E <br />JI.ALt: 1110 ”=1'-U" <br />" '1/8 STL TUBING <br />BLUE <br />1370 ❑ULnnt,vU <br />CONNECTOR <br />1"P OF 2 <br />BRACKET DETAIL B <br />SCALE: N.T.S. <br />?" HILTI KWIK BOLT II <br />OF 2 <br />HOSE RETRACTOR <br />PEMCO <br />>"EfZ /CDMPr2ES4n�2 <br />3/8 rr <br />'ANG <br />t4.=r, ; 1 <br />I <br />A <br />By <br />Pe ^n U*C,q Tbi� 7,wing St•; ulc a erify <br />info. „tC, T. ac{ Ins _-'<ing The Sae ": World <br />GENERAL NOTES: <br />1. COORDINATE EQUIPMENT INSTALLATION AND PIPE ROUTING WITH OTHER <br />WORK INCLUDING CONCRETE AND ELECTRICAL. <br />2. NOT USED. <br />3. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND <br />CONDUITS PRIOR TO CONSTRUCTION. <br />4. NOT USED. <br />E <br />I� <br />s <br />I <br />N <br />INSTALLATION SHALL MEET PACIFIC GAS & ELECTRIC STANDARDS <br />w <br />INCLUDING PG&E STANDARD H-15. COPY AVAILABLE UPON REQUEST. <br />I <br />n <br />I <br />s <br />Q <br />F <br />I <br />(n <br />f <br />L <br />F <br />W� <br />F m <br />I <br />``W <br />LLI <br />9. REFER TO AS -BUILT DESIGN DRAWINGS FOR ORIGIONAL SYSTEM - DRAWING <br />Zo <br />C-1 REV 4 BY TAITE & ASSOCIATES DATED 06/03/02 - FOR ADDITIONAL <br />ZQ <br />I <br />o <br />F <br />O <br />F <br />f m <br />I <br />s <br />o <br />F <br />I <br />I <br />� <br />F <br />o <br />f <br />I <br />G — <br />c <br />f <br />G <br />C <br />MARKET STREET <br />PROP LINE <br />CNG SUPPLY AND VENT <br />TUBING <br />PIPE RACK <br />(SIM TO EXISTING) <br />II,L) <br />Pt4l,-r'�E��v �SoR) <br />Ss� (T°Ool"pR <br />3/gj I <br />„ J S Sf <br />5' <br />3/9 <br />s <br />opgin���� <br />y - ,I <br />1h FILL, I 6'-8„ <br />111r�E�V/ / <br />I � /IAS � <br />TWE FILL 14ANi� L 77//3/N9 I)L7AIL <br />TIMEFILL BRACKET <br />AND RETRACTOR <br />(SEE DETAIL) <br />5000PSI HOSE ASSEMBLY <br />1 /4"CNG, 1 /4'VENT <br />HOSE BREAK FTG(S) <br />3—WAY FILL VALVE ASSEMBLY <br />W/NGV TYPE 2 NOZZLE <br />TYPICAL FILL STATION A <br />SCALE: N.T.S. <br />(E) CONC FLOOR <br />7^ <br />SUPPLY <br />c <br />SUPPLY AND VENT <br />TUBING <br />E <br />JI.ALt: 1110 ”=1'-U" <br />" '1/8 STL TUBING <br />BLUE <br />1370 ❑ULnnt,vU <br />CONNECTOR <br />1"P OF 2 <br />BRACKET DETAIL B <br />SCALE: N.T.S. <br />?" HILTI KWIK BOLT II <br />OF 2 <br />HOSE RETRACTOR <br />PEMCO <br />>"EfZ /CDMPr2ES4n�2 <br />3/8 rr <br />'ANG <br />t4.=r, ; 1 <br />I <br />A <br />By <br />Pe ^n U*C,q Tbi� 7,wing St•; ulc a erify <br />info. „tC, T. ac{ Ins _-'<ing The Sae ": World <br />GENERAL NOTES: <br />1. COORDINATE EQUIPMENT INSTALLATION AND PIPE ROUTING WITH OTHER <br />WORK INCLUDING CONCRETE AND ELECTRICAL. <br />2. NOT USED. <br />3. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND <br />CONDUITS PRIOR TO CONSTRUCTION. <br />C/) 10. SEE DRAWING P-3 FOR SIGNAGE DETAILS O <br />SHEET NOTES: Ox <br />CONTRF <br />CIELING <br />BRE <br />BqACKE <br />UP TO E (16) SINGLE <br />)LIETE WITFD <br />SES, NO <br />CTORS. MO ING <br />I OWNER P 0 INSTALL <br />PUS UTT ST NS ( D P . NEWL/ WS TO MATCH EXISTING. <br />INTOE G ESD CI IT. <br />CONTRACTOR SHALL PROVIDE AND INSTALL NEW CNG, GAS, AND VENT PIPING <br />TO SERVE NEW EQUIPMENT. SEE DRAWING P-1 FOR ADDITIONAL DETAIL. <br />(13) CONTRACTOR SHALL CONSTRUCT NEW CONCRETE COMPRESSOR PAD. SEE <br />CIVIL. <br />6 CONTRACTOR SHALL PROVIDE AND INSTALL NEW INLET GAS DRYER AND 50 <br />CFM CNG COMPRESSOR. <br />7� CONTRACTOR SHALL REMOVE EXISTING INLET GAS DRYER, REFEULING <br />APPLIANCES AND ASSOCIATED PLUMBING AND ELECTRICAL WITHIN <br />COMPRESSOR AREA <br />CONTRACTOR SHALL COORDINATE WITH PG&E TO UPGRADE EXISTING CNG <br />SYSTEM GAS SERVICE TO ACCOMIDATE NEW EQUIPMENT <br />D FURNISH AND INSTALL 20 B:C PORTABLE FIRE EXTINGUISHER(S) AND <br />CABINET(S) WITH GLASS FRONT AND SIGNAGE IN FUELING AREA AND <br />COMPRESSOR AREA. <br />REROUTE (E) CONDUIT AND PULL NEW WIRE FROM ELECTRIC ROOM TO NEW <br />EQUIPMENT. PROVIDE NEW 48OV13PH BREAKER. SEE ELECTRICAL. <br />COUNTY OF SAN JOAQUIN <br />Submitted 2008 <br />THOMAS RYAN FLINN <br />DIRECTOR OF PUBLIC WORKS <br />2 MINOR REVISION TM 03/0 <br />1 REVISED COMPRESSOR AREA TM 07/0 <br />p PRELIMINARY FOR CLIENT REVIEW TM <br />REV. DESCRIPTION BY DATE <br />SAN JOAQUIN COUNTY - PUBLIC WORKS <br />STOCKTON, CA <br />T. WTICHELL ENUNEERS <br />OAKLAND CALIFORNIA <br />SCALE AS NOTED FOR <br />CNG SYSTEM UPGRADE <br />DATE 05/06 DOWNTOWN GARAGE <br />DRWN TM <br />THE USE OF THESE DRAWINGS AND <br />SPECIFICATIONS SHALL BE RESTRICTED TO <br />THE ORIGINAL USE FOR WHICH THEY WERE APPROVED <br />PREPARED. REUSE, REPRODUCTION, OR <br />PUBLICATION, IN WHOLE OR IN PART, IS <br />'ROWBITED WITHOUT THE WRITTEN CONSENT JOB <br />OF T. MITCHELL ENGINEERS. 0521 <br />DWG. N <br />PIPING PLAN <br />AND SECTIONS <br />P2 <br />4. NOT USED. <br />5. LOCATIONS OF EQUIPMENT SHOWN ON DRAWINGS IS APPROXIMATE. <br />CONFIRM FINAL LOCATIONS WITH OWNER PRIOR TO INSTALLATION. <br />W6. <br />INSTALLATION SHALL MEET PACIFIC GAS & ELECTRIC STANDARDS <br />w <br />INCLUDING PG&E STANDARD H-15. COPY AVAILABLE UPON REQUEST. <br />7. PROVIDE FULL DEPTH PVC PIPE SLEEVE AROUND ALL PRIMARY PIPING OR <br />(n <br />TUBING PASSING THROUGH CONCRETE. SEAL VOID BETWEEN PIPING AND <br />Z <br />SLEEVE WITH WEATHER RESISTANT SEALANT. <br />8. UPGRADE EXISTING SAFETY SIGNAGE TO MEET REQUIREMENTS OF UFC <br />ARTICLE 5201 AND 5204, AND NFPA 52 AS NEEDED. <br />O <br />9. REFER TO AS -BUILT DESIGN DRAWINGS FOR ORIGIONAL SYSTEM - DRAWING <br />C-1 REV 4 BY TAITE & ASSOCIATES DATED 06/03/02 - FOR ADDITIONAL <br />ZQ <br />INFORMATION REGARDING EXISTING CONDITIONS. <br />C/) 10. SEE DRAWING P-3 FOR SIGNAGE DETAILS O <br />SHEET NOTES: Ox <br />CONTRF <br />CIELING <br />BRE <br />BqACKE <br />UP TO E (16) SINGLE <br />)LIETE WITFD <br />SES, NO <br />CTORS. MO ING <br />I OWNER P 0 INSTALL <br />PUS UTT ST NS ( D P . NEWL/ WS TO MATCH EXISTING. <br />INTOE G ESD CI IT. <br />CONTRACTOR SHALL PROVIDE AND INSTALL NEW CNG, GAS, AND VENT PIPING <br />TO SERVE NEW EQUIPMENT. SEE DRAWING P-1 FOR ADDITIONAL DETAIL. <br />(13) CONTRACTOR SHALL CONSTRUCT NEW CONCRETE COMPRESSOR PAD. SEE <br />CIVIL. <br />6 CONTRACTOR SHALL PROVIDE AND INSTALL NEW INLET GAS DRYER AND 50 <br />CFM CNG COMPRESSOR. <br />7� CONTRACTOR SHALL REMOVE EXISTING INLET GAS DRYER, REFEULING <br />APPLIANCES AND ASSOCIATED PLUMBING AND ELECTRICAL WITHIN <br />COMPRESSOR AREA <br />CONTRACTOR SHALL COORDINATE WITH PG&E TO UPGRADE EXISTING CNG <br />SYSTEM GAS SERVICE TO ACCOMIDATE NEW EQUIPMENT <br />D FURNISH AND INSTALL 20 B:C PORTABLE FIRE EXTINGUISHER(S) AND <br />CABINET(S) WITH GLASS FRONT AND SIGNAGE IN FUELING AREA AND <br />COMPRESSOR AREA. <br />REROUTE (E) CONDUIT AND PULL NEW WIRE FROM ELECTRIC ROOM TO NEW <br />EQUIPMENT. PROVIDE NEW 48OV13PH BREAKER. SEE ELECTRICAL. <br />COUNTY OF SAN JOAQUIN <br />Submitted 2008 <br />THOMAS RYAN FLINN <br />DIRECTOR OF PUBLIC WORKS <br />2 MINOR REVISION TM 03/0 <br />1 REVISED COMPRESSOR AREA TM 07/0 <br />p PRELIMINARY FOR CLIENT REVIEW TM <br />REV. DESCRIPTION BY DATE <br />SAN JOAQUIN COUNTY - PUBLIC WORKS <br />STOCKTON, CA <br />T. WTICHELL ENUNEERS <br />OAKLAND CALIFORNIA <br />SCALE AS NOTED FOR <br />CNG SYSTEM UPGRADE <br />DATE 05/06 DOWNTOWN GARAGE <br />DRWN TM <br />THE USE OF THESE DRAWINGS AND <br />SPECIFICATIONS SHALL BE RESTRICTED TO <br />THE ORIGINAL USE FOR WHICH THEY WERE APPROVED <br />PREPARED. REUSE, REPRODUCTION, OR <br />PUBLICATION, IN WHOLE OR IN PART, IS <br />'ROWBITED WITHOUT THE WRITTEN CONSENT JOB <br />OF T. MITCHELL ENGINEERS. 0521 <br />DWG. N <br />PIPING PLAN <br />AND SECTIONS <br />P2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.